    Installation Manual for SPD

    NSN Flexi Power Rectifier FPRB MODEL NO.:AA27540LPREPARED/DATE: Ferdinand Sisracon / 06/25/2013CHECKED/DATE: Bear Chen /

    ISSUE ECO #

    DATE

    SECTION REVISIONS DESCRIPTION APPROVED

    AA 06-30-2013 All New document for FPRB AA27540L Wood Lou

    AB 10-30-2013 3.1.3.7 Added special instruction when installing

    the N link cable into the Flexi Power

    terminal block

    Wood Lou

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    2/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page1of 45

    Installation Manual for

    Surge Protective Device

    Flexi Power Rectifier

    FPRB

    Manufactured by: Emerson Network Power / Embedded Power

    NSN Part Number: CS7000002.01

    Manufacturing PN: AA25130L

    Visit us @http://www.emersonnetworkpower.com

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    3/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page2of 45

    Manual Number: 970-009473-0000

    Manual Issue: AB

    Manual Status: Standard

    Release Date: October 30, 2013

    Copyright 2013 Emerson Electric Co. All rights reserved.

    CONSIDER IT SOLVED

    Published in China

    This document, and the information it contains, are the property of Emerson Network Power

    Co., Ltd, and are protected by law. Both must be held in strictest confidence at all times.

    Emerson Network Power grants no license or right to copy, use or disclose either, expressly or by

    implication.

    Disclaimer

    This document and the information contained herein are provided on an "AS IS" basis. Emerson

    Network Power may make improvements or changes in this documentation, at any time and

    without notice and as it sees fit. The information in this documentation was prepared by

    Emerson Network Power with reasonable care and is believed to be accurate. However,

    Emerson Network Power shall not assume responsibility for losses or damages resulting from

    any omissions, inaccuracies, or errors contained herein.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    4/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page3of 45

    History

    Date

    DD-MM-YYY

    Version Author Change Note No./Notes

    30-06-2013 AA Ferdinand Sisracon First release for FPRB

    30-10-2013 AB Ferdinand Sisracon

    Release to be used as a common

    SPD Instruction Manual for both

    FPRA and FPRB

    Added special instruction to

    connect the N link cable for both

    FPRA and FPRB

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    5/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page4of 45

    Table of Contents

    History ................................................................................................................................. 3

    Table of contents ................................................................................................................ 4

    List of figures ....................................................................................................................... 5

    List of tables ........................................................................................................................ 5Preface ................................................................................................................................ 9

    Application of this manual............................................................................................ 10

    Chapter 1 Product Introduction...................................................................................... 11

    1.1 General Description ........................................................................................... 11

    1.2 Main Specification of the SPD............................................................................ 11

    1.3 Properties........................................................................................................... 16

    Chapter 2 Preparation..................................................................................................... 18

    2.1 Installation tools ................................................................................................ 18

    2.2 Delivery contents ............................................................................................... 18

    Chapter 3 SPD Installation .............................................................................................. 20

    3.1 Make AC connection with the SPD .................................................................... 20

    3.1.1 Preparation ........................................................................................... 21

    3.1.2 Configure the Terminal Block ............................................................... 27

    3.1.3 3-phase star (3Y) AC connection with the SPD..................................... 29

    3.1.4 Single-phase (1) AC connection with the SPD ................................... 35

    3.1.5 2-phase AC connection with the SPD.................................................. 38

    3.1.6 3-phase delta (3) AC connection with the SPD ................................... 40

    3.2 Replace the SPD ................................................................................................. 44

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    6/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page5of 45

    List of Figures

    Figure 1 Internal circuit diagram of the SPD............................................................................... 11

    Figure 2 Structure of the SPD ..................................................................................................... 12

    Figure 3 Dimension of the SPD top view ................................................................................. 13Figure 4 Dimension of the SPD side view ................................................................................ 14

    Figure 5 SPD configuration in a TN-S system.............................................................................. 16

    Figure 6 Checking failure of the SPD .......................................................................................... 17

    Figure 7 PDA rear internal chassis layout................................................................................... 21

    Figure 8 The AC cable connection chart ..................................................................................... 27

    Figure 9 AC terminal block configuration 1 and 2 Configuration ...................................... 28

    Figure 10 AC terminal block configuration 3 ......................................................................... 28

    Figure 11 AC terminal block configuration 3Y ......................................................................... 29

    Figure 12 Schematic diagram of AC connection with the SPD 3Y ........................................... 29

    Figure 13 - Assemble the Link Cables to SPD................................................................................. 30

    Figure 14 - AC Ground wire ........................................................................................................... 31

    Figure 15 - Secure the SPD into the DIN rail .................................................................................. 31

    Figure 16 - Connect the Link cables to Terminal Block.................................................................. 32

    Figure 17 - Special Instruction for N Link Cable Installation.......................................................... 33

    Figure 18 AC connection with the SPD - 3Y ................................................................................ 34

    Figure 19 Schematic diagram of AC connection with the SPD 1 .......................................... 35

    Figure 20 SPD configuration for single-phase AC connection .................................................... 36

    Figure 21 - Connection of AC link cables from SPD to Terminal Block.......................................... 37

    Figure 22 Schematic diagram of AC connection with the SPD 2- Phase .................................. 38

    Figure 23 - AC connection with the SPD 2- Phase ...................................................................... 39

    Figure 24 Schematic diagram of AC connection with the SPD 3 ........................................... 40

    Figure 25 - Connection of AC link cables and SPD ground cables ................................................. 41

    Figure 26 Connecting the AC terminal block 3 ...................................................................... 42Figure 27 3-phase delta (3) AC connection with the SPD .......................................................... 43

    Figure 28 Removing the damaged OVP module from the SPD .................................................. 44

    Figure 29 The OVP module and the SPD base ............................................................................ 45

    Figure 30 Fitting a new OVP module to the SPD ........................................................................ 45

    List of Tables

    Table 1 Contents of this manual .............................................................................................. 9

    Table 2 Symbols in this manual ............................................................................................... 9

    Table 3 Reference documents of the SPD ............................................................................ 10

    Table 4 Main specification of the SPD .................................................................................. 15

    Table 5 Delivery contents of the SPD.................................................................................... 19

    Table 6 Recommended preparation for AC mains cable ................................................... 22

    Table 7 AC connection with the SPD ..................................................................................... 23

    Table 8 Schematic diagram of AC connection with the SPD.............................................. 25

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    7/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page6of 45

    List of Terms

    A Ampere

    AC Alternative current

    AWG American Wire Gauge

    BAT Battery

    BR Battery Return

    BTS Base Transceiver Station

    CB Circuit Breaker

    CSA Cross Section Area

    CU Control unit

    DC Direct current

    EMC Electromagnetic CompatibilityESD Electrostatic Discharge

    FPRB Flexi Power Rectifier

    GND Ground

    GUI Graphical User Interface

    IE Internet Explorer

    IP Internet Protocol

    L Live cable from the AC mains

    LAN Local Area Network

    LED Light Emitting Diode

    LVD Low Voltage Disconnect

    MAC Media Access Control

    MCB Miniature Circuit Breaker

    N Neutral cable from the AC mains

    PC Personal Computer

    PCB Printed Circuit Board

    PDA Power Distribution Assembly

    PE Protective earth

    PSU Power Supply Unit

    SPD Surge Protective Device

    V Volt

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    8/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page7of 45

    VPN Virtual Private Network

    1 Single-phase AC type

    3Y 3-phase star AC type

    3 3-phase delta AC type

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    9/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page8of 45

    This page left intentionally blank

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    10/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page9of 45

    Preface

    About this manual

    This manual provides all the necessary information to operate, install and maintain the

    Surge Protective Device (SPD) used in the Flexi Power Rectifier (FPRB).

    Table 1lists the contents of this manual:

    Table 1 Contents of this manual

    Chapter Title Content

    1 Product instruction Describes the specifications and properties of the

    SPD

    2 Preparation Describes the SPD installation preparations

    3 SPD installation Describes how to install and replace the SPD into the

    FPRB

    Terms and Symbols in this manual

    These term and symbols in Table 2might appear in the manual:

    Table 2 Symbols in this manual

    Symbol Description

    Warning statement identifies conditions or practices that couldresult in bodily injury or loss of life.

    It warns the reader to be extremely careful.

    Caution statement identifies conditions or practices that could

    result in damage to this product or devices connect to it.

    It indicates that the reader must be careful.

    Provides hints to the user for easier installation

    The necessary supplementary of the article to let user be clearer.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    11/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page10of 45

    Reference documents

    Table 3contains the reference documents of the SPD:

    Table 3 Reference documents of the SPD

    DocumentEmerson Network Power

    File No.

    Product Specification FPRB 970-009025-0000

    FPRB Installation Manual for SPD (This manual) 970-009473-0000

    FPRB User Manual 970-009474-0000

    FPRB Installation Manual 970-009475-0000

    FPRB Quick Start Guide for SPD 970-009476-0000

    FPRB Quick Start Guide 970-009477-0000

    Application of this manual

    This manual is regarded as a substitution of the partMake AC connection without the SPD

    (refer to section 3.4 of theFlexi Power Rectifier - Installation Manual, Emerson File No. 970-

    009475-0000).

    This manual is based on the present SPD in use. Emerson may change the SPD to a secondsource in future. However Emerson ensures the compatibility of the new SPD in the FPRB.

    This manual supports all applications of the SPD that can be used in the FPRB.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    12/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page11of 45

    Chapter 1 Product Introduction

    1.1 General Description

    The Flexi Power Rectifier (FPRX, Emerson part number AA25020L/ CS7000013.XX for 6kW

    and AA27540L/ CS7000030.XX for 9kW) is a 6kW or 9kW output power AC rectifier package

    respectively. The Surge Protective Device (SPD, Emerson part number AA25130L/

    CS7000002.XX) is used to prevent damage to the FPRX caused by high input voltages or

    surge.

    The SPD consists of three equivalent OVP modules used between live cables and neutral

    cable from the AC mains; one OVP module used between the neutral cable from the AC

    mains and the earth; and one remote signaling contact.

    The SPDs mentioned in this manual are applicable for both 6kW and 9kW system. The SPD

    used is the same as the one we used in FPRA.

    1.2 Main Specification of the SPDThe SPD illustrated in this manual is made by Phoenix Contact CO., Ltd(model number:

    VAL-MS 230IT/3+1-FM), or SICHUAN ZHONGGUANG LIGHTNING (model number:

    ZGG40-385(3+1)).

    L1 L2 L3 N

    11

    12 14

    FM

    VAL-MS 230 IT ST F-MS

    12 ST

    VAL-MS 230IT/3+1-FM

    Figure 1 Internal circuit diagram of the SPD

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    13/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page12of 45

    The SPD (module name VAL-MS 230IT/3+1-FM) consists of three equivalent OVP

    modules used between live cables and neutral cable from the AC mains (module name

    VAL-MS 230 IT ST), one OVP module used between the neutral cable from the AC

    mains and the earth (module name F-MS 12 ST) and one remote signaling contact

    (module name VAL-MS 230IT-FM) (seeFigure 1).

    The four OVP modules and the remote signaling contact are all installed on the SPD base

    and can be removed from the base. This structure leads to easier configuration and

    replacement of the OVP modules (see

    Figure2).

    Figure 2 Structure of the SPD

    VAL-MS230 IT ST

    F-MS12 ST

    Base

    VAL-MS230IT-FM Terminal

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    14/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page13of 45

    Figure 3andFigure 4show the dimension of the SPD. The four OVP modules are of the

    same dimensions.

    VAL-MS 230IT/3+1-FM

    ZGG40-385(3+1)

    Figure 3 Dimension of the SPD top view

    17.5m 17.5m70m

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    15/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page14of 45

    VAL-MS 230IT/3+1-FM

    ZGG40-385(3+1)

    Figure 4 Dimension of the SPD side view

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    16/46

    Installation Manual for SPD,

    Table 4lists the main specificat

    Ta

    Module name Parameter

    VAL-MS 230 ITST

    (OVP module for

    L-N)

    UN(L-N / L-L)

    UC(L-N)

    UP(L-N)

    In/ Imax(8/20 S)

    Screw thread / to

    F-MS 12 ST

    (OVP module for

    N-PE)

    UN (N-PE)

    UC(N-PE)

    UP(N-PE)

    In/ Imax(8/20 S)

    Screw thread / to

    VAL-MS 230IT-FM

    (Remote

    signaling

    contact)1

    Imax

    Screw thread / to

    VAL-MS

    230IT/3+1-FM

    (The whole SPD

    module)

    Temperature

    IP-code

    Class II

    Type 2

    Flexi Power

    Rev AB Page1

    ions of the OVP modules.

    ble 4 Main specification of the SPD

    Specification Descrip

    230VAC/ 400VAC Rated v

    385VAC Clampi

    1.9kV Protecti

    20kA / 40kA Rated d

    maximu

    rque M5 / 4.5Nm

    230 VAC Rated v

    260VAC Clampi

    1.0kV Protecti

    20kA / 40kA Rated d

    maximu

    rque M5 / 4.5Nm

    AC: 3A (125V)0.75A (250V)

    DC: 2A (30V)

    que M2 / 0.25Nm

    -40C ~ +80C

    IP20 Ingress

    degree

    IEC 61643-1: 2005-01

    EN 61643-11: 2002-12

    ectifier FPRB

    5of 45

    tion

    oltage

    g voltage

    ve voltage

    ischarge current /

    m discharge current

    oltage

    g voltage

    ve voltage

    ischarge current /

    m discharge current

    Protection (IP)

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    17/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page16of 45

    Note:

    1Although the SPD remote signaling contact has three pins, only two are applied when

    configured in the FPRB. Refer toFigure 13

    1.3 Properties

    Typical use

    Figure 5shows the configuration of the SPD in a TN-S system.

    Figure 5 SPD configuration in a TN-S system

    Note:

    It is recommended to use the SPD with a mains utility offering the appropriate line

    fuse protection.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    18/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page17of 45

    Failure Detection

    If any OVP module has been damaged, Emerson will provide the user with the individual

    OVP module but not the whole SPD for replacement.

    In the event that any one of the four OVP modules is damaged, the PDA will send alarm

    signal via the LCD.

    After opening the rear top cover of the PDA (refer to section 3.4 of the Flexi Power

    Rectifier Installation Manual, Emerson File No. 970-009475-0000), the user can

    confirm which OVP module is in failure.

    Failure Indication

    If the window is transparent, the OVP is OK; if the window is red, the OVP is damaged

    and should be replaced in time (seeFigure 6).

    Figure 6 Checking failure of the SPD

    Window

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    19/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page18of 45

    Chapter 2 Preparation

    2.1 Installation tools

    Tool kit:

    Allen key (hex key): 8 mm (0.31 in.)

    Allen key (hex key): 4 mm

    Awl: diameter of 2mm

    ESD wrist strap and cable

    TORX screwdriver set: T10, T20, T25

    Flat screwdriver

    Cross screwdriver

    Wrench 13 mm (0.51 in.)

    Folding knife

    Adjustable (monkey) wrench

    Side cutters

    Lint-free swab or wipe and 99% alcohol for cleaning optical connectors

    Cable ties for routing cables

    Tape measure

    Flashlight, pocket lamp or torch

    Hammer drill

    Marker pen or comparable tool

    Pliers

    Wire-stripper

    Test equipment:

    Multi-meter

    2.2 Delivery contents

    The SPD is optional for the user and shipped independent from the FPRB.

    Verify that all the material listed in Table 5 has been received and is in good condition.

    Report any missing or damaged items to our Emerson Network Power Service Department.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    20/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page19of 45

    Table 5 Delivery contents of the SPD

    Part Figure Description Usage Emerson

    Part Number

    Emerson

    Module

    Number

    SPD Surge Protective Device

    Manufacturer p/n:VAL-MS

    230IT/3+1-FM

    Manufacturer: PHOENIX

    CONTACT (SEA), PTE. LTD.

    1 pc 440-000700-

    0000

    AA25130L

    Surge Protective Device

    Manufacturer p/n: ZGG40-385(3+1)

    Manufacturer: SICHUAN

    ZHONGGUANG LIGHTNING

    PROTECTION TECHNOLOGIES

    CO.,LTD.

    SPD

    Jumper

    Short link for SPD terminals in

    single-phase AC connection

    (Color of plastic may vary)

    1 each 502-000496-

    0000/

    500-001769-

    0000

    L line

    short link

    L1/L2/L3 for three phase,

    L for single phase (AWG10)

    1 750-006658-

    0000

    N line

    short link

    N for three phase star,

    N for single phase (10mm2)

    1 438-000423-

    0000

    SPD

    groundlink

    SPD ground link to Chassis 1 750-000988-

    0000

    SPD

    sense

    cable

    SPD signal cable connecting to

    the MCU

    1 750-001004-

    0000

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    21/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page20of 45

    Chapter 3 SPD Installation

    3.1 Make AC connection with the SPD

    The AC power supply must be switched off prior to accessing the AC cable.

    This manual concentrates on the AC connection with the SPD, and omits the steps prior

    to the SPD installation, i.e. the AC terminal block configuration, etc. The user shouldrefer to Flexi Power Rectifier Installation Manual (Emerson File No. 970-009475-0000)

    for the relevant previous steps.

    The colors of the AC mains wire used in this manual are for illustration purpose only.

    However, the user should verify the AC mains referring to the color-coding in the

    respective field or country of application.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    22/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page21of 45

    3.1.1 Preparation

    3.1.1.1 Detach the PDArear top coverreferring to Flexi Power Rectifier Installation

    Manual (Emerson File No. 970-009475-0000).

    3.1.1.2 Loosen screws A, B and C as per attached photo with a TORX screwdriver (T20)

    Figure 7 PDA rear internal chassis layout

    B

    C

    PDA earthcable

    AC groundclamp

    SPD ground

    clamp

    SPDDIN Rail

    ACterminalblock

    FSPD sensorconnection

    A

    Strain-relief

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    23/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page22of 45

    3.1.1.3 Preparing the AC mains cable. The color of the wires may vary depending on the

    country where the SPD will be mounted.

    Table 6 Recommended preparation for AC mains cable

    (Tolerance: 3mm)

    AC type L1 L2 L3 N PE

    Single-phase

    (1)

    A (mm) 55 70 100

    B (mm) 20 20 20

    2-phase A (mm) 55 100 N/A

    B (mm) 20 20 N/A

    3-phase delta

    (3)

    A (mm) 55 60 70 N/A 100

    B (mm) 20 20 20 N/A 20

    3-phase star

    (3Y)

    A (mm) 55 60 70 85 100

    B (mm) 20 20 20 20 20

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    24/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page23of 45

    Table 7 AC connection with the SPD

    AC type Terminals connection Short link available(1)

    AC terminal block

    Configuration(2)

    SPD configuration

    AC

    mains

    SPD AC terminal

    block

    Chassis(3)

    1

    N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and4,5,6 respectively Short terminals L1,L2, L3

    L L2 5 N/A L2 for three-phase

    N/A L3 4 N/A L3 for three-phase

    N N 2 N/A N for single phase

    PE N/A N/A AC ground clamp N/A

    N/A N/A SPD ground clamp SPD ground link

    2-Phase N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and

    4,5,6 respectively

    Short terminals L1,

    L2, L3

    L1 L2 5 N/A L2 for three-phase

    N/A L3 4 N/A L3 for three-phase

    L2 N 2 N/A N for single phase

    N N/A N/A AC ground clamp N/A

    N/A N/A SPD ground clamp SPD ground link

    3Y

    L1 L1 6 N/A L1 for three-phase Short terminals 1,2,3 N/A

    L2 L2 5 N/A L2 for three-phase

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    25/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page24of 45

    L3 L3 4 N/A L3 for three-phase

    N N 2 N/A N for three-phase star

    PE N/A N/A AC ground clamp N/A

    N/A N/A SPD ground clamp SPD ground link

    3

    L1 L1 5 N/A L1 for three-phase Short terminals 1,2 and 3,4

    and 4,5 respectively

    N/A

    L2 L2 3 N/A L2 for three-phase

    L3 L3 1 N/A L3 for three-phase

    PE N/A N/A AC ground clamp

    N/A N N/A SPD ground clamp SPD ground link

    Note:

    (1) The short link names listed herein are in accordance with the actual labels on the short links.

    (2) The AC terminal block should be configured before the AC connection. User shall refer to section 3.4 in

    Flexi Power Rectifier Installation Manual (Emerson file No.970-009475-0000) for more details

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    26/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page25of 45

    (3) Refer toTable 3for the corresponding clamps.

    Table 8 Schematic diagram of AC connection with the SPD

    AC

    Type

    Schematic diagram Configuration of AC

    terminal block

    3Y

    L L L3 N

    3 4 5 6

    PD

    AC Terminal Block

    L

    L

    E

    AC Mains

    L3 N

    Short terminals 1,2,3

    1

    L L L3 N 3 4 5 6

    SPD

    AC Terminal Block

    L NE

    AC mains

    Short terminals 1,2,3;

    4,5,6 respectively

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    27/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page26of 45

    3

    L L L3 N

    3 4 5 6

    PD

    AC Terminal Block

    L LE

    AC mains

    L3

    Short terminals 1,2; 3,4;

    5,6 respectively

    2-phase

    Short terminals 1,2,3;

    4,5,6 respectively

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    28/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page27of 45

    3.1.2 Configure the Terminal Block

    Verify the AC power system types in field, and make sure the corresponding bridge

    configuration is used.

    The AC terminal block has been already configured for 3-phase star AC mains before

    the shipment. Therefore the user has to change the AC terminal block configuration

    if required referring to the actual AC type in field.

    Insert the bridges and screws (provided as accessories) to the corresponding slots on

    top of the AC terminal block referring to the AC CABLE CONNECTION CHART located

    on the chassis (and reproduced inFigure 8).

    Secure the screws with a flat screwdriver, tightening to 0.8Nm.

    Figure 8 The AC cable connection chart

    There are three AC power system types (see above Figure), and thus three AC

    configurations of the AC terminal block.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    29/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page28of 45

    Single-phase (1) and Two-phase (2) configuration

    For Single- phase AC system, use two 3-pole bridges to short the terminals 1, 2,

    3 and 4, 5, 6 respectively on the AC terminal block (seeFigure 9)

    Figure 9 AC terminal block configuration 1 and 2 Configuration

    3- phase delta (3) configuration

    For 3-phase delta AC system, use three 2-pole bridges to short the terminals 1, 2

    and 3, 4 and 5, 6 respectively on the AC terminal block (seeFigure 10)

    Figure 10 AC terminal block configuration 3

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    30/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page29of 45

    3- phase star (3Y) configuration

    For 3-phase star AC system, use one 3-pole bridges to short the terminals 1, 2, 3

    on the AC terminal block (seeFigure 11)

    Figure 11 AC terminal block configuration 3Y

    3.1.3 3-phase star (3Y) AC connection with the SPD

    L L L3 N

    3 4 5 6

    PD

    AC Terminal Block

    L

    L

    E

    AC Mains

    L3 N

    Figure 12 Schematic diagram of AC connection with the SPD 3Y

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    31/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page30of 45

    The terminal marks in Figure 12 are in accordance with the actual SPD and AC

    terminal block.

    Use the indicated L or N short link for the AC mains as shown in Figure 12 and Table7 referring to labels on the short links.

    The terminals 1, 2, 3 on the AC terminal block should be shorted before the

    connection. Refer to section 3.4 in Flexi Power Rectifier Installation Manual

    (Emerson file No.970-009475-0000)for details.

    3.1.3.1 Detach the cable strain-relief from the chassis by loosening the screw C in

    Figure 7 with a TORX screwdriver (T20). Insert the AC mains cable on the

    strain relief.

    3.1.3.2 Detach the AC ground clamp and SPD ground clamp from the chassis byloosening the screws A and B with a TORX screwdriver (T20).

    3.1.3.3 Prepare the AC mains of 3-phase star as perTable 6.

    3.1.3.4 Assemble the Link cables, the AC mains cable, the SPD sensor cable and the

    SPD grounding cable into the SPD. Refer to Figure 13

    Figure 13 - Assemble the Link Cables to SPD

    L1 forthree-phase

    L2 forthree-phase

    L3 forthree-

    phase

    N forthree-phasestar SPD

    ground

    cable

    SPDsensecable

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    32/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page31of 45

    Insert the connector of the SPD sense cable into the left two contacts; otherwise it will

    block the SPD from installing onto the chassis.

    3.1.3.5 Fix the AC ground wire into the terminal lug.

    .

    Figure 14 - AC Ground wire

    3.1.3.6 Secure the SPD into the SPD DIN rail. Connect the SPD sense cable to the

    stand by mating connector. Connect the SPD grounding cable into the

    terminal lug. Refer toFigure 15.

    Figure 15 - Secure the SPD into the DIN rail

    SPDsensecable

    SPDGroundingcable

    SPD

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    33/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page32of 45

    3.1.3.7 Connect the AC link cables from SPD to the Terminal Block. Assemble the

    SPD grounding cable and the AC grounding cable into the PDA

    Figure 16 - Connect the Link cables to Terminal Block

    1. Use the appropriate L and N short link referring to the label on the short links

    and the indications inFigure 12andTable 7.

    2. Rotate the N link cable 90 degrees either clockwise or counter clockwise when

    assembling the SPD on the FPRA due to the smaller slot of the terminal block.

    Refer toFigure 17 - Special Instruction for N Link Cable Installation

    SPDgroundingcable lug

    AC

    groundingcable lug

    N linkcable

    L3 linkcable

    L2 linkcable

    L1 link

    cable

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    34/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page33of 45

    Figure 17 - Special Instruction for N Link Cable Installation

    It is recommended to clamp the AC wire and the corresponding short link with one

    overlapping on another.

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    35/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page34of 45

    Below figure shows the PDA rear layout after completing the 3-phase star AC

    connection with the SPD.

    Figure 18 AC connection with the SPD - 3Y

    3.1.3.8 After finishing and checking the AC cable installation, re-install the PDA rear

    cover referring to Flexi Power Rectifier Installation Manual (Emerson File

    No. 970-009475-0000).

    After installation of the SPD kit has been completed, the installer should check the

    installation against the steps outlined within this document, supported by a multi-

    meter to check for wiring continuity.

    Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

    L1 short link

    L2 short link

    L3 short link

    N short link

    SPD sense cable

    L2

    L3

    L1

    SPD groundcable

    N

    PE of AC

    mains

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    36/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page35of 45

    3.1.4 Single-phase (1) AC connection with the SPD

    L

    L

    L3 N

    3 4 5 6

    SPD

    AC Terminal Block

    L NE

    AC mains

    Figure 19 Schematic diagram of AC connection with the SPD 1

    The terminal marks in Figure 19 are in accordance with the actual SPD and AC

    terminal block.

    Use the indicated L or N short link for the AC mains as shown in Figure 19 andTable

    7 referring to labels on the short links.

    The terminals 1,2,3 and 4,5,6 on the AC terminal block should be shorted

    respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier

    Installation Manual (Emerson file No.970-009475-0000) for details.

    3.1.4.1 Perform the same procedure in preparing the AC cables SPD grounding cables

    and the SPD sense cables.

    3.1.4.2 As indicated inFigure 19 andTable 7, the SPD terminals L1, L2 and L3 have to be

    paralleled by the SPD jumper (seeFigure 20).

    L1 for three-phase

    L2 for three-phase

    L3 for three-phase

    N for single phase

    AC groundclamp

    SPD groundclamp

    SPD ground link

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    37/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page36of 45

    The user should loosen the three terminal clamps of L1, L2 and L3, and hold the SPD

    upside down. Thus the SPD jumper can be easily inserted into the parallel clamps.

    The jumper should be fixed in the SPD together with the live cables of the AC mains

    and L line short links.

    Figure 20 SPD configuration for single-phase AC connection

    3.1.4.3 Connect the live cable from the AC mains and L2 short link into terminal L2 on

    the SPD referring to Figure 19 andTable 7, tightening the top screw to 4.5Nm

    with a cross screwdriver (seeFigure 21).

    SPD jumper

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    38/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page37of 45

    Figure 21 - Connection of AC link cables from SPD to Terminal Block

    3.1.4.4 After finishing and checking the AC cable installation, re-install the PDA rear

    cover referring to section 3.4 in Flexi Power Rectifier Installation Manual

    (Emerson File No. 970-009475-0000).

    L1 forthree-phase

    L2 forthree-phase

    L3 forthree-phase

    N for singlephase

    AC groundclamp

    SPD groundclamp

    SPDground

    link

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    39/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page38of 45

    3.1.5 2-phase AC connection with the SPD

    Figure 22 Schematic diagram of AC connection with the SPD 2- Phase

    3.1.5.1 Perform the same procedure in preparing the AC cables SPD grounding cables

    and the SPD sense cables

    3.1.5.2 As indicated inFigure 19andTable 7, the SPD terminals L1, L2 and L3 have to be

    paralleled by the SPD jumper (seeFigure 20).

    L1 for three-phase

    L2 for three-phase

    L3 for three-phase

    AC groundclamp

    SPD groundclamp

    SPD ground link

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    40/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page39of 45

    3.1.5.3 Connect the AC link cables and the AC cables to the SPD and to terminal block.

    Refer toFigure 23)

    Figure 23 - AC connection with the SPD 2- Phase

    3.1.5.4 After finishing and checking the AC cable installation, re-install the PDA rear

    cover referring to section 3.4 in Flexi Power Rectifier Installation Manual

    (Emerson File No. 970-009475-0000).

    After installation of the SPD kit has been completed, the installer should check the

    installation against the steps outlined within this document, supported by a multi-

    meter to check for wiring continuity.

    Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

    Use DMM to measure L1-L2 voltage

    Ensure L1-L2 voltage between 180VAC-276VAC

    L1 forthree-phase

    L2 forthree-phase

    L3 forthree-phase

    N for singlephase

    AC groundclamp

    SPD groundclamp

    SPDground

    link

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    41/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page40of 45

    The terminal marks in Figure 22 are in accordance with the actual SPD and AC

    terminal block.

    Refer to Single-phase (1) AC connection for details.

    3.1.6 3-phase delta (3) AC connection with the SPD

    L L L3 N

    3 4 5 6

    PD

    AC Terminal Block

    L

    L

    E

    AC mains

    L3

    Figure 24 Schematic diagram of AC connection with the SPD 3

    The terminal marks in Figure 24 are in accordance with the actual SPD and ACterminal block.

    Use the indicated L or N short link for the AC mains as shown in Figure 24 and Table

    7 referring to labels on the short links.

    The terminals 1,2 and 3,4 and 5,6 on the AC terminal block should be shorted

    respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier

    Installation Manual (Emerson file No.970-009475-0000) for details.

    L1 for three-phase

    L2 for three-phase

    L3 for three-phase

    SPD ground link

    AC groundclamp

    SPD groundclamp

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    42/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page41of 45

    3.1.6.1 Perform the same procedure in preparing the AC cables SPD grounding cables

    and the SPD sense cables

    3.1.6.2 Configure the terminal block as perFigure 10

    3.1.6.3 Assemble the AC cables, AC link cables into the SPD.

    3.1.6.4 Assemble the AC link cables into the Terminal Block.

    Figure 25 - Connection of AC link cables and SPD ground cables

    SPDgroundingcableconnected toN terminal ofthe SPD.

    N connectedto Ground

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    43/46

    Installation Manual for SP

    3.1.6.5 Connect the L1,

    block respectiv

    to 1.5Nm with a

    Figure

    SPDSenseCable

    SPDgroundlink

    Flexi Powe

    D, Rev AB

    L2 and L3 short links to terminals 5, 3, 1 on

    ly referring toFigure 24andTable 7, tightenin

    Cross screwdriver (seeFigure 26).

    26 Connecting the AC terminal block 3

    r Rectifier FPRB

    age42of 45

    the AC terminal

    g the top screws

    L1shortlink

    L2shortlink

    L3short

    link

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    44/46

    Flexi Power Rectifier FPRB

    Installation Manual for SPD, Rev AB Page43of 45

    3.1.6.6 Figure 27 shows the PDA rear internal layout after completing the 3-phase delta

    AC connection with the SPD.

    Figure 27 3-phase delta (3) AC connection with the SPD

    3.1.6.7 After finishing and checking the AC cable installation, replace the PDA rear cover

    referring to section 3.4 in Flexi Power Rectifier Installation Manual (Emerson

    File No. 970-009475-0000).

    After installation of the SPD kit has been completed, the installer should check the

    installation against the steps outlined within this document, supported by a multi-

    meter to check for wiring continuity.

    Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.

    L1 forthree-phase

    L2 forthree-phase

    L3 forthree-phase

    AC groundclamp

    SPD groundclamp

    SPDgroundlink

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    45/46

    Installation Manual for SP

    3.2 Replace the SPD

    The AC power supply m

    Ask Emerson Netw

    damaged. Emerson

    whole SPD for repla

    The user shall onlythe whole SPD from

    The user can verify

    Properties.

    3.2.1 Hold the tw

    base (see Fi

    Figure 28 R

    Flexi Powe

    D, Rev AB

    st be switched off prior to accessing the SPD.

    rk Power service people for help if any OVP

    ill provide the user with the individual OVP m

    ement.

    replace the damaged OVP module of the SPDthe PDA chassis.

    hich OVP module has been damaged Refe

    o sides of the damaged OVP module and pull it

    ure 28)

    emoving the damaged OVP module from the S

    r Rectifier FPRB

    age44of 45

    odule has been

    dule but not the

    ithout removing

    rring to section

    ut from the SPD

    D

  • 7/25/2019 FPRB Installation Manual for SPD Rev AB

    46/46

    Flexi Power Rectifier FPRB

    3.2.2 The SPD base is designed such that the two kinds of OVP modules cannot be

    mixed when installing onto it (seeFigure 29).

    Figure 29 The OVP module and the SPD base

    3.2.3 Fit the new module into its position on the SPD base (seeFigure 30).

    Figure 30 Fitting a new OVP module to the SPD