Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in your bid being declared irregular. If these changes affect any of your subcontractors or suppliers, IT IS YOUR RESPONSIBILITY to inform them. These changes are part of the contract for this project(s). Please contact me at (785) 296-3576, if there are questions. Thank you for your cooperation. _____________________________________________________________________________________ (Company Name) (Signature) (Date) C: District 2 & Marion Office TE0444.doc Kansas Department of Transportation Bureau of Construction and Maintenance Estimating Section To: Prime Contractor Bid Holders From: Shane Houser, P.E. - Estimating Engineer Date: November 10, 2017 Proposal/Contract No.: 517112202 Subject: Project Notice for the November 15, 2017 Letting 57 TE-0444-01 MARION COUNTYSIDEWALK IMPROVEMENTS Included are several revised sheets. Official revised plans will be sent out after the letting. Also included is an explanation of those revisions. To view this document, choose Addendum #1from our website (https://kdotapp.ksdot.org/Proposal/Proposal.aspx). We also recommend that you check the Bid Express “Questions and Answers” (https://www.bidx.com/ks/lettings) to review any questions that may have been posted for this project.

Upload: others

Post on 17-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result in your bid being declared irregular. If these changes affect any of your subcontractors or suppliers, IT IS YOUR RESPONSIBILITY to inform them. These changes are part of the contract for this project(s). Please contact me at (785) 296-3576, if there are questions. Thank you for your cooperation.

_____________________________________________________________________________________ (Company Name) (Signature) (Date) C: District 2 & Marion Office

TE0444.doc

4BKansas Department of Transportation

3BBureau of Construction and Maintenance 0BEstimating Section

1BTo: Prime Contractor Bid Holders

2BFrom: Shane Houser, P.E. - Estimating Engineer

5BDate: November 10, 2017 Proposal/Contract No.: 517112202 Subject: Project Notice for the November 15, 2017 Letting 57 TE-0444-01 MARION COUNTY– SIDEWALK IMPROVEMENTS Included are several revised sheets. Official revised plans will be sent out after the letting. Also included is an explanation of those revisions. To view this document, choose “Addendum #1” from our website (https://kdotapp.ksdot.org/Proposal/Proposal.aspx). We also recommend that you check the Bid Express “Questions and Answers” (https://www.bidx.com/ks/lettings) to review any questions that may have been posted for this project.

Page 2: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

57 TE-0444-01 Revisions 11/10/2017

28 Change Coating material for railing, anchor plates and anchors bolts from Galvanized to Black Powder Coated. 9 references on sheet in Details and General Notes. No change to the Bid Quantity.

33 Special Curb & Gutter Detail • Change Plate Material from ¼” 6061‐T6 Aluminum to 3/8” A786 Low Carbon Steel,

Black Powder Coating • Change 1‐1/2”x1‐1/2”x1/8” Aluminum Angle 6061‐T6 Mill Finish to

1‐1/2”x1‐1/2”x3/16” A36 Carbon Steel • Change Aluminum Angle under detail to A36 Carbon Steel Angle No change to any Bid Quantity.

61 & 62 Changes to Electrical System Connection to Primary Electric Service point No change to the Bid Quantity.

63 Change to Electrical Service Detail to match Existing Configuration Change Upper Receptacle to Single Twist Lock Receptacle on Light Pole Electric Connection Add Milbank product number to Electric Service Box Pedestal Elevation detail Add Panel Layout for current project configuration No change to the Bid Quantity.

64 Remove Panel Layout Add Transformer Pad Detail Add One Line Diagram Change Schematic layout to current conduit size and wire size on circuits No change to the Bid Quantity.

65 Add Single Twist Lock to upper receptacle on pole notes on each of the six pole options No change to the Bid Quantity.

67 Addjusted Quantities to match Addendum No change to the Bid Quantity.

Page 3: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 4: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

PEDESTRIAN BENCH ANCHORING WASTE RECEPTACLE ANCHORING

LIGHT POLE AND PULL BOXES

CONCRETE LEAVE OUT IN PAVER AREA FOR

SPECIAL CURB AND GUTTER DETAILLIGHT POLE AND PULL BOX SECTION

STEP ELIMINATION DETAIL 1 STEP ELIMINATION DETAIL 2

ASPHALTIC PAVING REPLACEMENT

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 5: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

1st S

t

2nd S

t

3rd S

t

Main St

Main St

LEGEND

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 6: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

3rd S

t

4th S

t

5th S

t

Main St

Main St

LEGEND

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 7: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

ELECTRICAL SERVICE DETAIL (PRE-ASSEMBLED PANEL)

ELECTRIC SERVICE BOX PEDESTAL ELEVATION

UTILITY CORRIDOR SECTION

LIGHT POLE ELECTRIC CONNECTION

VO

LT

AG

E D

RO

P

BR

AN

CH

C

IR

CU

IT

DE

SC

RIP

TIO

N

PROJECT PANEL: A

BR

AN

CH

C

IR

CU

IT

DE

SC

RIP

TIO

N

VO

LT

AG

E D

RO

P

240/120 VOLT BUS: 200A CU

1 PHASE 3 W MAIN: 200A MCB LOCATION:

FAULT CURRENT RATING:10 kAIC

VOLTAGE DROP TO PANEL 0.00% FED FROM:

MOUNTING: SURFACE

ID BREAKER DESCRIPTION V - A CIRCUIT PHASE CIRCUIT V - A DESCRIPTION BREAKER ID

0.01%

1 RUN (2-12, 12 GND, CU) 3ft 0.9A

+ 20 CONTROL POWER 100 1 A 2 720 RCPTS LOWER AT POLES L22-L25 20 G

1 RUN (2-6, 6 GND, CU) 385ft 6A

1.89%

2.61%

1 RUN (2-6, 6 GND, CU) 530ft 6A

G 20 RCPTS LOWER AT POLES L1-L4 720 3 B 4 720 RCPTS LOWER AT POLES L26-L29 20 G

1 RUN (2-4, 4 GND, CU) 710ft 6A

2.19%

2.80%

1 RUN (2-6, 6 GND, CU) 570ft 6A

G 20 RCPTS LOWER AT POLES L5-L8 720 5 A 6 720 RCPTS LOWER AT POLES L30-L33 20 G

2 RUN (2-6, 6 GND, CU) 1005ft 6A

2.47%

2.43%

1 RUN (2-4, 4 GND, CU) 785ft 6A

G 20 RCPTS LOWER AT POLES L9-L12 720 7 B 8 720 BUILDING LIGHT P1 20 L

1 RUN (2-8, 8 GND, CU) 340ft 6A

2.66%

2.14%

2 RUN (2-4, 4 GND, CU) 1110ft 7.5A

G 20 RCPTS LOWER AT POLES L13-L17 900 9 A 10 720 BUILDING LIGHT P2 20 L

1 RUN (2-8, 8 GND, CU) 280ft 6A

2.19%

2.21%

1 RUN (2-6, 6 GND, CU) 450ft 6A

G 20 RCPTS LOWER AT POLES L18-L21 720 11 B 12 720 BUILDING LIGHT P3 20 L

2 RUN (2-6, 6 GND, CU) 785ft 6A

1.93%

0.00% + 20 SPARE 0 13 A 14 720 BUILDING LIGHT P4 20 L

2 RUN (2-6, 6 GND, CU) 835ft 6A

2.05%

0.00% + 20 SPARE 0 15 B 16 720 BUILDING LIGHT P5 20 L

1 RUN (2-8, 8 GND, CU) 265ft 6A

2.07%

0.00% + 20 SPARE 0 17 B 18 720 BUILDING LIGHT P6 20 L

1 RUN (2-6, 6 GND, CU) 587ft 6A

2.89%

0.00% + 20 SPARE 0 19 B 20 720 BUILDING LIGHT P7 20 L

1 RUN (2-4, 4 GND, CU) 727ft 6A

2.25%

0.00% + 100/2 LIGHTING CONTACTOR/SPLIT BUS 0 21 A 22 720 BUILDING LIGHT P8 20 L

1 RUN (2-4, 4 GND, CU) 775ft 6A

2.40%

+

|

0 23 B 24 0 SPARE----

+

1.76%

1 RUN (2-12, 12 GND, CU) 535ft 2A

L 20/2 STREET LIGHTING L1-L8 238 25 A 26 1440 RCPTS UPPER AT POLE L1-L8 20 G

2 RUN (2-6, 6 GND, CU) 535ft 12A

2.63%

L

|

238 27 B 28 1620 RCPTS UPPER AT POLE L9-L17 20 G

2 RUN (2-2, 2 GND, CU) 1105ft 13.5A

2.42%

2.63%

1 RUN (2-10, 10 GND, CU) 1105ft 2.3A

L 20/2 STREET LIGHTING L9-L17 265 29 A 30 1440 RCPTS UPPER AT POLE L18-L25 20 G

2 RUN (2-6, 6 GND, CU) 435ft 12A

2.14%

L

|

265 31 B 32 1440 RCPTS UPPER AT POLE L26-L33 20 G

2 RUN (2-2, 2 GND, CU) 1145ft 12A

2.23%

1.43%

1 RUN (2-12, 12 GND, CU) 435ft 2A

L 20/2 STREET LIGHTING L18-L25 238 33 A 34 0 SPARE 20 + 0.00%

L

|

238 35 B 36 0 SPARE 20 + 0.00%

2.37%

1 RUN (2-10, 10 GND, CU) 1145ft 2A

L 20/2 STREET LIGHTING L26-L33 232 37 A 38 0 SPARE 20 + 0.00%

L

|

232 39 B 40 0 SPARE 20 + 0.00%

0.00% + 20/2 SPARE 0 41 A 42 0 SPARE 20 + 0.00%

+

|

0 43 B 44 0 SPARE 20 + 0.00%

0.00% + 20 SPARE 0 45 A 46 0 SPARE 20 + 0.00%

0.00% +20

SPARE 0 47 B 48 0 SPARE20

+ 0.00%

CONNECTED LOAD (Downstream Loads Included)

TOTALS LOAD SUMMARY

Phase A 9173 CATEGORY CONNECTED FACTOR CALC. V - A AMPS

Phase B 10513 LIGHTING 7706 125%

9,633

40.1

NOTES GENERAL RECEPTACLE 10000 100%

10,000

41.7

* = GFCI PROTECTED BREAKER REQUIRED REMAINING GENERAL REC. 1880 50% 940 3.9

DEDICATED RECEPTACLE 0 100% 0 0.0

MOTOR 0 100% 0 0.0

B - LARGEST MOTOR 0 125% 0 0.0

+ MISCELLANEOUS 100 100% 100 0.4

KITCHEN 0 65% 0 0.0

ELECTRIC HEAT 0 125% 0 0.0

Total Demand:

20,673

86

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 8: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

A-26

GFCI

WP

A-26

GFCI

WP

A-26

GFCI/WP

A-26

GFCI/WP

A-3

GFCI

WP

A-3

GFCI

WP

A-3

GFCI

WP

A-3

GFCI

WP

A-26

GFCI

WP

A-5

GFCI

WP

A-26

GFCI/WP

A-5

GFCI

WP

A-26

GFCI/WP

A-26

GFCI

WP

A-5

GFCI

WP

A-5

GFCI

WP

A-28

GFCI

WP

A-7

GFCI

WP

A-28

GFCI/WP

A-7

GFCI

WP

A-28

GFCI/WP

A-28

GFCI

WP

A-7

GFCI

WP

A-7

GFCI

WP

A-28

GFCI

WP

A-9

GFCI

WP

A-28

GFCI/WP

A-9

GFCI

WP

A-28

GFCI/WP

A-28

GFCI

WP

A-9

GFCI

WP

A-9

GFCI

WP

A-28

GFCI

WP

A-9

GFCI

WP

A-30

GFCI

WP

A-11

GFCI

WP

A-11

GFCI

WP

A-30

GFCI/WP

A-11

GFCI

WP

A-11

GFCI

WP

A-30

GFCI

WP

A-30

GFCI

WP

A-2

GFCI

WP

A-30

GFCI

WP

A-30

GFCI/WP

A-2

GFCI

WP

A-30

GFCI/WP

A-2

GFCI

WP

A-30

GFCI

WP

A-2

GFCI

WP

A-4

GFCI

WP

A-32

GFCI

WP

A-32

GFCI/WP

A-4

GFCI

WP

A-32

GFCI/WP

A-4

GFCI

WP

A-4

GFCI

WP

A-32

GFCI

WP

A-6

GFCI

WP

A-32

GFCI

WP

A-32

GFCI/WP

A-6

GFCI

WP

A-32

GFCI/WP

A-6

GFCI

WP

A-6

GFCI

WP

A-32

GFCI

WP

[LIGHTING

2 #12 THWN-2, 1 #12 GND,

2 #8 THWN-2, 1 #8 GND

ELECTRICAL RECEPTACLES

2-(2 #6 THWN-2, 1 #6 GND),

2 #6 THWN-2, 1 #6 GND]

IN 3" CONDUIT

[LIGHTING

2 #10 THWN-2, 1 #10 GND,

2-(2 #6 THWN-2, 1 #6 GND),

2-(2 #6 THWN-2, 1 #6 GND)

ELECTRICAL RECEPTACLES

2-(2 #2 THWN-2, 1 #2 GND),

2 #4 THWN-2, 1 #4 GND,

2-(2 #4 THWN-2, 1 #4 GND)]

IN 3" CONDUIT

LIGHTING

2 #12 THWN-2, 1 #12 GND,

2 #8 THWN-2, 1 #8 GND

ELECTRICAL RECEPTACLES

2-(2 #6 THWN-2, 1 #6 GND),

1-(2 #6 THWN-2, 1 #6 GND)

IN 3" CONDUIT

[LIGHTING

2 #12 THWN-2, 1 #12 GND,

2 #6 THWN-2, 1 #6 GND

ELECTRICAL RECEPTACLES

2 #6 THWN-2, 1 #6 GND,

2-(2 #6 THWN-2, 1 #6 GND)]

IN 3" CONDUIT

[LIGHTING

2 #10 THWN-2, 1 #10 GND,

2 #4 THWN-2, 1 #4 GND,

2 #4 THWN-2, 1 #4 GND,

ELECTRICAL RECEPTACLES

2-(2 #2 THWN-2, 1 #2 GND),

2 #4 THWN-2, 1 #4 GND),

2-(2 #6 THWN-2, 1 #6 GND)]

IN 3" CONDUIT

LIGHTING

2 #12 THWN-2, 1 #12 GND

ELECTRICAL RECEPTACLES

2-(2 #6 THWN-2, 1 #6 GND),

1-(2 #6 THWN-2, 1 #6 GND),

1-(2 #8 THWN-2, 1 #8 GND)

IN 3" CONDUIT

LIGHTING

2 #12 THWN-2, 1 #12 GND

ELECTRICAL RECEPTACLES

1-(2 #6 THWN-2, 1 #6 GND)

IN 3" CONDUIT

200/2P

PANEL A

TRANSFORMER

37.5KVA

2400V-120/204V,

1Ø,

TRANSFORMER

BY OWNER

4160/2400KV

TOWN OF

MARION

PRIMARY

POWER

5KV PRIMARY BY

OWNER

3 #3/O CU THWN, 1 #3/O

G.C.

ONE LINE DIAGRAM

SCALE: NONE

TRANSFORMER PAD DETAIL

SCALE: N.T.S.

37.5KVA

2400KV-120/240V, 1Ø

TRANSFORMER BY

OWNER

PRIMARY FEEDER FROM NEW RISER

ON EXISTING POLE TO WEST

ACROSS 2ND STREET BY OWNER

SECONDARY

FEEDER TO PANEL

A BY OWNER

CONCRETE

TRANSFORMER PAD WITH

#4 REBAR 12" ON CENTER

BY OWNER

3 #3/O CU THWN, 1 #3/O

G.C. BY CONTRACTOR

A-8 A-10 A-12 A-14

A-16 A-18 A-20 A-22

[LIGHTING

2 #10 THWN-2, 1 #10 GND,

2-(2 #6 THWN-2, 1 #6 GND),

2-(2 #6 THWN-2, 1 #6 GND)

ELECTRICAL RECEPTACLES

2-(2 #2 THWN-2, 1 #2 GND),

2 #4 THWN-2, 1 #4 GND,

2-(2 #4 THWN-2, 1 #4 GND)]

IN 3" CONDUIT

[LIGHTING

2 #10 THWN-2, 1 #10 GND,

2-(2 #6 THWN-2, 1 #6 GND)

ELECTRICAL RECEPTACLES

2-(2 #2 THWN-2, 1 #2 GND),

2-(2 #4 THWN-2, 1 #4 GND)]

IN 3" CONDUIT

[LIGHTING

2 #10 THWN-2, 1 #10 GND,

2 #4 THWN-2, 1 #4 GND,

2 #4 THWN-2, 1 #4 GND,

ELECTRICAL RECEPTACLES

2-(2 #2 THWN-2, 1 #2 GND),

2 #4 THWN-2, 1 #4 GND),

2-(2 #6 THWN-2, 1 #6 GND)]

IN 3" CONDUIT

[LIGHTING

2 #10 THWN-2, 1 #10 GND,

2 #4 THWN-2, 1 #4 GND

ELECTRICAL RECEPTACLES

2-(2 #2 THWN-2, 1 #2 GND),

2-(2 #6 THWN-2, 1 #6 GND)]

IN 3" CONDUIT

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 9: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

VERTICAL SECTION

HORIZONTAL SECTION

TYPICAL STREET LIGHT FOUNDATION DETAIL

HOLOPHANE STREET LIGHT

PULL BOX DETAIL

STERNBERG STREET LIGHT US ARCHITECTURAL STREET LIGHT

LIGHT POLE AND PULL BOX SECTION

NEW SHEET - Released by AddendumDATE - 11/10/2017VOID PREVIOUS ISSUE

Page 10: EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still … · 2017-11-10 · Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you

NOTE: LINEAR QUANTITIES ARE APPROXIMATE AND INCLUDED FOR

INFORMATION ONLY. THE CONTRACTOR SHALL CONDUCT ALL

WORK, AND FURNISH AND INSTALL ALL EQUIPMENT NECESSARY,

TO INSURE COMPLETE AND SATISFACTORY OPERATION OF THE

ELECTRIC LIGHTING SYSTEM WHETHER SPECIFICALLY

MENTIONED OR NOT.

ITEMS NOT SPECIFICALLY CALLED OUT ARE SUBSIDIARY

TO OTHER BID ITEMS.

ITEM

UNIT

QUANTITY

BID ITEM

L.S. LUMP SUMELECTRIC LIGHTING SYSTEM

ITEM UNITQUANTITY

ITEM UNITQUANTITY

ITEM UNIT QUANTITY

LIN FTTRENCH AND BACKFILL

GROUND RODS WITH CLAMPS

3

4" X 10'

EACH

3" SCHEDULE 40 PVC

LIN FT

EACH

EACH

STREET LIGHT POLE 26', MAST ARM, LIGHT FIXTURE,

LAMP, INTERNAL WIRING, & OTHER ACCESSORIES

30" CONCRETE BASE FOR LIGHT

SUMMARY OF ELECTRIC LIGHTING

SYSTEM QUANTITIES

(CONDUIT & HARDWARE)

SUMMARY OF ELECTRIC LIGHTING

SYSTEM QUANTITIES

(LIGHT STANDARDS)

SUMMARY OF ELECTRIC LIGHTING

SYSTEM QUANTITIES

(MISCELLANEOUS ITEMS)

EACH

ITEM UNIT QUANTITY

LIN FT

SUMMARY OF ELECTRIC LIGHTING

SYSTEM QUANTITIES

(CONDUCTOR)

1 / C #12 AWG RHW-2 COPPER, 600V CONDUCTOR

ITEM UNITQUANTITY

EACH

SUMMARY OF ELECTRIC LIGHTING

SYSTEM QUANTITIES

(WIRE CONNECTORS)

BREAKAWAY 1 / C FUSED TAP CONNECTOR AT

STREET LIGHT POLE BASE

ITEM UNIT QUANTITY

EACH

SUMMARY OF ELECTRIC LIGHTING

SYSTEM QUANTITIES

(PULL BOXES)

ELECTRICAL SYSTEM, NESTABLE FLARED WALL STYLE,

QUAZITE B10132418A FRP OR EQUAL, DIVIDER

HARDWARE, 13X24X18D INCH WITH COVER

28

STREET LIGHT POLE 16', MAST ARM, LIGHT FIXTURE,

LAMP, INTERNAL WIRING, & OTHER ACCESSORIES

33

15

18

8004

34

99

3000

3,300

7,500

3,000

22,200

17,500

1,500

1 / C #10 AWG RHW-2 COPPER, 600V CONDUCTOR

1 / C #8 AWG RHW-2 COPPER, 600V CONDUCTOR

1 / C #6 AWG RHW-2 COPPER, 600V CONDUCTOR

1 / C #4 AWG RHW-2 COPPER, 600V CONDUCTOR

1 / C #2 AWG RHW-2 COPPER, 600V CONDUCTOR

LIN FT

LIN FT

LIN FT

LIN FT

LIN FT