Workshop on Workshop on
Conservation of Cultural HeritageConservation of Cultural Heritage7-13 January, 20127-13 January, 2012
Group A
Ayesha Agha Shah (NEDUET)
Ali Haider (Archeology Dept.)
Abdul Fateh Shaikh (Archeology Dept.)
Mohammed Ilyas (Mehran University)
Visual inspection from accessible level
Note on the monument, identifying the materials of construction
Condition of the fabric
Identify structural fault
Suggestions/ Recomandations
Visits of Cultural HeritageVisits of Cultural Heritage
Monuments at Makli Hills, Thatta
Group of Buildings Kalhora monuments and its surrounding at Hyderabad
Sites Bhanbhore
MethodologyMethodology
The Assessment is based on the
Monuments at Makli Hills, ThattaMonuments at Makli Hills, Thatta
Understanding of the siteUnderstanding of the site Different monument and structures
Accessing SignificanceAccessing Significance Examples of rich architectural features, influenced by Islamic and
Hindu architecture
Evidence of unique craftsmanship
Architectural features include arches, pilasters, jharoka, roundels, moldings, brackets etc.
Systematic rhythm of the arrangement of architectural decorationSystematic rhythm of the arrangement of architectural decoration
Site PlanSite Plan
N
A
BC
TOMB OF JAM NIZAMUDDINTOMB OF JAM NIZAMUDDIN
A Note Of MaterialsA Note Of Materials
The major construction material used in the monument is stone with lime and chiroli mortar ( gypsum)
The Condition Of Fabric And Structural FaultsThe Condition Of Fabric And Structural Faults
The overall condition of monumentThe overall condition of monument
is alarming and this warrants anis alarming and this warrants an
immediate attention. As eastern wallimmediate attention. As eastern wall
of the monument is tilting outward of the monument is tilting outward
direction causing the structuraldirection causing the structural
deformation. deformation.
As a result of this the tomb has developed As a result of this the tomb has developed vertical cracks inviting the rain water humidity vertical cracks inviting the rain water humidity and air into historic fabric which can further and air into historic fabric which can further exacerbate the situation may be the cause ofexacerbate the situation may be the cause of further decay. further decay.
Besides, due to time factor and weathering the mortarBesides, due to time factor and weathering the mortar from masonry joints has been found mostly eroded . Also,from masonry joints has been found mostly eroded . Also, the rusting dowel bars has been noticed and many bit holesthe rusting dowel bars has been noticed and many bit holeshave been found perhaps due to saline winds and attritionhave been found perhaps due to saline winds and attrition by sand particles.by sand particles.
THE CANOPY OF JAM TAMACHITHE CANOPY OF JAM TAMACHI
A Note Of MaterialsA Note Of Materials The major construction material used in the monument is stone
with lime and chiroli mortar ( gypsum)
The Condition Of Fabric And Structural FaultsThe Condition Of Fabric And Structural Faults The canopy is tilting towards east like tomb of Jam
Nizamudin. due to the settlement of foundation of the structure
Primitive measures have been taken, however, the connection of the material is inappropriate
Tilting slope is against the water outlet, causing water penetration from the roof in the structure
The main cause of tilting of canopy Jam Tamchi is non containment of rain run off . Apron provided to the canopy is a later addition due to the fact that it is laid down in the cement concrete . the wastage rain water gullies found in murum soil around the monument is a major cause of tilting . The spalling and flanking of stone membranes inside the canopy perhaps due toaccumulation and seepage of rain water. Steel shoring provided to Arrest the tilting of the canopy is in direct contact with historic fabric of the monument . which is source of the damage to the fabric and its design and beauty.
THE OPEN SITETHE OPEN SITE
The Condition Of Fabric And Structural FaultsThe Condition Of Fabric And Structural Faults The open site has a variety of different significant canopies The physical status of the canopies are some partially
demolished, partially maintained and in some cases completely demolished.
Sketch on site condition and available parts Sketch on site condition and available parts of the structureof the structure
Physical status of the sitePhysical status of the site
SuggestionsSuggestions
SuggestionsSuggestions
Urgent measuresUrgent measures
Firstly grouting of cracks should be Firstly grouting of cracks should be carried out with lime mortar apartcarried out with lime mortar apart
from repointing of masonry joints for from repointing of masonry joints for sound bondage. The damage from rainsound bondage. The damage from rain
water can be avoided by leveling off the water can be avoided by leveling off the ground .the glass should be affixed over ground .the glass should be affixed over the cracks of the monument so as to the cracks of the monument so as to determine the movement.determine the movement.
Site at HyderabadSite at Hyderabad
Critical Issues at the Fortress of Ghulam Shah Kalhoro
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Wooden planks were used in the walls of fortress due to deterioration of wall facing, due to this wooden planks are also deteriorated and wholes are developed and used by birds as a nesting place.
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Actual wall thickness is approximately 30 ft thick which is reducing day by day due to local public damage, weather and seasonal rain falling.
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Ground Level of the fortress is going to be down as compare to road. Road is constructed along the walls by cutting the wall foundation.
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Garbage is thrown along the all walls of the fortress especially a huge dustbin is developed outside the entrance gate
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Encroachment developed along the all walls especially space available between the fortress embossments of fortress.
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Encroachment all aroundEncroachment all around
Monument facing urban settlement ORUrban settlement facing the monument
Under construction houseUnder construction house
Government agencies such as revenue dept, Sui gas dept, and wapda is also responsible for all the developed encroachments by providing them the facilities.
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
According to our survey from locals 80 sq-yds plot is sold in 12 lacs.
Fortress of Ghulam Shah KalhoroFortress of Ghulam Shah Kalhoro
Cultural site like group of buildings can be planned according to the international law.
It is suggested to introduce CONSERVATION AREA DESIGNATION in national policy making.
SuggestionSuggestion
By concluding, there is an Urgent Need to protect the ‘Cultural Heritage', to initiate the understand and the significance. It is suggested to work on the process of Anastylosis and the Anastylosis and the viability of Conservation Area Designation, for the heritage inheritance of the country. It can work as a mile stone to initiate this effort. These historic precinct are the tangible links to our intangible past.
Site at BhambhoreSite at Bhambhore
Surface ControlSurface Control For the control of rain water a topographic map of the
whole site has to be made (Totalstation or scanning) Along with the map a drainage plan has to be developed
with registration of gullies etc
Walls and BuildingsWalls and BuildingsWork out a careful plan for re-building as well as
consolidation of structures in BhanbhoreAfter approval execution of work
special conservation workspecial conservation workWork out a highly technical plan for the
conservation of the Grand Mosque at BhanbnoreWork out a highly technical plan for the
conservaion/ repair of original floors (Lime concrete flooring)
LandscapingLandscapingPlanting gras and low root trees between citadel
area and Lower areaEstablish a guided path along with sun shades for
1, 2,3 hours walks avoiding walking over remains
Master planMaster planInvite international experts for the
development of a master plan