fdot district 5 maintenance resurfacing sr 100 moody boulevard from east of i-95 to sr a1a ocean...

13
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland Blvd. DeLand Florida 32720 385 943 5145 [email protected] December 13, 2011 Public Information Meeting FPID : 427232-1- 52-01

Upload: darcy-lamb

Post on 16-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

FDOT District 5 MAINTENANCE RESURFACINGSR 100 Moody Boulevard fromEast of I-95 to SR A1A Ocean Shore Boulevard

GENE VARANO PROJECT MANAGER719 S. Woodland Blvd. DeLand Florida 32720385 943 5145 [email protected]

December 13, 2011 Public Information Meeting

FDOT District 5 MAINTENANCE RESURFACINGSR 100 Moody Boulevard fromEast of I-95 to SR A1A Ocean Shore Boulevard

GENE VARANO PROJECT MANAGER719 S. Woodland Blvd. DeLand Florida 32720385 943 5145 [email protected]

December 13, 2011 Public Information Meeting

FPID : 427232-1-52-01

Page 2: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Americans with Disabilities ActAmericans with Disabilities Act

This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida 32720 or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL 32399-0450. All inquiries or complaints will behandled according to FDOT procedure and in an expeditious manner.

Page 3: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Central Florida Roads Central Florida Roads

You may also view information on the project at:

www.cflroads.com

Select by county, or by FPID number, under Future Projects link.

Page 4: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Project Description/OverviewProject Description/Overview

The project limits are from west of Old Kings Road to SR A1A. The improvements consist of removing old asphalt (milling), repaving the roadway and shoulders, when new pavement markings are applied, the roadway will accommodate bicycle lanes through right turn lanes at Old Kings Road and Roberts Road.

Other work includes improving pedestrian curb ramps, relocating the westerly midblock pedestrian crossing in Flagler Beach and installing signing and pavement markings.

Page 5: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Stakeholder/Public InvolvementStakeholder/Public Involvement

Your input is very important during this process. Public participation is solicited without regard to race, color,

national origin, age, sex, religion, disability or family status. Public involvement efforts with local agencies.

Flagler County City of Palm Coast City of Bunnell City of Flagler Beach Local Interest Groups (Friends of A1A)

Community Awareness Plan

Page 6: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Rural Typical SectionRural Typical Section

Dashed lines ( ) = Existing Features

Solid lines ( ) = Proposed Features

Legend

From west of Old Kings Road to the Intracoastal Waterway

Page 7: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Urban Typical SectionUrban Typical Section

Dashed lines ( ) = Existing Features

Solid lines ( ) = Proposed Features

Legend

From west of Flagler Avenue to SR A1A

Page 8: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Project DetailsProject Details

Work Type: Resurfacing Length: 3.27 miles City: Flagler Beach County: Flagler Routine Resurfacing ADA Compliance Curb Ramps Pedestrian Improvements Bicycle Lane connectivity New Pavement Markings New Signage Business Access assured during Construction No Right of Way is needed for the project.

Page 9: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Project Schedule Project Schedule

Completion: 08/1/12

Letting: 10/24/12

Construction: Spring 2013

Design Schedule: View Production Date Summer 2012 Letting Date Fall 2012 Construction Begin Winter 2012/2013 Construction End Estimated

Summer/Fall 2013 (6 months)

Page 10: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Project Schedule Project Schedule

Completion: 08/1/12

Letting: 10/24/12

Construction: Winter 2012/Spring 2013

Page 11: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Project CostProject Cost

The current production date is August 1, 2012

Design Fees: $400,000

Construction Estimate: $3.62 million

The Project is on schedule and on budget

Page 12: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Comment CardComment Card

Mail to:

Ms. Ada VargasPublic Information CoordinatorBurgess & Niple, Inc.1800 Pembrook Drive, Suite 265Orlando, FL 32810

Page 13: FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland

Thank you!Thank you!

FOR MORE INFORMATION, YOU MAY CONTACT:

Gene Varano, FDOT Project Manager at (386) 943-5145 or via e-mail at [email protected]

Scott Perfater, Burgess & Niple at (407) 401-8527 or via e-mail at [email protected]