FEED-IN MANAGEMENT &
ZERO EXPORT
Fronius International GmbH
Froniusplatz 1
4600 Wels
OVERVIEW
/ Feed-in management
/ Electricity grid operators in many countries increasingly demand feed-in limitations as a condition
for grid connection. With the dynamic feed-in control, Fronius offers a solution for optimal feed-in
management for photovoltaic systems. If there are feed-in limitations, the inverter supplies the
connected loads in the household or the building. Additionally the inverter reduces its output
according to the maximum power value accepted by the grid operator.
/ What‘s new?
/ As of now Fronius inverters support zero export, meaning a feed-in limitation of 0%. Thus, no PV
electricity is being fed into the grid. The requirements from the grid operator can easily be met via a
setting on the web interface of the inverter.
/ All Fronius SnapINverters inclusive the Fronius Symo Hybrid support this feature.
2Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
SYSTEM REQUIREMENTS FOR ZERO EXPORT
/ Hardware Requirements
/ Fronius SnapINverter with integrated Fronius
Datamanager 2.0 or Fronius Datamanager Box 2.0
/ Fronius Symo Hybrid
/ Fronius Smart Meter 1)
/ Fronius Smart Meter 63A-1
/ Fronius Smart Meter 63A-3
/ Fronius Smart Meter 50kA-31) This feature cannot be guaranteed with a S0 pulse meter.
/ Software Requirements
/ Datamanager Firmware 3.5.1-2 and higher
/ Fronius Symo Hybrid Firmware 1.4.1-11 and higher
/ Inverters with older firmware may require a firmware
update3
Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
CONFIGURATION
4Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
/ The configuration can be done via the web interface of the Datamanager (see
“settings DNO Editor”)
Adjustable range:
-10% to 100% of the total DC power
Default value in percent or Watt
APPLICATION EXAMPLE 1: 10% LIMITATION
5Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
/ Requirement: 10% limitation from the grid supplier
/ Instead of 10% also 60% (Germany) can be requested
APPLICATION EXAMPLE 2: ZERO FEED-IN
6Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
/ Requirement: No PV energy is fed into the public grid
APPLICATION EXAMPLE 3: -2% LIMITATION
7Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
/ Requirement: Permanent, mininal consumption from public grid
/ Reason: Grid suppliers are afraid that PV energy is fed into the public grid
despite the zero feed-in regulation. Therefore the -2% can be seen as a safety
factor. It is selected to guarantee a continuous minimum consumption (like a
buffer).
CONFIGURATION DIAGRAM
8Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
The Fronus Smart Meter
can also be installed in
the consumption path.
SPECIFICATION ZERO EXPORT
/ Adjustable Range: -10% to 100%
/ Settling time: < 5 Seconds
/ Applies only to the following system configuration:
/ 1 - 5 Fronius SnapINverter 1)
/ 1 Fronius Datamanager
/ 1 Fronius Smart Meter
/ Phase-balanced
/ In three-phase systems, the sum of the load on all phases is being measured and the inverters are
feeding in symmetrically. No regulation per-phase.
/ Failure safety:
/ If the connection between the Fronius Datamanager and the Fronius Smart Meter fails, the inverters
reduce their output to the predefined minimal value (fall back scenario).
1) For system size > 5 Fronius SnapINverters the settling time of under 5 seconds cannot be guaranteed. Furthermore the configuration
with several inverters is not possible with Fronius Hybrid inverters. Only one Fronius Hybrid inverter can be combined with one Fronius
Smart Meter.
9Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
SPECIFICATION ZERO EXPORT
/ Chronological sequence by load shedding
Example:
Fronius Primo 8.2-1-M
Zero export
Load drop from 6700W to 1700W
Further details see manufacturer’s declation!
10Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
AVAILABLE DOCUMENTS
/ Planning guide for dynamic power reduction
/ Manufacturer`s declaration
/ Flyer
11Fronius International GmbH / Feed-in Management & Zero export / 01.2017 - v03
All information is without guarantee in spite of careful editing - liability excluded.
Intellectual property and copyright: all rights reserved. Copyright law and other laws protecting intellectual property apply to the content of this presentation and the documentation enclosed (including texts, pictures, graphics, animations
etc.) unless expressly indicated otherwise. It is not permitted to use, copy or alter the content of this presentation for private or commercial purposes without explicit consent of Fronius.