TERA NEVA IMPACT REPORTING COUNTRY BREAKDOWN SECTOR BREAKDOWN EXPECTED REDUCTION OF 157 000 TONS / CO PER YEAR EQUALS UNITED KINGDOM AFRICA & MIDDLE EAST Institutional investors 12 Million Euros invested 500 Projects 14 Cars in use (approx.) -33 000 Of forests absorption capacity (approx.) 74 000 ha 17% FINLAND 63% UNITED KINGDOM 6% NETHERLANDS 96% RENEWABLE ENERGY 4% ENERGY EFFICIENCY 2 3% ITALY 2% BELGIUM 3% ZAMBIA 2% GERMANY 2% ISRAEL 2% MOROCCO Beatrice Offshore United: Offshore windfarm of around 600 MW Galloper Offshore Wind: Offshore windfarm of around 340 MW National Grid Networks Upgrade: Reinforcement and extension of a high-voltage transmission with focus on renewables North Yorkshire and York Waste PPP: Waste treatment facilities that enables energy and materials recovery from residual waste CONTINENTAL EUROPE Aanekoski Bio-Product Mill (FIN): Pulp mill working with a heat and power plant fed by renewable by-products from the main production process Kilpilahti CHP Plant (FIN): Heat and power plant that valorises low-value oil refining and petrochemical side streams for energy production Netherlands Offshore Wind (NLD): Offshore windfarm of around 600 MW Wind Park Noordoostpolder (NLD): Onshore windfarm of 26 wind turbines Powercrop Biomass Programme (ITA): Two biomass power plants of around 30MW each Nordergruende Offshore Wind (DEU): Offshore windfarm of around 110 MW Nobelwind Offshore Wind (BEL): Offshore windfarm of around 330 MW Ouarzazate III (MAR): Concentrated solar power plant of around 150 MW as part of the Ouarzazate solar complex Itezhi-Tezhi Hydro Project (ZMB): Hydropower plant of around 120 MW Megalim Solar Thermal Plant (ISR): Solar thermal power plant of around 120 MW DISCLAIMER Sources: www.eib.org/investor_relations/documents/cab-statement-2016.htm, www.epa.gov/energy/greenhouse-gas-equivalencies-calculator. For information purposes only. Tera Neva is a registered trademark of BNP Paribas. This document is CONFIDENTIAL AND FOR DISCUSSION PURPOSES ONLY and does not constitute an offer or a solicitation to engage in any trading strategy or to purchase or sell any financial instruments. Given its general nature, the information included in this document does not contain all the elements that may be relevant for an investor to make an informed decision in relation to any strategies or financial products discussed herein. In providing this document, BNP Paribas (“BNPP”) gives no financial, legal, tax or any other type of advice to, nor has any fiduciary duties towards, recipients. The information contained in this document has been obtained from sources believed to be reliable, but BNPP makes no representation, express or implied, that such information, or any opinions based thereon and contained in this document, are accurate or complete. BNPP is further under no obligation to update or keep current the information contained in this document. All figures and examples are provided by way of illustration only. BNPP accepts no liability for any direct or consequential losses arising from any action taken in connection with or reliance on the information contained in this document. BNP Paribas London Branch (registered office: 10 Harewood Avenue, London NW1 6AA; tel: [+44 20] 7595 2000; fax: [+44 20] 7595 2555) is lead supervised by the European Central Bank (ECB) and the Autorité de Contrôle Prudentiel et de Résolution (ACPR). BNP Paribas London Branch is authorised by the ECB, the ACPR and the Prudential Regulation Authority and subject to limited regulation by the Financial Conduct Authority and Prudential Regulation Authority. Details about the extent of our authorisation and regulation by the Prudential Regulation Authority, and regulation by the Financial Conduct Authority are available from us on request. BNP Paribas London Branch is registered in England and Wales under no. FC13447. www.bnpparibas.com

Upload: vuongcong

Post on 08-Dec-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

TERA NEVAIMPACT REPORTING

COUNTRY BREAKDOWN

SECTOR BREAKDOWNEXPECTED REDUCTION OF 157 000 TONS / CO PER YEAR EQUALS

UNITED KINGDOM

AFRICA & MIDDLE EAST

Institutional investors12

Million Euros invested500

Projects14

Cars in use (approx.)-33 000

Of forests absorption capacity (approx.)74 000 ha

17% FINLAND

63% UNITED KINGDOM

6% NETHERLANDS

96%RENEWABLE

ENERGY

4%ENERGYEFFICIENCY

2

3% ITALY

2% BELGIUM

3% ZAMBIA

2% GERMANY

2% ISRAEL

2% MOROCCO

Beatrice Offshore United: Offshore windfarm of around600 MWGalloper Offshore Wind: Offshore windfarm of around 340 MWNational Grid Networks Upgrade: Reinforcement and extension of a high-voltage transmission with focus on renewablesNorth Yorkshire and York Waste PPP: Waste treatment facilities that enables energy and materials recovery from residual waste

CONTINENTAL EUROPEAanekoski Bio-Product Mill (FIN): Pulp mill working with a heat and power plant fed by renewable by-products from the main production process Kilpilahti CHP Plant (FIN): Heat and power plant that valorises low-value oil refining and petrochemical side streams for energy production Netherlands Offshore Wind (NLD): Offshore windfarm of around 600 MW Wind Park Noordoostpolder (NLD): Onshore windfarm of 26 wind turbines Powercrop Biomass Programme (ITA): Two biomass power plants of around 30MW each Nordergruende Offshore Wind (DEU): Offshore windfarm of around 110 MW Nobelwind Offshore Wind (BEL): Offshore windfarm of around 330 MW

Ouarzazate III (MAR): Concentrated solar power plant of around 150 MW as part of the Ouarzazate solar complex Itezhi-Tezhi Hydro Project (ZMB): Hydropower plant of around 120 MW Megalim Solar Thermal Plant (ISR): Solar thermal power plant of around 120 MW

DISCLAIMERSources: www.eib.org/investor_relations/documents/cab-statement-2016.htm, www.epa.gov/energy/greenhouse-gas-equivalencies-calculator. For information purposes only. Tera Neva is a registered trademark of BNP Paribas. This document is CONFIDENTIAL AND FOR DISCUSSION PURPOSES ONLY and does not constitute an offer or a solicitation to engage in any trading strategy or to purchase or sell any �nancial instruments. Given its general nature, the information included in this document does not contain all the elements that may be relevant for an investor to make an informed decision in relation to any strategies or �nancial products discussed herein. In providing this document, BNP Paribas (“BNPP”) gives no �nancial, legal, tax or any other type of advice to, nor has any �duciary duties towards, recipients. The information contained in this document has been obtained from sources believed to be reliable, but BNPP makes no representation, express or implied, that such information, or any opinions based thereon and contained in this document, are accurate or complete. BNPP is further under no obligation to update or keep current the information contained in this document. All �gures and examples are provided by way of illustration only. BNPP accepts no liability for any direct or consequential losses arising from any action taken in connection with or reliance on the information contained in this document.BNP Paribas London Branch (registered of�ce: 10 Harewood Avenue, London NW1 6AA; tel: [+44 20] 7595 2000; fax: [+44 20] 7595 2555) is lead supervised by the European Central Bank (ECB) and the Autorité de Contrôle Prudentiel et de Résolution (ACPR). BNP Paribas London Branch is authorised by the ECB, the ACPR and the Prudential Regulation Authority and subject to limited regulation by the Financial Conduct Authority and Prudential Regulation Authority. Details about the extent of our authorisation and regulation by the Prudential Regulation Authority, and regulation by the Financial Conduct Authority are available from us on request. BNP Paribas London Branch is registered in England and Wales under no. FC13447. www.bnpparibas.com