hbd hv control and monitoring system installation manuel proissl hbd meeting 11/18/2008
TRANSCRIPT
HBD HV Controland Monitoring System
INSTALLATION
Manuel ProisslHBD Meeting 11/18/2008
OUTLINE
Development Status Software and Hardware components Server/HV Control Safety
Relay Board Rack in IR The New Shielding Add-on to PHENIX HV Racks
Installation Procedure Transfer from the HBD Simulation Project IR Implementation Counting Room Extension & First Testing
Coming Up
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008
HBD HV Control & Monitoring System Manuel Proissl Page 2 of 8
DEVELOPMENT STATUS
After discussions with Martin, the shell-based control option hvcontrol_HBD has been worked out and extended for all our HV needs: Functions as init, quick_init, standby, operating, disable, set_tripcurrent, etc. are made easily
available for users on va022 (hvserver needs to be running!) So far, one would have to change all config data in the perl script manually… Not any more! The
new script loads at every start-up the new data from hvdb, one central database every GUI client uses
Documentation on how to use it at /hv_stuff/hvcontrol_HBD coming soon!
Major VA Server Update Completed Successfully! Global HV parameters update every 5sec in one-time transmission, triggered by the client!
Software-based Trip-Behavior Function added to HV Control Based on monitoring measured (peak) current changes in 5sec update frame
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008
HV Client
HBD Server
hvclient
hvdb
combine package
1
2 3
HBD HV Control & Monitoring System Manuel Proissl Page 3 of 8
DEVELOPMENT STATUS
VA racks have been moved and reconnected to network Due to complaints from RCF about gateway activities due to telnet usage of the HV
Control, communication has been changed to SSH. New communication setup still in testing & improving…
Quick Intro to Control ProtectTM
Server Malfunction NOT Loosing Control over Detector!
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008
VAs
HV
Clie
ntS
A1
Clie
nt 022023
029
1.) VA022 not responding / available on network…
2.) Initiating switch to other VA server+ based on preferred list & process activity
3.) Transfer Authorization Message+ Automated Expert in Charge Call
4.) Transfer Approved by Expert via Call
5.) Start hvserver & HBD Server on VAxxx+ Downtime overall less than 2min
6.) Return to VA022 when problem resolved
HB
D E
xper
t
via hvdb
HBD HV Control & Monitoring System Manuel Proissl Page 4 of 8
RELAY BOARD RACK IN IR
All Relay Board issues have been completely resolved! In order to protect the VERY sensitive L1471Ns, customized 1U Aluminum boxes
were built and placed in our own rack Setup successfully tested without any trips up to 4kV! The Relay Board Rack will be installed up to the bridge in IR (2nd Level)
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008
LeCroy 1458HPMainframe
LC
147
1
LC
147
116 ………
Dividers
Plastic isolation betweenchassis and board
Air flow inbetween boxes
Sec
on
d L
evel
HV
Rac
k in
IR
HBD HV Control & Monitoring System Manuel Proissl Page 5 of 8
INSTALLATION PROCEDURE
HBD Simulation Project will find it’s end on installation date! Step 1: Removing Tunnel from 1008 to 510
LeCroy Module Tests NOW in the IR Step 2: LV Output tests of all 6 HBD-modified & calibrated Run9 L1471Ns with Fluke
+ Running HV Control on Laptop in IR
+ NO HV connection to actual detector!!!
HBD East (1471N #1-3) & HBD West (1471N #4-6) Hook-Up Step 3: Connecting HV modules to Relay Board Rack & Repeat Step 2 Step 4: (Re-)Connecting Relay Boards with Dividers Hardware Installation Complete
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008
PH
EN
IX
Wir
eles
s
IBM eServer
VA 022
HVCV2.0
LeC
roy
1458
HP
Mai
nfr
ame
LC 1471
LC 1471
16 …
…
RackIR
HBD HV Control & Monitoring System Manuel Proissl Page 6 of 8
INSTALLATION PROCEDURE
Counting Room Implementation Step 5: Installing HVCV2.0 on SA1 Terminal and two backup machines Step 6: Run9 Simulation Tests with first LV detector performance statistics
HBD Expert Distribution Step 7: HV Control for download on HBD website
with documentation
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008
PH
EN
IX
LA
N
IBM eServer
VA 022
LeC
roy
1458
HP
Mai
nfr
ame
LC 1471
LC 1471
16 …
…
RackIR
HVCV2.0
Voltage Divider
HBD HV Control & Monitoring System Manuel Proissl Page 7 of 8
COMING UP
Finalizing all functions to incorporate in HV Control (incl. FB/RB table look-up) Intense Crash Testing & Debugging until Deadline!!!
In order to guarantee system stability, this is The most important test period of all
Final Run9 database & log report setup with Martin
Distribution / Installation Files for Linux & XP/Vista Platform independence Final installation files with Installation Wizard
Planned Run9 HV System Installation: DEC 1st, 9AM ++ Preparation Tests in PHENIX continue until the second half shipped (approx. Dec 10 th)
HBD HV Control & Monitoring System Manuel Proissl Page 8 of 8
Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008