Network Reliability and Interoperability Council
Focus Group 2
Network Reliability
PJ Aduskevicz, AT&T
Ross Callon, JuniperWayne Hall, Comcast
-
8/3/2019 FG2 Reliability Sept13
2/27
Network Reliability and Interoperability Council
Focus Group Membership PJ Aduskevicz, AT&T
Jeff Barrows, Firefly Networks
Ron Bath, VoiceStream
Dan Benyon, Cisco
Ken Biholar, Alcatel USA
Ken Buckley, Federal Reserve Board
Jane Builder, VoiceStream
Rex Bullinger, NCTA
Ross Callon, Juniper
Rick Canaday, AT&T
Kevin Cavanagh, AT&T Wireless
William Check, NCTA
Wayne Chiles, Verizon
Joe Craig, Qwest
Victor Devito, AT&T
Bernie Farrell, NCS
David Fears, Cox Communications
Perry Fergus, Booz Allen & Hamilton
Lee Fitzsimmons, Nextel Ron Garrett, Tekelec
Brian Goemmer, Western Wireless
Jeff Goldthorp, FCC
Chris Gunner, Avici Systems
Ed Hall, ATIS
Thomas Hall, MFN
Wayne Hall, Comcast
Rick Harrison, Telcordia
Paul Hart, SBC
Jake Hartinger, Cisco
John Healy, FCC
Dean Henderson, Nortel Networks
Bob Holley, Cisco
Bruce Johnson, Verisign
Lynn Johnson, Boeing
Rick Kemper, CTIA
Jay Kitchen, PCIA
Bill Klein, ATIS
Bernie Ku, WorldCom
Jim Lankford, SBC Bill LaPerch, MFN
-
8/3/2019 FG2 Reliability Sept13
3/27
Network Reliability and Interoperability Council
Focus Group Membership Greg Larson, Exodus/CWUSA
Mike Lecocke, SBC
Chris Liljenstolpe, CW
Virgil Long, Tekelec
Chris MacFarland, Allegiance
Spilios Makris, Telcordia
Joseph Maloney, Hughes
Archie McCain, BellSouth
Mike Meyers, Microsoft Corp.
Art Menko, BPI Telcodata
Brian Micene, AT&T Wireless
Denny Miller, Nortel
Kent Nilsson, FCC
Eamon OLeary, AT&T Wireless
Gary Pellegrino, CommFlow Resources
Bonnie Petti, Verizon Wireless
Sam Phillips, BITS
Tom Purcell, Nextel
Karl Rauscher, Lucent Arthur Reilly, Cisco Systems
Ira Richer, The Telesis Group
Gary Roboff, BITS
Jim Runyon, Lucent
Sonia Sakovich, Sprint
Harold Salters, Voicestream
Dan Schutzer, BITS
Andy Scott, NCTA
Pete Shelus, Telcordia Technologies
Ken Silva, Verisign
Don Smith, NCS
Ron Stear, C&W
Sandy Stephens, Focal
Jeff Swinton, Conexion Corp.
Whitey Thayer, FCC
John Todd, NCS
Rachel Torrence, Qwest
Robert Vogel, PanAmSat Corp.
Scott Wallhermfechtel, Metromedia
Doug Williams, Comcast Cable Heather Wyson, BITS
-
8/3/2019 FG2 Reliability Sept13
4/27
Network Reliability and Interoperability Council
Focus Group Mission Statement Define reliability measurements (units) for commercial communications networks
(i.e., wireline and wireless transport networks, including satellite and cable) and forthe Internet by March 22, 2003.
Define reasonable, measurable customer-affecting outage reporting thresholds forcommercial communications networks (i.e., wireline and wireless transportnetworks, including satellite and cable) and for the Internet by March 22, 2003.
Conduct voluntary outage reporting trial, collect data, analyze results, and reporton the validity, usefulness, and timeliness of the process and information obtained,and make recommendations for improvement.
Based on trial results (including information on services affected by an outage),evaluate and report on the reliability of public communications network services in
the United States. Should the Commission initiate an inquiry or rulemaking with respect to any of the
above-mentioned issues, the Focus Group will provide input to the NRIC, whichmay make formal recommendations as a part of such proceeding(s).
Evaluate, and report on, the reliability of public telecommunications networkservices in the United States.
-
8/3/2019 FG2 Reliability Sept13
5/27
Network Reliability and Interoperability Council
Focus Group Status
Initial work on measurements andthresholds in technology specific teams
Voluntary Outage Reporting Trial processand data criteria to be based on previouswork of NRIC V (modifications/adaptations
are being identified) Expected levels and conditions of
participation in the Voluntary OutageReporting Trial are being assessed
-
8/3/2019 FG2 Reliability Sept13
6/27
Network Reliability and Interoperability Council
Measurements and Thresholds TeamsTeam Leader
Internet Ross Callon (data) /
Dean Henderson (voice)
Wireless Dean Henderson
Cable Wayne Hall
Satellite Bob Vogel
Wireline Wayne Chiles /
PJ Aduskevicz
-
8/3/2019 FG2 Reliability Sept13
7/27
Network Reliability and Interoperability Council
NRIC V Process
Outage Occurs
Determine if
Outage Meets Vol.
Trial Criteria
Fax to NCS/NCC
On (703/607-4998 )
Create Initial Report
within 3 Days
Mark Company
Proprietary
ConductRoot Cause
Analysis
Identify
Best Practices
Fax Final Report
with in 30 D ays
NCS/NCC
Logs Report
Scrub Data per
Criteria Established
by 2.B1
Share Scrubbed
Data (i.e. NIPC)
Handoff scrubbed
data required by 2.A1 &
2.A2 (Best Practices
for Packet)
Does 2.B2 want
to use data?
Analyze Scrubbed
Data:
By Type/Segment
Impact
Frequency
Root cause for
Commonality
Provide status at
NRIC V Council
meetings
Make
Recommendations
Monitor Progress
Concur or Provide
Input on
Recommendations
Develop F inal
Report to Include
Recommendations
Service Provider NCS/NCCSubcommittee
2.B 1NRIC V
If yes
If noLocal Root
Cause
Analysis
Initial Final
Aggregate
And
Send Data
Initial Final
File Final Report
Determine
whether request to
share data should
be made
Take No
Further
Action
If yes
If no
Grant
Permission
to Share
Data?
If no
If yes
-
8/3/2019 FG2 Reliability Sept13
8/27
Network Reliability and Interoperability Council
NRIC V Data CriteriaFinal Report field Scrub Action
Reporting Carrier/Service Provider
Delete and create outage tag
(Industry segment identifier, i.e.,
CMRS, Satellite,Cable Telephony,
Data Services, and ISPs, plus a
unique numerical identifier)
Contact Person Delete
Start Date Unchanged
Start Time of Impact Unchanged
Geographic area affected Delete
Es timated number of cus tomers affec ted Unchanged
Types of Services Affected (i f appl icable) Unchanged
Durat ion of Outage (hours and minutes ) Unchanged
Apparent or known cause UnchangedName of Equipment Involved [OPTIONAL] Delete
Type of Equipment Involved [OPTIONAL] Delete
Specific Part of Network Involved Unchanged
Methods Used to Restore Service [OPTIONAL] Unchanged
Steps Taken to Prevent Recurrence Unchanged
Root Cause and Trouble Found [OPTIONAL] Unchanged
Applicable Best Practice [OPTIONAL] Unchanged
-
8/3/2019 FG2 Reliability Sept13
9/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC Reports
The Network Reliability Steering Committee (NRSC) wasestablished under the auspices of the Alliance for
Telecommunications Industry Solutions (ATIS) to monitornetwork reliability utilizing major outage reports filed withthe Federal Communications Commission (FCC) pursuantto Part 63.100 of the FCC Rules.
The NRSCs mission is to analyze network outage data
reported by companies, to identify trends, makerecommendations aimed at improving network reliability,and make the results publicly available, and whereapplicable refer matters to other industry fora for further
action.
-
8/3/2019 FG2 Reliability Sept13
10/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual ReportAnnual Control Chart for Outage Frequency
157160
169
154
184181
185
174 176
120
140
160
180
200
220
1993 1994 1995 1996 1997 1998 1999 2000 2001
Year
NumberofOutages
RED
YELLOW
GREEN
-
8/3/2019 FG2 Reliability Sept13
11/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual ReportAnnual Aggregated Outage Index Control Chart
1580
1978
1566
1907
160816281653
13351330
1000
1200
1400
1600
1800
2000
2200
2400
1993 1994 1995 1996 1997 1998 1999 2000 2001
Year
Ag
gregatedOutageIndex
RED
YELLOW
GREEN
-
8/3/2019 FG2 Reliability Sept13
12/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual ReportNumber Of Outages By Failure Category
61
27
32
17
68
6
72
33
14 14
4 5
89
21 22
15 14
2
6
86
35
12 11
2
8
86
32
19 1917
8
4
76
1921 20
11
2
26
20
13
20
9
5
63
30
22
8
62
11
28
17
21
5
10
18
20
32
83
22
31
8
0
10
20
30
40
50
60
70
80
90
100
Facility Local Sw itch CCS Tandem Sw itch CO Pow er DCS Other
Num
berofOutages
2001
Baseline Years(1993 - 2000)
-
8/3/2019 FG2 Reliability Sept13
13/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual ReportAnnual Frequency Control Chart for Procedural Error Outages
4447
63
49
767675
56
63
30
40
50
60
70
80
90
1993 1994 1995 1996 1997 1998 1999 2000 2001
Year
Nu
mberofOutages
RED
YELLOW
GREEN
-
8/3/2019 FG2 Reliability Sept13
14/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual ReportAnnual Aggregated Outage Index Control Chart for Procedural ErrorOutages
370
820
619
497
423423
275
420
741
0
100
200
300
400
500
600
700
800
900
1993 1994 1995 1996 1997 1998 1999 2000 2001
Year
AggregatedOutageIndex
RED
YELLOW
GREEN
-
8/3/2019 FG2 Reliability Sept13
15/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual Report
For outages reported in 2001:
Local Switch outages had their lowest annual
frequency and aggregated outage index to date. The annual aggregated outage index of Procedural
Errors was the highest to date.
The number of outages was lower than in any year todate. Nonetheless, the aggregated outage reached itssecond highest value to date.
The average outage index per outage was the highest todate.
-
8/3/2019 FG2 Reliability Sept13
16/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2001 Annual ReportSignificant trends noted over the course of the nine-year
data history include:
Local switch outage annual frequency and aggregated outage
index are decreasing at the rate of 6% and 13% per yearrespectively.
Central Office (CO) Power outage frequency is increasing at a rateof 12% per year.
The frequency of Facility outages has decreased in the last two
years, and the Facility aggregated outage index is decreasing at arate of 6% per year.
The frequency of outages with a Procedural Error as a root causeis increasing at a rate of 6% per year.
The frequency of Common Channel Signaling (CCS) outages hasincreased in the last two years.
-
8/3/2019 FG2 Reliability Sept13
17/27
Network Reliability and Interoperability Council
NRSC Timing Outages Task GroupImpact of Timing Outages
2000-01 Total Outages
9%91%
Timing Outage
Other Outage
2000-01 CCS7 OUTAGES
67% 33%Other Outages - CCS7
Timing Outages - CCS7
33% of all CCS7
Outages were
Timing Outages
9.4% of all Outages
were from TimingOutages
-
8/3/2019 FG2 Reliability Sept13
18/27
Network Reliability and Interoperability Council
NRSC Timing Outages Task GroupThree New Best Practices
Network Operators and Service Providers should insure thatengineering, design, and installation processes address how newnetwork elements are integrated into the office synchronization
plan.
Network Operators and Service Providers should developmanagement and records keeping tools that accurately track thediversity of internal wiring for office synchronization, includingtiming leads and power.
Network Operators and Service Providers should conduct periodicverification of the office synchronization plan and the diversity oftiming links, power feeds and alarms.
-
8/3/2019 FG2 Reliability Sept13
19/27
Network Reliability and Interoperability Council
NRSC Timing Outages Task Group
Office Inspections and New Procedures
Upgrade all BITS clocks to models capable offull A/B Power redundancy
Verify that BITS is on fully protected power (UPS) with generator, and fedseparately (A/B)
IfD4 channel banks are used for transporting common channel signaling, there arespecial timing considerations:
Redundant SS7 links should be timed from redundant timing sources (e.g., from differentBITS timing output cards).
Typically, all D4 Shelves (e.g., six) can be daisy chained with same BITS clock lead. As such, theredundant SS7 Links should terminate on Bays or Shelves with different timing sources
Periodic tests for BITS switchover should be executed where applicable
Power (A/B)
Input (redundant Clock cards) Output (redundant Timing Output cards)
Alarms (e.g., power, input, output, fuse)
A one-time physical audit of timing redundancy, with special attention to SS7 linkdiversity should be conducted
Any outages, which are determined to have the BITS clock as a contributing cause;whether supplier/service provider/other attributable, should be shared with the
BITS clock supplier to assist that supplier in improving the quality of their product
-
8/3/2019 FG2 Reliability Sept13
20/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2Q02 ReportFCC Reportable Service Outages(by number of events)
38
54
3229
4041
48
38
35
4240
45
4240
47 48
4447
44
35
4852
48
44
4341
34
46 47
52 5552
43
38 39
2928
32
15
25
35
45
55
65
1Q93
3Q93
1Q94
3Q94
1Q95
3Q95
1Q96
3Q96
1Q97
3Q97
1Q98
3Q98
1Q99
3Q99
1Q00
3Q00
1Q01
3Q01
1Q02
Quarter
NumberofOutages
-
8/3/2019 FG2 Reliability Sept13
21/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2Q02 ReportFCC Reportable Service Outages(by outage index)
430
265
318
622
299
618
427
470 555
364
305
481
345
414422
326223
519510
362
411
287
458
246
249
401
376376
440
331
412
300301 286
346
553
675
439
0
100
200
300
400
500
600
700
800
1Q93
3Q93
1Q94
3Q94
1Q95
3Q95
1Q96
3Q96
1Q97
3Q97
1Q98
3Q98
1Q99
3Q99
1Q00
3Q00
1Q01
3Q01
1Q02
Quarter
OutageIndex
-
8/3/2019 FG2 Reliability Sept13
22/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2Q02 ReportIncidents by Failure Category(Common Channel Signaling)
8
5
7 7
3
2 2
5 5
2
3
2
5
14
5
12
1
5
44
5
4
77
66
7
10
14
88
9
77
8 10
0
2
4
6
8
10
12
14
16
1Q93
3Q93
1Q94
3Q94
1Q95
3Q95
1Q96
3Q96
1Q97
3Q97
1Q98
3Q98
1Q99
3Q99
1Q00
3Q00
1Q01
3Q01
1Q02
Quarter
NumberofOutages
-
8/3/2019 FG2 Reliability Sept13
23/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2Q02 ReportIncidents by Failure Category(CO Power)
2
5
9
1
6
3
0
2
13
1
23
55
4
3
5 5
32
1
2
0
2
87 7 7
4 4
7 7 78
6
3
4
0
2
4
6
8
10
12
1Q93
3Q93
1Q94
3Q94
1Q95
3Q95
1Q96
3Q96
1Q97
3Q97
1Q98
3Q98
1Q99
3Q99
1Q00
3Q00
1Q01
3Q01
1Q02
Quarter
NumberofOutage
s
-
8/3/2019 FG2 Reliability Sept13
24/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2Q02 ReportProcedural Error Attributed Outages(by number of events)
101111
14
2019
19
15
29
1617
11
15
18
25
16
1510
26
20
19
13
18
1213
1213
11
13
9
11 6
16
1413 13
9
20
0
5
10
15
20
25
30
35
1Q93
3Q93
1Q94
3Q94
1Q95
3Q95
1Q96
3Q96
1Q97
3Q97
1Q98
3Q98
1Q99
3Q99
1Q00
3Q00
1Q01
3Q01
1Q02
Quarter
N
umberofOutages
-
8/3/2019 FG2 Reliability Sept13
25/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC 2Q02 Report
Based upon analysis of all outages reported from1Q93 through 2Q02, the NRSC notes that:
There is an increasing trend in the number ofCO Power and CCS outages.
There is an increasing trend in the frequency
and aggregated outage index of ProceduralErrors as the root cause of outages.
There is a decreasing trend in the number ofLocal Switch outages.
-
8/3/2019 FG2 Reliability Sept13
26/27
Network Reliability and Interoperability Council
Reliability ReportingNRSC Reports
The NRSC urges all service providers
and equipment vendors to review allbest practices for application in their
operations.
These Best Practices may be found at:http://www.nric.org/
-
8/3/2019 FG2 Reliability Sept13
27/27
Network Reliability and Interoperability Council