electronic waste_it waste management
TRANSCRIPT
伟翔 TES-‐AMM
TES-‐AMM Corpora-on (China) Ltd
Send electronic waste back to home. And create a be?er life
Jun 2016
TES-‐AMM
E-‐waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, and fax machines are common electronic products.
TES-‐AMM
With the rapid development of economy, the speed of electronic wastes in our country is very striking. According to a report released by the 2010 United NaIons Environment Programme, China has become the world's second largest e-‐waste producer, annual producIon of more than 230 million tons of electronic waste, second only to the United States 300 million tons; by 2020, China's waste computer than 2007 turned a lot to two, discarded mobile phones will increase 7 Imes. In the process of recycling and comprehensive uIlizaIon of electronic waste, there are different degrees of polluIon and harm to human health, which needs to be paid aSenIon to.
TES-‐AMM
In 2003, the State Environmental ProtecIon AdministraIon issued a noIce on strengthening the environmental management of waste electronic and electric equipment, which requires strengthening the environmental management of electronic waste. "Waste electrical and electronic products recycling management regulaIons" has also been adopted at the twenty-‐third execuIve meeIng of the State Council in August 20, 2008, since January 1, 2011. In 2009, China established a special fund for e-‐waste recycling (Chinese version WEEE) The shortage of funds has always been one of the scienIfic standard of "e-‐waste" a major boSleneck, the problem as solved the establishment of a fund waste electrical and electronic products processing. In 2010 , Labeling Tips established for new electronic products "RegulaIons" provisions, electronic products sales, maintenance agencies, aZer-‐sales service agencies should be marked in its business premises marked with waste electrical and electronic products recycling processing Ips informaIon. Qualifica-on approval Only qualified recycler can join the Chinese version WEEE program. Qualified recycling companies must accept the supervision and inspecIon by the government. The recycling process must be under 24 hours of monitoring.
We must take law to enforce the recycling of electronic waste.
TES-‐AMM
T otal E nvironmental S olu-ons A sset
M aterial M anagement
v founded by team of waste management and engineering professionals. v supported by global service network spanning Asia, Oceania, Europe, E.M.E.A and Americas over 28 locations v comprehensive “Extended Producers’ Liability Management Solutions (EPLMS)” to MNCs:
• segregation & dismantling • mechanical crushing • data wipe/ degauss
Integrated WEEE Management Solutions• precious metal recovery
• lithium-ion battery recycling • epoxy-plastic composite (EPC) recycling
TES-‐AMM Global Network
TES-‐AMM
Office, Warehouse, Mechanical plant, Chemical plant
TES-AMM CHINA
• SHANGHAI
TES-AMM
MALAYSIA
TES-AMM
SINGAPORE
Phase 4
Office, Warehouse, Mechanical Plant
Office & Warehouse (perform sort/demanufacture acIviIes)
Office
Processing Capability* Colour Code
* denotes Partner Facility
** denotes Facility upgrade to Phase 4
TES-AMM UAE
TES-AMM
SOUTH AFRICA
Phase 1
TES-AMM CAMBODIA
TES-AMM BRAZIL *
TES-AMM VIETNAM *
Phase 2
TES-AMM
LATIN AMERICA
TES-AMM
BANGLADESH *
TES-AMM
TAIWAN
TES-AMM INDONESIA
TES-AMM PHILIPPINES
TES-AMM JAPAN
TES-AMM U.K. • TES-AMM BEIJING
• TES-AMM SUZHOU
• TES-AMM GUANGZHOU
• TES-AMM HONG KONG
Phase 3
TES-AMM INDIA
TES-AMM NEW ZEALAND
TES-AMM AUSTRALIA • Sydney • Melbourne • Brisbane
TES-AMM THAILAND
TES-AMM S.KOREA**
SRI LANKA *
Global Network
RUSSIA *
SERBIA *
TES-‐AMM
TES-‐AMM MALAYSIA
TES-‐AMM AUSTRALIA
TES-‐AMM Malaysia
TES-‐AMM Korea
TES-‐AMM 泰国
TES-‐AMM Australia
TES-‐AMM Global Facili-es
TES-‐AMM 泰国
TES-‐AMM 韩国
TES-‐AMM India
Singapore
Malaysia
United Kingdom Thailand Australia
Beijing Taiwan Suzhou
Shanghai India
Korea
Phase 4
Phase 3 Phase 2
Phase 4 Phase 4 Phase 4
Phase 4
Phase 3 Phase 3
Phase 3
Phase 2
Phase 2
TES-‐AMM
Beijing
Shanghai Suzhou
Guangzhou Hong Kong TES-‐AMM CHINA
TES-‐AMM Shanghai
TES-‐AMM Suzhou
TES-‐AMM Beijing
TES-‐AMM Guangzhou
TES-‐AMM Hong Kong
Facili-es in China
TES-‐AMM
TES-‐AMM Shanghai Headquarter of TES-‐AMM China
Commenced OperaIon September 2005
LocaIon Shanghai Jiading Industrial Zone North District
Area 30,307.5 ㎡
Capacity 45,000 ton/year
9
Shanghai Facility
Capabili-es
Mechanical Process
Chemical Process
Used PlasIc Recycling
WEEE Recycling
RemarkeIng Services
Reverse LogisIc Services
TES-‐AMM
Beijing
2005
Beijing Tong Zhou District
22160 ㎡
20,000 ton/year
Suzhou
2006
Suzhou High-‐tech New District
27000 ㎡
50,000 ton/year
Guangzhou
2006
Guangzhou Luo Gang District
3500 ㎡
5,000 ton/year
Hong Kong
2007
Kowloon
1500 ㎡
5,000 ton/year
Site Capability
Capabili-es: Warehousing, Mechanical (SegregaIon, Dismantling, DestrucIon), WEEE Recycling, RemarkeIng, PolluIon Control.
Capabili-es: Warehousing, Mechanical (SegregaIon, Dismantling, Destruction), WEEE Recycling, RemarkeIng, PolluIon Control.
Capabili-es: Warehousing, Mechanical (SegregaIon, Dismantling,Destruction), RemarkeIng, PolluIon Control.
Capabili-es: Warehousing, Mechanical (SegregaIon, Dismantling,Destruction), RemarkeIng, PolluIon Control.
Beijing Suzhou Guangzhou
TES-‐AMM
TES-‐AMM China Business
Extended Producers’ Liability
Management Solu-ons (EPLMS)
Industrial Waste
Waste Electrical and Electronic Equipment
Recycling (WEEE)
China WEEE
Services
Data Wipe RemarkeIng
Business Segments
TES-‐AMM Permits & Licenses
Waste Disposal Permits and Licenses: Loca-on Permits and Licenses Relevant Materials
TES Shanghai 1. OperaIon Permit for Hazardous Wastes (Shanghai)
2. The List of E-‐Waste Disposal Unit
3. OperaIon Permit for Waste Electrical and Electronic Equipment(WEEE)
TES Suzhou 1. OperaIon Permit for Hazardous Wastes (Jiangsu Province)
2. The List of E-‐Waste Disposal Unit
3. OperaIon Permit for Waste Electrical and Electronic Equipment(WEEE)
4. CollecIon Permit for Mercury-‐contained Hazardous Wastes
TES-‐AMM
Waste Disposal Permits and Licenses: Loca-on Permits and Licenses Relevant Materials
TES Beijing 1. OperaIon Permit for Hazardous Wastes (Beijing)
2. The List of E-‐Waste Disposal Unit
3. OperaIon Permit for Waste Electrical and Electronic Equipment(WEEE)
TES Guangzhou Subsidiary company, own the same permits as TES Shanghai
TES Hong Kong
1. Business License
2. Export Permit of Waste Li-‐ion BaSery
Permits & Licenses
TES-‐AMM Interna-onal Accredita-ons
ü ISO9001, ISO14001, ISO27001, OHSAS18001 ü Responsible Recycling (R2) ü CHWMEG (The 3rd Party Audit)
R2
ISO 9001 ISO 14001 OHSAS 18001
ISO 27001
CHWMEG (The 3rd Party Audit)
TES-‐AMM
Components/Accessories Parts Manufacturers
PCB Manufacturers PCB Assembly Manufacturers
OEM/EMS Manufacturers
Repair Centers/ IT Process
WEEE/Take-‐back Recycling Program
Recyclable Materials from:
Material Sources
TES-‐AMM
Weigh / Sort / Categorize - material weighing / recording - sorting / segregation - waste streams categorization
Plastic Metal Electronics
final segregation - plastic family
weigh / record
De-manufacturing & Destruction
Acid & Fume Scrubber
Dust Collector
Waste Water Treatment
Safe Discharge
Collection
Crusher
Electrostatic Separation
Mechanical Process Chemical Process
Pollution Control Equipment
Epoxy-Plastic Composite (EPC) Pallet
store / recycle
final segregation - ferrous metal - non-ferrous metal
weigh / record
store / sales
Integrated Process Flow
Precious Metals Refinery
Cyanide Stripping
Reverse Electrolysis
TES-‐AMM
Copper Powder
EPC Pallet
Construc-on Materials Ar-facts
Gold Silver
Tin
Plas-c Granule
Metallic Non-‐metallic
Op-mal Resource Recovery
TES-‐AMM Sor-ng & Segrega-on
Dismantling Line
Waste Streams
Dismantling Line
Dismantling
TES-‐AMM Mechanical Process
PCB processing system-‐Electrosta-c Separa-on
PCB processing system-‐crusher PCB processing system-‐control panel
Overview of Mechanical Plant
TES-‐AMM
A certain propor-on of addi-ve will be added to change the material
characteris-cs, then to produce plas-c granule.
Plas-c Granula-on Line Plas-c Powder Plas-c Granule
Plas-c manufacture
TES-‐AMM Chemical Process
Precious Metals Refinery
Cyanide Stripping Reverse Electrolysis
Precious Metals Smel-ng
TES-‐AMM
FugiIve dusts generated during the crushing process are collected via a network of ducIng to the dust collecIon system.
Acid / Fume Scrubbers
Waste Water Treatment
Pollu-on Control
The chemical fumes generated during the process are collected via a network of ducIng to be treated in the fume scrubber system.
All in house wastewater streams (effluent from electrolysis process and fume scrubber system) are sent to the wastewater treatment plant to eliminate the hazardous threat to the environment and to ensure safe discharge.
Cyclone Dust Collector
TES-‐AMM
E-‐Waste Management System (EWMS) Func-on: informaIon system to cover from collecIon noIce, transportaIon, storage, segregaIon and dismantle process, producIon process, Use the barcode system to track the inbound and outbound materials.
Internal Control Management System
TES-‐AMM Intellectual Proprietary Protec-on
Ø TES-‐AMM’s values Customer’s Intellectual Proprietary Rights
• Ensures materials deemed as “No Resale in Original Form” are destructed
• Materials will not retain original FuncIonal CharacterisIcs aZer DestrucIon process
• Materials aZer TES-‐AMM processes are no longer IPR sensiIve
Ø Customized TES-‐AMM Demanufacturing &
DestrucIon Programs • Reduces Waste Assets materials into Waste Streams • Removes integral features of IPR sensiIve material
Ø CerIficaIon of DestrucIon issued upon successful DestrucIon Process
• WriSen Guarantee by TES-‐AMM “CerIficate of DestrucIon”
TES-‐AMM Comprehensive Security Systems
All our faciliIes implement a complete range of security measures to ensure Intellectual Proprietary Protec-on on customers’ products
• Access controlled / entry log registered centralized security monitoring sta-on
• 195 units of 24/7 CCTVs monitoring of entry & exit points, material processing & storage areas etc.
• Clear footage stored for up to 60 days
TES-‐AMM
Many of e-‐waste can be reused, refurbished, or finally be recycled.
How we deal with the challenges of the future
TES-‐AMM
Recycling
Customer on-‐site
Dismantling
Phisical process
Chemical process
Data erasing
Re-‐sell
Data erasing
Degaussing
DestrucIon
TES-‐AMM plant
CollecIon
Metal
PlasIc
Paper Copper
Precious metal
Re-‐sell products
Compound material
Send to recycle
Data service
Re-‐marke-ng Program
TES-‐AMM
25%
5%
70%
general community
Professional groups
Students
★ In Feb 2012, TES-‐AMM Shanghai was approved to be one of the National Eco-Economy EducaIon demonstraIon base (1st batch). There’re only 8 bases naIonwide.
★ This program had benefited a total of 10191 parIcipants (2014).
ECO Awareness Program
TES-‐AMM
E
Environmental Educa-on
TES-‐AMM Environmental Educa-on
TES-‐AMM Public Educa-on
TES-‐AMM
In future TES-‐AMM team needs to work hard to achieve the goals
伟翔 TES-‐AMM
Thank you!