facility management engineer
TRANSCRIPT
![Page 1: Facility Management Engineer](https://reader036.vdocument.in/reader036/viewer/2022082906/577cc9bb1a28aba711a4757b/html5/thumbnails/1.jpg)
Curriculum vitaeMechanical Engineer
Proposed position: Facility Engineer Name ALTAF KHANFather’s Name MUHAMMAD MUSA
Personal Information:Date of Birth: MAY 28, 1988Nationality: Pakistani
contact number 03149723972
2. Education: B.Sc. Mechanical Engineering,N.W.F.P University of Engineering & Technology (UET) Peshawar KPK Pakistan
3. Career Summery and Objective:An enthusiastic individual with more than 2years’experience as a facility engineer/ Maintenance Engineer. Areas of expertise include HEAD LOAD CALCULATION, and maintenance of HVAC systems in commercial buildings and villas. Well versed in use of AutoCAD, HAP& Pro‐E software’s. Committed and persuasive to avail my experience, skills and abilities in a fast moving environment which will provide challenges and allow further development of my leadership , technical and communication skills that will be useful both for me and my employer.
PERSONAL SKILLSi. Design and Analysis
a) AutoCADb) PRO ENGINEERS and ;c) ENGINEERING SOFTWARES used in the designing of HVAC and Plumbing. (Hourly Analysis
program)
ii. Planning and Scheduling, Construction Management, Analysis, Documentation and Presentation
a) MS Wordb) MS PowerPointc) MS Excel
iii. .I worked in Pakistan and UAE in HVAC.Scope of our my work:
a. Heating, Ventilation, Air Conditioning.b. Works on using UTM, IMPACT TESTING MACHINE AS MATERAIL LAB ENGINEER.c. I worked as internee in SNGPL under dost internship programd. I worked as internee in OGDCL dhakni branch.
![Page 2: Facility Management Engineer](https://reader036.vdocument.in/reader036/viewer/2022082906/577cc9bb1a28aba711a4757b/html5/thumbnails/2.jpg)
My Job Description As Maintenance and Estimation EngineerRoles and Responsibilities:
a) Performed short term and long term planning for the property.
b) Supervised development/monitoring of facilities maintenance program.
c) Directed all activities relating to contracted facility services, including but not limited to technical reviews, material.
d) Load Calculation of HVAC system through software and manually.e) Selection of equipment’s according to requirements.f) Making HVAC ducts and piping layout design. Duct design according to ASHRAE standardsg) Preparation of Ductwork layout drawings in AutoCAD.h) Preparation of Piping layout drawings & Distribution drawings in AutoCADi) Load and pressure drop calculations. Equipment selection (Chillers, AHUs, FCUs, Pumps,
Dampers, Grills and diffusers)
iv. Customer Orientation : a) Carries out customer communication, Technical explanation and discussions. b) Handles complaints to the full satisfaction of the customer and the Company. d) Provide excellent customer service to comply with all occupational health and safety legislation,
guidelines, standards, policies, procedures and practices.d) Maintains the customer’s files which are a reference record for the projects,
4. Employment Record : Position Held: (Mechanical Engineer)
Employer:ALJABIR llc Abu Dubai (mussaffah) UAE KTH PESHAWAR Pakistan.
My Major Responsibilities
As Supervisor of : a) Assign duty to technicians and operators by receiving complain. b) Responsible for servicing and maintenance of air conditioning/refrigeration unit.c) Preventive maintenance of cooling tower and other HVAC equipments. Country of Work:a) UAE Dubai. b) Pakistan
5. Professional Courses and Lectures:Membership of Professional Societies:
a) Member of ASHRE HVCR Society Pakistan Northern Chapterb) Cecos enhancement society
Attain seminar on PLC and primavera p6 6. My final year project:
HEAT LOAD CALCULATION SYSTEM SELECTION DESIGN OF SYSTEM OF KTH NEPROLOGY SECTION KTH PESHAWAR.. Post applied for trainee hvac engineer.