Góngora 1 1 Urban Waste Treatment Plant Góngora Urban Waste Treatment Plant Located in Aranguren Valley, 12 km southwest of Pamplona, the Góngora Urban Waste Treatment Plant, in operation since 1992, covers a surface area of 77 hectares. It treats the waste from the 50 municipalities belonging to the Greater Pamplona Area, averaging 365 tonnes per day. The facility combines package sorting with the controlled landfilling of the other domestic waste and non-recyclable fraction. A A Controlled Landfill Non-recyclable urban waste is dumped into the cells, compacted and capped with earth. The landfill cells are lined with impermeable material and equiped with protection measures to minimise their environmental impact. When they fill up they are sealed and subsequently revegetated. B B Leachate Collector Leachates, contaminant liquids resulting from the breakdown of organic material, are piped from the cells to the Araxuri Water Treatment Plant. C C The use of gases D D Quality control The Laboratory and the Remote Command and Control Centre ensure the safety and proper operation of the treatment processes and provide real-time information on the operating conditions of the facilities. Gas utilisation 1 Gas capture in the cells 2 Pipes 3 Gas flow regulation and analysis hut 4 Blower equipment building 5 Gas holder 6 Gas-to-electric plant 7 Power distribution tower 8 Flare stack Waste treatment 1 Entrance 2 Office and service building 3 Control and weighing 4 Wheel washing 5 Sorting plant 6 Controlled landfill: utilisation cell 7 Capped cell in the process of degasification 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 Recycled paper General View of Plant Permanent exhibition “The Butterfly Effect” Workshop room Audiovisual room Models Environmental Hall The gas generated by the breakdown of organic waste material is captured in the cells and stored in the Gas Holder, from where it is conveyed to the Gas-to-Electric plant.

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Góngora Urban Waste Treatment Plant Góngora Urban Waste A

Góngora

11

Urban Waste Treatment Plant Góngora Urban Waste

Treatment PlantLocated in Aranguren Valley, 12 km southwest of Pamplona, the Góngora Urban Waste Treatment Plant, in operation since 1992, covers a surface area of77 hectares.

It treats the waste from the 50 municipalitiesbelonging to the Greater Pamplona Area, averaging 365 tonnes per day.

The facility combines package sorting with the controlled landfilling of the other domestic waste and non-recyclable fraction.

A

A

Controlled LandfillNon-recyclable urban waste is dumped into the cells, compacted andcapped with earth. The landfill cells are lined with impermeable material and equiped with protection measures to minimise their environmental impact. When they fill upthey are sealed and subsequently revegetated.

B

B

Leachate CollectorLeachates, contaminant liquidsresulting from the breakdown of organic material, are piped from the cells to the Araxuri Water TreatmentPlant.

C

C

The use of gases D

D

Quality controlThe Laboratory and the Remote Command and Control Centre ensure the safety andproper operation of the treatment processes and provide real-time information on the operating conditions of the facilities.

Gas utilisation1 Gas capture in the cells2 Pipes

3 Gas flow regulation and analysis hut

4 Blower equipment building

5 Gas holder

6 Gas-to-electric plant

7

Power distribution tower

8

Flare stack

Waste treatment1 Entrance

2 Office and service building

3 Control and weighing

4 Wheel washing

5 Sorting plant

6 Controlled landfill: utilisation cell

7 Capped cell in theprocess of degasification

12

34 5

6

7 1

2

3

4 5

6

7 8

Recy

cled

pap

er

Gen

eral

Vie

w o

f Pla

nt

• Permanent exhibition “The Butterfly Effect”

• Workshop room • Audiovisual room • Models

Environmental Hall

The gas generated by the breakdown of organic waste materialis captured in the cells and stored in the Gas Holder, from where it is conveyed to the Gas-to-Electric plant.

Page 2: Góngora Urban Waste Treatment Plant Góngora Urban Waste A

Góngora

11

Urban Waste Treatment Plant The Separation Plant

1 Reception area

2 First manual sorting cabin ·separates large-sized plastic film and unsuitable waste

3 Bag-opening machine

4 Trommel

5 Ballistic separator

6 Optical separators – plastic

7 Second manual sorting cabin Tetra Pack, plastic (PET, polyethylene, film, mixed)

8 Overband Magnet – ferrous metals

9 Eddy currents – non-ferrous metals

10 Rejected material carried to controlled landfill

11 Recirculation conveyor belt

Detailed view of Optical Sorting Unit

1

2

3

4

5

6

7

88

8

9

10

11

10

Itinerario de visitas

Inadecuados

Rechazo

Rechazo

Plástico fi lm grande

Metales férricos pequeños

Brik y plásticos (pet, polietileno, fi lm, mixto)

Metales férricos, aluminio y brik

Scanner

Rejected material

Detailed view of Overband Magnet and Eddy Current Separator

8

9

6

Ferrous Material

Overband Magnet

Eddy Current

RejectedMaterial Aluminium,

Tetra Pack

Blowers

Plastic

Plastic

The

Sepa

ratio

n Pl

ant

The plastics, metals and tetra packsoriginating from selective waste collection are sorted by a combination of electronic, mechanical andmanual means, allowing their recovery as raw materials for new production processes.

Unsuitable waste

Large-sized plastic film

DL

NA

216

9-20

18

Unsuitable waste

Large-sized plastic film