Page 1: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

Ph

oto

s:

© E

DF

med

ia l

ibra

ry -

Ale

xis

MO

RIN

/ A

nto

ine

SO

UB

IGO

U / A

ll r

igh

ts r

eserv

ed

Fla

man

vil

le 3

co

ns

tru

cti

on

gro

up

, C

om

mu

nic

ati

on

Team

.

FLAMANVILLE 3 EPR Relive the major highlights of the year 2016 in photos!

Page 2: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

January 2016 Implementation of the first operating tests on a part of the Component Cooling

System in the nuclear part of the plant.

Page 3: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

January 2016 Installation of a pylon hosting the telecoms system of the future site emergency

response centre.

Page 4: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

February 2016 Entry of the reactor vessel head in the reactor building.

Page 5: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

February 2016 The sluice gate, 12.6 m high and 7.5 m wide, separates the reactor pool into two

compartments: the reactor cavity and the reactor vessel internals stand.

Page 6: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

The mechanical assembly

operations on Flamanville EPR

main primary system were

completed. This stage marked

achievement of the first key

milestone laid down by the EDF

Group in September 2015.

March 2016

Page 7: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

March 2016 Installation of the refuelling machine. As indicated by its name, this tool is used in the

operating phase to load the fuel in the reactor vessel with the telescopic mast.

Page 8: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

April 2016

The two metal decks each weighing 38 tonnes, enabling the personnel to access the

steam generators and continue mechanical assembly operations were installed.

Page 9: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

April 2016 The concrete mixing plant left the construction site permanently. This departure

marked the end of the main building structure works, giving way to the finishing

works.

Page 10: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

May 2016 Installation of the filter handling machine for the different nuclear island systems in the

effluent treatment building.

Page 11: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

May 2016 Closing of the equipment hatch, through which all the building equipment was

transported, especially the major components of the main primary system.

Page 12: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

June 2016 Welding work on the piping of one the plant safety systems.

Page 13: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

June 2016 After significant updating of plant configuration carried out since the start of the

year, the plant I & C system was returned to service.

Page 14: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

July 2016 Connection of the piping for measurement of nuclear island gaseous effluent. An

activity carried out by rope access professionals.

Page 15: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

July 2016 After three concreting lifts, the fuel building handling tower was closed off.

Page 16: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

August 2016 On 1 August, the future EPR shift crews took up their first functions in the control

room to ensure monitoring and operation of certain plant systems: a significant stage

for the construction site, signalling the start of the operating and test phases.

Page 17: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

August 2016 Turbine rotational testing. This involved rotation of the turbine connected to the

generator at 5 revs per hour to check good working order of the equipment.

Page 18: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

September 2016 After removal of all the dome access walkways, the last mobile crane left the EPR

construction worksite.

Page 19: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

September 2016 Cabling of the Safety and Information Control System (SICS) in the control room.

Within the framework of this specific activity, it is admissible not to wear gloves.

Page 20: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

October 2016 Entry of the spent fuel racks. The purpose of these stainless steel parts, each one

weighing between 7 and 16 tonnes, is to store spent fuel in the spent fuel pool

compartment.

Page 21: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

October 2016 Start-up of testing on the Reactor Water and Boron Makeup System.

Page 22: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

October 2016 Testing was continued in the pumping station. Filling of the plant cooling systems with

water for leak testing.

Page 23: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

November 2016 Connection of the signals between the I & C system and the different items of plant

was tested from the control room.

Page 24: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

November 2016 Cleaning of the piping prior to connection to the diesel generator motors.

Page 25: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

November 2016 Installation of the first control rod drive mechanisms on the reactor vessel head.

Page 26: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

December 2016 Rotational testing of one of the two filter drums filled with water in the pumping

station.

Page 27: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

December 2016 Measurement performed within the framework of rotational testing on one of the

motors on the turbine lubrication and jacking system in the turbine hall.

Page 28: FLAMANVILLE 3 EPR · Relive the major highlights of the year 2016 in photos! January 2016 Implementation of the first operating tests on a part of the Component Cooling System in

EDF Flamanville 3 wishes you season's greetings and a happy new year.