film budget format
TRANSCRIPT
-
8/14/2019 film budget format
1/26
Details
Page 1
#
Production Budget Details:
Format: 16 mmLength: min.
Shooting ratio: :1 Title:Producer:
complete length 0 ft. Company:rolls needed 0 rls. Director:
rushes length 0 ft. Budget by:Prep: days Date Prepared:
Shoot: daysPost: weeks
Equip PU:Equip Return:
Test Day:
Only complete fields with a pink background on this page
-
8/14/2019 film budget format
2/26
Details
Page 2
3-Jun-08
-
8/14/2019 film budget format
3/26
"Title" DATE PREPARED 06/03/2008
Page No.3
1 STORY AND SCRIPT SUPPLIER
STORY RIGHTS
WRITER AND SCREENPLAY
TYPING AND DUPLICATION
TOTAL STORY AND SCRIPT
2 PRODUCER & DIRECTOR NAME
EXECUTIVE PRODUCER
PRODUCER
DIRECTOR
EXPENSES
TOTAL PRODUCER AND DIRECTOR
3 PERFORMERS NAME
PERFORMERS
-
8/14/2019 film budget format
4/26
"Title" DATE PREPARED 06/03/2008
Page No.4
EXTRAS
STUNTPERSONS
UNION FEES
OTHER
TOTAL PERFORMERS
4 PRODUCTION STAFF NAME
PRODUCTION MANAGER
ASSISTANT DIRECTOR
PRODUCTION SECRETARY
SCRIPT SUPERVISOR
PRODUCTION ASSISTANTS
DIRECTOR OF PHOTOGRAPHY
CAMERA ASSISTANT
GAFFER
BEST BOY
KEY GRIP
DOLLY GRIP
SOUND MIXER
BOOM OPERATOR
PROD DESIGNER/ART DIRECTOR
ASSISTANT ART DIRECTOR
PROPERTYMASTER
-
8/14/2019 film budget format
5/26
"Title" DATE PREPARED 06/03/2008
Page No.5
WARDROBE SUPERVISOR
MAKEUP ARTIST
SPECIAL EFFECTS
DRIVERS
STILL PHOTOGRAPHER
CASTING DIRECTOR
TOTAL PRODUCTION STAFF
5 LOCATIONS & STUDIO SUPPLIER
TRANSPORTATION
PER DIEMS
PETTY CASH
CATERING
LOCATION FEES AND PERMITS
TRAVEL EXPENSES
STUDIO RENTAL
SET CONSTRUCTION/SUPPLIES
TOTAL LOCATIONS AND STUDIO
6 Quantity PRODUCTION EQUIPMENT SUPPLIER
CAMERA PACKAGE0 Arriflex SR II Body, Magazine & Battery0 Additional Magazines0 Additional Battery0 Extension Viewfinder 0 Digi-Tach
-
8/14/2019 film budget format
6/26
"Title" DATE PREPARED 06/03/2008
Page No.6
0 3x3 Matte Box0 4x4 Matte Box with Hard Mattes0 Arri Bridge Plate0 Follow Focus Kit
0 Light Weight Follow Focus & Rods0 Zeiss 10-100 T2.0/Chroiziel MF 5'0 Canon 8-64 T2.0/Chroiziel MF 2'0 Cooke 9-50 T2.5/Chroiziel MF 18"0 5.9mm Angenieux T2, Shade & 85 Filt.0 9.5mm Zeiss T1.3 MF 10"0 12mm Zeiss T1.3 MF 8"0 16mm Zeiss T1.3 MF 8"0 25mm Zeiss T1.3 MF 10"0 50mm Zeiss T1.3 MF 2'4"0 85mm Zeiss T1.3 MF 3'0 300mm Canon F2.80 Sachtler Studio, Legs & Spreader 0 Sachtler Horizon, Legs & Spreader 0 Sachtler Video 20, Legs & Spreader 0 Baby legs0 Dolly Adaptor 0 High Hat
Filters (3x3):0 85's: (85), 85N3, (85N6), 85N9
0 ND's:N3, N6, N90 Pol's: 85 Pol, (Pol)0 Double Fogs: 1/8, 1/4, 1/2, 1-50 Fogs: 1/8, 1/4, 1/2, 1-50 Black Frosts: 00, (00+), (0), 0+, 1, 1+, 20 White Frosts: 00, 00+, 0, 0+, 1, 1+, 20 Diffusion: 1/8, 1/4, 1/2, 1-50 Black Dot Diff: 1/2, 1, 2, 3, 4, 50 Corals: 1/8, 1/4, 1/2, 1-70 ND Grads: N3, N6
0 Color Enhancer
SOUND PACKAGE1 Nagra IVL, Headsets, Battery & Electric Slate0 Senheisser Shotgun 8050 Sony ECM-50 Lav0 Micron Wireless Transmitter 0 Fishpole
-
8/14/2019 film budget format
7/26
"Title" DATE PREPARED 06/03/2008
Page No.7
0 Microphone Cables 25'
LIGHTING PACKAGE0 12K HMI
0 6K HMI0 4K HMI0 2500W HMI0 1200W HMI0 575W HMI0 200W HMI0 2500W HMI PAR0 1200W HMI PAR0 4K HMI Xenon0 2K HMI Xenon0 2000W IANIRO BLONDE with scrims0 1000W IANIRO REDHEAD with scrims0 2000W FRESNEL with doors, scrims0 1000W FRESNEL with doors, scrims0 500W Arri, doors & snoots0 300W Arri, doors & snoots0 2000W SOFTLIGHT with grid0 1000W SOFT with grid0 Zoom Lekolite0 4x2 Fluorescent Fix 48"lamps0 Sungun, 200W HMI & Extra Batteries
0 Sungun, Tungsten & extra battery0 Dedo light0 Mini-Cool Kit0 Stick Up Kit0 Portable Location Kit:4-650W,Stands, AC0 Light Weight Stands0 2K Stands0 5K Senior Sky High Stands0 Wind Up Stand0 750 Hangers
0 2K Hangers0 Gaffer Grip0 Mafer Grip0 Extension Chords 25'0 2K Dimmer 0 60 KVA AC Blimped Generator 0 6.5K Honda Generator
Tie-In, Seaway, Boxes, etc.
-
8/14/2019 film budget format
8/26
"Title" DATE PREPARED 06/03/2008
Page No.8
DOLLY & GRIP PACKAGE0 Cinejib Crane with Dolly0 Chapman Pee Wee
0 Elemack0 La Grue Crane0 Straight Tracks 8'0 Curved Tracks0 Grip Stands/Head0 Sky-High Grip Stand and Head0 Grip Box (18x24)0 Grip Box (24x30)0 6x6 Butterfly Set0 12x12 Butterfly Set0 12x12 Black Cloth0 4x8 Bamboola0 Ianiro Pole Cat, Long0 Ianiro Pole Cat, Short0 Sandbags0 Wedges (box)0 2-4-6 (box)0 Full Apple Boxes0 Half Apple Boxes0 Quarter Apple Boxes0 Step Ladder (6')
0 Step Ladder (10')0Fan0 Fog Machine
CAMERA, LIGHTING & GRIP PURCHASES0 Gaffer Tape 2"0 White Camera Tape 1"0 Black Camera Tape 1"0 Exposed Film Tape0 Arri Eye Cup
0 Dulling Spray0 Foamcore Large0 Tracing Paper roll 48"0 Clothes Pins0 Camera Reports0 Cans & Bags0 Cleaning Fluid & Lens Tissue0 Dust Off
-
8/14/2019 film budget format
9/26
"Title" DATE PREPARED 06/03/2008
Page No.9
0 Markers, Sharpies0 Light Gel Rolls & Sheets:0 Black Scrim #3421 roll0 Black Wrap 24"x25" roll
0 RoscoSun 85/34010 RoscoSun 1/2 CTO/34080 Light Bastard Amber/010 Tough MT2/31020 Golden Amber/210 Pale Amber Gold/090 Straw/120 Deep Straw/150 Full Blue/32020 Half Blue/32040 Tough White Flame Green/31100 Opal Tough Frost/30100 Light Tough Spun/30070 Rosco N6/34030 Fire/190 Broadway Pink/3390 Lavender/570 Primary Blue/800 Kelly Green/94
TOTAL PRODUCTION EQUIPMENT
7 RAW STOCK
16MM NEGATIVE
1/4" AUDIO STOCK
PROMO STILLS35mm Stock & Lab
TOTAL RAW STOCK
8 LABORATORY
PROCESSING
WORKPRINT
-
8/14/2019 film budget format
10/26
"Title" DATE PREPARED 06/03/2008
Page No.10
SOUND TRANSFERS
TOTAL LABORATORY
9 MISCELLANEOUS
SET DRESSING PURCHASES & RENTALS
PROPS PURCHASES & RENTALS
WARDROBE PURCHASES & RENTALS
OFFICE AND PHONE
POSTAGE AND COURIERS
ACCOUNTING/LEGAL/INSURANCE
AUDITION EXPENSES
TESTS & RETAKES
PUBLICITY
TOTAL MISCELLANEOUS
10 SOUND AND MUSIC
COMPOSER
STOCK MUSIC AND SOUND EFFECTS
STUDIO COSTS
FOLEY/ADR
ADD'T SOUND TRANSFERS
SOUND MIXMixing Theatre35mm Sound Stock
-
8/14/2019 film budget format
11/26
"Title" DATE PREPARED 06/03/2008
Page No.11
TOTAL SOUND AND MUSIC
11 EDITING AND FINISHING
EDITING STAFFEditor Assistant Editor Sound Editor
CUTTING ROOM RENTAL
SUPPLIES, FILL, LEADERS
EDGE NUMBERS AND CODING
MAIN/END TITLES
OPTICALS
VIDEOS & SCRATCH PRINTS
NEGATIVE CUTTING
PRINTINGAnswer Print (includes B roll)
IntermediateOptical Sound (transfer & stock)
REELS, CANS AND CASES
FILM TO TAPE TRANSFERLow Con Print1" Video Transfer 1" Video Tape
TOTAL EDITING AND FINISHING
-
8/14/2019 film budget format
12/26
"Title" DATE PREPARED 06/03/2008
Page No.12
-
8/14/2019 film budget format
13/26
"Title" DATE PREPARED 06/03/2008
Page No.13
No. days/weeks Rate Total
0.00
No. days/weeks Rate Total
0.00
No. days/weeks Rate Total
0.00
0.000.000.000.000.000.000.000.000.000.00
0.000.000.000.000.000.000.00
-
8/14/2019 film budget format
14/26
"Title" DATE PREPARED 06/03/2008
Page No.14
0.00
No. days/weeks Rate Total
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-
8/14/2019 film budget format
15/26
"Title" DATE PREPARED 06/03/2008
Page No.15
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0.00
No. days/weeks Rate Total
0.00
0.00
No. days/weeks Rate Total
0 285.00 0.000 55.00 0.000 30.00 0.000 50.00 0.000 125.00 0.00
-
8/14/2019 film budget format
16/26
"Title" DATE PREPARED 06/03/2008
Page No.16
0 30.00 0.000 55.00 0.000 25.00 0.000 60.00 0.00
0 45.00 0.000 225.00 0.000 225.00 0.000 275.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 75.00 0.000 225.00 0.000 135.00 0.000 105.00 0.000 70.00 0.000 25.00 0.000 10.00 0.002 5.00 0.00
0 6.00 0.00
0 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 6.00 0.000 10.00 0.000 6.00 0.000 8.00 0.00
0 10.00 0.00
0 50.00 0.000 25.00 0.000 20.00 0.000 55.00 0.000 17.00 0.00
-
8/14/2019 film budget format
17/26
"Title" DATE PREPARED 06/03/2008
Page No.17
0 2.50 0.00
0 550.00 0.00
0 490.00 0.000 285.00 0.000 190.00 0.000 150.00 0.000 100.00 0.000 75.00 0.000 300.00 0.000 175.00 0.000 600.00 0.000 300.00 0.000 44.00 0.000 30.00 0.000 55.00 0.000 36.00 0.000 32.00 0.000 32.00 0.000 40.00 0.000 23.00 0.000 20.00 0.000 15.00 0.000 160.00 0.00
0 65.00 0.000 30.00 0.000 20.00 0.000 35.00 0.000 100.00 0.000 3.00 0.000 3.00 0.000 6.00 0.000 20.00 0.000 1.50 0.00
0 2.50 0.000 2.50 0.000 2.50 0.000 1.00 0.000 10.00 0.000 550.00 0.000 75.00 0.00
0.00
-
8/14/2019 film budget format
18/26
"Title" DATE PREPARED 06/03/2008
Page No.18
0 650.00 0.000 300.00 0.00
0 200.00 0.000 150.00 0.000 12.00 0.000 15.00 0.000 6.00 0.000 12.00 0.000 40.00 0.000 55.00 0.000 48.00 0.000 70.00 0.000 22.00 0.000 10.00 0.000 7.50 0.000 5.00 0.000 1.00 0.000 5.00 0.000 5.00 0.000 1.00 0.000 1.00 0.000 1.00 0.000 8.00 0.00
0 12.00 0.000 30.00 0.000 60.00 0.00
12.00 0.0010.00 0.0010.00 0.0010.00 0.00
3.00 0.00
10.00 0.0015.00 0.0030.00 0.00
3.00 0.000.00 0.000.00 0.006.00 0.00
14.00 0.00
-
8/14/2019 film budget format
19/26
"Title" DATE PREPARED 06/03/2008
Page No.19
5.00 0.000.00 0.00
150.00 0.0040.00 0.00
8.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.008.00 0.00
0.00
Quantity Rate Total
0 135.00 0.000
0 10.00 0.00
0.00
No. feet Rate Total
0 0.184 0.00
0 0.315 0.00
-
8/14/2019 film budget format
20/26
"Title" DATE PREPARED 06/03/2008
Page No.20
0 0.160 0.00
0.00
Quantity Rate Total
0.00
Quantity Rate Total
365.00 0.000.180 0.00
-
8/14/2019 film budget format
21/26
"Title" DATE PREPARED 06/03/2008
Page No.21
0.00
No. days/weeks Rate Total
0.000.000.00
0 300.00 0.00
0 0.020 0.00
0 0.730 0.00
0 0.520 0.00450.00 0.00
4.50 0.00
0.00
0.00
-
8/14/2019 film budget format
22/26
"Title" DATE PREPARED 06/03/2008
Page No.22
-
8/14/2019 film budget format
23/26
estimated BUDGET SUMMARYfor 0
project title 0producer 0
director 0
budget by 0approved byprepared 30-Dec-99
prep period: 0 daysshoot period:0 days
post period: 0 weeks
format: 16mmlength (min): 0
NO. DESCRIPTION
1 STORY AND SCRIPT
2 PRODUCER AND DIRECTOR
3 PERFORMERS
4 PRODUCTION STAFF
5 LOCATIONS AND STUDIO
6 PRODUCTION EQUIPMENT
7 RAW STOCK
8 LABORATORY
9 MISCELLANEOUS
Sub Total
10 SOUND AND MUSIC
11 EDITING AND FINISHING
Sub Total
Total
-
8/14/2019 film budget format
24/26
Contingency 10%
Grand Total
-
8/14/2019 film budget format
25/26
Totals Totals
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
8/14/2019 film budget format
26/26
0.00
0.00