friedrich führ desertec foundation, director/vorstand friedrich.fuehr@desertec

29
DESERTEC Concept: Clean power from deserts for a world of 10 billion people Turning a Vision into Reality Friedrich Führ DESERTEC Foundation, Director/Vorstand [email protected]

Upload: haile

Post on 24-Jan-2016

24 views

Category:

Documents


1 download

DESCRIPTION

DESERTEC Concept: Clean power from deserts for a world of 10 billion people Turning a Vision into Reality. Friedrich Führ DESERTEC Foundation, Director/Vorstand [email protected]. DESERTEC Concept. DESERTEC-Konzept. The world with 10 billion people at about 2050. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

DESERTEC Concept:Clean power from deserts

for a world of 10 billion people

Turning a Vision into Reality

Friedrich FührDESERTEC Foundation, Director/Vorstand

[email protected]

Page 2: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

DESERTEC-KonzeptDESERTEC Concept

Page 3: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

The world with 10 billion people at about 2050

space

food

water

energy

climate

livelihoods

sufficient

manageable

insufficient

super-insufficient

self-destructing

fast changes

Fossil World 2050

4 times red light

Page 4: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Clean Power World – achievable with DESERTEC

Within 3000 km from deserts:

To more than 90% of world pop clean power from deserts available.

HVDC

via HVDC super grid to a World with 10 billion People

3000 km

Friedrich Führ, Berlin 14.10.2009

World total demand 2050:

60 PWh/yScenario: 50% from deserts:

30 PWh/y collectors for

12,000 GW-el

from 450 x 450 km²= 0.55% of all deserts

= 1% of useful deserts distributed over “10,000” sites

10% loss

12,000 solar GigaWatt from Deserts

Page 5: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

GLOBAL INTEREST coming up

• DESERTEC – INDIA

• (DESERTEC – CHINA)

• DESERTEC – AUSTRALIA

• DESERTEC - IRAN

• DESERTEC – ECOWAS (sub-Sahara)

• DESERTEC - EUMENA

Friedrich Führ, Berlin 14.10.2009

Page 6: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Renewable Energy Scenario for EUMENA based on a grid interconnecting all renewable energy resources in this region

Studies by DLR forEUMENA region

MED-CSP TRANS-CSP for German gov‘t

CLUB OF ROMEWhite Book 2009www.desertec.org

Friedrich Führ, Berlin 14.10.2009

Page 7: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Climate security:Decarbonization in EUMENA,

compatible with climate goal ∆T<2°

0

500

1000

1500

2000

2500

3000

3500

4000

2000 2010 2020 2030 2040 2050

Year

CO

2-E

mis

sio

ns

in

Mt/

y

Avoided

Import Solar

Photovoltaics

Wind

Geothermal

Hydropower

Wave / Tidal

Biomass

CSP Plants

Oil / Gas

Coal

Nuclear

-81%

-81%

Friedrich Führ, Berlin 14.10.2009

Page 8: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

0

500

1000

1500

2000

2500

3000

3500

4000

4500

2000 2010 2020 2030 2040 2050

Year

Ele

ctric

ity [T

Wh/

y]

Import SolarPhotovoltaicsWindGeothermalHydropowerBiomassWave / TidalCSP PlantsOil GasCoalNuclear

0

500

1000

1500

2000

2500

3000

3500

4000

4500

2000 2010 2020 2030 2040 2050

Year

Ele

ctri

city

[T

Wh

/y]

DesalinationExport SolarPhotovoltaicsWindGeothermalHydropowerBiomassWave / TidalCSP PlantsOil / GasCoalNuclear

in MENA, including export to Europe and power for desalination

in EU-25, and17% import from MENA

By clean power from deserts EU gets clean firm capacity and may win 10-15 years in the fight against climate change.

Thanks to energy efficiency and renewable energies nuclear energy can be phased out completely, andgas and coal largely.

Power demand, and supply scenario (TWh/y) in MENA and EU

8

transition mix 2000-2050 6 times m

ore

Friedrich Führ, Berlin 14.10.2009

Page 9: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Freshwater Crisis in MENA region:Deficits by Country (bn m³/y)

0

20

40

60

80

100

120

140

160

2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050

Year

Fre

shw

ater

Def

icit

[b

illio

n m

³/y]

BahrainYemenUAESaudi ArabiaQatarKuwaitOmanIranIraqSyriaLebanonJordanIsraelPalestineEgypt LibyaTunisiaAlgeriaMorocco

9

NILE

NILE

NILE

NILE

Page 10: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Global DESERTEC program phases for a rapid implementation

DESERTEC CSP DEPLOYMENT PLANA coarse implementation scheme:

Phase 1 HIGH SPEED MARKET PREPARATION6 Years 2010 -2015 policy driven

Phase 2 COLLECTOR PRODUCTION CAP. SCALE UP20 Years 2016– 2035 market driven

Phase 3 HIGH SPEED DEPLOYMENT20 Years 2031 – 2050 market driven

DESERTEC CSP DEPLOYMENT PLANA coarse implementation scheme:

Phase 1 HIGH SPEED MARKET PREPARATION6 Years 2010 -2015 policy driven

Phase 2 COLLECTOR PRODUCTION CAP. SCALE UP20 Years 2016– 2035 market driven

Phase 3 HIGH SPEED DEPLOYMENT20 Years 2031 – 2050 market driven

Friedrich Führ, Berlin 14.10.2009

Fast completion of phase 1 = key to success !

Main task for DESERTEC Industrial Initiative

Page 11: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

The world with 10 billion people at about 2050

11

space

food

water

energy

climate

livelihoods

sufficient

manageable

insufficient

super-insufficient

self-destructing

fast changes

Fossil World 2050

sufficient

sufficient

manageable

sufficient

stabilizing

stable

Clean Power World

4 times red light no red light

Friedrich Führ, Berlin 14.10.2009

Page 12: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

from

burden sharing

The new sustainability spirit for the DII:

creating a world that we can enjoy to live in

to

saving the planet:

the biggest business case ever

Friedrich Führ, Berlin 14.10.2009

Page 13: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

13 13

Page 14: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

14 14

Page 15: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC
Page 16: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC
Page 17: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC
Page 18: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Plan Solaire

Page 19: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Umweltminister-konferenz

e-parliament

D EU EMPA

JungBerg

KauchFell

1,700 members

PötteringHarmsPrody

Wiekmann

SchennachBouhrizi

Page 20: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Dr. Gerhard Knies HRH Prince Hassan

bin Talal of Jordan

Dr. Klaus Töpfer Anders Wijkman

Page 21: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Al Gore: „This is not pie in the sky, this can be done.“

Page 22: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

First Step to

Page 23: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

First Step to

Laila Georgy

Ministry of

Electricity and

Energy

Page 24: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

First Step to

Jamila Matar

Head of Energy

Department

League

of Arab States

Page 25: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

The DESERTEC concept forms the basis of the Desertec Industrial Initiative (DII)

Memorandum of Understanding (MoU)

25

•12 companies and the DESERTEC Foundation signed a Memorandum of Understanding.•The objective of this initiative is to analyse and develop the technical, economic, political, social and ecological framework for carbon-free power generation in the deserts of North Africa.

Page 26: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC
Page 27: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC
Page 28: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

PublicInitiative

IndustrialInitiative

AcademicInitiative

Political Initiative

Page 29: Friedrich Führ DESERTEC Foundation, Director/Vorstand Friedrich.Fuehr@DESERTEC

Friedrich Führ, Berlin 14.10.2009

Contact: [email protected]