Application and Validity:
Type approved transit system for cable, pipe and bundle pipe in Class A divisions (bulkhead and deck). GK transits consist of GK metal frame and GK sealing system (modules and accessories halogen-free). GK transits meet the integrity and insulation criteria of the divisions. Max. operating temperature of the cable/pipe 90°C. All work is carried out in accordance with current welding and mounting instructions and should only be carried out by trained personnel, in compliance with legal regulations. For projects of the German Navy VG 88717 must be taken into account. Depending on the requirements, transits can be completely-, partially- or un-insulated. The regulations of the responsible flag state administration must be ob-served if necessary. Information, technical drawings, certificates, insulation instructions, training and inspections are available on request from Roxtec GmbH ([email protected] or www.gkmarine.de).
GK frame (welded or bolted)
The choice of frame type, size and material depends on the specific requirements of the transit. If there is a risk of corrosion or electromagnetic influence, a stainless steel frame should be used!
Frames available in:Steel, stainless steel or aluminium (welded or bolted)
Type SPK: -F; -S30; -S50; -F-R and -BTB (Back to Back) Seal type: Wedge seal (KAD)Frame sizes: 2, 4, 6 & 8, single, group and multiple frames
Type SPKh: -120; -180 and -BTBSeal type: Wedge seal (KAD)Frame sizes: 2, 4, 6 & 8, single frame.
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
Recommended tools:
Test mandrel Rubber hammer Pre-press tool (VPH) Anchor clutch (VASK) Ratchet/ 15 mm wrench KAD screw adapterGK Caliper gauge
GK Sealing System ComponentsThe material selection of the metal parts depends on the specific requirements of the transit. If there is a risk of corrosion or electromagnetic influence, metal compo-nents made of stainless steel should be used!
Line modules type: „MH“, „MPL“ und „RAM“ Filling modules Type: „FM“ Anchor plates: „VAS-Metal“ made of metal or „VAS-HF“ made of plastic (only permit-ted without pressure requirement) tween plates: „ZWP“, corner adapters: „ADTP“ and wedge seal: „KAD“ (galvanized or stainless steel).
According to certification, the Roxtec modular system may be used in GK packing frames, please follow specific Roxtec mounting instructions!
GK Packing System Mounting Instructions
Mounting Instructions at a glance: Five steps to safe penetration
D
120
H1
H2
+20+20+20
+40
+40
+40 180
$
1. Set of packing chambers: Measure & Prepare
2. Pipes/Cables: Number & Diameter
3. Modules: Size & Diameter
4. Transit: Filling & Packing heights
5. Frame: Finish & KAD tightening
Ca. 1 mm
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
1. Packing chambers: Measure & Prepare
Clean the frame and, if neces-sary, re-paint it (approx. 100 µm layer thickness).
Quick check of the chamber dimension with GK test mandrel (61.0; 121.0 or 181.0 mm) or suit-able measuring equipment.
Single frames and the outer chambers of the group frames in particular tend to warp due to the weld-ing process. Deviations from the tolerance should be eliminated before inserting the cables/pipes. If in doubt, determine exact values with suitable measuring equipment. For gas and water tightness, the tolerance of ± 1.0 mm must be observed.
D
Max.121 mmSPK-S30
120
SPK
120
SPK-S50
120
SPKh-120
120
SPKh-180
180
SPK-60
60
GK packing frame: Tolerances chamber dimension „D“ ± 1.0 mm
3.1 Module halves „MH“
GK module halves „MH“ are available in 7 block sizes with partially overlapping inner diameters.
22 23 24 25 26 27 28 29 300 10 20 30 40 50 60 70 80 90 100 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
mm
M 2-11MH-15MH-20
MH-30MH-40
MH-60MH-90MH-120
M 4-16M 8-25
M 18-35M 29-54
M 50-76M 50-108
Naming example: MH-20/07special dimensions on request Alignment modules:
MH, FM & RAM modules must be aligned with the parting line parallel to the KAD. Beside large modules the small ones can be turned by 90°! (e.g. 2x40 & 4x20).
Use only for SPKh-180
raa
a
2. Lines: Number & Diameter
Determine the module size and layout planning with Roxtec Transit DesignerTM
(RTD) or manually with GK planning sheets ([email protected])
Cables and pipes are routed through separate chambers. Overcrowding must be ruled out.
Align the center of each cable/pipe in the frame on the modular grid. Special modules on request. For large cables/pipes, position the KAD between the cables/pipes.
Guide the cables/pipes straight and without radius through the frame. Align large or rigid cables/pipes to the module position in the frame and tighten the KAD. Only then, tighten the line holder.
SPK-S50-6x3
$$$$
$$
3. Modules: Size & Diameter
Determine cable/pipe diameter e.g. with GK caliper gauge.
Check fit of both module halves on the lines. An approx. 1 mm gap between the module halves should not be compressible by hand. For gas and water tightness, the modules must not be selected too large or too small.
The „MPL“ module plates are suitable for 8 lines of the same size (7-11 mm) in a row.
Filling modules „FM“ and tween plates „ZWP“ fill the frame completely (max. FM-60/00 & RAM 60/00 allowed in transits with pressure requirements).
Select module halves: MH-15; -20; -30; -40; -60; -90 & -120 for Ø 2-108 mm with partially overlapping inner diameters.
too small too large
r r
Nominal diameter of both module halves may deviate by max. one size (e.g. MH-40/30 with MH-40/31).
Select adapters for radius frames: „ADTP“ are filled with module halves „MH“ or filling modules „FM”.
Radius modules type „RAM“ of sizes -40; -60 and size -120 with radius on one or both sides are available for mounting larger lines diameters in corners. Size 120 is also available with reduced height on request ([email protected]).
$Ca. 1 mm
2x R1x RAt pressure requirement :
RAM-60/00max. 1.5 bar water pressure allowed.
SPK-S50-6x3
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
3.2 Filling modules „FM“Filling modules are used to fill the frame. For pressure requirements, use only up to size FM-60/00!
A
A
Edge length AxA
10 15 20 30 40 60 90 120
Depth 60 mm
Naming example:: MH-20/00
4. Execution: Filling & Packing heightsBy filling the packing frames with modules, the certified fire resis-tance class (through additional fire protection insulation) and the compressive strength is guaranteed. Filling continues until the pack-ing height „H“ is reached. Two module halves „MH“ each seal one line. In case of pressure requirements, (gas and water pressure) only one block size should be used in each module row. If a large number of lines is required, four small „MH“ modules may be used in addition to large „MH“ modules (e.g. 2x40 & 4x20). Only here may the small modules be turned by 90° if necessary. The largest module in the row determines the height of the packing row. Filling modules „FM“ and tween plates „ZWP“ fill the frame completely. Each row ends with a metal anchor plate „VAS-Metal“. Without pressure require-ment, plastic anchor plates „VAS-HF“ can be used instead of metal anchor plates.
120
H1
H2
+20+20+20
+40
+40
+40 180
Determining the packing height „H“ without the wedge seal „KAD“. Protection against fire, gas and water pressure
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
3.3 Mounting lubricant (Please use only GK mounting lubricant)
Important for tightness: Slightly and evenly lubricate the contact surfaces of all system components. Lubricating the 90° corners is particularly important!
4.1 Required packing height „H“= H1+H2 (fire resistance class A-0 to A-60)
Frame type SPK/ SPK-S30 SPK-S50 SPK/ -S30 & -S50 SPKh-120/ SPKh-180
Frame size 2 2 4 6 8 2 4 6 8
Packing height „H“ without pressure requirement 60-63 80-83 120-125 180-190 240-255 60-63 120-125 180-190 240-255
Packing height „H“ with pressure requirement 60-63 80-83 120-125 185-190 250-255 60-63 120-125 180-190 240-255
VAS-HF
Plastic anchor plate VAS-HF (1 mm) without pressure requirements (with protection against cold smoke)
Metal anchor plate VAS metal (0.5 mm) with gas & water pressure tightness requirements
SPKh-180-6180
H2
H1
SPKh-120-4120
H1
H2
SPK-S50-2120
H1
H2
SPK-S50-6
H1
H2
120 120
VAS-Metal
SPK-2120
H
SPK-60-260
H
VAS-Metal
20,0
3,0 ZWP3,5 VAS-Metal (7x0,5)
30,040,060,0
189,5 mm
H
SPK-8
SPKh-180-6 SPKh-180-8
30,0
3,0 ZWP
SPK-6x1
Anchor plates:0,5 mm for VAS metal and 1,0 mm for VAS-HF for the determination of „H“
4.2 Module combinations (fire resistance class A-0 to A-60 and gas & water tightness requirements)
Starting with 60 FM or MH with ZWP & VAS
60‘s module sizes
Permissible assignments: In general, rows between the VAS are created with one block size, in exceptional cases one large module may be replaced by four small ones. For tween plates ZWP > 5mm, finish row with VAS.
40‘s module sizes
Radius adapters & modules
Start with FM or MH up to size 40 without VAS & ZWP
Start up to 40’s FM or MH without VAS & ZWP
Starting with 60‘s FM or MH with ZWP & VAS
For type SPKh- the FM or MH must be additionally secured by VAS metal in the radius adapter „ADTP“!
SPK-S50-8x3 SPKh-120-2
For type SPKh-180 avoid modules of 40 & 120! For large lines use 90 modules!
MH-120 and RAM-120 are also available in heights „80“ & „90“; use MH-90 only for SPKh-180.
VAS-Metal
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
5. Frame: Finish & Tighten KADThe KAD is always secured between two „VAS metal“. Always use a „ZWP“ between frame and „VAS“!
The pre-press tool (VPH) reduces air gaps and further assembly is made easier. If mounting is interrupted, the VPH compresses the module rows and the anchor clutch (VASK) secures the modules when the VPH is removed. The VASK must be removed before further assembly.
One wedge seal KAD for each chamber width: KAD-60; KAD-120 and KAD-180 (untightened height = 40 mm).
Expose the wedges of the KAD and then carefully lubricate all sliding surfaces with GK mounting lubricant directly before assembly.
Push the KAD in completely up to the stop. The KAD must al-ways be mounted between two VAS. Beyond that, the position is arbitrary.
Tighten KAD nuts evenly (with wedge tool). Tighten the special nut tighten the nuts until stop, but each nut must be checked individually. Module offset max. 3 mm, modules must not rest on the VAS edge! The tightening procedure is OK when all visible gaps are closed, lines are firmly compressed between the module halves and GK mounting lubricant is pressed-out. Optimum tightness is achieved after 24 hours!
$VPH
$
VASK
$Wedge Tool
VASK
min100 mm
SW24
VPH
$Max. 3 mm
SPKh-180-2
At pressure requirement :max. FM-60/00
with empty radius corners:max. RAM-40/00max. FM-40/00
At pressure requirement :
RAM-60/00max. 1.5 bar water pressure allowed.
Fire-resistance class:Transits of fire resistance class A-15 to A-60 require fire protection insulation according to insulation drawings.Transits for cables and bundle pipes in A-0 divisions are mainly designed without fire protection insulation.Transits for pipes in A-0 divisions require fire protection insulation according to insulation drawings.Detailed insulation instructions are available from Roxtec GmbH ([email protected]).
KADSW15
$STOP
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
Disassembly & ModificationGeneral note:
The GK Packing System is a type-approved and safety-relevant element for shipbuilding and must be used accordingly. Initial installation puts the plastic material under considerable compressive force and distorts it to a degree in order to achieve the required fire resistance class and any required pressure resistance. Depending on the time, temperature and other environmental influences, material that has already been installed should not be reused in cases of uncertainty. Corrections to incorrectly installed transits must be made promptly after initial installation before the lubricant has dried and the installation shows signs of setting. For modification of the transits, the wedge seal must always be completely loosened and reset to the height of 40 mm (see following points). No care or maintenance of the GK Packing System is required. However, the system should be checked at regular intervals for com-pleteness, damage, corrosion or contamination with harmful substances such as oil, fuel, acids and alkalis, etc., which could impair the safety of the penet-ration. If necessary, the GK Packing System should be cleaned or replaced in order to restore its safe condition.
To open the packing chamber, loosen KAD nuts step by step and loosen the wedges of the KAD by hammer blows on the nut(s) until KAD is completely relaxed.
Use a flat object to lower the KAD plates from VAS or mod-ules, release KAD to 40 mm initial height.
Remove KAD and reuse it only if KAD is undamaged and in perfect condition. Faultless VAS metal are reusable!
For transits without pressure re-quirements: Fill the affected rows completely with new modules; with pressure requirement: fill the frame completely with new modules and accessories.
Lubricate the module halves; insert the lower half of the module into the frame, insert the upper half at a slight angle into the frame, apply slight pressure or short hammer blows.
The GK cable and pipe entry sealing system (“the GK Packing System”) is manufactured by Roxtec. This GK Packing System is a modular based system of sealing products consisting of different components. Each and every one of the components is necessary for the best performance of the GK Packing Sys-tem. It has been certified to resist a number of different haz-ards. Any such certification, and the ability of the GK Packing System to resist such hazards, is dependent on all components that are installed as a part of the GK Packing System. Thus, the certification is not valid and does not apply unless all components installed as part of the GK Packing System are manufactured by or under license from Roxtec (“authorized manufacturer”). Roxtec gives no performance guarantee with respect to the GK Packing System, unless (I) all components installed as part of the GK Packing System are manufactured by an authorized manufacturer and (II) the purchaser is in compliance with (a) and (b) below. (a) During storage, the GK Packing System or part thereof shall be kept indoors in its original packaging at room temperature. (b) Installation shall
be carried out in accordance with latest GK Packing System Mounting instructions. The product information provided by Roxtec does not release the purchaser of the GK Packing System, or part thereof, from the obligation to independently determine the suitability of the products for the intended process, installation and/or use. Roxtec gives no guarantee for the GK Packing System or any part thereof and assumes no liability for any loss or damage whatsoever, whether direct, indirect, consequential, loss of profit or otherwise, occurred or caused by the GK Packing System or installations containing components not manufactured by an authorized manufac-turer. Roxtec expressly excludes any implied warranties of merchantability and fitness for a particular purpose and all other express or implied representations and warranties provi-ded by statute or common law. User determines suitability of the GK Packing System for intended use and assumes all risk and liability in connection therewith. In no event shall Roxtec be liable for consequential, punitive, special, exemplary or incidental damages
DISCLAIMER(For GK Packing System Mounting Instruction)
ROXTEC GmbHNeuer Höltigbaum 1-3, 22143 Hamburg, GERMANYTEL +49 (0)40 657398 -0, FAX +49 (0)40 657398 -50
EMAIL [email protected], (www.gkmarine.de)
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
Use only undamaged KAD. Lubricate the KAD again before assembly. Tighten the special nut(s) alternately and evenly to the stop; each nut must be checked individually. Module offset max. 3 mm, modules must not rest on the VAS edge! The tightening procedure is OK when all visible gaps are closed, lines are firmly compressed between the module halves and GK mounting lubricant is pressed-out. Optimum tightness is achieved after 24 hours! If necessary, restore/implement fire protection insulation according to certification.
$Max. 3 mm
$Wedge Tool
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
© R
oxte
c G
mbH
; err
ors
and
mod
ifica
tion
rese
rved
. Doc
umen
t: G
K-IN
STRU
CTI
ON
-SPK
_EN
_JA
N20
20
Notes