greenhouse gas emission reduction in balikpapan · methane gas utilization (at manggar landfill)...
TRANSCRIPT
DEVELOPMENT PLANNING BOARD BALIKPAPAN MUNICIPAL GOVERNMENT
GREENHOUSE GAS EMISSION
REDUCTION IN BALIKPAPAN
Seoul, South Korea 3-6 November 2013
• Gateway to East Kalimantan
• MICE City Destination in Indonesia
• Oil Refinery Centre of East Indonesia
A GLIMPSE OF BALIKPAPAN
Growth Rate 2011-2012
4.52%
Total Area 83,189 ha
Sea 39.50%
Land (Flat) 9.08%
Land (Hills) 51.43%
Natural Growth 1.56%
Immigration 2.96%
Population (Per Aug 2013): 660,437
SPATIAL ORGANIZATION PLANNING 2012-2032
City spatial organization
Protected Area 52%
Cultivation Area 48%
OUR COMMITMENT TO ENVIRONMENT
Protected Forest 16,184.19 ha
Wain River Protected Forest (HLSW)
9,782.8 ha
Manggar River Protected Forest (HLSM)
4999 ha
Expansion of HLSW 1,402.39 ha
Open Green Space 15,033.68 ha
(42.4% of Urban Space)
Existing, Public 4,582 ha
Existing, Private 320 ha
Developing, Private 4411 ha
Developing, Public 5720 ha
DEVELOPING BALIKPAPAN AS ECOLOGICAL CITY
Foresting The City Planting plants and trees from Sungai Wain Protected Forest in urban areas
Green Corridor Greening the street corridors
Developing Kariangau Industrial Estate (KIE) to be Green Industry • ZERO WASTE: Provisioning enterprises in KIE to treat their waste in accordance with the 3R concept • ZERO SEDIMENT: Provisioning enterprises in KIE to build their own sediment trap
PROHIBITION TO OPEN MINING
o Surat Walikota Balikpapan Nomor : 050.13/ 1083/ Bpd-Bfp/ XII/ 2011
Tanggal 21 Desember 2011 Perihal Tanggapan Draft Final Wilayah
Pertambangan (WP) sebagaimana Surat Dirjen Mineral dan Batu Bara
Kementerian ESDM Nomor : 3854/30/DJB/2011 tanggal 9 November 2011
perihal Persetujuan Wilayah Pertambangan (WUP, WPN, dan WPR).
o There is no Energy and Mining Agency in Balikpapan
There has been a significant decrease in
dust level (57.44%) from 2011 to 2012
RELOCATING THE CONTAINER PORT
Container port has been
moved from Semayang to
Kariangau in June 2012
Methane gas utilization (at Manggar Landfill)
Independently conducted by the community with the help of private companies through CSR programs
Generates 4000 watts of electricity for 40 households
Biogas Utilization (at Pandansari Market)
Organic waste from Pandansari market (402m3/day) is estimated to be able to produce 185 kgs daily of LPG
Feasibility study has been conducted in 2012 , in cooperation with Gajah Mada University
Facility construction will start in 2014
METHANE & BIOGAS UTILIZATION