H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments Fed/State Local 16313 0523-08-013 TXDOT HOUSTON DISTRICT (MON) FM 1488 (EXISTING FM …, FM 1774) CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION… R RTP (CONFORM) Add Add (2024) 16314 0523-09-018 TXDOT HOUSTON DISTRICT (MON) FM 1488 (FM 1774, PROPOSED SH …) CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION… R RTP (CONFORM) Add Add (2024) 499 0523-09-009 TXDOT HOUSTON DISTRICT (MON) FM 1488 (FM 1774, W OF FM 149) WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS … R RTP (CONFORM) ($26.4) -0- Fed Advance (2025 to 2023) 16315 0523-04-017 TXDOT HOUSTON DISTRICT (MON) FM 1488 (W OF JOSEPH …, MONTGOMERY C…) WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS … R RTP (CONFORM) + $2.0 -0- Add Add (2023) 501 0523-08-007 TXDOT HOUSTON DISTRICT (MON) FM 1488 (WALLER C/L, FM 1774) WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS … R RTP (CONFORM) ($17.7) -0- Fed Limits Advance (2025 to 2023) 10133 0976-02-086 TXDOT HOUSTON DISTRICT (BRA) FM 518 (FM 865, SH 35) RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES R RTP (CONFORM) Add Add (2024) 10132 3416-01-012 TXDOT HOUSTON DISTRICT (BRA) FM 518 (SH 288, FM 865) RECONSTRUCT AND WIDEN FROM 4 AND 6 LANES… R RTP (CONFORM) Add Add (2024) 514 3049-01-022 TXDOT HOUSTON DISTRICT (GAL) FM 646 (EDMUNDS WAY, FM 1266) WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI… R RTP (CONFORM) ($29.9) -0- Fed Advance (2024 to 2022) 10920 3049-01-023 TXDOT HOUSTON DISTRICT (GAL) FM 646 (FM 1266, FM 3436) WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI… R RTP (CONFORM) ($18.6) -0- Fed Advance (2025 to 2023) 10144 0978-02-053 TXDOT HOUSTON DISTRICT (GAL) FM 646 (FM 3436, SH 146) WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI… R RTP (CONFORM) ($7.4) -0- Fed Advance (2025 to 2023) 1099 0508-01-359 CITY OF BAYTOWN (HAR) IH 10 E (JOHN MARTIN …, GARTH RD) EB RAMPS REVERSAL R STIP + $1.0 Cat-1 16328 0500-03-599 TXDOT HOUSTON DISTRICT (HAR) IH 45 (AT IH 10, ) RECONSTRUCT INTERCHANGE INCLUDING IH 10 … R RTP (CONFORM) Add (NHHIP) Add (2025) 16327 0500-03-597 TXDOT HOUSTON DISTRICT (HAR) IH 45 (AT IH 610, ) RECONSTRUCT INTERCHANGE R RTP (CONFORM) Add (NHHIP) Add (2026) 16329 0500-03-601 TXDOT HOUSTON DISTRICT (HAR) IH 45 (AT IH 69 S, ) RECONSTRUCT INTERCHANGE INCLUDING IH 45 … R RTP (CONFORM) + $856.5 -0- Add (NHHIP) Add (2021) 16330 0500-08-001 TXDOT HOUSTON DISTRICT (HAR) IH 45 (AT IH 69/IH …, ) RECONSTRUCT INTERCHANGE INCLUDING IH 45,… R RTP (CONFORM) Add (NHHIP) Add (2023) 16332 0500-03-560 TXDOT HOUSTON DISTRICT (HAR) IH 45 (IH 10, IH 610) RECONSTRUCT MAIN LANES, FRONTAGE LANES A… R RTP (CONFORM) Add (NHHIP) Add (2026) 16334 0110-06-132 TXDOT HOUSTON DISTRICT (HAR) IH 45 (S OF WEST RD, N OF BW 8) RECONSTRUCT MAIN LANES, FRONTAGE LANES A… R RTP (CONFORM) Add (NHHIP) Add (2026) MPOID/CSJ Sponsor/County Project Proj Type Proposed Modifications Type Funding (M) Scope Schedule Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other 1/18/2018 Page 1 of 3

Upload: others

Post on 13-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

H-GAC 2017-2020 TIP and 2040 RTP

January TPC Amendments

Fed/State Local

16313

0523-08-013

TXDOT HOUSTON

DISTRICT (MON)

FM 1488 (EXISTING FM …, FM 1774)

CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION…

R RTP(CONFORM)

Add Add

(2024)

16314

0523-09-018

TXDOT HOUSTON

DISTRICT (MON)

FM 1488 (FM 1774, PROPOSED SH …)

CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION…

R RTP(CONFORM)

Add Add

(2024)

499

0523-09-009

TXDOT HOUSTON

DISTRICT (MON)

FM 1488 (FM 1774, W OF FM 149)

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS …

R RTP(CONFORM)

($26.4) -0- Fed Advance

(2025 to 2023)

16315

0523-04-017

TXDOT HOUSTON

DISTRICT (MON)

FM 1488 (W OF JOSEPH …, MONTGOMERY C…)

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS …

R RTP(CONFORM)

+ $2.0 -0- Add Add

(2023)

501

0523-08-007

TXDOT HOUSTON

DISTRICT (MON)

FM 1488 (WALLER C/L, FM 1774)

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS …

R RTP(CONFORM)

($17.7) -0- Fed Limits Advance

(2025 to 2023)

10133

0976-02-086

TXDOT HOUSTON

DISTRICT (BRA)

FM 518 (FM 865, SH 35)

RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES

R RTP(CONFORM)

Add Add

(2024)

10132

3416-01-012

TXDOT HOUSTON

DISTRICT (BRA)

FM 518 (SH 288, FM 865)

RECONSTRUCT AND WIDEN FROM 4 AND 6 LANES…

R RTP(CONFORM)

Add Add

(2024)

514

3049-01-022

TXDOT HOUSTON

DISTRICT (GAL)

FM 646 (EDMUNDS WAY, FM 1266)

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…

R RTP(CONFORM)

($29.9) -0- Fed Advance

(2024 to 2022)

10920

3049-01-023

TXDOT HOUSTON

DISTRICT (GAL)

FM 646 (FM 1266, FM 3436)

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…

R RTP(CONFORM)

($18.6) -0- Fed Advance

(2025 to 2023)

10144

0978-02-053

TXDOT HOUSTON

DISTRICT (GAL)

FM 646 (FM 3436, SH 146)

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…

R RTP(CONFORM)

($7.4) -0- Fed Advance

(2025 to 2023)

1099

0508-01-359

CITY OF BAYTOWN

(HAR)

IH 10 E (JOHN MARTIN …, GARTH RD)

EB RAMPS REVERSAL

R STIP + $1.0 Cat-1

16328

0500-03-599

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (AT IH 10, )

RECONSTRUCT INTERCHANGE INCLUDING IH 10 …

R RTP(CONFORM)

Add

(NHHIP)

Add

(2025)

16327

0500-03-597

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (AT IH 610, )

RECONSTRUCT INTERCHANGE

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

16329

0500-03-601

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (AT IH 69 S, )

RECONSTRUCT INTERCHANGE INCLUDING IH 45 …

R RTP(CONFORM)

+ $856.5 -0- Add

(NHHIP)

Add

(2021)

16330

0500-08-001

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (AT IH 69/IH …, )

RECONSTRUCT INTERCHANGE INCLUDING IH 45,…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2023)

16332

0500-03-560

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (IH 10, IH 610)

RECONSTRUCT MAIN LANES, FRONTAGE LANES A…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

16334

0110-06-132

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (S OF WEST RD, N OF BW 8)

RECONSTRUCT MAIN LANES, FRONTAGE LANES A…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

MPOID/CSJ Sponsor/County Project

Proj

Type

Proposed Modifications

TypeFunding (M)

Scope Schedule

Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other1/18/2018

Page 1 of 3

Page 2: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

H-GAC 2017-2020 TIP and 2040 RTP

January TPC Amendments

Fed/State LocalMPOID/CSJ Sponsor/County Project

Proj

Type

Proposed Modifications

TypeFunding (M)

Scope Schedule16331

0500-03-446

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 (TIDWELL RD, S OF SHEPHER…)

RECONSTRUCT MAIN LANES, FRONTAGE LANES A…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

16333

0500-03-596

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 N (IH 610, TIDWELL RD)

RECONSTRUCT MAIN LANES, FRONTAGE LANES A…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

16335

0110-06-139

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 N (S OF SHEPHER…, S OF WEST RD)

RECONSTRUCT MAIN LANES, FRONTAGE LANES A…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

16336

0500-03-598

TXDOT HOUSTON

DISTRICT (HAR)

IH 45 S (IH 69, IH 10)

REMOVE EXISTING PIERCE ELEVATED AND CONS…

R RTP(CONFORM)

Add

(NHHIP)

Add

(2026)

16337

0027-13-221

TXDOT HOUSTON

DISTRICT (HAR)

IH 69 (AT MCGOWEN, …, )

RECONSTRUCT 3 BRIDGES

R STIP(CONFORM)

+ $55.8 -0- Add

(NHHIP)

Add

(2020)

7428

0027-13-200

TXDOT HOUSTON

DISTRICT (HAR)

IH 69 S (IH 45, SH 288)

WIDEN FROM 8 TO 12 MAIN LANES AND RECONS…

R RTP(CONFORM)

+ $173.5 -0- Add

(NHHIP)

Add

(2021)

155

0027-13-201

TXDOT HOUSTON

DISTRICT (HAR)

IH 69 S (SH 288, SP 527)

RECONSTRUCT TO 10 MAIN LANES

R STIP(CONFORM)

+ $192.0 -0- Add

(NHHIP)

Add

(2020)

11743 GULF COAST

CENTER (BRA)

LAKE JACKSON/ANG… (VA, VA)

LAKE JACKSON/ANGLETON CAPITAL COST OF CO…

T STIP + $0.2 FTA

5307

Add grant. Add grant.

11744 GULF COAST

CENTER (BRA)

LAKE JACKSON/ANG… (VA, VA)

LAKE JACKSON/ANGLETON CAPITAL ENGINEERIN…

T STIP + $0.9 FTA

5307

Add grant. Add grant.

504

0338-04-060

TXDOT HOUSTON

DISTRICT (MON)

SH 105 (10TH ST, SL 336)

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAI…

R RTP(CONFORM)

($12.7) -0- Source Advance

(2024 to 2021)

16338

0338-05-028

TXDOT BEAUMONT

DISTRICT (LIB)

SH 105 (MONTGOMERY C…, CLEVELAND BY…)

WIDEN FROM 2 TO 4 LANES

R RTP(CONFORM)

Add Add

(2024)

7705

0338-06-011

TXDOT HOUSTON

DISTRICT (SAN)

SH 105 (MONTGOMERY C…, MONTGOMERY C…)

INFORMATION ONLY (PROJECT IN SAN JACINTO…

R RTP(CONFORM)

($5.9) -0- Source Advance

(2024 to 2022)

7706

0338-07-019

TXDOT HOUSTON

DISTRICT (MON)

SH 105 (SAN JACINTO …, LIBERTY C/L)

WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WI…

R RTP(CONFORM)

($21.3) -0- Advance

(2024 to 2023)

467

0389-07-025

TXDOT HOUSTON

DISTRICT (GAL)

SH 146 (FM 519, SL 197)

CONSTRUCT RR OVERPASS

R RTP(CONFORM)

+ $15.0 -0- Partial Advance

(2030 to 2021)

13841

0389-05-129

TXDOT HOUSTON

DISTRICT (HAR)

SH 146 (N OF FAIRMON…, SPENCER HWY)

CONSTRUCT NEW CONCRETE PAVEMENT TO REMOV…

R RTP(CONFORM)

+ $0.3 -0- Add Add

(2023)

914

0720-02-074

MONTGOMERY

COUNTY (MON)

SH 249 (FM 1774/FM 1…, SPRING CREEK…)

CONSTRUCT 4-LANE TOLLWAY WITH GRADE SEPA…

R STIP(CONFORM)

-0- ($19.9) Description

16349 MONTGOMERY

COUNTY (MON)

SH 249 (FM 1774/FM 1…, SPRING CREEK…)

WIDEN FROM 4-LANE TO 6-LANE TOLLWAY

R RTP(CONFORM)

Add Add

(2035)

Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other1/18/2018

Page 2 of 3

Page 3: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

H-GAC 2017-2020 TIP and 2040 RTP

January TPC Amendments

Fed/State LocalMPOID/CSJ Sponsor/County Project

Proj

Type

Proposed Modifications

TypeFunding (M)

Scope Schedule16342

0720-03-133

TXDOT HOUSTON

DISTRICT (HAR)

SH 249 (S OF CHASEWO…, N OF GREGSON…)

WIDEN FROM 6 TO 8 LANES AND RAMP REVERSA…

R STIP(CONFORM)

+ $3.2 -0- Add Add

(2018)

14712

0188-03-022

TXDOT HOUSTON

DISTRICT (BRA)

SH 36 (N OF CR 467/…, SH 35)

GRADE SEPARATION OVER NEW SH 35 AND REST…

R STIP Delay FY2019 to

FY2022.

251

0111-08-100

TXDOT HOUSTON

DISTRICT (BRA)

SH 36 (S OF THE BRA…, FM 1495)

WIDEN FROM 2 TO 4 LANES (SEG 15)

R STIP(CONFORM)

+ $8.5 -0- Add Add

(2019)

14248

3187-02-010

TXDOT BEAUMONT

DISTRICT (CHA)

SH 99 (AT IH 10 E, )

SEG I-1/I-2: CONSTRUCT 4 DCs (TOLL)

R STIP(CONFORM)

Delay

(2020 to 2025)

187

0338-11-028

TXDOT HOUSTON

DISTRICT (MON)

SL 336 (E OF IH 45, FM 3083)

WIDEN FROM 4 TO 6 LANES

R RTP(CONFORM)

Add Add

(2025)

16343

0338-11-056

TXDOT HOUSTON

DISTRICT (MON)

SL 336 (FM 1314, IH 45)

WIDEN FROM 2 TO 4 LANES

R RTP(CONFORM)

Add Add

(2022)

16344

3256-03-096

TXDOT HOUSTON

DISTRICT (HAR)

SL 8 (US 90, S OF IH 10 E)

WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXIST…

R STIP(CONFORM)

+ $0.5 -0- Add Add

(2020)

11740 GULF COAST

CENTER (GAL)

TEXAS CITY/LA MA… (VA, VA)

TEXAS CITY/LA MARQUE CAPITAL COST OF CON…

T STIP + $0.3 FTA

5307

Add grant. Add grant.

11741 GULF COAST

CENTER (GAL)

TEXAS CITY/LA MA… (VA, VA)

TEXAS CITY/LA MARQUE OPERATING ASSISTANC…

T STIP + $0.9 FTA

5307

Add grant. Add grant.

11742 GULF COAST

CENTER (GAL)

TEXAS CITY/LA MA… (VA, VA)

TEXAS CITY/LA MARQUE PLANNING: FY 2017

T STIP + $0.2 FTA

5307

Add grant. Add grant.

16345 METRO (HAR) US 290 (BARKER CYPRE…, W 34TH ST)

OFF-PEAK DIAMOND/HOV LANES WITH DYNAMIC …

R STIP(CONFORM)

-0- + $4.7 Add Add

(2018)

16016

0050-09-089

TXDOT HOUSTON

DISTRICT (HAR)

US 290 (W OF FM 529, W OF LITTLE …)

CONSTRUCT 3-LANE REVERSIBLE MANAGED LANE…

R RTP(CONFORM)

Cancel. Cancel.

16346

0177-03-099

TXDOT BEAUMONT

DISTRICT (LIB)

US 59 (SAN JACINTO …, N END OF CLE…)

CONVERT MAINLANES TO FREEWAY AND CONSTRU…

R RTP(CONFORM)

Add Add

(2022)

16347

0028-04-069

TXDOT BEAUMONT

DISTRICT (LIB)

US 90 (FM 160, SH 61)

RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED …

R RTP(CONFORM)

+ $40.0 -0- Add Add

(2024)

16348

0027-08-180

TXDOT HOUSTON

DISTRICT (FOR)

US 90A (AT SH 99, )

CONSTRUCT GRADE SEPARATION AND INTERSECT…

R RTP(CONFORM)

-0- + $27.0 Add Add

(2021)

Proj Type: R=Roadway, T=Transit, P/B=Ped/Bike, O=Other1/18/2018

Page 3 of 3

Page 4: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm
Page 5: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm
Page 6: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 1099/0508-01-359 FY 2018

Amendment #JAN-2018 - 1/26/18 - Add $1M of Category-1 funding. ***

Amendment #15 - 12/16/16 - Add to the TIP.

EB RAMPS REVERSAL

HOUSTON HARRIS 0508-01-359 IH 10 C BAYTOWN CITY OF BAYTOWN $4,000,000

JOHN MARTIN RD

GARTH RD

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $4,000,000

Preliminary Engineering: $196,000

Construction Engineering: $240,000

Contingencies: $400,000

Indirects: $203,200

Total Project Cost: $5,039,200

Right Of Way: ---

Bond Financing: ---

1,3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$4,000,000

1099MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

IH 10 ESTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

1-PREV-M: $800,000 $200,000 --- $1,000,000 --- ---

3-LOCAL CONT: --- --- --- $3,000,000$3,000,000 ---

Funding by Share: $800,000 --- $4,000,000$3,000,000 ---$200,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 1

houston
Highlight
houston
Highlight
houston
Highlight
houston
Highlight
Page 7: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 1099/0508-01-359 FY 2018

Amendment #15 - 12/16/16 - Add to the TIP.

EB RAMPS REVERSAL

HOUSTON HARRIS 0508-01-359 IH 10 C BAYTOWN CITY OF BAYTOWN $3,000,000

JOHN MARTIN RD

GARTH RD

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $4,000,000

Preliminary Engineering: $196,000

Construction Engineering: $240,000

Contingencies: $400,000

Indirects: $203,200

Total Project Cost: $5,039,200

Right Of Way: ---

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$4,000,000

1099MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

IH 10 ESTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-LOCAL CONT: --- --- --- $3,000,000$3,000,000 ---

Funding by Share: --- --- $3,000,000$3,000,000 --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 2

Page 8: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 11740/NA FY 2018

Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 projects with TDCs in the

TIP.

TEXAS CITY/LA MARQUE CAPITAL COST OF CONTRACTING: FY 2017

HOUSTON GALVESTON VA T TEXAS CITY GULF COAST CENTER $300,000

VA

VA

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $300,000

Preliminary Engineering: ---

Construction Engineering: ---

Contingencies: ---

Indirects: ---

Total Project Cost: $300,000

Right Of Way: ---

Bond Financing: ---

5307FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$300,000

11740MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

TEXAS CITY/LA MARQUESTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

Sec. 5307: $300,000 --- --- $300,000 --- ---

Funding by Share: $300,000 --- $300,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 3

houston
Highlight
houston
Highlight
houston
Highlight
Page 9: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 11740/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 4

Page 10: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 11741/NA FY 2018

Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 projects with TDCs.

TEXAS CITY/LA MARQUE OPERATING ASSISTANCE: FY 2017

HOUSTON GALVESTON VA T TEXAS CITY GULF COAST CENTER $918,392

VA

VA

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $918,392

Preliminary Engineering: ---

Construction Engineering: ---

Contingencies: ---

Indirects: ---

Total Project Cost: $918,392

Right Of Way: ---

Bond Financing: ---

5307FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$918,392

11741MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

TEXAS CITY/LA MARQUESTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

Sec. 5307: $918,392 --- --- $918,392 --- ---

Funding by Share: $918,392 --- $918,392 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 5

houston
Highlight
houston
Highlight
houston
Highlight
Page 11: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 11741/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 6

Page 12: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 11742/NA FY 2018

Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 grants with TDCs.

TEXAS CITY/LA MARQUE PLANNING: FY 2017

HOUSTON GALVESTON VA T TEXAS CITY GULF COAST CENTER $200,000

VA

VA

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $200,000

Preliminary Engineering: ---

Construction Engineering: ---

Contingencies: ---

Indirects: ---

Total Project Cost: $200,000

Right Of Way: ---

Bond Financing: ---

5307FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$200,000

11742MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

TEXAS CITY/LA MARQUESTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

Sec. 5307: $200,000 --- --- $200,000 --- ---

Funding by Share: $200,000 --- $200,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 7

houston
Highlight
houston
Highlight
houston
Highlight
Page 13: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 11742/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 8

Page 14: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 11743/NA FY 2018

Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 grants with TDCs.

LAKE JACKSON/ANGLETON CAPITAL COST OF CONTRACTING: FY 2017

HOUSTON BRAZORIA VA T ANGLETON GULF COAST CENTER $200,000

VA

VA

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $200,000

Preliminary Engineering: ---

Construction Engineering: ---

Contingencies: ---

Indirects: ---

Total Project Cost: $200,000

Right Of Way: ---

Bond Financing: ---

5307FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$200,000

11743MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

LAKE JACKSON/ANGLETONSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

Sec. 5307: $200,000 --- --- $200,000 --- ---

Funding by Share: $200,000 --- $200,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 9

houston
Highlight
houston
Highlight
houston
Highlight
houston
Highlight
houston
Highlight
houston
Highlight
Page 15: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 11743/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 10

Page 16: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 11744/NA FY 2018

Amendment #JAN-2018 - 1/26/18 - Program FTA 5307 grants with TDCs.

LAKE JACKSON/ANGLETON CAPITAL ENGINEERING DESIGN: FY 2017

HOUSTON BRAZORIA VA T ANGLETON GULF COAST CENTER $876,665

VA

VA

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $876,665

Preliminary Engineering: ---

Construction Engineering: ---

Contingencies: ---

Indirects: ---

Total Project Cost: $876,665

Right Of Way: ---

Bond Financing: ---

5307FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$876,665

11744MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

LAKE JACKSON/ANGLETONSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

Sec. 5307: $876,665 --- --- $876,665 --- ---

Funding by Share: $876,665 --- $876,665 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 11

houston
Highlight
houston
Highlight
houston
Highlight
houston
Highlight
Page 17: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 11744/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 12

Page 18: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 14712/0188-03-022 FY 2022

Amendment #JAN-2018 - 1/26/18 - Delay out of TIP into FY2022 of the RTP. ***

Amendment #SEP-2017A - 9/22/17 - Change sponsor to TxDOT, delay to FY 2019

and reflect potential use of federal funds.

GRADE SEPARATION OVER NEW SH 35 AND RESTRIPE PAVEMENT FROM 2 TO 4-LANES

HOUSTON BRAZORIA 0188-03-022 SH 36 WEST COLUMBIA TXDOT HOUSTON DISTRICT $11,073,302

N OF CR 467/HOGG RANCH RD

SH 35

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

14712MPO PROJECT ID:

Project History:

SH 36STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, January 23, 2018

26-JAN-18 Page 13

houston
Highlight
Page 19: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 14712/0188-03-022 FY 2019

Amendment #SEP-2017A - 9/22/17 - Change sponsor to TxDOT, delay to FY 2019

and reflect potential use of federal funds.

GRADE SEPARATION OVER NEW SH 35 AND RESTRIPE PAVEMENT FROM 2 TO 4-LANES

HOUSTON BRAZORIA 0188-03-022 SH 36 C WEST COLUMBIA TXDOT HOUSTON DISTRICT $7,707,000

N OF CR 467/HOGG RANCH RD

SH 35

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $7,707,000

Preliminary Engineering: $377,643

Construction Engineering: $361,458

Contingencies: $576,483

Indirects: $364,541

Total Project Cost: $11,073,302

Right Of Way: $1,686,177

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$7,707,000

14712MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 36STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-PTF: $6,165,600 $1,541,400 --- $7,707,000 --- ---

Funding by Share: $6,165,600 --- $7,707,000 --- ---$1,541,400

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, November 29, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 14

Page 20: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16345/NA FY 2018

Amendment #JAN-2018 - 1/26/18 - Add operational treatment project to the TIP.

One main lane in each direction will be operated as a diamond/HOV lane in the off-

peak direction (WB in AM, EB in PM).

OFF-PEAK DIAMOND/HOV LANES WITH DYNAMIC MESSAGE SIGNS (1 LANE EACH DIRECTION)

HOUSTON HARRIS US 290 C HOUSTON METRO $4,690,000

BARKER CYPRESS RD

W 34TH ST

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $4,690,000

Preliminary Engineering: $229,810

Construction Engineering: $281,400

Contingencies: $469,000

Indirects: $238,252

Total Project Cost: $5,908,462

Right Of Way: ---

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$4,690,000

16345MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

US 290STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-LOCAL: --- --- $4,690,000 $4,690,000 --- ---

Funding by Share: --- $4,690,000 $4,690,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 15

Page 21: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16345/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 16

Page 22: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16327/0500-03-597 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the

RTP.

RECONSTRUCT INTERCHANGE

HOUSTON HARRIS 0500-03-597 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $953,431,035

AT IH 610LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16327MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 17

Page 23: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16327/0500-03-597

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 18

Page 24: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16328/0500-03-599 FY 2025

Amendment #JAN-2018 - 1/26/18 - Add NHHIP Develop Authority project to the

RTP. Express lanes are non-tolled.

RECONSTRUCT INTERCHANGE INCLUDING IH 10 EXPRESS LANES

HOUSTON HARRIS 0500-03-599 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $1,060,081,286

AT IH 10LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16328MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 19

Page 25: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16328/0500-03-599

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 20

Page 26: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16329/0500-03-601 FY 2021

Amendment #JAN-2018 - 1/26/18 - Add NHHIP to the RTP, funding committed by

TxDOT at Mar 2017 Commission meeting.

RECONSTRUCT INTERCHANGE INCLUDING IH 45 & IH 69 MAINLANES

HOUSTON HARRIS 0500-03-601 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $1,485,488,700

AT IH 69 SLIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16329MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 21

Page 27: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16329/0500-03-601

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 22

Page 28: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16330/0500-08-001 FY 2023

Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the

RTP. Express lanes are non-tolled.

RECONSTRUCT INTERCHANGE INCLUDING IH 45, IH 10 & IH 69

MAINLANES AND IH 10 EXPRESS LANES

HOUSTON HARRIS 0500-08-001 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $1,268,315,436

AT IH 69/IH 10LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16330MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 23

Page 29: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16330/0500-08-001

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 24

Page 30: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16331/0500-03-446 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP Develop Authority project to the

RTP.

RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4

ADDITIONAL MANAGED LANES

HOUSTON HARRIS 0500-03-446 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $653,249,875

TIDWELL RD

S OF SHEPHERD DR

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16331MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 25

Page 31: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16331/0500-03-446

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 26

Page 32: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16332/0500-03-560 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP Develop Authority project to the

RTP.

RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED

LANES

HOUSTON HARRIS 0500-03-560 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $499,303,972

IH 10

IH 610

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16332MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 27

Page 33: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16332/0500-03-560

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 28

Page 34: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16333/0500-03-596 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority to the RTP.

RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED

LANES

HOUSTON HARRIS 0500-03-596 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $567,366,612

IH 610

TIDWELL RD

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16333MPO PROJECT ID:

Project History:

IH 45 NSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 29

Page 35: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16333/0500-03-596

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 30

Page 36: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16334/0110-06-132 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP development authority project to

the RTP.

RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED

LANES

HOUSTON HARRIS 0110-06-132 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $492,763,520

S OF WEST RD

N OF BW 8

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16334MPO PROJECT ID:

Project History:

IH 45STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 31

Page 37: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16334/0110-06-132

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 32

Page 38: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16335/0110-06-139 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the

RTP.

RECONSTRUCT MAIN LANES, FRONTAGE LANES AND CONSTRUCT 4 ADDITIONAL MANAGED

LANES

HOUSTON HARRIS 0110-06-139 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $639,936,760

S OF SHEPHERD DR

S OF WEST RD

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16335MPO PROJECT ID:

Project History:

IH 45 NSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 33

Page 39: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16335/0110-06-139

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 34

Page 40: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16336/0500-03-598 FY 2026

Amendment #JAN-2018 - 1/26/18 - Add NHHIP develop authority project to the

RTP.

REMOVE EXISTING PIERCE ELEVATED AND CONSTRUCT PARKWAY CONNECTORS INTO

DOWNTOWN HOUSTON

HOUSTON HARRIS 0500-03-598 IH 45 HOUSTON TXDOT HOUSTON DISTRICT $267,845,342

IH 69

IH 10

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16336MPO PROJECT ID:

Project History:

IH 45 SSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 35

Page 41: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16336/0500-03-598

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 36

Page 42: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 155/0027-13-201 FY 2020

Amendment #JAN-2018 - 1/26/18 - Add NHHIP project segment to the TIP. Funding

committed by TxDOT at the Mar 2017 Commission meeting.

RECONSTRUCT TO 10 MAIN LANES

HOUSTON HARRIS 0027-13-201 US 69 C HOUSTON TXDOT HOUSTON DISTRICT $192,000,000

SH 288

SP 527

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $192,000,000

Preliminary Engineering: $9,408,000

Construction Engineering: $7,680,000

Contingencies: $19,200,000

Indirects: $9,753,600

Total Project Cost: $293,241,600

Right Of Way: $55,200,000

Bond Financing: ---

12FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$192,000,000

155MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

IH 69 SSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

12-STRATEGIC: $153,600,000 $38,400,000 --- $192,000,000 --- ---

Funding by Share: $153,600,000 --- $192,000,000 --- ---$38,400,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 37

Page 43: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 155/0027-13-201

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 38

Page 44: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 7428/0027-13-200 FY 2021

Amendment #JAN-2018 -1/26/18 - Add NHHIP project segment to the RTP. Funding committed by TxDOT at the Mar 2017 Commission meeting.

WIDEN FROM 8 TO 12 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE

HOUSTON HARRIS 0027-13-200 IH 69 C HOUSTON TXDOT HOUSTON DISTRICT $173,500,000

IH 45

SH 288

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $173,500,000

Preliminary Engineering: $8,501,500

Construction Engineering: $6,940,000

Contingencies: $17,350,000

Indirects: $8,813,800

Total Project Cost: $215,105,300

Right Of Way: ---

Bond Financing: ---

12FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$173,500,000

7428MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

IH 69 SSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

12-STRATEGIC: $138,800,000 $34,700,000 --- $173,500,000 --- ---

Funding by Share: $138,800,000 --- $173,500,000 --- ---$34,700,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 15, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 39

Page 45: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 7428/0027-13-200 FY 2021

Amendment #JAN-2018 - 1/26/18 - Add NHHIP project segment to the RTP.

Funding committed by TxDOT at the Mar 2017 Commission meeting.

WIDEN FROM 8 TO 12 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE

HOUSTON HARRIS 0027-13-200 IH 69 HOUSTON TXDOT HOUSTON DISTRICT $239,160,300

IH 45

SH 288

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

7428MPO PROJECT ID:

Project History:

IH 69 SSTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 40

Page 46: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16337/0027-13-221 FY 2020

Amendment #JAN-2018 - 1/26/18 - Add NHHIP project segment to the TIP. Funding

committed by TxDOT at March 2017 Commission meeting.

RECONSTRUCT 3 BRIDGES

HOUSTON HARRIS 0027-13-221 IH 69 C HOUSTON TXDOT HOUSTON DISTRICT $55,800,000

AT MCGOWEN, TUAM AND ELGINLIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $55,800,000

Preliminary Engineering: $2,734,200

Construction Engineering: $2,232,000

Contingencies: $5,580,000

Indirects: $2,834,640

Total Project Cost: $73,680,840

Right Of Way: $4,500,000

Bond Financing: ---

12FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$55,800,000

16337MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

IH 69STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

12-STRATEGIC: $44,640,000 $11,160,000 --- $55,800,000 --- ---

Funding by Share: $44,640,000 --- $55,800,000 --- ---$11,160,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 41

Page 47: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16337/0027-13-221

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 42

Page 48: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16342/0720-03-133 FY 2018

Amendment #JAN-2018 - 1/26/18 - Re-striping to eliminate capacity bottleneck.

Project funded under district maintenance program (Cat 1).

WIDEN FROM 6 TO 8 LANES AND RAMP REVERSAL AT SPRING CYPRESS RD (RE-STRIPE EXISTING

PAVEMENT)

HOUSTON HARRIS 0720-03-133 SH 249 C NONE TXDOT HOUSTON DISTRICT $3,200,000

S OF CHASEWOOD PARK DR

N OF GREGSON RD

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $3,200,000

Preliminary Engineering: $156,800

Construction Engineering: $192,000

Contingencies: $320,000

Indirects: $162,560

Total Project Cost: $4,031,360

Right Of Way: ---

Bond Financing: ---

1FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$3,200,000

16342MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 249STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

1-PREV-M: $2,560,000 $640,000 --- $3,200,000 --- ---

Funding by Share: $2,560,000 --- $3,200,000 --- ---$640,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 43

Page 49: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16342/0720-03-133

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 44

Page 50: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16344/3256-03-096 FY 2020

Amendment #JAN-2018 - 1/26/18 - Re-striping project to eliminate capacity

bottleneck. Funding committed by TxDOT Houston District (Cat 11)

WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXISTING PAVEMENT)

HOUSTON HARRIS 3256-03-096 SL 8 C NONE TXDOT HOUSTON DISTRICT $500,000

US 90

S OF IH 10 E

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $500,000

Preliminary Engineering: $24,500

Construction Engineering: $45,000

Contingencies: $50,000

Indirects: $25,400

Total Project Cost: $644,900

Right Of Way: ---

Bond Financing: ---

11FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$500,000

16344MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SL 8STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

11-ST DIST DISC: $400,000 $100,000 --- $500,000 --- ---

Funding by Share: $400,000 --- $500,000 --- ---$100,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 45

Page 51: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16344/3256-03-096

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 46

Page 52: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 16348/0027-08-180 FY 2021

Amendment #JAN-2018 -1/26/18 - Add locally funded project to the RTP. Funding provided by Fort Bend County.

CONSTRUCT GRADE SEPARATION AND INTERSECTION IMPROVEMENTS

HOUSTON FORT BEND 0027-08-180 US 90A C NONE TXDOT HOUSTON DISTRICT $27,000,000

AT SH 99LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $27,000,000

Preliminary Engineering: $1,323,000

Construction Engineering: $1,080,000

Contingencies: $2,700,000

Indirects: $1,371,600

Total Project Cost: $33,474,600

Right Of Way: ---

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$27,000,000

16348MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

US 90ASTREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-LOCAL: --- --- $27,000,000 $27,000,000 --- ---

Funding by Share: --- $27,000,000 $27,000,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 47

Page 53: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 16348/0027-08-180

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 48

Page 54: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16338/0338-05-028 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the

RTP.

WIDEN FROM 2 TO 4 LANES

BEAUMONT LIBERTY 0338-05-028 SH 105 CLEVELAND TXDOT BEAUMONT DISTRICT $15,552,107

MONTGOMERY C/L

CLEVELAND BYPASS

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16338MPO PROJECT ID:

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 49

Page 55: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16338/0338-05-028 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the

RTP.

WIDEN FROM 2 TO 4 LANES

BEAUMONT LIBERTY 0338-05-028 SH 105 CLEVELAND TXDOT BEAUMONT DISTRICT $15,552,107

MONTGOMERY C/L

CLEVELAND BYPASS

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16338MPO PROJECT ID:

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 50

Page 56: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16346/0177-03-099 FY 2022

Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the

RTP.

CONVERT MAINLANES TO FREEWAY AND CONSTRUCT TWO 2-LANE FRONTAGE ROADS

BEAUMONT LIBERTY 0177-03-099 US 59 CLEVELAND TXDOT BEAUMONT DISTRICT $70,265,982

SAN JACINTO C/L

N END OF CLEVELAND BYPASS

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16346MPO PROJECT ID:

Project History:

US 59STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 51

Page 57: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16346/0177-03-099 FY 2022

Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the

RTP.

CONVERT MAINLANES TO FREEWAY AND CONSTRUCT TWO 2-LANE FRONTAGE ROADS

BEAUMONT LIBERTY 0177-03-099 US 59 CLEVELAND TXDOT BEAUMONT DISTRICT $70,265,982

SAN JACINTO C/L

N END OF CLEVELAND BYPASS

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16346MPO PROJECT ID:

Project History:

US 59STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 52

Page 58: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16313/0523-08-013 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.

CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)

HOUSTON MONTGOMERY 0523-08-013 FM 1488 NONE TXDOT HOUSTON DISTRICT $19,088,736

EXISTING FM 1488, W OF MAGNOLIA

FM 1774

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16313MPO PROJECT ID:

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 53

Page 59: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16313/0523-08-013 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.

CONSTRUCT 4 LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)

HOUSTON MONTGOMERY 0523-08-013 FM 1488 NONE TXDOT HOUSTON DISTRICT $19,088,736

EXISTING FM 1488, W OF MAGNOLIA

FM 1774

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16313MPO PROJECT ID:

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 54

Page 60: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16314/0523-09-018 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.

CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)

HOUSTON MONTGOMERY 0523-09-018 FM 1488 NONE TXDOT HOUSTON DISTRICT $22,120,200

FM 1774

PROPOSED SH 249

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16314MPO PROJECT ID:

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 55

Page 61: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16314/0523-09-018 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.

CONSTRUCT 4-LANE ROADWAY ON NEW LOCATION (MAGNOLIA BYPASS)

HOUSTON MONTGOMERY 0523-09-018 FM 1488 NONE TXDOT HOUSTON DISTRICT $22,120,200

FM 1774

PROPOSED SH 249

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16314MPO PROJECT ID:

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 56

Page 62: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 10132/3416-01-012 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.

RECONSTRUCT AND WIDEN FROM 4 AND 6 LANES TO 6 LANES

HOUSTON BRAZORIA 3416-01-012 FM 518 PEARLAND TXDOT HOUSTON DISTRICT $36,417,010

SH 288

FM 865

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

10132MPO PROJECT ID:

Project History:

FM 518STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 57

Page 63: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 10132/3416-01-012

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 58

Page 64: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 10133/0976-02-086 FY 2024

Amendment #JAN-2018 - 1/26/18 - Add develop authority project to the RTP.

RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES

HOUSTON BRAZORIA 0976-02-086 FM 518 PEARLAND TXDOT HOUSTON DISTRICT $36,417,010

FM 865

SH 35

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

10133MPO PROJECT ID:

Project History:

FM 518STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 59

Page 65: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 10133/0976-02-086

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 60

Page 66: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 187/0338-11-028 FY 2025

Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the

RTP.

WIDEN FROM 4 TO 6 LANES

HOUSTON MONTGOMERY 0338-11-028 LP 336 CONROE TXDOT HOUSTON DISTRICT $28,623,358

E OF IH 45

FM 3083

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

187MPO PROJECT ID:

Project History:

LP 336STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 61

Page 67: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 187/0338-11-028

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 62

Page 68: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16343/0338-11-056 FY 2022

Amendment #JAN-2018 - 1/26/18 - Add TxDOT develop authority project to the

RTP.

WIDEN FROM 2 TO 4 LANES

HOUSTON MONTGOMERY 0338-11-056 SL 336 CONROE TXDOT HOUSTON DISTRICT $16,329,023

FM 1314

IH 45

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16343MPO PROJECT ID:

Project History:

SL 336STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 63

Page 69: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 16343/0338-11-056

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 64

Page 70: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 914/0720-02-074 FY 2018

Amendment #JAN-2018 - 1/26/18 - Modify scope to reflect initial 4-lane tollway.

Future widening to 6-lanes added to RTP (MPOID 16349).

CONSTRUCT 4-LANE TOLLWAY WITH GRADE SEPARATIONS AT STAGECOACH RD AND

WOODLANDS PARKWAY

HOUSTON MONTGOMERY 0720-02-074 SH 249 C,E,R NONE MONTGOMERY COUNTY $110,000,000

FM 1774/FM 149 IN PINEHURST

SPRING CREEK/HARRIS C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $93,138,739

Preliminary Engineering: $3,539,272

Construction Engineering: $11,968,328

Contingencies: $14,790,432

Indirects: $6,491,770

Total Project Cost: $129,928,541

Right Of Way: ---

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$110,000,000

914MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 249STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-TOLL: --- --- $110,000,000 $110,000,000 --- ---

Funding by Share: --- $110,000,000 $110,000,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 65

houston
Highlight
houston
Highlight
houston
Highlight
Page 71: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 914/0720-02-074 FY 2018

CONSTRUCT 6-LANE TOLLWAY WITH GRADE SEPARATIONS AT STAGECOACH RD AND

WOODLANDS PARKWAY

HOUSTON MONTGOMERY 0720-02-074 SH 249 C,E,R NONE MONTGOMERY COUNTY $129,930,000

FM 1774/FM 149 IN PINEHURST

SPRING CREEK/HARRIS C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $93,138,739

Preliminary Engineering: $3,539,272

Construction Engineering: $11,968,328

Contingencies: $14,790,432

Indirects: $6,491,770

Total Project Cost: $129,928,541

Right Of Way: ---

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$129,930,000

914MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 249STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-TOLL: --- --- $129,930,000 $129,930,000 --- ---

Funding by Share: --- $129,930,000 $129,930,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 66

houston
Typewritten Text
houston
Typewritten Text
Page 72: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16349/NA FY 2035

Amendment #JAN-2018 - 1/26/18 - Add 6-lane widening to RTP to retain ultimate

scope. Initial construction as 4-lane tollway is designed for future 6-lane widening.

WIDEN FROM 4-LANE TO 6-LANE TOLLWAY

HOUSTON MONTGOMERY SH 249 MONTGOMERY COUNTY $30,000,000

FM 1774/FM 149 IN PINEHURST

SPRING CREEK/HARRIS C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

16349MPO PROJECT ID:

Project History:

SH 249STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 67

Page 73: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 16349/NA

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Thursday, August 10, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 68

Page 74: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 14248/3187-02-010 FY 2025

Amendment #JAN-2018 - 1/26/18 - Delay from FY 2020 to FY 2025.

SEG I-1/I-2: CONSTRUCT 4 DCS (TOLL)

BEAUMONT CHAMBERS 3187-02-010 SH 99 NONE TXDOT BEAUMONT DISTRICT $80,800,000

AT IH 10 ELIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

14248MPO PROJECT ID:

Project History:

SH 99STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, January 23, 2018

26-JAN-18 Page 69

houston
Highlight
Page 75: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 14248/3187-02-010 FY 2020

CONSTRUCT 4 DIRECT CONNECTORS (TOLL)

BEAUMONT CHAMBERS 3187-02-010 SH 99 C,E NONE TXDOT BEAUMONT DISTRICT $76,000,000

AT IH 10 ELIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $72,449,952

Preliminary Engineering: $3,550,048

Construction Engineering: $2,897,998

Contingencies: $7,244,995

Indirects: $3,680,458

Total Project Cost: $89,823,451

Right Of Way: ---

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$76,000,000

14248MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 99STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-TOLL: --- $76,000,000 --- $76,000,000 --- ---

Funding by Share: --- --- $76,000,000 --- ---$76,000,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 70

Page 76: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 16347/0028-04-069 FY 2024

Amendment #JAN-2018 -1/26/18- Add TxDOT BMT District Cat 4 connectivity

project to the RTP.

RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED ROADWAY WITH CONTINUOUS LEFT TURN

LANE

BEAUMONT LIBERTY 0028-04-069 US 90 C DEVERS TXDOT BEAUMONT DISTRICT $40,000,000

FM 160

SH 61

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $40,000,000

Preliminary Engineering: $1,960,000

Construction Engineering: $1,600,000

Contingencies: $4,000,000

Indirects: $2,032,000

Total Project Cost: $49,592,000

Right Of Way: ---

Bond Financing: ---

4FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$40,000,000

16347MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

US 90STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

4-ST-WIDE: $32,000,000 $8,000,000 --- $40,000,000 --- ---

Funding by Share: $32,000,000 --- $40,000,000 --- ---$8,000,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 71

Page 77: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16347/0028-04-069

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 72

Page 78: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 499/0523-09-009 FY 2023

Amendment #JAN-2018 - 1/26/18 - ADVANCE TO FY 2023 AND UPDATE CAT 2

FUNDING. *** Amendment #2040-3 - 4/22/16 - Program in FY 2025 with PROP-7

funding.

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LEFT TURN LANE AND BICYCLE

ACCOMMODATIONS

HOUSTON MONTGOMERY 0523-09-009 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $40,100,000

FM 1774

W OF FM 149

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $40,100,000

Preliminary Engineering: $1,964,900

Construction Engineering: $1,604,000

Contingencies: $4,010,000

Indirects: $2,037,080

Total Project Cost: $54,678,777

Right Of Way: $4,962,797

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$40,100,000

499MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $32,080,000 $8,020,000 --- $40,100,000 --- ---

Funding by Share: $32,080,000 --- $40,100,000 --- ---$8,020,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 73

houston
Highlight
houston
Highlight
houston
Highlight
Page 79: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 499/0523-09-009 FY 2025

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LEFT TURN LANE AND BICYCLE

ACCOMMODATIONS

HOUSTON MONTGOMERY 0523-09-009 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $66,474,000

FM 1774

W OF FM 149

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $66,474,000

Preliminary Engineering: $3,257,226

Construction Engineering: $2,658,960

Contingencies: $6,647,400

Indirects: $3,376,879

Total Project Cost: $82,414,465

Right Of Way: ---

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$66,474,000

499MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $66,474,000 --- $66,474,000 --- ---

Funding by Share: --- --- $66,474,000 --- ---$66,474,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 74

Page 80: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 501/0523-08-007 FY 2023

Amendment #JAN-2018 - 1/26/18 - Split off 0523-04-017, advance project to FY

2023 and adjust funding. *** Amendment #2040-3 - 4/22/16 - Program in FY 2025

with PROP-1 funding.

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LEFT TURN LANE AND BICYCLE

ACCOMMODATIONS

HOUSTON MONTGOMERY 0523-08-007 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $26,900,000

WALLER C/L

FM 1774

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $26,900,000

Preliminary Engineering: $1,318,100

Construction Engineering: $1,076,000

Contingencies: $2,690,000

Indirects: $1,366,520

Total Project Cost: $48,068,620

Right Of Way: $14,718,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$26,900,000

501MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $21,520,000 $5,380,000 --- $26,900,000 --- ---

Funding by Share: $21,520,000 --- $26,900,000 --- ---$5,380,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 75

houston
Highlight
houston
Highlight
houston
Highlight
Page 81: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 501/0523-08-007 FY 2025

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LFET TURN LANE AND BICYCLE

ACCOMODATIONS

HOUSTON MONTGOMERY 0523-08-007 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $44,592,000

JOSEPH RD

FM 1774

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $44,592,000

Preliminary Engineering: $2,185,008

Construction Engineering: $1,783,680

Contingencies: $4,459,200

Indirects: $2,265,274

Total Project Cost: $55,285,162

Right Of Way: ---

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$44,592,000

501MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-1: --- $44,592,000 --- $44,592,000 --- ---

Funding by Share: --- --- $44,592,000 --- ---$44,592,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 76

Page 82: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 16315/0523-04-017 FY 2023

Amendment #JAN-2018 -1/26/18 - Split segment in Waller Co. from existing

project and advance construction funding to FY2023. No change in scope.

WIDEN FROM 2 TO 4-LANES WITH CONTINUOUS CENTER LFET TURN LANE AND BICYCLE

ACCOMODATIONS

HOUSTON MONTGOMERY 0523-04-017 FM 1488 C NONE TXDOT HOUSTON DISTRICT $2,000,000

W OF JOSEPH RD

MONTGOMERY C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $2,000,000

Preliminary Engineering: $98,000

Construction Engineering: $120,000

Contingencies: $200,000

Indirects: $101,600

Total Project Cost: $2,519,600

Right Of Way: ---

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$2,000,000

16315MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 1488STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $1,600,000 $400,000 --- $2,000,000 --- ---

Funding by Share: $1,600,000 --- $2,000,000 --- ---$400,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 15, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 77

Page 83: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 16315/0523-04-017

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 78

Page 84: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 514/3049-01-022 FY 2022

Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2022, modify

Cat-2 funding and reflect potential use of federal funds. *** Amendment #2040-3 -

4/22/16 - Modify description and program funding.

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN AND RAILROAD OVERPASS

HOUSTON GALVESTON 3049-01-022 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $31,127,000

EDMUNDS WAY

FM 1266

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $31,127,000

Preliminary Engineering: $1,525,223

Construction Engineering: $1,245,080

Contingencies: $3,112,700

Indirects: $1,581,252

Total Project Cost: $44,741,255

Right Of Way: $6,150,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$31,127,000

514MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 646STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $24,901,600 $6,225,400 --- $31,127,000 --- ---

Funding by Share: $24,901,600 --- $31,127,000 --- ---$6,225,400

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 79

houston
Highlight
houston
Highlight
Page 85: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 514/3049-01-022 FY 2024

WIDEN FROM 2 TO 4 LANES WITH OVERPASS

HOUSTON GALVESTON 3049-01-022 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $61,003,000

EDMUNDS WAY

FM 1266

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $61,003,000

Preliminary Engineering: $2,989,147

Construction Engineering: $2,440,120

Contingencies: $6,100,300

Indirects: $3,098,952

Total Project Cost: $75,631,519

Right Of Way: ---

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$61,003,000

514MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 646STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $61,003,000 --- $61,003,000 --- ---

Funding by Share: --- --- $61,003,000 --- ---$61,003,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 80

Page 86: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 10144/0978-02-053 FY 2023

Amendment #JAN-2018 - 1/26/18 - Advance from FY 2025 to FY 2023, modify

Cat-2 funding and reflect potential use of federal funds. *** Amendment #2040-3 -

4/22/16 - Advance to FY 2025, modify description and program funding.

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN

HOUSTON GALVESTON 0978-02-053 FM 646 C TXDOT HOUSTON DISTRICT $7,000,000

FM 3436

SH 146

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $7,000,000

Preliminary Engineering: $343,000

Construction Engineering: $350,000

Contingencies: $700,000

Indirects: $355,600

Total Project Cost: $12,968,600

Right Of Way: $4,220,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$7,000,000

10144MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 646STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $5,600,000 $1,400,000 --- $7,000,000 --- ---

Funding by Share: $5,600,000 --- $7,000,000 --- ---$1,400,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 81

houston
Highlight
houston
Highlight
Page 87: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 10144/0978-02-053 FY 2025

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN

HOUSTON GALVESTON 0978-02-053 FM 646 C TXDOT HOUSTON DISTRICT $14,422,000

FM 3436

SH 146

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $14,422,000

Preliminary Engineering: $706,678

Construction Engineering: $721,100

Contingencies: $1,442,200

Indirects: $732,638

Total Project Cost: $22,244,616

Right Of Way: $4,220,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$14,422,000

10144MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 646STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $14,422,000 --- $14,422,000 --- ---

Funding by Share: --- --- $14,422,000 --- ---$14,422,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 82

Page 88: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 10920/3049-01-023 FY 2023

Amendment #JAN-2018 - 1/26/18 - Advance project from FY 2025 to FY 2023,

modify Cat-2 funding and reflect potential use of federal funds. *** Amendment #

2040-3 - 4/22/16 - Advance to FY 2025, modify description and program funding.

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN

HOUSTON GALVESTON 3049-01-023 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $21,200,000

FM 1266

FM 3436

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $21,200,000

Preliminary Engineering: $1,038,800

Construction Engineering: $1,060,000

Contingencies: $2,120,000

Indirects: $1,076,960

Total Project Cost: $34,895,760

Right Of Way: $8,400,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$21,200,000

10920MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 646STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $16,960,000 $4,240,000 --- $21,200,000 --- ---

Funding by Share: $16,960,000 --- $21,200,000 --- ---$4,240,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 83

houston
Highlight
houston
Highlight
Page 89: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 10920/3049-01-023 FY 2025

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN

HOUSTON GALVESTON 3049-01-023 FM 646 C LEAGUE CITY TXDOT HOUSTON DISTRICT $39,785,000

FM 1266

FM 3436

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $39,785,000

Preliminary Engineering: $1,949,465

Construction Engineering: $1,591,400

Contingencies: $3,978,500

Indirects: $2,021,078

Total Project Cost: $57,725,443

Right Of Way: $8,400,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$39,785,000

10920MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

FM 646STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $39,785,000 --- $39,785,000 --- ---

Funding by Share: --- --- $39,785,000 --- ---$39,785,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 84

Page 90: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 504/0338-04-060 FY 2021

Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2021, modify

funding source to Cat-4 connectivity. *** Amendment #2040-3 - 4/22/16 - Program

in FY 2024 with PROP-7 funding.

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIANS AND INTERSECTION

IMPROVEMENTS

HOUSTON MONTGOMERY 0338-04-060 SH 105 C CONROE TXDOT HOUSTON DISTRICT $21,400,000

10TH ST

SL 336

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $21,400,000

Preliminary Engineering: $1,048,600

Construction Engineering: $1,070,000

Contingencies: $2,140,000

Indirects: $1,087,120

Total Project Cost: $28,051,690

Right Of Way: $1,305,970

Bond Financing: ---

4FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$21,400,000

504MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

4-ST-WIDE: --- $21,400,000 --- $21,400,000 --- ---

Funding by Share: --- --- $21,400,000 --- ---$21,400,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 85

houston
Highlight
houston
Highlight
houston
Highlight
Page 91: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 504/0338-04-060 FY 2024

WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIANS AND INTERSECTION

IMPROVEMENTS

HOUSTON MONTGOMERY 0338-04-060 SH 105 C CONROE TXDOT HOUSTON DISTRICT $34,110,000

10TH ST

LP 336

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $34,110,000

Preliminary Engineering: $1,671,390

Construction Engineering: $1,364,400

Contingencies: $3,411,000

Indirects: $1,732,788

Total Project Cost: $42,289,578

Right Of Way: ---

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$34,110,000

504MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $34,110,000 --- $34,110,000 --- ---

Funding by Share: --- --- $34,110,000 --- ---$34,110,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 86

Page 92: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 7705/0338-06-011 FY 2022

Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2022 and modify

funding. *** Amendment #2040-3 - 4/22/16 - Not in TMA. Information Only.

INFORMATION ONLY (PROJECT IN SAN JACINTO CO): WIDEN TO 4-LANE DIVIDED RURAL

ROADWAY WITH INTERSECTION IMPROVEMENTS

LUFKIN SAN JACINTO 0338-06-011 SH 105 C NONE TXDOT HOUSTON DISTRICT $10,000,000

MONTGOMERY C/L

MONTGOMERY C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $10,000,000

Preliminary Engineering: $490,000

Construction Engineering: $500,000

Contingencies: $1,000,000

Indirects: $508,000

Total Project Cost: $12,863,760

Right Of Way: $365,760

Bond Financing: ---

4FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$10,000,000

7705MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

4-ST-WIDE: --- $10,000,000 --- $10,000,000 --- ---

Funding by Share: --- --- $10,000,000 --- ---$10,000,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 87

houston
Highlight
houston
Highlight
houston
Highlight
Page 93: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 7705/0338-06-011 FY 2024

INFORMATION ONLY (PROJECT IN SAN JACINTO CO): WIDEN TO 4-LANE DIVIDED RURAL

ROADWAY WITH INTERSECTION IMPROVEMENTS

LUFKIN SAN JACINTO 0338-06-011 SH 105 C NONE TXDOT HOUSTON DISTRICT $15,939,000

MONTGOMERY C/L

MONTGOMERY C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $15,939,000

Preliminary Engineering: $781,011

Construction Engineering: $796,950

Contingencies: $1,593,900

Indirects: $809,701

Total Project Cost: $21,170,562

Right Of Way: $1,250,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$15,939,000

7705MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $15,939,000 --- $15,939,000 --- ---

Funding by Share: --- --- $15,939,000 --- ---$15,939,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 08, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 88

Page 94: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 7706/0338-07-019 FY 2023

Amendment #JAN-2018 - 1/26/18 - Advance from FY 2024 to FY 2023 and modify

funding. *** Amendment #2040-3 - 4/22/16 - Program in FY 2024 with PROP-7

funding.

WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WITH INTERSECTION IMPROVEMENTS

HOUSTON MONTGOMERY 0338-07-019 SH 105 C NONE TXDOT HOUSTON DISTRICT $26,900,000

SAN JACINTO C/L

LIBERTY C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $26,900,000

Preliminary Engineering: $1,318,100

Construction Engineering: $1,076,000

Contingencies: $2,690,000

Indirects: $1,366,520

Total Project Cost: $34,074,940

Right Of Way: $724,320

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$26,900,000

7706MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: --- $26,900,000 --- $26,900,000 --- ---

Funding by Share: --- --- $26,900,000 --- ---$26,900,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Friday, October 20, 2017

26-JAN-18 Page 89

houston
Highlight
houston
Highlight
Page 95: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 7706/0338-07-019 FY 2024

WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WITH INTERSECTION IMPROVEMENTS

HOUSTON MONTGOMERY 0338-07-019 SH 105 C NONE TXDOT HOUSTON DISTRICT $47,181,000

SAN JACINTO C/L

LIBERTY C/L

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $47,181,000

Preliminary Engineering: $2,311,869

Construction Engineering: $1,887,240

Contingencies: $4,718,100

Indirects: $2,396,795

Total Project Cost: $62,895,004

Right Of Way: $4,400,000

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$47,181,000

7706MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 105STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-PROP-7: --- $47,181,000 --- $47,181,000 --- ---

Funding by Share: --- --- $47,181,000 --- ---$47,181,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 90

Page 96: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 467/0389-07-025 FY 2021

Amendment #JAN-2018 - 1/26/18 - Advance from FY 2030 to FY 2021. TxDOT

Cat-6 (bridge) authorized for $15m.

CONSTRUCT RR OVERPASS

HOUSTON GALVESTON 0389-07-025 SH 146 TEXAS CITY TXDOT HOUSTON DISTRICT $39,165,000

FM 519

SL 197

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

467MPO PROJECT ID:

Project History:

SH 146STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 91

houston
Highlight
Page 97: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 467/0389-07-025 FY 2030

CONSTRUCT RR OVERPASS

HOUSTON GALVESTON 0389-07-025 SH 146 TEXAS CITY TXDOT HOUSTON DISTRICT $55,225,258

FM 519

SL 197

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

MTP REFERENCE:

467MPO PROJECT ID:

Project History:

SH 146STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR TOTAL COST

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 09, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 92

Page 98: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 13841/0389-05-129 FY 2023

Amendment #JAN-2018 -1/26/18 - Add project to RTP. Project eliminates

bottleneck between existing segment and planning improvements

CONSTRUCT NEW CONCRETE PAVEMENT TO REMOVE BOTTLE NECK

HOUSTON HARRIS 0389-05-129 SH 146 C LA PORTE TXDOT HOUSTON DISTRICT $250,000

N OF FAIRMONT PKWY

SPENCER HWY

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $250,000

Preliminary Engineering: $12,250

Construction Engineering: $22,500

Contingencies: $25,000

Indirects: $12,700

Total Project Cost: $322,450

Right Of Way: ---

Bond Financing: ---

2FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$250,000

13841MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 146STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

2-METRO-TMA: $200,000 $50,000 --- $250,000 --- ---

Funding by Share: $200,000 --- $250,000 --- ---$50,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 93

Page 99: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 13841/0389-05-129

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 94

Page 100: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

PROPOSED VERSION

MPOID/CSJ: 251/0111-08-100 FY 2019

Amendment #JAN-2018 -1/26/18 - Add to FY 2019 of the TIP. Funding from Cat 4

(connectivity) in 2018 UTP.

WIDEN FROM 2 TO 4 LANES (SEG 15)

HOUSTON BRAZORIA 0111-08-100 SH 36 C FREEPORT TXDOT HOUSTON DISTRICT $8,500,000

S OF THE BRAZOS RIVER

FM 1495

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $8,500,000

Preliminary Engineering: $416,500

Construction Engineering: $425,000

Contingencies: $850,000

Indirects: $431,800

Total Project Cost: $10,623,300

Right Of Way: ---

Bond Financing: ---

4FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$8,500,000

251MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

SH 36STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

4-ST-WIDE: $6,800,000 $1,700,000 --- $8,500,000 --- ---

Funding by Share: $6,800,000 --- $8,500,000 --- ---$1,700,000

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Tuesday, August 15, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 95

Page 101: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

OLD VERSION

MPOID/CSJ: 251/0111-08-100

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 96

Page 102: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

JANUARY 2018 MODIFICATIONS AND PREVIEWS

PROPOSED VERSION

MPOID/CSJ: 16016/0050-09-089 CANCELLED

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, January 03, 2018

26-JAN-18 Page 97

houston
Highlight
houston
Highlight
Page 103: H-GAC 2017-2020 TIP and 2040 RTP January TPC Amendments · r rtp (conform) ($17.7) -0- fed limits advance (2025 to 2023) 10133 0976-02-086 txdot houston district (bra) fm 518 (fm

2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM

2040 REGIONAL TRANSPORTATION PLAN

HOUSTON-GALVESTON MPO

OLD VERSION

MPOID/CSJ: 16016/0050-09-089 FY 2015

Amendment #PENDING - 12/15/17 - Cancel project. Existing access from 1-lane

reversible HOV will be preserved.

CONSTRUCT 3-LANE REVERSIBLE MANAGED LANE CONNECTOR AND T-RAMP TO METRO PARK &

RIDE

HOUSTON HARRIS 0050-09-089 US 290 C,E,R JERSEY VILLAGE TXDOT HOUSTON DISTRICT $26,000,000

W OF FM 529

W OF LITTLE YORK W

LIMITS FROM:

TIP

DESCRIPTION:

REMARKS:

LIMITS TO:

Total Project Cost Information:

Construction: $17,452,007

Preliminary Engineering: $855,148

Construction Engineering: $698,080

Contingencies: $1,745,201

Indirects: $886,562

Total Project Cost: $26,000,000

Right Of Way: $4,363,002

Bond Financing: ---

3FUNDING CATEGORY:

MTP REFERENCE:

Cost of

Approved

Phases:

$26,000,000

16016MPO PROJECT ID:

Authorized Funding by Category/Share:

Federal State Regional Local

Local

Contribution

Funding

By Category

Project History:

US 290STREET:

DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST

3-LOCAL: --- --- $26,000,000 $26,000,000 --- ---

Funding by Share: --- $26,000,000 $26,000,000 --- --- ---

PHASE: C=CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER Wednesday, August 16, 2017

JANUARY 2018 MODIFICATIONS AND PREVIEWS

26-JAN-18 Page 98