Kewaunee School District Facilities Study Table of Contents
August 28, 2014
Page 1 of 2
EUA No. 314242-01
TABLE OF CONTENTS
SECTION 1 Executive Summary
SECTION 2 Site and Building Capacity Data a) Site Size Analysis b) Analysis of Building Capacity (HS) c) Analysis of Building Utilization (HS) d) ADA Study Overview
SECTION 3 Site and Building Inspection Summary - by School
1. Grade School a) Floor Plans & Historical Plans b) Educational Adequacy Assessment c) ADA Compliance Report d) Building System Lifespan Comparison e) Building Inspection Report – EUA f) Mechanical Inspection Report – Fredericksen Engineering g) Electrical Inspection Report – Muermann Engineering h) Plumbing Inspection Report – Muermann Engineering
2. High School
a) Floor Plans & Historical Plans b) Educational Adequacy Assessment c) ADA Compliance Report d) Building System Lifespan Comparison e) Building Inspection Report – EUA f) Mechanical Inspection Report – Fredericksen Engineering g) Electrical Inspection Report – Muermann Engineering h) Plumbing Inspection Report – Muermann Engineering
3. Hillcrest Building a) Floor Plans & Historical Plans b) Educational Adequacy Assessment c) ADA Compliance Report d) Building System Lifespan Comparison e) Building Inspection Report – EUA f) Mechanical Inspection Report – Fredericksen Engineering g) Electrical Inspection Report – Muermann Engineering h) Plumbing Inspection Report – Muermann Engineering
2
Kewaunee School District Facilities Study Table of Contents
August 28, 2014
Page 2 of 2
EUA No. 314242-01
TABLE OF CONTENTS (CONTINUED)
SECTION 4 Appendices a) Reference Plans from Education Adequacy Assessment
a. Campus Site Plan b. Grade School c. High School d. Hillcrest Building
b) Construction Date and Approximate Size of Facilities c) Districtwide Utility Usage by Building d) Articles
1. Do School Facilities Affect Academic Outcomes? – Mark Schneider 2. Educational Trends Shaping School Planning, Design, Construction, Funding and
Operation – Kenneth Stevenson 3. School Facility Conditions and Student Academic Achievement – Glen Earthman 4. Flipped Classrooms Spreading in Wisconsin – Matthew Defour, Wisconsin State Journal 5. 2011 ASHRAE Handbook – HVAC Applications
1
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 1 of 9
EUA No. 314242-01
EXECUTIVE SUMMARY
The Facilities Study is a critical first step in the planning process which helps school districts and their communities to better understand the current state of its facilities and how well these components support educational goals. The Facilities Study provides an independent, objective analysis of the present conditions and capabilities of the district’s facilities and grounds. This study also serves as a foundational resource document to support immediate and long term facilities planning. The information presented in this report was gathered through on-site inspections of the sites and buildings, interviews with various building administrators and maintenance staff. Included in this report is an analysis of the existing building capacities, ADA facility assessments, educational adequacy, building systems assessments, and an overview of the site occupied by the Kewaunee School District campus. Kewaunee School District serves approximately 983 students in grades 4K-12 in two buildings. Kewaunee’s relatively rural setting allows students to enjoy small class sizes and participate in many extra-curricular opportunities. Kewaunee School District Vision:
Provide the opportunity for each student to belong, engage, and excel
Demonstrate professional commitment and integrity
Sustain a visionary, collegial culture
Uphold the trust of our community
Ensure organizational quality
Celebrate success
For each building and major section of this report, Eppstein Uhen Architects (EUA) has identified professional observations and recommendations to inform future facilities planning. This Executive Summary attempts to capture significant findings that are detailed within the larger Facilities Study. Please reference the complete Facilities Study in the following sections for supporting data to the observations and recommendations. The Kewaunee School District Facilities Study indicates that building systems in several of the existing buildings are outdated, some core spaces are either under utilized or undersized for intended use, several of the buildings could be more energy efficient, and building security could be improved. All buildings provide appropriate capacity for today’s student population with flexibility for growth in students and educational programs. However, the high school (built in 1967) and Hillcrest (built in 1958) each have major building systems, such as/e.g., roofs, windows, mechanical, electrical, and plumbing systems that are beyond or approaching the end of their expected service life. Compared to the grade school, the high school provides less equitable learning environments and several departments are vastly underutilized due to a combination of lower student enrollment and reduced staff. Designed in the mid 20th century when building codes were less stringent, the high school and Hillcrest now face significant code compliance issues related to required fresh air in classrooms and fire alarm systems. Americans with Disabilities Act (ADA) compliance is also a factor for serious consideration at Hillcrest as the building does not have an elevator and occupants are served on multiple levels. While Hillcrest is legally “grandfathered” by the previous building codes, significant improvements to this building would likely require the entire school to comply with the current accessibility code. Therefore a cost-benefit analysis of maintaining or replacing these components is advised for future planning purposes. The intention of the Facilities Study is to focus on the areas that are inadequate and/or require a significant investment in the near future. Any decisions made to maintain or improve the high school and Hillcrest should support long term solutions. Providing the optimum combination of adaptable and appropriate spaces for teaching and learning should support student and staff achievement and reflect the Kewaunee School District’s community values.
2
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 2 of 9
EUA No. 314242-01
The following paragraphs provide an introductory description of the specific issues reviewed in each report section:
SITE AND BUILDING CAPACITY DATA The 4K-12 Kewaunee School District campus occupies approximately 41 acres of land bordered by Center Street to the north, Third Street to the east, Lincoln Street to the south, and Fifth Street to the west. The 4K-12 campus side is relatively flat and doesn’t have land set aside for detention/retention ponds. Based on the total existing enrollment for each of the schools, a similar campus should have approximately 50 acres of buildable area as recommended by the Council of Educational Facility Planners International (CEFPI) and other guideline publications. When a school lacks land that can be developed it is most often apparent with complicated traffic patterns. This has proven to be somewhat of an issue on the Kewaunee Campus as described in the Educational Adequacy Assessment. Kewaunee also owns land on the other side of Third Street that is associated with the Hillcrest facility. The Hillcrest site is relatively flat at 18.6 total acres. Although some of the land is used as agricultural, this buildable property could allow for future expansion of existing campus amenities. The student capacity of the High School was reviewed and evaluated against several nationally recognized educational planning recommendations. Three different capacity calculation methods were used:
1. Functional Capacity by Area is based on the maximum number of students recommended per the area of each educational (classroom/teaching) space.
2. Functional Capacity by Scheduling Procedure is based on administrative practice for number of students that can be scheduled in each educational (classroom/teaching) space.
3. Capacity based on Building Area analyzes the entire school’s gross square footage and determines capacity by utilizing best practices for square foot per student in comparable facilities.
Over the past decade, recommended space provided per student has increased. The major reasons are:
• Space is needed to support children with special needs; students with disabilities, cognitively disabled students and special education needs.
• Space needed to support specialists in the area of reading, speech, occupational therapy, physical therapy, and Title I programs.
• Space needed to support paraprofessionals, volunteers and parent support groups. • Space needed to support personalized learning, team teaching, and flexible collaboration in common areas. • Space to accommodate technology and its infrastructure.
The capacity study indicates, however, that even with the increased space needs, the high school is well under capacity:
• The 2013 WDPI enrollment for the facility was 316 total students. • The three calculations show possible capacities ranging from 532 to 819 total students. • Depending on the capacity method used, there is room for between 216 and 503 additional students. • Common spaces within the building appear to be disproportionately small compared with the amount of
academic space provided. The high school was also studied to determine exactly how its academic spaces were being used throughout the day. This analysis give us a clear picture of the current Building Utilization. Based on timetables provided by staff the following observations were made: (Note: This data may need to be updated once class schedules are finalized)
1. The Building Utilization Factor for KHS is at 46.5%. Schools are considered at recommended utilization when utilization averages 80%. This means that significantly more educational spaces are empty during a typical school day.
2. Average Class Size for KHS is at 61.3% Capacity. Generally, based on current space sizes and staffing levels, additional students could be added in many of the classrooms.
3
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 3 of 9
EUA No. 314242-01
3. Spaces that may be particularly underutilized include Technical Education, Agricultural, and Science areas. Additional analyses of staffing and scheduling procedures may be warranted for Computer Labs and Special Education areas.
FACILITIES SUMMARY The following summary of each building is divided into two specific sections. The Educational Adequacy Assessment (EAA) is a comprehensive review of the following key areas and departments:
Grade school: overall school site; entrances / security; and general observations
High school: overall school site; entrances / security; lobbies, corridors, and common spaces; science classrooms; Library/Media Center; Physical Education, and Auditorium
Hillcrest: overall site; entrances / security; and general observations
The EAA reviews the actual program activities, use of the building, and physical space required for each activity and provides analysis of how effectively the spaces support student learning and program delivery. The Building Systems Assessment considers the building’s shell and interior materials, mechanical, electrical, and plumbing systems, and finally the compliance with the Americans with Disabilities Act (ADA) relative to accepted industry standards. A building’s compliance with the ADA is based on the review of the accessible routes to and through the building and site, as well as accessible features and accommodations inside the building as defined by ADA design guidelines and the International Building Code. The following is a summary of EAA, Building Systems, and ADA observations. A deeper analysis is provided within the complete Facilities Assessment report. The findings presented in this report will provide the Kewaunee School District with up-to-date information to assess its existing site and building conditions relative to providing optimal learning environments for successful curriculum delivery. The report identifies the positive aspects of the facility as well as deficient conditions that impact building function and educational opportunity. SITE Below is a summary of the site as it relates to the Education Adequacy Assessment: Positives:
Grounds are relatively well maintained
4K-12 students served on a common campus environment
All athletic activities are contained in a single vicinity (spread over two disjointed properties) Negatives:
Existing 4K-12 campus site is undersized for the existing student enrollment (not including Hillcrest site)
Traffic separation of parents, staff, buses, and students can be challenging during daily pick-up and drop off
The Hillcrest acreage does not provide an easy solution to ease traffic challenges because it is separated by Third Street
The southeast corner of the grade school site is underutilized
A lack of fencing around the grade school playground makes supervision of students difficult during recess
The grass athletic fields get heavy use
The existing storage shed is beyond its useful life and its current location makes traffic paths challenging
Hillcrest site is underutilized
Running track asphalt is badly deteriorated
Parking lots and drives have deteriorated asphalt
4
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 4 of 9
EUA No. 314242-01
GRADE SCHOOL Below is a summary of the grade school as it relates to the Education Adequacy Assessment: Positives:
Marginal security at front entrance
Identifiable main entrance
Ability to compartmentalize portions of the building in the event of an emergency or for nighttime activities
Negatives:
Main entrance security does not include passive supervision
Access into the building does not provide additional security measures for the control of visitors
Secondary exterior doors are not electronically monitored
Gymnasium atrium space is underutilized
Restrooms for nighttime use are not easily accessible from the gymnasium
Gym is heavily used by high school athletics
Wrestling team must practice at the Hillcrest facility due to scheduling of athletics GRADE SCHOOL Below is a summary of the grade school as it relates to the Building Systems Assessment: Positives:
Constructed in 1998 and is in generally good condition
Some existing light fixtures have been updated from T8 to LED in the cafeteria
Lighting motion sensors have been added to the classrooms
Gym recently updated to 2x4 high bay fluorescent fixtures
Building has digital and IP based cameras and access control software
Negatives:
Several areas of the roof have leaks
Hollow metal doors and frames on the exterior are starting to rust
Heating - hot water pump is only single speed flow and is not energy efficient
Cooling - chilled water pump is only single speed flow and is not energy efficient
Mechanical control system software needs updating
Classrooms lack occupancy sensors that are connected to the VAV boxes
Exterior lacks proper lighting for security
Data room lacks dedicated Air Conditioning to cool equipment
Data room lacks emergency power
Flush valves and faucets are beyond expected life and are not low-flow
Hot water heater is beyond the expected life and is not energy efficient
Boiler and hot water storage tank are oversized for the current building demand and are not energy efficient
Interior and exterior below grade sewers should be regularly investigated with a camera for deficiencies
5
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 5 of 9
EUA No. 314242-01
HIGH SCHOOL Below is a summary of the high school as it relates to the Education Adequacy Assessment: Positives:
Marginal security at front entrance
Building is within the calculated capacity
Select learning environments are relatively large for the current student population
Negatives:
Main entrance security does not include passive supervision
Access into the building does not provide additional security measures for the control of visitors
Secondary exterior doors are not electronically monitored
The entrance lobby lacks furniture to be used as a pre-function space for the Auditorium
The school generally lacks mobile classroom furniture which promotes independent, personalized, small group, and large group learning opportunities
Cafeteria is not utilized for student socialization and academic purposes beyond dining and study hall
Nearly 580 student lockers in the hallway are empty. These lockers block supervision from the classrooms into the hallway which limits the use of the corridors for small group instruction opportunities
Outdated/unused technology and audio/visual equipment is prevalent in the building
Family and Consumer Education spaces are outdated for the curricula of fashion design and culinary arts
Media Center and its furniture is outdated for modern instruction and use
Technical Education spaces are large but underutilized for the current student and staff population
Science spaces are large but underutilized for the current student and staff population
Auditorium lacks several major spaces; backstage for scene construction, side stages for performers, dressing rooms, storage, and orchestra pit
Gym space is over utilized by athletic teams
Weight room location in the basement does not lend itself to any type of shared community use and lacks cardiovascular equipment
Basement wrestling room lacks proper ventilation
HIGH SCHOOL Below is a summary of the high school as it relates to the Building Systems Assessment: Positives:
The building has no sigs of being built on unsuitable soils.
Interior finishes are generally in good condition.
Roofing is in good condition
Electrical service may be large enough for future additions
Gym recently updated to 2x4 high bay fluorescent fixtures
Exterior lighting is LED type
Wireless data receivers are being added to the building
Building has digital and IP based cameras and access control software
Fire alarm was updated in 2001
6
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 6 of 9
EUA No. 314242-01
Negatives:
Asphalt, curbs, and sidewalks on the accessible route from the street and handicap parking stalls are deteriorated
Site lacks a designated accessible crosswalk from handicap parking stalls to entrance
Handrails, guardrails, restrooms, door knobs, and shower facilities are not ADA compliant
1967 windows are single pane and not energy efficient
Exterior steel doors and frames are original, rusted, and are not energy efficient
Exterior brick walls needs tuck-pointing and sealant replacement
Exterior steel lintels are rusted
Metal canopy fascia needs replacement and soffits require painting
School contains asbestos floor tile
Acoustic ceiling tiles are stained and beyond useful life
Heavily used door hinges are damaged
Restroom flooring and wall tile will require replacement when bathrooms are reconfigured for ADA compliance
Classroom doors should have intruder locksets
Heating - hot water pump is only single speed flow and is not energy efficient
Air handling units are beyond expected life
Auditorium is not correctly ventilated for the occupant load
Administrative office area is poorly ventilated due to the pressurized plenum method
Chilled water from the Grade School runs to the High School but the equipment was never added o Further investigate if Grade School can provide entire AC load of HS
Constant volume air and unit ventilators do not provide zoned control and are not energy efficient
Pneumatic system controls are outdated, difficult to calibrate, and replacement parts are difficult to find
Electrical service panel is full, beyond the expected life, and does not have surge protection
Several branch electrical panels are original to the building and beyond the expected life
Building lacks daylighting sensors in the classrooms
Some incandescent lights still exist in the building
Exit lighting is not LED type
Emergency lighting does not meet current code including the Technical Education area
Exterior lacks proper lighting for security
Data room lacks independent air conditioning (window unit is not acceptable)
Public address speakers are beyond expected life
Generator is beyond expected life and is no longer code compliant
Data room lacks emergency power
Technical Education lacks a master shut off switch
Plumbing fixtures are not low flow
Science room faucets are beyond expected life and lack backflow prevention
Hot water boiler & storage tank is oversized and beyond expected life
Water softeners are beyond expected life
Interior and exterior below grade sewers should be regularly investigated with a camera for deficiencies
Sanitary main is not PVC
Although the supply pipes are copper, they are beyond expected life
7
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 7 of 9
EUA No. 314242-01
HILLCREST Below is a summary of the Hillcrest building as it relates to the Education Adequacy Assessment:
Positives:
Building is used by community partners
The building allows the district to use an existing asset
Negatives:
The main entrance is not secure
Main entrance security does not include passive supervision
Access into the building does not provide additional security measures for the control of visitors
Secondary exterior doors are not electronically monitored
The facility is not designed to be used as a tenant office building
Only a few of the tenants pay rent
The operational cost to maintain the facility should be studied further HILLCREST Below is a summary of the Hillcrest building as it relates to the Building Systems Assessment: Positives:
Building has digital and IP based cameras and access control software
Negatives:
Asphalt, curbs, and sidewalks on the accessible route from the street and handicap parking stalls are deteriorated
Site lacks a designated accessible crosswalk from handicap parking stalls to entrance
Handrails, guardrails, restrooms, door knobs, and shower facilities are not ADA compliant
Building lacks a lift/elevator for accessibility
Stairs are not compliant with the current building code
Parking lots slope toward the building and cause water damage
Parking lots are badly deteriorated
Concrete stoops have heaved and are a walking hazard
Single pane windows are beyond useful life, deteriorated, and are not energy efficient
Entire roof requires replacement
Downspouts and gutters leak
Exterior wood doors and frame are deteriorated
Exterior brick and concrete block walls are deteriorated, require tuck-pointing, and sealant replacement
Noticeable leaking into the building occurs in several locations
Wood fascia is deteriorated
Exterior metal soffit is rusted
All interior walls should be painted to cover staining
Building contains asbestos floor tile
Acoustic ceiling tile and grid is stained and beyond useful life
Metal ceiling structure requires painting
Interior wood doors are worn and require refinishing or replacement
Restroom flooring and wall tile will require replacement when bathrooms are reconfigured for ADA compliance
Cabinetry and counters are worn and beyond useful life
Basketball equipment does not meet current safety standards
Steam boiler is beyond expected life and is not energy efficient
8
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 8 of 9
EUA No. 314242-01
Boiler piping is beyond expected life
Heat exchanger is beyond expected life
Unit ventilators are beyond expected life
Pneumatic system controls are outdated, difficult to calibrate, and replacement parts are difficult to find
Service switchgear is outdated and beyond expected life
Electrical feeders are outdated and beyond expected life
Electrical panels are full, beyond expected life, and breakers to do operate properly
Classrooms lack adequate number of outlets
Most lighting has not been updated
Emergency lighting does not meet current code
Exterior lacks proper lighting for security
Data room lacks a dedicated room, independent air conditioning, and heat
Fire alarm system is outdated in its entirety and does not comply with the current code
Building lacks an intercom system
Plumbing fixtures are not low-flow
Grease interceptor is beyond expected life
Water heater will reach expected life in 5-7 years
Although the supply pipes are copper, they are beyond expected life
Galvanized and cast iron sanitary piping is beyond expected life
Cast iron storm piping is beyond expected life
Interior and exterior below grade sewers should be regularly investigated with a camera for deficiencies
9
Kewaunee School District Districtwide Facilities Study Executive Summary
August 28, 2014
Section 1
Page 9 of 9
EUA No. 314242-01
As of July, 2002 the building code in the State of Wisconsin changed to the International Building Code (IBC). One major difference between the prior code and the current IBC that impacts school projects is the requirement for schools to be protected by a fire sprinkler system if the fire areas within the facility are over 12,000 square feet. Although this requirement does not affect existing facilities that do not receive upgrades, significant remodeling or additions to an existing structure may trigger this requirement.
CONCLUSION As stated, the Executive Summary highlights specific sections of the complete Facilities Study. Although all of the buildings are within the calculated capacity, there are minor to significant deficiencies found in the schools and the campus. Specifically, the high school appears to be at a point that attention should be given to update the systems and learning environment before it falls further behind the conditions of the grade school. There are several options that could be explored through a planning process that range from mechanical, electrical, and plumbing updates all the way to significant academic space remodeling. Attention should also be given to the future of the Hillcrest facility. Based on the grade school and high school capacities, this facility will not be needed as an educational space but it was never designed for its current use as office tenant space. The building is in need of significant improvements but the fiscal benefit of this structure to the school district should be studied further. This study is not intended to provide specific solutions but rather to allow the school district to understand the existing conditions of the buildings and campus layout. The educational market is entering an era of increased consumer choice and increasing competition between public, private and charter schools options. This ultimately impacts enrollment and the associated operational funding.
RECOMMENDED NEXT STEPS At the conclusion of a Facilities Study, many schools ask how to proceed. It is our recommendation that the Administration and Board of Education review the document for content and understand the observations and recommendations. The next step should be prioritizing the items identified in this report into two different categories; items that can be budgeted for with annual maintenance funds and those items which would require significant capital expenditure. This facilities study could be considered a work in progress and a system should be put in place to track items that get updated through a Capital Improvement Plan. This study should serve as a reference to the district and its constituents in making informed decisions for effective planning into the future. Thank you for the opportunity to participate in this endeavor. If you have any questions or concerns regarding this summary, please feel free to contact the EUA team.
Sincerely, Eric Dufek, RA, LEED AP Senior Design Architect
Robert Vajgrt, AIA, LEED AP Senior Project Manager
Bob Morris, RA Design Architect