204 Stationing Actions – Making Fort Bragg 1/10th of the Army Population Soldier/Civilian Growth: From 54,631 to 77,092 Trips per Day: 90,000 to 150,000 Command Growth: 2005 2011

15,000,000 sf of new facility requirements (not including COF/TEMF deficit). 2,250 new Family Housing Units (6,238 total) $3 Billion in new Military Construction (FY03-15) Traffic/Parking Congestion

2 – 3-Star Commands 5 – 2-Star Commands 3 – 1-Star Commands21 – Brigade Equivalents

1 – 4-Star Command 4 – 3-Star Commands 5 – 2-Star Commands 3 – 1-Star Commands28 – Brigade Equivalent

Page 3: Fort Bragg, NC

WE MADE

Real Property Master Plan

DIGEST

Fort Bragg, North Carolina

WORKSWORKSPUBLICPUBLIC

Page 4: Fort Bragg, NC

• Roads• Motor Pools• Company Operations Facilities• Fitness Centers

MILCON Program

Page 5: Fort Bragg, NC

Program Highlights:• Funding Based on FSM• Building Renovation/Construction• Energy Efficiencies•HVAC/Electrical Upgrades• Plumbing Repair• Paving, Paving, Paving• Roofing

SRM Program

0

20

40

60

80

100

120

140

160

180

200

$Mill

ion

Page 6: Fort Bragg, NC

FY12• Retro-Commission multiple buildings on the installation

– Need A/E’s, RCx agents, control and mechanical contractors• Renewable Energy Geothermal & Retro Cx Historical District• Transpired Solar Collectors for Various buildings• PV and Solar Water projects

FY13• ECIP Renewable Solar Heating and DDC Conversion• Retro-Commission multiple buildings on the installation• Combined heat and power plant

FY14• New Geothermal central energy plant• Bio-mass plant

Energy Program

Page 7: Fort Bragg, NC

Program Highlights:• Water & Wastewater Infrastructure

•Fort Bragg, Pope AAF, Camp MacKall•Housing

• Continuous Life Cycle Renewal & Replacement• System Wide Water and Sewer Modeling• Water and Sewer Pipeline Replacement• Backflow Preventer Replacement• Lift Station Rehabilitation

Water Wastewater Infrastructure

0

5

10

15

20

25

30

35

40

45

$M

illio

n

Pipeline Replacement

BFP Replacement

LS Rehabilitation

Page 8: Fort Bragg, NC

TO JOIN THE FORT BRAGG