hazards identification and risk assessment for continual improvement in safety and towards zero...
TRANSCRIPT
![Page 1: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/1.jpg)
Hazards Identification and Risk Assessment
For continual improvement in safety and towards zero
Disaster Risk Management
![Page 2: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/2.jpg)
OH&S PolicyOH&S Policy
PlanningPlanning
Implementation Implementation & Operation& Operation
Checking &Checking &Corrective ActionCorrective Action
ManagementManagementReviewReview Continual Continual
ImprovementImprovement
![Page 3: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/3.jpg)
Clearly states overall OH&S objectives Authorised by top management Appropriate to nature & scale of OH&S
risks Documented, implemented, and
maintained Communicated to all employees Available to interested parties Reviewed periodically
OH&S Policy
![Page 4: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/4.jpg)
OH&S Policy Commitments Improve health & safety performance* Continual improvement “at least” comply with current
applicable OH&S legislation and other
requirements*Performance: measurable results of the OH&S management system, related to the organization’s control of health and safety risks, based on its OH&S policy and objectives.
![Page 5: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/5.jpg)
OH&S Planning Hazard identification, risk
assessment, and risk control Legal and other requirements Objectives OH&S management program(s)
![Page 6: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/6.jpg)
Hazard Identification, Risk Assessment & Risk Control Conceptually similar to environmental
aspects and impacts –target of management program(s)
Much more detailed than 14001 approach
Assessment must address: routine and non-routine activities all personnel, including contractors and
visitors facilities at the workplace, whether
provided by the organization or by others
![Page 7: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/7.jpg)
Hazard Identification, Risk Assessment & Risk Control Methodology must be proactive
in advance of process/equipment changes
allow engineering of hazard controls during design
implementation of controls as change occurs
Success requires strong Management of Change (MOC) procedure
![Page 8: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/8.jpg)
Hazard Identification, Risk Assessment & Risk Control Process overview
identification of hazards evaluation of risks under current controls evaluation of the tolerability of residual risk identification of needed additional controls
People are involved significant risks must be controlled individual behaviour is a significant factor
![Page 9: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/9.jpg)
Hazard Identification, Risk Assessment & Risk Control Process overview
identification of hazards evaluation of risks under current controls evaluation of the tolerability of residual risk identification of needed additional controls
People are involved significant risks must be controlled individual behaviour is a significant factor
![Page 10: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/10.jpg)
OH&S Planning
![Page 11: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/11.jpg)
Film
![Page 12: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/12.jpg)
Implementation & Operation Structure and responsibilities Training awareness and competence Consultation and communication Documentation Document and data control Operational control Emergency preparedness and
response
![Page 13: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/13.jpg)
Structure & Responsibilities Documented roles,
responsibilities, authorities, and accountability
Management appointee responsible for implementation
Resources Managers must demonstrate
commitment to continual improvement
![Page 14: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/14.jpg)
Training, Awareness & Competence Ensure employee awareness and
competence Take into account differing levels
of: Responsibility Ability Literacy Risk
Much of required training driven by regulation
![Page 15: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/15.jpg)
Consultation & Communication More internally focused than ISO 14001 Employee involvement and consultation
in development/review of policies and procedures
about changes that affect workplace safety or health
ensuring representation in OH&S matters Buy-in, ownership, motivation Insights of shop floor perspective
![Page 16: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/16.jpg)
Documentation & Data Documentation of core elements
aids employee awareness shows how the various system relate extremely valuable during certification
process Document and data control
procedures critical documents are available obsolete documents and data are
removed
![Page 17: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/17.jpg)
Operational Control Identify operations and activities
where risk requires further control Plan these to ensure that
documented procedures are developed operating criteria specify key steps
and requirements procedures addressing risks related to
contractor goods and services establish design procedures to
reduce/eliminate source of risks
![Page 18: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/18.jpg)
Emergency Preparedness & Response
Emergency response procedures to address identifying potential for incidents
and emergencies preventing and mitigating
resultant illnesses and injuries responding to incidents and
emergencies when they occur.
![Page 19: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/19.jpg)
Checking & Corrective Action
Performance measurement and monitoring
Accidents, incidents, non-conformances and corrective and preventive action
Records and records management
OH&S management system audit
![Page 20: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/20.jpg)
Performance Measurement & Monitoring Monitoring the achievement of
objectives Quantitative and qualitative
measures Proactive and reactive methods Records to facilitate corrective and
preventive actions Calibration of monitoring equipment
![Page 21: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/21.jpg)
Quantitative & Qualitative Direct Quantitative Measures
number of lost work days following an injury
decibel levels of noise in a work area
Indirect Qualitative Measures review of inspection logs observation of a task interviews
![Page 22: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/22.jpg)
Proactive & Reactive Measures Proactive monitoring of compliance
routine basis, independent of any event monitoring may be required by
regulations daily equipment checks periodic review of hot-work permits
Reactive monitoring of accidents or incidents in response to an event or trigger
accident investigation monitoring in response to a complaint
![Page 23: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/23.jpg)
Accident, Incidents, Non-conformances & Corrective and Preventive Action
Handle, investigate, mitigate Accidents Incidents non-conformances
Corrective and preventive actions
Review action plans through risk assessment process
![Page 24: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/24.jpg)
Accident, Incidents & Non-conformances Handle = immediate action
Notification emergency response recordkeeping to facilitate
investigation Investigation process
team and procedures root cause analysis
People are involved human elements
![Page 25: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/25.jpg)
Corrective and Preventive Action
Correct immediate problem Mitigate consequences Eliminate or control root cause Prevent recurrence Review action plans through risk
assessment process Communicate results and
monitor
![Page 26: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/26.jpg)
Case study
![Page 27: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/27.jpg)
Records & Record Management Identification, maintenance, and
disposition Records must be:
Legible Identifiable traceable to the activities involved easily retrievable protected from damage, deterioration,
or loss held for specified and documented
retention times
![Page 28: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/28.jpg)
OH&S Management System Audit
Determine if OH&S-MS: conforms with planned arrangements is properly implemented and maintained is effective in meeting policy and
objectives Results provided to top management Audit program and schedule reflect
risks and previous audit results
![Page 29: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/29.jpg)
Description and definition of system
iption and definition of system
Hazard Identification
Accident Modeling/investigation
dent Modeling/investigationFrequency estimations
Risk Quantification
Risk Documentation & Follow up plan
Sys
tem
Mod
ifica
tion
toin
corp
orat
e su
gges
ted
risk
con
trol
mea
sure
s
Saf
ety
Ana
lysi
s
Qua
ntita
tive
Ris
kas
sess
men
t
Pro
babi
listic
Saf
ety
Ana
lysi
s
Ris
k m
anag
emen
tO
n-s
ite a
nd O
ff-
site
Em
erge
ncy
Pla
nnin
g
![Page 30: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/30.jpg)
Management Review
![Page 31: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/31.jpg)
OHSAS 18001 - Occupational health and safety management system
![Page 32: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/32.jpg)
Continual improvement : Pl refer the papers circulated and open for discussion
![Page 33: Hazards Identification and Risk Assessment For continual improvement in safety and towards zero Disaster Risk Management](https://reader035.vdocument.in/reader035/viewer/2022062221/56649ef45503460f94c07b1f/html5/thumbnails/33.jpg)
Thanks