Installation Manual for SPD
NSN Flexi Power Rectifier FPRB MODEL NO.:AA27540LPREPARED/DATE: Ferdinand Sisracon / 06/25/2013CHECKED/DATE: Bear Chen /
ISSUE ECO #
DATE
SECTION REVISIONS DESCRIPTION APPROVED
AA 06-30-2013 All New document for FPRB AA27540L Wood Lou
AB 10-30-2013 3.1.3.7 Added special instruction when installing
the N link cable into the Flexi Power
terminal block
Wood Lou
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
2/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page1of 45
Installation Manual for
Surge Protective Device
Flexi Power Rectifier
FPRB
Manufactured by: Emerson Network Power / Embedded Power
NSN Part Number: CS7000002.01
Manufacturing PN: AA25130L
Visit us @http://www.emersonnetworkpower.com
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
3/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page2of 45
Manual Number: 970-009473-0000
Manual Issue: AB
Manual Status: Standard
Release Date: October 30, 2013
Copyright 2013 Emerson Electric Co. All rights reserved.
CONSIDER IT SOLVED
Published in China
This document, and the information it contains, are the property of Emerson Network Power
Co., Ltd, and are protected by law. Both must be held in strictest confidence at all times.
Emerson Network Power grants no license or right to copy, use or disclose either, expressly or by
implication.
Disclaimer
This document and the information contained herein are provided on an "AS IS" basis. Emerson
Network Power may make improvements or changes in this documentation, at any time and
without notice and as it sees fit. The information in this documentation was prepared by
Emerson Network Power with reasonable care and is believed to be accurate. However,
Emerson Network Power shall not assume responsibility for losses or damages resulting from
any omissions, inaccuracies, or errors contained herein.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
4/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page3of 45
History
Date
DD-MM-YYY
Version Author Change Note No./Notes
30-06-2013 AA Ferdinand Sisracon First release for FPRB
30-10-2013 AB Ferdinand Sisracon
Release to be used as a common
SPD Instruction Manual for both
FPRA and FPRB
Added special instruction to
connect the N link cable for both
FPRA and FPRB
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
5/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page4of 45
Table of Contents
History ................................................................................................................................. 3
Table of contents ................................................................................................................ 4
List of figures ....................................................................................................................... 5
List of tables ........................................................................................................................ 5Preface ................................................................................................................................ 9
Application of this manual............................................................................................ 10
Chapter 1 Product Introduction...................................................................................... 11
1.1 General Description ........................................................................................... 11
1.2 Main Specification of the SPD............................................................................ 11
1.3 Properties........................................................................................................... 16
Chapter 2 Preparation..................................................................................................... 18
2.1 Installation tools ................................................................................................ 18
2.2 Delivery contents ............................................................................................... 18
Chapter 3 SPD Installation .............................................................................................. 20
3.1 Make AC connection with the SPD .................................................................... 20
3.1.1 Preparation ........................................................................................... 21
3.1.2 Configure the Terminal Block ............................................................... 27
3.1.3 3-phase star (3Y) AC connection with the SPD..................................... 29
3.1.4 Single-phase (1) AC connection with the SPD ................................... 35
3.1.5 2-phase AC connection with the SPD.................................................. 38
3.1.6 3-phase delta (3) AC connection with the SPD ................................... 40
3.2 Replace the SPD ................................................................................................. 44
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
6/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page5of 45
List of Figures
Figure 1 Internal circuit diagram of the SPD............................................................................... 11
Figure 2 Structure of the SPD ..................................................................................................... 12
Figure 3 Dimension of the SPD top view ................................................................................. 13Figure 4 Dimension of the SPD side view ................................................................................ 14
Figure 5 SPD configuration in a TN-S system.............................................................................. 16
Figure 6 Checking failure of the SPD .......................................................................................... 17
Figure 7 PDA rear internal chassis layout................................................................................... 21
Figure 8 The AC cable connection chart ..................................................................................... 27
Figure 9 AC terminal block configuration 1 and 2 Configuration ...................................... 28
Figure 10 AC terminal block configuration 3 ......................................................................... 28
Figure 11 AC terminal block configuration 3Y ......................................................................... 29
Figure 12 Schematic diagram of AC connection with the SPD 3Y ........................................... 29
Figure 13 - Assemble the Link Cables to SPD................................................................................. 30
Figure 14 - AC Ground wire ........................................................................................................... 31
Figure 15 - Secure the SPD into the DIN rail .................................................................................. 31
Figure 16 - Connect the Link cables to Terminal Block.................................................................. 32
Figure 17 - Special Instruction for N Link Cable Installation.......................................................... 33
Figure 18 AC connection with the SPD - 3Y ................................................................................ 34
Figure 19 Schematic diagram of AC connection with the SPD 1 .......................................... 35
Figure 20 SPD configuration for single-phase AC connection .................................................... 36
Figure 21 - Connection of AC link cables from SPD to Terminal Block.......................................... 37
Figure 22 Schematic diagram of AC connection with the SPD 2- Phase .................................. 38
Figure 23 - AC connection with the SPD 2- Phase ...................................................................... 39
Figure 24 Schematic diagram of AC connection with the SPD 3 ........................................... 40
Figure 25 - Connection of AC link cables and SPD ground cables ................................................. 41
Figure 26 Connecting the AC terminal block 3 ...................................................................... 42Figure 27 3-phase delta (3) AC connection with the SPD .......................................................... 43
Figure 28 Removing the damaged OVP module from the SPD .................................................. 44
Figure 29 The OVP module and the SPD base ............................................................................ 45
Figure 30 Fitting a new OVP module to the SPD ........................................................................ 45
List of Tables
Table 1 Contents of this manual .............................................................................................. 9
Table 2 Symbols in this manual ............................................................................................... 9
Table 3 Reference documents of the SPD ............................................................................ 10
Table 4 Main specification of the SPD .................................................................................. 15
Table 5 Delivery contents of the SPD.................................................................................... 19
Table 6 Recommended preparation for AC mains cable ................................................... 22
Table 7 AC connection with the SPD ..................................................................................... 23
Table 8 Schematic diagram of AC connection with the SPD.............................................. 25
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
7/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page6of 45
List of Terms
A Ampere
AC Alternative current
AWG American Wire Gauge
BAT Battery
BR Battery Return
BTS Base Transceiver Station
CB Circuit Breaker
CSA Cross Section Area
CU Control unit
DC Direct current
EMC Electromagnetic CompatibilityESD Electrostatic Discharge
FPRB Flexi Power Rectifier
GND Ground
GUI Graphical User Interface
IE Internet Explorer
IP Internet Protocol
L Live cable from the AC mains
LAN Local Area Network
LED Light Emitting Diode
LVD Low Voltage Disconnect
MAC Media Access Control
MCB Miniature Circuit Breaker
N Neutral cable from the AC mains
PC Personal Computer
PCB Printed Circuit Board
PDA Power Distribution Assembly
PE Protective earth
PSU Power Supply Unit
SPD Surge Protective Device
V Volt
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
8/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page7of 45
VPN Virtual Private Network
1 Single-phase AC type
3Y 3-phase star AC type
3 3-phase delta AC type
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
9/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page8of 45
This page left intentionally blank
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
10/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page9of 45
Preface
About this manual
This manual provides all the necessary information to operate, install and maintain the
Surge Protective Device (SPD) used in the Flexi Power Rectifier (FPRB).
Table 1lists the contents of this manual:
Table 1 Contents of this manual
Chapter Title Content
1 Product instruction Describes the specifications and properties of the
SPD
2 Preparation Describes the SPD installation preparations
3 SPD installation Describes how to install and replace the SPD into the
FPRB
Terms and Symbols in this manual
These term and symbols in Table 2might appear in the manual:
Table 2 Symbols in this manual
Symbol Description
Warning statement identifies conditions or practices that couldresult in bodily injury or loss of life.
It warns the reader to be extremely careful.
Caution statement identifies conditions or practices that could
result in damage to this product or devices connect to it.
It indicates that the reader must be careful.
Provides hints to the user for easier installation
The necessary supplementary of the article to let user be clearer.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
11/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page10of 45
Reference documents
Table 3contains the reference documents of the SPD:
Table 3 Reference documents of the SPD
DocumentEmerson Network Power
File No.
Product Specification FPRB 970-009025-0000
FPRB Installation Manual for SPD (This manual) 970-009473-0000
FPRB User Manual 970-009474-0000
FPRB Installation Manual 970-009475-0000
FPRB Quick Start Guide for SPD 970-009476-0000
FPRB Quick Start Guide 970-009477-0000
Application of this manual
This manual is regarded as a substitution of the partMake AC connection without the SPD
(refer to section 3.4 of theFlexi Power Rectifier - Installation Manual, Emerson File No. 970-
009475-0000).
This manual is based on the present SPD in use. Emerson may change the SPD to a secondsource in future. However Emerson ensures the compatibility of the new SPD in the FPRB.
This manual supports all applications of the SPD that can be used in the FPRB.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
12/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page11of 45
Chapter 1 Product Introduction
1.1 General Description
The Flexi Power Rectifier (FPRX, Emerson part number AA25020L/ CS7000013.XX for 6kW
and AA27540L/ CS7000030.XX for 9kW) is a 6kW or 9kW output power AC rectifier package
respectively. The Surge Protective Device (SPD, Emerson part number AA25130L/
CS7000002.XX) is used to prevent damage to the FPRX caused by high input voltages or
surge.
The SPD consists of three equivalent OVP modules used between live cables and neutral
cable from the AC mains; one OVP module used between the neutral cable from the AC
mains and the earth; and one remote signaling contact.
The SPDs mentioned in this manual are applicable for both 6kW and 9kW system. The SPD
used is the same as the one we used in FPRA.
1.2 Main Specification of the SPDThe SPD illustrated in this manual is made by Phoenix Contact CO., Ltd(model number:
VAL-MS 230IT/3+1-FM), or SICHUAN ZHONGGUANG LIGHTNING (model number:
ZGG40-385(3+1)).
L1 L2 L3 N
11
12 14
FM
VAL-MS 230 IT ST F-MS
12 ST
VAL-MS 230IT/3+1-FM
Figure 1 Internal circuit diagram of the SPD
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
13/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page12of 45
The SPD (module name VAL-MS 230IT/3+1-FM) consists of three equivalent OVP
modules used between live cables and neutral cable from the AC mains (module name
VAL-MS 230 IT ST), one OVP module used between the neutral cable from the AC
mains and the earth (module name F-MS 12 ST) and one remote signaling contact
(module name VAL-MS 230IT-FM) (seeFigure 1).
The four OVP modules and the remote signaling contact are all installed on the SPD base
and can be removed from the base. This structure leads to easier configuration and
replacement of the OVP modules (see
Figure2).
Figure 2 Structure of the SPD
VAL-MS230 IT ST
F-MS12 ST
Base
VAL-MS230IT-FM Terminal
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
14/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page13of 45
Figure 3andFigure 4show the dimension of the SPD. The four OVP modules are of the
same dimensions.
VAL-MS 230IT/3+1-FM
ZGG40-385(3+1)
Figure 3 Dimension of the SPD top view
17.5m 17.5m70m
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
15/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page14of 45
VAL-MS 230IT/3+1-FM
ZGG40-385(3+1)
Figure 4 Dimension of the SPD side view
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
16/46
Installation Manual for SPD,
Table 4lists the main specificat
Ta
Module name Parameter
VAL-MS 230 ITST
(OVP module for
L-N)
UN(L-N / L-L)
UC(L-N)
UP(L-N)
In/ Imax(8/20 S)
Screw thread / to
F-MS 12 ST
(OVP module for
N-PE)
UN (N-PE)
UC(N-PE)
UP(N-PE)
In/ Imax(8/20 S)
Screw thread / to
VAL-MS 230IT-FM
(Remote
signaling
contact)1
Imax
Screw thread / to
VAL-MS
230IT/3+1-FM
(The whole SPD
module)
Temperature
IP-code
Class II
Type 2
Flexi Power
Rev AB Page1
ions of the OVP modules.
ble 4 Main specification of the SPD
Specification Descrip
230VAC/ 400VAC Rated v
385VAC Clampi
1.9kV Protecti
20kA / 40kA Rated d
maximu
rque M5 / 4.5Nm
230 VAC Rated v
260VAC Clampi
1.0kV Protecti
20kA / 40kA Rated d
maximu
rque M5 / 4.5Nm
AC: 3A (125V)0.75A (250V)
DC: 2A (30V)
que M2 / 0.25Nm
-40C ~ +80C
IP20 Ingress
degree
IEC 61643-1: 2005-01
EN 61643-11: 2002-12
ectifier FPRB
5of 45
tion
oltage
g voltage
ve voltage
ischarge current /
m discharge current
oltage
g voltage
ve voltage
ischarge current /
m discharge current
Protection (IP)
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
17/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page16of 45
Note:
1Although the SPD remote signaling contact has three pins, only two are applied when
configured in the FPRB. Refer toFigure 13
1.3 Properties
Typical use
Figure 5shows the configuration of the SPD in a TN-S system.
Figure 5 SPD configuration in a TN-S system
Note:
It is recommended to use the SPD with a mains utility offering the appropriate line
fuse protection.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
18/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page17of 45
Failure Detection
If any OVP module has been damaged, Emerson will provide the user with the individual
OVP module but not the whole SPD for replacement.
In the event that any one of the four OVP modules is damaged, the PDA will send alarm
signal via the LCD.
After opening the rear top cover of the PDA (refer to section 3.4 of the Flexi Power
Rectifier Installation Manual, Emerson File No. 970-009475-0000), the user can
confirm which OVP module is in failure.
Failure Indication
If the window is transparent, the OVP is OK; if the window is red, the OVP is damaged
and should be replaced in time (seeFigure 6).
Figure 6 Checking failure of the SPD
Window
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
19/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page18of 45
Chapter 2 Preparation
2.1 Installation tools
Tool kit:
Allen key (hex key): 8 mm (0.31 in.)
Allen key (hex key): 4 mm
Awl: diameter of 2mm
ESD wrist strap and cable
TORX screwdriver set: T10, T20, T25
Flat screwdriver
Cross screwdriver
Wrench 13 mm (0.51 in.)
Folding knife
Adjustable (monkey) wrench
Side cutters
Lint-free swab or wipe and 99% alcohol for cleaning optical connectors
Cable ties for routing cables
Tape measure
Flashlight, pocket lamp or torch
Hammer drill
Marker pen or comparable tool
Pliers
Wire-stripper
Test equipment:
Multi-meter
2.2 Delivery contents
The SPD is optional for the user and shipped independent from the FPRB.
Verify that all the material listed in Table 5 has been received and is in good condition.
Report any missing or damaged items to our Emerson Network Power Service Department.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
20/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page19of 45
Table 5 Delivery contents of the SPD
Part Figure Description Usage Emerson
Part Number
Emerson
Module
Number
SPD Surge Protective Device
Manufacturer p/n:VAL-MS
230IT/3+1-FM
Manufacturer: PHOENIX
CONTACT (SEA), PTE. LTD.
1 pc 440-000700-
0000
AA25130L
Surge Protective Device
Manufacturer p/n: ZGG40-385(3+1)
Manufacturer: SICHUAN
ZHONGGUANG LIGHTNING
PROTECTION TECHNOLOGIES
CO.,LTD.
SPD
Jumper
Short link for SPD terminals in
single-phase AC connection
(Color of plastic may vary)
1 each 502-000496-
0000/
500-001769-
0000
L line
short link
L1/L2/L3 for three phase,
L for single phase (AWG10)
1 750-006658-
0000
N line
short link
N for three phase star,
N for single phase (10mm2)
1 438-000423-
0000
SPD
groundlink
SPD ground link to Chassis 1 750-000988-
0000
SPD
sense
cable
SPD signal cable connecting to
the MCU
1 750-001004-
0000
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
21/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page20of 45
Chapter 3 SPD Installation
3.1 Make AC connection with the SPD
The AC power supply must be switched off prior to accessing the AC cable.
This manual concentrates on the AC connection with the SPD, and omits the steps prior
to the SPD installation, i.e. the AC terminal block configuration, etc. The user shouldrefer to Flexi Power Rectifier Installation Manual (Emerson File No. 970-009475-0000)
for the relevant previous steps.
The colors of the AC mains wire used in this manual are for illustration purpose only.
However, the user should verify the AC mains referring to the color-coding in the
respective field or country of application.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
22/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page21of 45
3.1.1 Preparation
3.1.1.1 Detach the PDArear top coverreferring to Flexi Power Rectifier Installation
Manual (Emerson File No. 970-009475-0000).
3.1.1.2 Loosen screws A, B and C as per attached photo with a TORX screwdriver (T20)
Figure 7 PDA rear internal chassis layout
B
C
PDA earthcable
AC groundclamp
SPD ground
clamp
SPDDIN Rail
ACterminalblock
FSPD sensorconnection
A
Strain-relief
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
23/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page22of 45
3.1.1.3 Preparing the AC mains cable. The color of the wires may vary depending on the
country where the SPD will be mounted.
Table 6 Recommended preparation for AC mains cable
(Tolerance: 3mm)
AC type L1 L2 L3 N PE
Single-phase
(1)
A (mm) 55 70 100
B (mm) 20 20 20
2-phase A (mm) 55 100 N/A
B (mm) 20 20 N/A
3-phase delta
(3)
A (mm) 55 60 70 N/A 100
B (mm) 20 20 20 N/A 20
3-phase star
(3Y)
A (mm) 55 60 70 85 100
B (mm) 20 20 20 20 20
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
24/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page23of 45
Table 7 AC connection with the SPD
AC type Terminals connection Short link available(1)
AC terminal block
Configuration(2)
SPD configuration
AC
mains
SPD AC terminal
block
Chassis(3)
1
N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and4,5,6 respectively Short terminals L1,L2, L3
L L2 5 N/A L2 for three-phase
N/A L3 4 N/A L3 for three-phase
N N 2 N/A N for single phase
PE N/A N/A AC ground clamp N/A
N/A N/A SPD ground clamp SPD ground link
2-Phase N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and
4,5,6 respectively
Short terminals L1,
L2, L3
L1 L2 5 N/A L2 for three-phase
N/A L3 4 N/A L3 for three-phase
L2 N 2 N/A N for single phase
N N/A N/A AC ground clamp N/A
N/A N/A SPD ground clamp SPD ground link
3Y
L1 L1 6 N/A L1 for three-phase Short terminals 1,2,3 N/A
L2 L2 5 N/A L2 for three-phase
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
25/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page24of 45
L3 L3 4 N/A L3 for three-phase
N N 2 N/A N for three-phase star
PE N/A N/A AC ground clamp N/A
N/A N/A SPD ground clamp SPD ground link
3
L1 L1 5 N/A L1 for three-phase Short terminals 1,2 and 3,4
and 4,5 respectively
N/A
L2 L2 3 N/A L2 for three-phase
L3 L3 1 N/A L3 for three-phase
PE N/A N/A AC ground clamp
N/A N N/A SPD ground clamp SPD ground link
Note:
(1) The short link names listed herein are in accordance with the actual labels on the short links.
(2) The AC terminal block should be configured before the AC connection. User shall refer to section 3.4 in
Flexi Power Rectifier Installation Manual (Emerson file No.970-009475-0000) for more details
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
26/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page25of 45
(3) Refer toTable 3for the corresponding clamps.
Table 8 Schematic diagram of AC connection with the SPD
AC
Type
Schematic diagram Configuration of AC
terminal block
3Y
L L L3 N
3 4 5 6
PD
AC Terminal Block
L
L
E
AC Mains
L3 N
Short terminals 1,2,3
1
L L L3 N 3 4 5 6
SPD
AC Terminal Block
L NE
AC mains
Short terminals 1,2,3;
4,5,6 respectively
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
27/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page26of 45
3
L L L3 N
3 4 5 6
PD
AC Terminal Block
L LE
AC mains
L3
Short terminals 1,2; 3,4;
5,6 respectively
2-phase
Short terminals 1,2,3;
4,5,6 respectively
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
28/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page27of 45
3.1.2 Configure the Terminal Block
Verify the AC power system types in field, and make sure the corresponding bridge
configuration is used.
The AC terminal block has been already configured for 3-phase star AC mains before
the shipment. Therefore the user has to change the AC terminal block configuration
if required referring to the actual AC type in field.
Insert the bridges and screws (provided as accessories) to the corresponding slots on
top of the AC terminal block referring to the AC CABLE CONNECTION CHART located
on the chassis (and reproduced inFigure 8).
Secure the screws with a flat screwdriver, tightening to 0.8Nm.
Figure 8 The AC cable connection chart
There are three AC power system types (see above Figure), and thus three AC
configurations of the AC terminal block.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
29/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page28of 45
Single-phase (1) and Two-phase (2) configuration
For Single- phase AC system, use two 3-pole bridges to short the terminals 1, 2,
3 and 4, 5, 6 respectively on the AC terminal block (seeFigure 9)
Figure 9 AC terminal block configuration 1 and 2 Configuration
3- phase delta (3) configuration
For 3-phase delta AC system, use three 2-pole bridges to short the terminals 1, 2
and 3, 4 and 5, 6 respectively on the AC terminal block (seeFigure 10)
Figure 10 AC terminal block configuration 3
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
30/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page29of 45
3- phase star (3Y) configuration
For 3-phase star AC system, use one 3-pole bridges to short the terminals 1, 2, 3
on the AC terminal block (seeFigure 11)
Figure 11 AC terminal block configuration 3Y
3.1.3 3-phase star (3Y) AC connection with the SPD
L L L3 N
3 4 5 6
PD
AC Terminal Block
L
L
E
AC Mains
L3 N
Figure 12 Schematic diagram of AC connection with the SPD 3Y
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
31/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page30of 45
The terminal marks in Figure 12 are in accordance with the actual SPD and AC
terminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 12 and Table7 referring to labels on the short links.
The terminals 1, 2, 3 on the AC terminal block should be shorted before the
connection. Refer to section 3.4 in Flexi Power Rectifier Installation Manual
(Emerson file No.970-009475-0000)for details.
3.1.3.1 Detach the cable strain-relief from the chassis by loosening the screw C in
Figure 7 with a TORX screwdriver (T20). Insert the AC mains cable on the
strain relief.
3.1.3.2 Detach the AC ground clamp and SPD ground clamp from the chassis byloosening the screws A and B with a TORX screwdriver (T20).
3.1.3.3 Prepare the AC mains of 3-phase star as perTable 6.
3.1.3.4 Assemble the Link cables, the AC mains cable, the SPD sensor cable and the
SPD grounding cable into the SPD. Refer to Figure 13
Figure 13 - Assemble the Link Cables to SPD
L1 forthree-phase
L2 forthree-phase
L3 forthree-
phase
N forthree-phasestar SPD
ground
cable
SPDsensecable
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
32/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page31of 45
Insert the connector of the SPD sense cable into the left two contacts; otherwise it will
block the SPD from installing onto the chassis.
3.1.3.5 Fix the AC ground wire into the terminal lug.
.
Figure 14 - AC Ground wire
3.1.3.6 Secure the SPD into the SPD DIN rail. Connect the SPD sense cable to the
stand by mating connector. Connect the SPD grounding cable into the
terminal lug. Refer toFigure 15.
Figure 15 - Secure the SPD into the DIN rail
SPDsensecable
SPDGroundingcable
SPD
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
33/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page32of 45
3.1.3.7 Connect the AC link cables from SPD to the Terminal Block. Assemble the
SPD grounding cable and the AC grounding cable into the PDA
Figure 16 - Connect the Link cables to Terminal Block
1. Use the appropriate L and N short link referring to the label on the short links
and the indications inFigure 12andTable 7.
2. Rotate the N link cable 90 degrees either clockwise or counter clockwise when
assembling the SPD on the FPRA due to the smaller slot of the terminal block.
Refer toFigure 17 - Special Instruction for N Link Cable Installation
SPDgroundingcable lug
AC
groundingcable lug
N linkcable
L3 linkcable
L2 linkcable
L1 link
cable
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
34/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page33of 45
Figure 17 - Special Instruction for N Link Cable Installation
It is recommended to clamp the AC wire and the corresponding short link with one
overlapping on another.
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
35/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page34of 45
Below figure shows the PDA rear layout after completing the 3-phase star AC
connection with the SPD.
Figure 18 AC connection with the SPD - 3Y
3.1.3.8 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to Flexi Power Rectifier Installation Manual (Emerson File
No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
L1 short link
L2 short link
L3 short link
N short link
SPD sense cable
L2
L3
L1
SPD groundcable
N
PE of AC
mains
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
36/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page35of 45
3.1.4 Single-phase (1) AC connection with the SPD
L
L
L3 N
3 4 5 6
SPD
AC Terminal Block
L NE
AC mains
Figure 19 Schematic diagram of AC connection with the SPD 1
The terminal marks in Figure 19 are in accordance with the actual SPD and AC
terminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 19 andTable
7 referring to labels on the short links.
The terminals 1,2,3 and 4,5,6 on the AC terminal block should be shorted
respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier
Installation Manual (Emerson file No.970-009475-0000) for details.
3.1.4.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables.
3.1.4.2 As indicated inFigure 19 andTable 7, the SPD terminals L1, L2 and L3 have to be
paralleled by the SPD jumper (seeFigure 20).
L1 for three-phase
L2 for three-phase
L3 for three-phase
N for single phase
AC groundclamp
SPD groundclamp
SPD ground link
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
37/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page36of 45
The user should loosen the three terminal clamps of L1, L2 and L3, and hold the SPD
upside down. Thus the SPD jumper can be easily inserted into the parallel clamps.
The jumper should be fixed in the SPD together with the live cables of the AC mains
and L line short links.
Figure 20 SPD configuration for single-phase AC connection
3.1.4.3 Connect the live cable from the AC mains and L2 short link into terminal L2 on
the SPD referring to Figure 19 andTable 7, tightening the top screw to 4.5Nm
with a cross screwdriver (seeFigure 21).
SPD jumper
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
38/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page37of 45
Figure 21 - Connection of AC link cables from SPD to Terminal Block
3.1.4.4 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to section 3.4 in Flexi Power Rectifier Installation Manual
(Emerson File No. 970-009475-0000).
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
N for singlephase
AC groundclamp
SPD groundclamp
SPDground
link
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
39/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page38of 45
3.1.5 2-phase AC connection with the SPD
Figure 22 Schematic diagram of AC connection with the SPD 2- Phase
3.1.5.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables
3.1.5.2 As indicated inFigure 19andTable 7, the SPD terminals L1, L2 and L3 have to be
paralleled by the SPD jumper (seeFigure 20).
L1 for three-phase
L2 for three-phase
L3 for three-phase
AC groundclamp
SPD groundclamp
SPD ground link
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
40/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page39of 45
3.1.5.3 Connect the AC link cables and the AC cables to the SPD and to terminal block.
Refer toFigure 23)
Figure 23 - AC connection with the SPD 2- Phase
3.1.5.4 After finishing and checking the AC cable installation, re-install the PDA rear
cover referring to section 3.4 in Flexi Power Rectifier Installation Manual
(Emerson File No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
Use DMM to measure L1-L2 voltage
Ensure L1-L2 voltage between 180VAC-276VAC
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
N for singlephase
AC groundclamp
SPD groundclamp
SPDground
link
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
41/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page40of 45
The terminal marks in Figure 22 are in accordance with the actual SPD and AC
terminal block.
Refer to Single-phase (1) AC connection for details.
3.1.6 3-phase delta (3) AC connection with the SPD
L L L3 N
3 4 5 6
PD
AC Terminal Block
L
L
E
AC mains
L3
Figure 24 Schematic diagram of AC connection with the SPD 3
The terminal marks in Figure 24 are in accordance with the actual SPD and ACterminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 24 and Table
7 referring to labels on the short links.
The terminals 1,2 and 3,4 and 5,6 on the AC terminal block should be shorted
respectively before the connection. Refer to section 3.4 in Flexi Power Rectifier
Installation Manual (Emerson file No.970-009475-0000) for details.
L1 for three-phase
L2 for three-phase
L3 for three-phase
SPD ground link
AC groundclamp
SPD groundclamp
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
42/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page41of 45
3.1.6.1 Perform the same procedure in preparing the AC cables SPD grounding cables
and the SPD sense cables
3.1.6.2 Configure the terminal block as perFigure 10
3.1.6.3 Assemble the AC cables, AC link cables into the SPD.
3.1.6.4 Assemble the AC link cables into the Terminal Block.
Figure 25 - Connection of AC link cables and SPD ground cables
SPDgroundingcableconnected toN terminal ofthe SPD.
N connectedto Ground
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
43/46
Installation Manual for SP
3.1.6.5 Connect the L1,
block respectiv
to 1.5Nm with a
Figure
SPDSenseCable
SPDgroundlink
Flexi Powe
D, Rev AB
L2 and L3 short links to terminals 5, 3, 1 on
ly referring toFigure 24andTable 7, tightenin
Cross screwdriver (seeFigure 26).
26 Connecting the AC terminal block 3
r Rectifier FPRB
age42of 45
the AC terminal
g the top screws
L1shortlink
L2shortlink
L3short
link
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
44/46
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AB Page43of 45
3.1.6.6 Figure 27 shows the PDA rear internal layout after completing the 3-phase delta
AC connection with the SPD.
Figure 27 3-phase delta (3) AC connection with the SPD
3.1.6.7 After finishing and checking the AC cable installation, replace the PDA rear cover
referring to section 3.4 in Flexi Power Rectifier Installation Manual (Emerson
File No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check the
installation against the steps outlined within this document, supported by a multi-
meter to check for wiring continuity.
Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
AC groundclamp
SPD groundclamp
SPDgroundlink
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
45/46
Installation Manual for SP
3.2 Replace the SPD
The AC power supply m
Ask Emerson Netw
damaged. Emerson
whole SPD for repla
The user shall onlythe whole SPD from
The user can verify
Properties.
3.2.1 Hold the tw
base (see Fi
Figure 28 R
Flexi Powe
D, Rev AB
st be switched off prior to accessing the SPD.
rk Power service people for help if any OVP
ill provide the user with the individual OVP m
ement.
replace the damaged OVP module of the SPDthe PDA chassis.
hich OVP module has been damaged Refe
o sides of the damaged OVP module and pull it
ure 28)
emoving the damaged OVP module from the S
r Rectifier FPRB
age44of 45
odule has been
dule but not the
ithout removing
rring to section
ut from the SPD
D
-
7/25/2019 FPRB Installation Manual for SPD Rev AB
46/46
Flexi Power Rectifier FPRB
3.2.2 The SPD base is designed such that the two kinds of OVP modules cannot be
mixed when installing onto it (seeFigure 29).
Figure 29 The OVP module and the SPD base
3.2.3 Fit the new module into its position on the SPD base (seeFigure 30).
Figure 30 Fitting a new OVP module to the SPD