form -1 mining plan & pre-feasibility reporta.sakthivel. the salient features of the proposal...
TRANSCRIPT
FORM -1
MINING PLAN &
PRE-FEASIBILITY REPORT
TO OBTAIN ENVIRONMENTAL CLEARANCE
FOR QUARRYING OF ROUGH STONE (Extent: 2.45.0Ha)-B2 Project
IN
S.F.No: 219 (P) (Bit -2) (Western side)
Village: Kutlamparai
Taluk: Paramathi - Velur
District: Namakkal
State: Tamilnadu
SUBMITTED TO
State Level Environment Impact Assessment Authority (SEIAA),
Government of Tamilnadu
Chennai
SUBMITTED BY
A.Sakthivel,
S/o.Arunachalam,
No.17, Dr.Sankaran Road,
Gandhi Nagar Extension,
Namakkal District - 637001.
INDEX FILE
S.No DESCRIPTION PAGE
NOS
1 To Obtain Environmental Clearance 3
2 Environmental Clearance Format 5-9
3 Declaration Letter 11
4 Demand Draft 13
5 Form-1 15-51
6 Approved Mining Plan along with
Approval Letter 53- 139
7 Pre-Feasibility Report 141-187
8 VAO signed for Quarry site 171
9 Baselines Studies 189-201
10 Affidavit Document 203-207
11 Copy of Explosive License 209-211
12 Consolidated Above Document In
PDF Format (DVD)
212
To consider the proposal for the grant of Environmental Clearance for Rough stone quarrying in at
S.F.No: 219 (P) (Bit -2) (Western side) of Kutlamparai Village in Paramathi - Velur Taluk,
Namakkal District by Thiru. A.Sakthivel,
The Proposal is for mining of Rough stone by Thiru. A.Sakthivel. the salient features of the proposal
are as follows:
S.No: Details of the proposal : Data furnished Page No:
1.
Name of the owner/Firm
:
A.Sakthivel,
S/o.Arunachalam,
No.17, Dr.Sankaran Road,
Gandhi Nagar Extension,
Namakkal District - 637001
Mobile No: 9043563252, 9443344287
19,53,109,14
1
2. Type of quarrying (Savudu/Rough
stone/ Sand/Granite) :
It is a Rough stone quarry project in Kutlamparai
Village.
17,53,109,14
1
3. S.F.No of the quarry site with area
break up :
219 (P) (Bit -2) (Western side) 17,53,109,14
1
4. Village in which situated
: Kutlamparai Village 17,53,109,14
1
5. Taluk in which situated
: Paramathi - Velur Taluk 17,53,109,14
1
6. District in which situated
: Namakkal District 17,53,109,14
1
7. Extent of quarry (in ha)
2.45.0Ha 17,53,109,14
1
8. Period of quarrying proposed
: Five years only. 53,71,109,11
1
9. Production (Quantity in m
3)
: The proposed quantity of reserves is 54175m
3 of
Rough stone for a period of Five years only.
17,77,81,143
10. Latitude and Longitude of all corners
of the quarry site :
11o10’9.31”N to11
o10’15.88”N
78o6’43.03”E to 78
o06’50.27”E
17,73,145
11. Topo sheet No : 58 -I/04 17,73,145
12. Precise area communication approved
by the District Collector with date : Roc.No.179/Mines/2016 Dated: 03.03.2016. 109
13. Mining plan approved by the Deputy
Director of the District with date :
Roc.No.179/Mines/2016 Dated: 04.03.2016. 53
14.
Water Requirement:
1. Drinking & Domestic
purpose (in KLD)
2. Dust suppression & Green
Belt (in KLD)
;
Purpose Quantity
KLD
Source
Drinking 0.3KLD Water vendors
Domestic purpose 0.3KLD Existing borehole on
near the quarry area
Dust suppression
and Afforestation
0.4KLD Existing borehole on
near the quarry area
33,91,167
15. Depth of quarrying : Proposed depth up to 11m above the ground level. 17,89,145
16.
Project cost (Excluding EMP cost)
:
The total Project cost (A+B+C) and including CSR
cost is about Rs.71,34,000/- (Rupees Seventy one
lakhs thirty four thousand only)
103,183
17. EMP cost
: The EMP cost is about Rs.7,60,000/- (Rupees Seven
lakhs sixty thousand only)
103,183
Checklist for Mining of Minor Mineral 2.45.0Ha mine lease area
S.No: Details of the proposal : Data furnished Page No:
1. Name of the owner/Firm A.Sakthivel, 19,53,109
,141
2.
Correspondence Address with Pin
Code
S/o.Arunachalam,
No.17, Dr.Sankaran Road,
Gandhi Nagar Extension,
Namakkal District - 637001.
3. Email Address [email protected] 19,151
4. Mobile Number 9043563252, 9443344287 19,151
5. Type of quarrying
(Earth/ Rough stone/Sand/Granite)
It is a Rough stone quarry project in Kutlamparai
village.
17,53,109
,141
6.
S.F. No of the Quarry site S.F.No:219 (P) (Bit -2) (Western side) of
Kutlamparai Village in Paramathi - Velur Taluk,
Namakkal District
17,53,109
,141
7. Village, Town Panchayat/ Panchayat
Union in which situated
Village : Kutlamparai
Panchayat Union : Paramathi - Velur
17,53,109
,141
8. Taluk in which situated Paramathi - Velur Taluk 17,53,109
,141
9. District in which situated Namakkal District 17,53,109
,141
10. Extent of quarry (in Ha) 2.45.0Ha 17,53,109
,141
11. New or existing quarry It is a New Proposal Rough Stone Quarry in
Kutlamparai Village.
17,53,109
,145
12.
If in case of existing Rough Stone/
Blue Metal/ Granite Quarry, the
length, width and depth to which
quarrying has already been done
(below the ground level/ above the
ground level)
It is a New Proposal Rough Stone Quarry in
Kutlamparai Village.
17,53,109
,145
13. If quarrying had been done below the
ground level/above the Ground level,
the height of quarrying already done
It is a New Proposal Rough Stone Quarry in
Kutlamparai Village.
17,53,109
,145
14.
Name of the owner who had earlier
undertaken the quarrying & a copy of
mining lease issued with date, if he is
different from the present applicant
It is a New Proposal Rough Stone Quarry in
Kutlamparai Village.
17,53,109
,145
15.
Proof of land ownership.
If owned patta copy.
If not own patta land agreement/ lease
copy entered with the owner (to be
enclosed) details
It is a Government land the applicant has awarded
tender from the Government.
73,115,11
7,119,121
16. Period of quarrying proposed Five years only. 53,71,109
17.
Production (quantity in m3) The proposed quantity of reserves is to be mined is
54175m3 (or) 9572 Lorry Load of Rough stone up to
depth for 11m above the ground level for a period of
Five years only.
Description
Rough
stone
in m3
Topsoil
in m3
Geological Resources 370800 24048
Available Mineable reserves 230375 20864
Five years plan period
As in the approved mining plan
54175 10880
17,77,81,
143
18.
Method of Mining
The quarrying operation will be carried out by
Opencast Semi - Mechanized Method in conjunction
with conventional method of mining using Manual
jackhammer drilling, slurry explosives blasting and
transportation of Rough stone to the needy
Residential and industrial customers.
79,145
19.
Top soil/ Overburden in case of Rough
Stone/ Blue Metal
The overburden in the form of Topsoil, the topsoil
formation has been removed during previous quarry
operation Hence there is no proposing of removal of
topsoil for this plan period.
79,81
20. Quantity of rejects in m3 in case of
Granite Mining.
There is no rejects. 79,81
21.
Length, Width, Depth & Proposed
Quarry in meters.
Conceptual plan:
Description Length
(Max)
(m)
Width
(Max)
(m)
Depth
(Max)
(m)
Conceptual 75 128 11
83
22.
Land use pattern for a radius of 1Km
around the quarry site such as
Agriculture, Habitation etc.,
Poultry Farm – 20%
Trees / Barren Land – 20%
Hill area – 05%
Seasonal Agri land – 25%
Roads – 15%
Habitation – 15%
131
23. Details of other quarries for a radius of
1Km, around the quarry site
There are no quarries within 500m radius. 131,173,
205
24.
Aerial distance from periphery of the
site to the nearest habitation,
Structures, Temples etc.,
The Nearest habitation is Rasampalayam village
which is about 1km on the North eastern side of the
area.
47,95,175
25.
Aerial distance to the interstate
borders, in case of Rough Stone/ Blue
Metal/ Granite quarry to be obtained
from IRS, Anna University.
There is no interstate boundary within the radius of
15km.
47,147,
173
26.
In case of Rough Stone/ Blue Metal/
Granite quarry no objection certificate
from the concerned district Forest
Officer/ Wild Life Sanctuaries/
National Parks/ HACA/ Western
Ghats region if the quarry site is within
There are no wild life sanctuaries, Western Ghats,
National parks, HACA, within the radius of 15km.
47,147,
173
15 Kms of these areas.
27.
Aerial distance to the nearest eco-
sensitive areas, CRZ, Forests,
Monuments etc., within 15Kms of
these areas.
There is no eco- sensitive areas, Reserved forest,
CRZ, Monuments etc., within the radius of 15km.
47,147,
173
28. Latitude and Longitude of all corners
of the quarry site.
11o10’9.31”N to11
o10’15.88”N
78o6’43.03”E to 78
o06’50.27”E
17,73,145
29. Topo Sheet No 58 -I/04 17,73,145
30.
Copy of explosives license and a
consent letter/ agreement of competent
recognized person who has agreed to
handle explosive for the blasting, in
case of Rough Stone/ Blue Metal/
Granite quarry.
A copy of explosive license and consent letter
enclosed.
209,211
31.
Brief details of APC measures
proposed to be proposed to be
implemented.
The Air quality will be affected during the quarrying
period due to blasting and jackhammer drilling,
which will be within prescribed limits. Air quality
will be monitored periodically as per norms and
Mitigation measures will be carried out to prevent
dust and air propagation in to air.
Mist water spraying will be carried out to
suppress dust.
95
32.
Mine Closure Plan to be furnished in
Mining plan.
There is no proposal for back filling, reclamation and
rehabilitation. The quarry pit will be fenced by
barbed wire to prevent inherent entry of public and
cattle. The quarried out pit will be allowed to collect
rain and seepage water which will act as a reservoir
for storage. This water storage will enhance the static
level and ground water recharge on nearby wells.
103
33. Mining plan prepared by (Xerox copy
of certificate to be attached)
RQP certificate with validity is enclosed as Annexure
No: VII
55,107,12
5
34. Precise area communication approved
by the District Collector
The Precise area communication letter was received
from the District Collector, Namakkal vide
Roc.No.179/Mines/2016 Dated: 03.03.2016.
109
35.
Mining plan approved by the Deputy/
Assistant Director of the District.
The mining plan was approved by the Deputy
Director, Department of Geology and Mining
Namakkal vide Roc.No.179/Mines/2016 Dated:
04.03.2016.
53
36.
Water requirement :
a) Drinking & domestic purposes
in KLD.
b) Dust suppression (in KLD)
c) Green belt (in KLD)
Drinking Water &
Domestic purpose - 0.3 KLD
Dust Suppression - 0.3 KLD
Green belt - 0.4 KLD
Total - 1 KLD
33,167
37.
Source of water Purpose Sources
Drinking &
Domestic
Purpose
Water purchase from approved
water vendor available in
Rasampalayam village is 1km on
the North eastern side of the area.
Dust
suppression
From Existing Borehole on nearby
the quarry area
Green belt
development
From Existing Borehole on nearby
the quarry area
33,167
38. Ground water table The Ground water table is about 50mt depth from
ground level.
29,93,145
39.
Project Cost (excluding EMP Cost) The Project cost:
A. Fixed asset cost =Rs. 40,00,000/-
B. Operational cost = Rs.22,00,000/-
C. EMP cost = Rs. 7,60,000/-
CSR Cost = Rs. 1,74,000/-
Total cost = Rs. 71,34,000/-
The total Project cost (A+B+C) and including CSR
cost is about Rs.71,34,000/- (Rupees Seventy one
lakhs thirty four thousand only)
103,183
40. EMP Cost The EMP cost is about Rs.7,60,000/- (Rupees Seven
lakhs sixty thousand only)
103,183
41. Disclosure RQP M. IfthikharAhmed,M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
55,107,12
5
42. Soft copy of the Form–I,
Pre –feasibility report and Mining plan
in CD.
There is enclosed Soft copy for form – I, Pre –
feasibility report and mining plan in CD.
212
43.
Key map showing the approach roads
to the site to be attested by the Deputy/
Assistant Director of Geology and
Mining of the concerned District.
The Key map showing with approach roads to the
site is enclosed Plate No: 1B
133
44.
Village map with S.F. Nos& salient
features such as vegetation, habitations
etc., for a radius of 500m around the
quarry site.
Village map with S.F.No and Salient features such as
vegetation, habitation etc., for 500mt radius is
enclosed as Plate No. IC
131,203,2
05
45.
If lakes, Ponds, river, nallah, odai etc.
are situated near the quarry site
permission from the concerned PWD
authorities for mining
There are no major water bodies like river, pond,
lake, etc., within 500m radius.
Singilipatti Lake is situated 6km away from the NE
side of the area.
Thirumanimutharu River is situated within 9km
away from the NW side of the area.
Kaveri River is situated 10km away from the SW
side of the area.
47,147,17
3
46.
Section map for mining to be attested
by the Deputy/ Assistant Director of
Geology and Mining of the concerned
District.
The Geological Plan and section in 1:1000 & 1:500
scale is enclosed
137
47. Photograph of the proposed Mining
site with S.Nos and break – up –
details attested by VAO or a senior
The Photo of the Mines site attached by VAO is
enclosed.
171
official.
48. Form –I To be signed by applicant I am hereby signed 51
49. Pre- Feasibility Report to be signed by
Both applicant and RQP.
Pre-feasibility report has been signed by the applicant
and RQP
187
50.
First and last page and the page at
which quantity of mining has been
worked out to be signed by the
Deputy/Assistant Director of Geology
and Mining of the concerned District.
First page and last page and the quantity proposed in
the plan have been signed by the Deputy Director of
Geology and Mining.
69,107
51. Affidavit from the applicant that child
labour is not being employed in the
mining activity.
There is no child labor using in this quarry and
enclosed affidavit Annexure - II
203,205
52.
Affidavit from the applicant regarding
planting of trees around the quarry site
in fulfillment of the Green belt
commitment furnished.
Affidavit from the applicant regarding the proposal
for planting trees around the quarry and fulfillment of
greenbelt commitment is enclosed Annexure -II
203,205
53. Details (POD) Regarding
communicating the proposal to the
members of the committee.
1. Signature of the applicant
A.Sakthivel,
2. Signature of the Recognized qualified person
M. IfthikharAhmed,M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
KUTLAMPARAI ROUGH STONE QUARRY LEASE APPLIED AREA (2.45.0HA)
The proponent Thiru. A.Sakthivel, has applied for Environmental clearance for the proposed quarry
Rough stone for over an extent of 2.45.0Ha in S.F.No: 219 (P) (Bit -2) (Western side) of
Kutlamparai Village in Paramathi - Velur Taluk, Namakkal District and Tamilnadu.
Salient features of the proposal are as follows:
S.No Details of the proposal : Data furnished Page No
1. Name of the Owner + Firm : A.Sakthivel,
S/o.Arunachalam,
No.17, Dr.Sankaran Road,
Gandhi Nagar Extension,
Namakkal District - 637001
Mobile No: 9043563252, 9443344287
19,53,109,
141
2. Location of the quarry-
S.F.No.
: S.F.No:219 (P) (Bit -2) (Western side) of
Kutlamparai Village in Paramathi - Velur Taluk,
Namakkal District
17,53,109,
141
3. Purpose of Application : It is a New Proposal Rough Stone Quarry in
Kutlamparai Village.
17,53,109,
141
4. Extent of quarry in Ha- : 2.45.0Ha 17,53,109,
141
5. Land use planning
a) Mining b) Storage of Topsoil over
burden
c) Infrastructure Road d) Utilized Area
Total
: Description
Present
Area
(Ha.)
Area at the
end of lease
period (Ha.)
Area under Quarrying Nil 0.97.0
Infrastructure Nil 0.01.0
Roads Nil 0.02.0
Green Belt Nil 0.12.0
Unutilized 2.45.0 1.33.0
Grand Total 2.45.0 2.45.0
23,93,177
6. Production (quantity in m3) : The proposed quantity of reserves is to be mined
is 54175m3 (or) 9572 Lorry Load of Rough stone
up to depth for 11m above the ground level for a
period of Five years only.
Description
Rough
stone
in m3
Topsoil
in m3
Geological Resources 370800 24048
Available Mineable reserves 230375 20864
Five years plan period
As in the approved mining
plan
54175 10880
17,77,81,143
7. Top soil & overburden
(quantity in m3)
: The overburden in the form of Topsoil, the topsoil
formation has been removed during previous quarry operation Hence there is no proposing of
removal of topsoil for this plan period.
79,81
8. Method of Mining : The quarrying operation will be carried out by Opencast Semi - Mechanized Method in
conjunction with conventional method of mining
using Manual jackhammer drilling, slurry
explosives blasting and transportation of Rough
stone to the needy Residential and industrial
customers.
79,145
9. Life of Mine as per approved
mining plan
: Five years only. 53,71,109
10. Height / width of the bench : Height 5.0m & Width 5.0m 23,79,163
11. Source of water / quantity required :
Quantity
required
(in litres)
Source 33,91,167
37,43,179
a. Drinking and Domestic
Purpose
0.3KLD Approved Water vendors
b. Dust Suppression
0.3KLD Existing borehole on near the quarry area
c. Green belt development 0.4KLD Existing borehole on near the quarry
12. Waste water
Sewage water
Mode of disposal
:
:
There is no waste water.
37,43,179
The septic tank is constructed on permanent
structure with in the quarry lease area.
To local Panchyat Authority
13. APC Measures : 1.Mist Spray using water tankers,
2. Enclosed covered system. (Tarpaulin) for
transportation.
39
14. Ariel distance of nearest habitation
: S.
No
Name of the
Village
Approximate
distance &
Direction from
lease applied area
Approximate
population
1. Rasampalayam 1.0km - NE 600
2. Madakasampatti 2.5km - SE 300
3. Valliyappampatti
Pudur 1.5km - SW 400
4. Thattankuttai 2.5km- NW 300
47,95,175
15. Ariel distance from Reserve
forest, Sensitive areas, Forest,
Bird sanctuaries, Wild life
sanctuaries, National parks,
Monuments etc., within 15km
Reserved Forest - Nil
Wildlife sanctuary - Nil
Bird Sanctuaries – Nil
National Park – Nil
Monuments – Nil
47,147,173
16. Land owner ship document
Own patta land
Lease Govt. Poromboke
:
: :
It is a Government land the applicant has awarded
tender from the Government.
75,115,117
,119,121
17. Land use classification : It is a New Proposal Rough Stone Quarry in
Kutlamparai Village.
53,109
18. Mining plan
Prepared by
:
M. IfthikharAhmed,M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
55,107,125
Approved by : The mining plan was approved by the Deputy
Director, Department of Geology and Mining Namakkal vide Roc.No.179/Mines/2016 Dated:
04.03.2016.
53
19. Precise area statement
Approved by
: The Precise area communication letter was
received from the District Collector, Namakkal
vide Roc.No.179/Mines/2016 Dated: 03.03.2016.
109
20. Nearby quarries : There are no quarries within the radius of 500m. 131,205
21. Nearby lake / river/ odai /
channel etc.
: There are no major water bodies like river, pond,
lake, etc., within 500m radius. Singilipatti Lake is situated 6km away from the
NE side of the area.
Thirumanimutharu River is situated within 9km
away from the NW side of the area.
Kaveri River is situated 10km away from the SW
side of the area.
47,147,173
22. Latitude / Longitude : 11o10’9.31”N to11
o10’15.88”N
78o6’43.03”E to 78o06’50.27”E 17,73,145
23. GI Sheet No. : 58 -I/04 17,73,145
24. Project Cost(Project cost +
EMP cost)
: The Project cost:
A. Fixed asset cost =Rs. 40,00,000/-
B. Operational cost = Rs.22,00,000/-
C. EMP cost = Rs. 7,60,000/- CSR Cost = Rs. 1,74,000/-
Total cost = Rs. 71,34,000/-
The total Project cost (A+B+C) and including CSR cost is about Rs.71,34,000/- (Rupees
Seventy one lakhs thirty four thousand only)
103,183
25. EMP Cost (Capital and
recurring)
: The EMP cost is about Rs.7,60,000/- (Rupees
Seven lakhs sixty thousand only)
103,183
26. Water table : The Ground water table is about 50mt depth from
ground level.
29,93,145
27. Interstate boundary : There is no interstate boundary situated within the
radius of 15km.
47,147,173
28. Western Ghats : There is no Western Ghats region within the
radius of 15km.
47,147,173
From:
A.Sakthivel,
S/o.Arunachalam,
No.17, Dr.Sankaran Road,
Gandhi Nagar Extension,
Namakkal District - 637001
Mobile No: 9043563252, 9443344287
To
THE CHAIRMAN,
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,
PANAGAL BUILDING, SAIDAPET,
CHENNAI.
Sir,
Sub: Submission of Approval Mining Plan (Roc.No.179/Mines/2016 Dated:
04.03.2016) Form–I and Pre-feasibility report for obtaining Environmental
Clearance for our Kutlamparai Rough stone Quarry - Reg.,
*****
I am here by submitting the processing fee in the form of demand draft for rupees Twenty
thousand, along with Form -I, Pre-feasibility report and Copy of Approved mining plan to your
good office for obtaining clearance from SEIAA, Chennai, for our Kutlamparai Rough stone
Quarry Lease applied area for over an extent of 2.45.0Ha located in S.F.No: 219 (P) (Bit -2)
(Western side) of Kutlamparai Village in Paramathi - Velur Taluk, Namakkal District,
Tamilnadu- Reg.,
I have submitted all the relevant documents to your good office to the best of our
knowledge. If any clarifications are required, we are ready to submit the same to your office at
your convenient time. Also we are ready to present the project in front of the committee.
Hence we request your good office to kindly process our application and allow us to
present our project at the earliest.
Thanking you.
Yours sincerely
A.Sakthivel,
Place: Namakkal
Date: 19.03.2016