FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent: 2.45.0Ha)-B2 Project IN S.F.No: 219 (P) (Bit -2) (Western side) Village: Kutlamparai Taluk: Paramathi - Velur District: Namakkal State: Tamilnadu SUBMITTED TO State Level Environment Impact Assessment Authority (SEIAA), Government of Tamilnadu Chennai SUBMITTED BY A.Sakthivel, S/o.Arunachalam, No.17, Dr.Sankaran Road, Gandhi Nagar Extension, Namakkal District - 637001.

Upload: hoangdat

Post on 16-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

FORM -1

MINING PLAN &

PRE-FEASIBILITY REPORT

TO OBTAIN ENVIRONMENTAL CLEARANCE

FOR QUARRYING OF ROUGH STONE (Extent: 2.45.0Ha)-B2 Project

IN

S.F.No: 219 (P) (Bit -2) (Western side)

Village: Kutlamparai

Taluk: Paramathi - Velur

District: Namakkal

State: Tamilnadu

SUBMITTED TO

State Level Environment Impact Assessment Authority (SEIAA),

Government of Tamilnadu

Chennai

SUBMITTED BY

A.Sakthivel,

S/o.Arunachalam,

No.17, Dr.Sankaran Road,

Gandhi Nagar Extension,

Namakkal District - 637001.

INDEX FILE

S.No DESCRIPTION PAGE

NOS

1 To Obtain Environmental Clearance 3

2 Environmental Clearance Format 5-9

3 Declaration Letter 11

4 Demand Draft 13

5 Form-1 15-51

6 Approved Mining Plan along with

Approval Letter 53- 139

7 Pre-Feasibility Report 141-187

8 VAO signed for Quarry site 171

9 Baselines Studies 189-201

10 Affidavit Document 203-207

11 Copy of Explosive License 209-211

12 Consolidated Above Document In

PDF Format (DVD)

212

To consider the proposal for the grant of Environmental Clearance for Rough stone quarrying in at

S.F.No: 219 (P) (Bit -2) (Western side) of Kutlamparai Village in Paramathi - Velur Taluk,

Namakkal District by Thiru. A.Sakthivel,

The Proposal is for mining of Rough stone by Thiru. A.Sakthivel. the salient features of the proposal

are as follows:

S.No: Details of the proposal : Data furnished Page No:

1.

Name of the owner/Firm

:

A.Sakthivel,

S/o.Arunachalam,

No.17, Dr.Sankaran Road,

Gandhi Nagar Extension,

Namakkal District - 637001

Mobile No: 9043563252, 9443344287

19,53,109,14

1

2. Type of quarrying (Savudu/Rough

stone/ Sand/Granite) :

It is a Rough stone quarry project in Kutlamparai

Village.

17,53,109,14

1

3. S.F.No of the quarry site with area

break up :

219 (P) (Bit -2) (Western side) 17,53,109,14

1

4. Village in which situated

: Kutlamparai Village 17,53,109,14

1

5. Taluk in which situated

: Paramathi - Velur Taluk 17,53,109,14

1

6. District in which situated

: Namakkal District 17,53,109,14

1

7. Extent of quarry (in ha)

2.45.0Ha 17,53,109,14

1

8. Period of quarrying proposed

: Five years only. 53,71,109,11

1

9. Production (Quantity in m

3)

: The proposed quantity of reserves is 54175m

3 of

Rough stone for a period of Five years only.

17,77,81,143

10. Latitude and Longitude of all corners

of the quarry site :

11o10’9.31”N to11

o10’15.88”N

78o6’43.03”E to 78

o06’50.27”E

17,73,145

11. Topo sheet No : 58 -I/04 17,73,145

12. Precise area communication approved

by the District Collector with date : Roc.No.179/Mines/2016 Dated: 03.03.2016. 109

13. Mining plan approved by the Deputy

Director of the District with date :

Roc.No.179/Mines/2016 Dated: 04.03.2016. 53

14.

Water Requirement:

1. Drinking & Domestic

purpose (in KLD)

2. Dust suppression & Green

Belt (in KLD)

;

Purpose Quantity

KLD

Source

Drinking 0.3KLD Water vendors

Domestic purpose 0.3KLD Existing borehole on

near the quarry area

Dust suppression

and Afforestation

0.4KLD Existing borehole on

near the quarry area

33,91,167

15. Depth of quarrying : Proposed depth up to 11m above the ground level. 17,89,145

16.

Project cost (Excluding EMP cost)

:

The total Project cost (A+B+C) and including CSR

cost is about Rs.71,34,000/- (Rupees Seventy one

lakhs thirty four thousand only)

103,183

17. EMP cost

: The EMP cost is about Rs.7,60,000/- (Rupees Seven

lakhs sixty thousand only)

103,183

Checklist for Mining of Minor Mineral 2.45.0Ha mine lease area

S.No: Details of the proposal : Data furnished Page No:

1. Name of the owner/Firm A.Sakthivel, 19,53,109

,141

2.

Correspondence Address with Pin

Code

S/o.Arunachalam,

No.17, Dr.Sankaran Road,

Gandhi Nagar Extension,

Namakkal District - 637001.

3. Email Address [email protected] 19,151

4. Mobile Number 9043563252, 9443344287 19,151

5. Type of quarrying

(Earth/ Rough stone/Sand/Granite)

It is a Rough stone quarry project in Kutlamparai

village.

17,53,109

,141

6.

S.F. No of the Quarry site S.F.No:219 (P) (Bit -2) (Western side) of

Kutlamparai Village in Paramathi - Velur Taluk,

Namakkal District

17,53,109

,141

7. Village, Town Panchayat/ Panchayat

Union in which situated

Village : Kutlamparai

Panchayat Union : Paramathi - Velur

17,53,109

,141

8. Taluk in which situated Paramathi - Velur Taluk 17,53,109

,141

9. District in which situated Namakkal District 17,53,109

,141

10. Extent of quarry (in Ha) 2.45.0Ha 17,53,109

,141

11. New or existing quarry It is a New Proposal Rough Stone Quarry in

Kutlamparai Village.

17,53,109

,145

12.

If in case of existing Rough Stone/

Blue Metal/ Granite Quarry, the

length, width and depth to which

quarrying has already been done

(below the ground level/ above the

ground level)

It is a New Proposal Rough Stone Quarry in

Kutlamparai Village.

17,53,109

,145

13. If quarrying had been done below the

ground level/above the Ground level,

the height of quarrying already done

It is a New Proposal Rough Stone Quarry in

Kutlamparai Village.

17,53,109

,145

14.

Name of the owner who had earlier

undertaken the quarrying & a copy of

mining lease issued with date, if he is

different from the present applicant

It is a New Proposal Rough Stone Quarry in

Kutlamparai Village.

17,53,109

,145

15.

Proof of land ownership.

If owned patta copy.

If not own patta land agreement/ lease

copy entered with the owner (to be

enclosed) details

It is a Government land the applicant has awarded

tender from the Government.

73,115,11

7,119,121

16. Period of quarrying proposed Five years only. 53,71,109

17.

Production (quantity in m3) The proposed quantity of reserves is to be mined is

54175m3 (or) 9572 Lorry Load of Rough stone up to

depth for 11m above the ground level for a period of

Five years only.

Description

Rough

stone

in m3

Topsoil

in m3

Geological Resources 370800 24048

Available Mineable reserves 230375 20864

Five years plan period

As in the approved mining plan

54175 10880

17,77,81,

143

18.

Method of Mining

The quarrying operation will be carried out by

Opencast Semi - Mechanized Method in conjunction

with conventional method of mining using Manual

jackhammer drilling, slurry explosives blasting and

transportation of Rough stone to the needy

Residential and industrial customers.

79,145

19.

Top soil/ Overburden in case of Rough

Stone/ Blue Metal

The overburden in the form of Topsoil, the topsoil

formation has been removed during previous quarry

operation Hence there is no proposing of removal of

topsoil for this plan period.

79,81

20. Quantity of rejects in m3 in case of

Granite Mining.

There is no rejects. 79,81

21.

Length, Width, Depth & Proposed

Quarry in meters.

Conceptual plan:

Description Length

(Max)

(m)

Width

(Max)

(m)

Depth

(Max)

(m)

Conceptual 75 128 11

83

22.

Land use pattern for a radius of 1Km

around the quarry site such as

Agriculture, Habitation etc.,

Poultry Farm – 20%

Trees / Barren Land – 20%

Hill area – 05%

Seasonal Agri land – 25%

Roads – 15%

Habitation – 15%

131

23. Details of other quarries for a radius of

1Km, around the quarry site

There are no quarries within 500m radius. 131,173,

205

24.

Aerial distance from periphery of the

site to the nearest habitation,

Structures, Temples etc.,

The Nearest habitation is Rasampalayam village

which is about 1km on the North eastern side of the

area.

47,95,175

25.

Aerial distance to the interstate

borders, in case of Rough Stone/ Blue

Metal/ Granite quarry to be obtained

from IRS, Anna University.

There is no interstate boundary within the radius of

15km.

47,147,

173

26.

In case of Rough Stone/ Blue Metal/

Granite quarry no objection certificate

from the concerned district Forest

Officer/ Wild Life Sanctuaries/

National Parks/ HACA/ Western

Ghats region if the quarry site is within

There are no wild life sanctuaries, Western Ghats,

National parks, HACA, within the radius of 15km.

47,147,

173

15 Kms of these areas.

27.

Aerial distance to the nearest eco-

sensitive areas, CRZ, Forests,

Monuments etc., within 15Kms of

these areas.

There is no eco- sensitive areas, Reserved forest,

CRZ, Monuments etc., within the radius of 15km.

47,147,

173

28. Latitude and Longitude of all corners

of the quarry site.

11o10’9.31”N to11

o10’15.88”N

78o6’43.03”E to 78

o06’50.27”E

17,73,145

29. Topo Sheet No 58 -I/04 17,73,145

30.

Copy of explosives license and a

consent letter/ agreement of competent

recognized person who has agreed to

handle explosive for the blasting, in

case of Rough Stone/ Blue Metal/

Granite quarry.

A copy of explosive license and consent letter

enclosed.

209,211

31.

Brief details of APC measures

proposed to be proposed to be

implemented.

The Air quality will be affected during the quarrying

period due to blasting and jackhammer drilling,

which will be within prescribed limits. Air quality

will be monitored periodically as per norms and

Mitigation measures will be carried out to prevent

dust and air propagation in to air.

Mist water spraying will be carried out to

suppress dust.

95

32.

Mine Closure Plan to be furnished in

Mining plan.

There is no proposal for back filling, reclamation and

rehabilitation. The quarry pit will be fenced by

barbed wire to prevent inherent entry of public and

cattle. The quarried out pit will be allowed to collect

rain and seepage water which will act as a reservoir

for storage. This water storage will enhance the static

level and ground water recharge on nearby wells.

103

33. Mining plan prepared by (Xerox copy

of certificate to be attached)

RQP certificate with validity is enclosed as Annexure

No: VII

55,107,12

5

34. Precise area communication approved

by the District Collector

The Precise area communication letter was received

from the District Collector, Namakkal vide

Roc.No.179/Mines/2016 Dated: 03.03.2016.

109

35.

Mining plan approved by the Deputy/

Assistant Director of the District.

The mining plan was approved by the Deputy

Director, Department of Geology and Mining

Namakkal vide Roc.No.179/Mines/2016 Dated:

04.03.2016.

53

36.

Water requirement :

a) Drinking & domestic purposes

in KLD.

b) Dust suppression (in KLD)

c) Green belt (in KLD)

Drinking Water &

Domestic purpose - 0.3 KLD

Dust Suppression - 0.3 KLD

Green belt - 0.4 KLD

Total - 1 KLD

33,167

37.

Source of water Purpose Sources

Drinking &

Domestic

Purpose

Water purchase from approved

water vendor available in

Rasampalayam village is 1km on

the North eastern side of the area.

Dust

suppression

From Existing Borehole on nearby

the quarry area

Green belt

development

From Existing Borehole on nearby

the quarry area

33,167

38. Ground water table The Ground water table is about 50mt depth from

ground level.

29,93,145

39.

Project Cost (excluding EMP Cost) The Project cost:

A. Fixed asset cost =Rs. 40,00,000/-

B. Operational cost = Rs.22,00,000/-

C. EMP cost = Rs. 7,60,000/-

CSR Cost = Rs. 1,74,000/-

Total cost = Rs. 71,34,000/-

The total Project cost (A+B+C) and including CSR

cost is about Rs.71,34,000/- (Rupees Seventy one

lakhs thirty four thousand only)

103,183

40. EMP Cost The EMP cost is about Rs.7,60,000/- (Rupees Seven

lakhs sixty thousand only)

103,183

41. Disclosure RQP M. IfthikharAhmed,M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

55,107,12

5

42. Soft copy of the Form–I,

Pre –feasibility report and Mining plan

in CD.

There is enclosed Soft copy for form – I, Pre –

feasibility report and mining plan in CD.

212

43.

Key map showing the approach roads

to the site to be attested by the Deputy/

Assistant Director of Geology and

Mining of the concerned District.

The Key map showing with approach roads to the

site is enclosed Plate No: 1B

133

44.

Village map with S.F. Nos& salient

features such as vegetation, habitations

etc., for a radius of 500m around the

quarry site.

Village map with S.F.No and Salient features such as

vegetation, habitation etc., for 500mt radius is

enclosed as Plate No. IC

131,203,2

05

45.

If lakes, Ponds, river, nallah, odai etc.

are situated near the quarry site

permission from the concerned PWD

authorities for mining

There are no major water bodies like river, pond,

lake, etc., within 500m radius.

Singilipatti Lake is situated 6km away from the NE

side of the area.

Thirumanimutharu River is situated within 9km

away from the NW side of the area.

Kaveri River is situated 10km away from the SW

side of the area.

47,147,17

3

46.

Section map for mining to be attested

by the Deputy/ Assistant Director of

Geology and Mining of the concerned

District.

The Geological Plan and section in 1:1000 & 1:500

scale is enclosed

137

47. Photograph of the proposed Mining

site with S.Nos and break – up –

details attested by VAO or a senior

The Photo of the Mines site attached by VAO is

enclosed.

171

official.

48. Form –I To be signed by applicant I am hereby signed 51

49. Pre- Feasibility Report to be signed by

Both applicant and RQP.

Pre-feasibility report has been signed by the applicant

and RQP

187

50.

First and last page and the page at

which quantity of mining has been

worked out to be signed by the

Deputy/Assistant Director of Geology

and Mining of the concerned District.

First page and last page and the quantity proposed in

the plan have been signed by the Deputy Director of

Geology and Mining.

69,107

51. Affidavit from the applicant that child

labour is not being employed in the

mining activity.

There is no child labor using in this quarry and

enclosed affidavit Annexure - II

203,205

52.

Affidavit from the applicant regarding

planting of trees around the quarry site

in fulfillment of the Green belt

commitment furnished.

Affidavit from the applicant regarding the proposal

for planting trees around the quarry and fulfillment of

greenbelt commitment is enclosed Annexure -II

203,205

53. Details (POD) Regarding

communicating the proposal to the

members of the committee.

1. Signature of the applicant

A.Sakthivel,

2. Signature of the Recognized qualified person

M. IfthikharAhmed,M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

KUTLAMPARAI ROUGH STONE QUARRY LEASE APPLIED AREA (2.45.0HA)

The proponent Thiru. A.Sakthivel, has applied for Environmental clearance for the proposed quarry

Rough stone for over an extent of 2.45.0Ha in S.F.No: 219 (P) (Bit -2) (Western side) of

Kutlamparai Village in Paramathi - Velur Taluk, Namakkal District and Tamilnadu.

Salient features of the proposal are as follows:

S.No Details of the proposal : Data furnished Page No

1. Name of the Owner + Firm : A.Sakthivel,

S/o.Arunachalam,

No.17, Dr.Sankaran Road,

Gandhi Nagar Extension,

Namakkal District - 637001

Mobile No: 9043563252, 9443344287

19,53,109,

141

2. Location of the quarry-

S.F.No.

: S.F.No:219 (P) (Bit -2) (Western side) of

Kutlamparai Village in Paramathi - Velur Taluk,

Namakkal District

17,53,109,

141

3. Purpose of Application : It is a New Proposal Rough Stone Quarry in

Kutlamparai Village.

17,53,109,

141

4. Extent of quarry in Ha- : 2.45.0Ha 17,53,109,

141

5. Land use planning

a) Mining b) Storage of Topsoil over

burden

c) Infrastructure Road d) Utilized Area

Total

: Description

Present

Area

(Ha.)

Area at the

end of lease

period (Ha.)

Area under Quarrying Nil 0.97.0

Infrastructure Nil 0.01.0

Roads Nil 0.02.0

Green Belt Nil 0.12.0

Unutilized 2.45.0 1.33.0

Grand Total 2.45.0 2.45.0

23,93,177

6. Production (quantity in m3) : The proposed quantity of reserves is to be mined

is 54175m3 (or) 9572 Lorry Load of Rough stone

up to depth for 11m above the ground level for a

period of Five years only.

Description

Rough

stone

in m3

Topsoil

in m3

Geological Resources 370800 24048

Available Mineable reserves 230375 20864

Five years plan period

As in the approved mining

plan

54175 10880

17,77,81,143

7. Top soil & overburden

(quantity in m3)

: The overburden in the form of Topsoil, the topsoil

formation has been removed during previous quarry operation Hence there is no proposing of

removal of topsoil for this plan period.

79,81

8. Method of Mining : The quarrying operation will be carried out by Opencast Semi - Mechanized Method in

conjunction with conventional method of mining

using Manual jackhammer drilling, slurry

explosives blasting and transportation of Rough

stone to the needy Residential and industrial

customers.

79,145

9. Life of Mine as per approved

mining plan

: Five years only. 53,71,109

10. Height / width of the bench : Height 5.0m & Width 5.0m 23,79,163

11. Source of water / quantity required :

Quantity

required

(in litres)

Source 33,91,167

37,43,179

a. Drinking and Domestic

Purpose

0.3KLD Approved Water vendors

b. Dust Suppression

0.3KLD Existing borehole on near the quarry area

c. Green belt development 0.4KLD Existing borehole on near the quarry

12. Waste water

Sewage water

Mode of disposal

:

:

There is no waste water.

37,43,179

The septic tank is constructed on permanent

structure with in the quarry lease area.

To local Panchyat Authority

13. APC Measures : 1.Mist Spray using water tankers,

2. Enclosed covered system. (Tarpaulin) for

transportation.

39

14. Ariel distance of nearest habitation

: S.

No

Name of the

Village

Approximate

distance &

Direction from

lease applied area

Approximate

population

1. Rasampalayam 1.0km - NE 600

2. Madakasampatti 2.5km - SE 300

3. Valliyappampatti

Pudur 1.5km - SW 400

4. Thattankuttai 2.5km- NW 300

47,95,175

15. Ariel distance from Reserve

forest, Sensitive areas, Forest,

Bird sanctuaries, Wild life

sanctuaries, National parks,

Monuments etc., within 15km

Reserved Forest - Nil

Wildlife sanctuary - Nil

Bird Sanctuaries – Nil

National Park – Nil

Monuments – Nil

47,147,173

16. Land owner ship document

Own patta land

Lease Govt. Poromboke

:

: :

It is a Government land the applicant has awarded

tender from the Government.

75,115,117

,119,121

17. Land use classification : It is a New Proposal Rough Stone Quarry in

Kutlamparai Village.

53,109

18. Mining plan

Prepared by

:

M. IfthikharAhmed,M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

55,107,125

Approved by : The mining plan was approved by the Deputy

Director, Department of Geology and Mining Namakkal vide Roc.No.179/Mines/2016 Dated:

04.03.2016.

53

19. Precise area statement

Approved by

: The Precise area communication letter was

received from the District Collector, Namakkal

vide Roc.No.179/Mines/2016 Dated: 03.03.2016.

109

20. Nearby quarries : There are no quarries within the radius of 500m. 131,205

21. Nearby lake / river/ odai /

channel etc.

: There are no major water bodies like river, pond,

lake, etc., within 500m radius. Singilipatti Lake is situated 6km away from the

NE side of the area.

Thirumanimutharu River is situated within 9km

away from the NW side of the area.

Kaveri River is situated 10km away from the SW

side of the area.

47,147,173

22. Latitude / Longitude : 11o10’9.31”N to11

o10’15.88”N

78o6’43.03”E to 78o06’50.27”E 17,73,145

23. GI Sheet No. : 58 -I/04 17,73,145

24. Project Cost(Project cost +

EMP cost)

: The Project cost:

A. Fixed asset cost =Rs. 40,00,000/-

B. Operational cost = Rs.22,00,000/-

C. EMP cost = Rs. 7,60,000/- CSR Cost = Rs. 1,74,000/-

Total cost = Rs. 71,34,000/-

The total Project cost (A+B+C) and including CSR cost is about Rs.71,34,000/- (Rupees

Seventy one lakhs thirty four thousand only)

103,183

25. EMP Cost (Capital and

recurring)

: The EMP cost is about Rs.7,60,000/- (Rupees

Seven lakhs sixty thousand only)

103,183

26. Water table : The Ground water table is about 50mt depth from

ground level.

29,93,145

27. Interstate boundary : There is no interstate boundary situated within the

radius of 15km.

47,147,173

28. Western Ghats : There is no Western Ghats region within the

radius of 15km.

47,147,173

From:

A.Sakthivel,

S/o.Arunachalam,

No.17, Dr.Sankaran Road,

Gandhi Nagar Extension,

Namakkal District - 637001

Mobile No: 9043563252, 9443344287

To

THE CHAIRMAN,

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,

PANAGAL BUILDING, SAIDAPET,

CHENNAI.

Sir,

Sub: Submission of Approval Mining Plan (Roc.No.179/Mines/2016 Dated:

04.03.2016) Form–I and Pre-feasibility report for obtaining Environmental

Clearance for our Kutlamparai Rough stone Quarry - Reg.,

*****

I am here by submitting the processing fee in the form of demand draft for rupees Twenty

thousand, along with Form -I, Pre-feasibility report and Copy of Approved mining plan to your

good office for obtaining clearance from SEIAA, Chennai, for our Kutlamparai Rough stone

Quarry Lease applied area for over an extent of 2.45.0Ha located in S.F.No: 219 (P) (Bit -2)

(Western side) of Kutlamparai Village in Paramathi - Velur Taluk, Namakkal District,

Tamilnadu- Reg.,

I have submitted all the relevant documents to your good office to the best of our

knowledge. If any clarifications are required, we are ready to submit the same to your office at

your convenient time. Also we are ready to present the project in front of the committee.

Hence we request your good office to kindly process our application and allow us to

present our project at the earliest.

Thanking you.

Yours sincerely

A.Sakthivel,

Place: Namakkal

Date: 19.03.2016