HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

Upload: jemima-floyd

Post on 01-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

HBD HV Controland Monitoring System

INSTALLATION

Manuel ProisslHBD Meeting 11/18/2008

Page 2: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

OUTLINE

Development Status Software and Hardware components Server/HV Control Safety

Relay Board Rack in IR The New Shielding Add-on to PHENIX HV Racks

Installation Procedure Transfer from the HBD Simulation Project IR Implementation Counting Room Extension & First Testing

Coming Up

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008

HBD HV Control & Monitoring System Manuel Proissl Page 2 of 8

Page 3: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

DEVELOPMENT STATUS

After discussions with Martin, the shell-based control option hvcontrol_HBD has been worked out and extended for all our HV needs: Functions as init, quick_init, standby, operating, disable, set_tripcurrent, etc. are made easily

available for users on va022 (hvserver needs to be running!) So far, one would have to change all config data in the perl script manually… Not any more! The

new script loads at every start-up the new data from hvdb, one central database every GUI client uses

Documentation on how to use it at /hv_stuff/hvcontrol_HBD coming soon!

Major VA Server Update Completed Successfully! Global HV parameters update every 5sec in one-time transmission, triggered by the client!

Software-based Trip-Behavior Function added to HV Control Based on monitoring measured (peak) current changes in 5sec update frame

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008

HV Client

HBD Server

hvclient

hvdb

combine package

1

2 3

HBD HV Control & Monitoring System Manuel Proissl Page 3 of 8

Page 4: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

DEVELOPMENT STATUS

VA racks have been moved and reconnected to network Due to complaints from RCF about gateway activities due to telnet usage of the HV

Control, communication has been changed to SSH. New communication setup still in testing & improving…

Quick Intro to Control ProtectTM

Server Malfunction NOT Loosing Control over Detector!

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008

VAs

HV

Clie

ntS

A1

Clie

nt 022023

029

1.) VA022 not responding / available on network…

2.) Initiating switch to other VA server+ based on preferred list & process activity

3.) Transfer Authorization Message+ Automated Expert in Charge Call

4.) Transfer Approved by Expert via Call

5.) Start hvserver & HBD Server on VAxxx+ Downtime overall less than 2min

6.) Return to VA022 when problem resolved

HB

D E

xper

t

via hvdb

HBD HV Control & Monitoring System Manuel Proissl Page 4 of 8

Page 5: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

RELAY BOARD RACK IN IR

All Relay Board issues have been completely resolved! In order to protect the VERY sensitive L1471Ns, customized 1U Aluminum boxes

were built and placed in our own rack Setup successfully tested without any trips up to 4kV! The Relay Board Rack will be installed up to the bridge in IR (2nd Level)

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008

LeCroy 1458HPMainframe

LC

147

1

LC

147

116 ………

Dividers

Plastic isolation betweenchassis and board

Air flow inbetween boxes

Sec

on

d L

evel

HV

Rac

k in

IR

HBD HV Control & Monitoring System Manuel Proissl Page 5 of 8

Page 6: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

INSTALLATION PROCEDURE

HBD Simulation Project will find it’s end on installation date! Step 1: Removing Tunnel from 1008 to 510

LeCroy Module Tests NOW in the IR Step 2: LV Output tests of all 6 HBD-modified & calibrated Run9 L1471Ns with Fluke

+ Running HV Control on Laptop in IR

+ NO HV connection to actual detector!!!

HBD East (1471N #1-3) & HBD West (1471N #4-6) Hook-Up Step 3: Connecting HV modules to Relay Board Rack & Repeat Step 2 Step 4: (Re-)Connecting Relay Boards with Dividers Hardware Installation Complete

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008

PH

EN

IX

Wir

eles

s

IBM eServer

VA 022

HVCV2.0

LeC

roy

1458

HP

Mai

nfr

ame

LC 1471

LC 1471

16 …

RackIR

HBD HV Control & Monitoring System Manuel Proissl Page 6 of 8

Page 7: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

INSTALLATION PROCEDURE

Counting Room Implementation Step 5: Installing HVCV2.0 on SA1 Terminal and two backup machines Step 6: Run9 Simulation Tests with first LV detector performance statistics

HBD Expert Distribution Step 7: HV Control for download on HBD website

with documentation

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008

PH

EN

IX

LA

N

IBM eServer

VA 022

LeC

roy

1458

HP

Mai

nfr

ame

LC 1471

LC 1471

16 …

RackIR

HVCV2.0

Voltage Divider

HBD HV Control & Monitoring System Manuel Proissl Page 7 of 8

Page 8: HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

COMING UP

Finalizing all functions to incorporate in HV Control (incl. FB/RB table look-up) Intense Crash Testing & Debugging until Deadline!!!

In order to guarantee system stability, this is The most important test period of all

Final Run9 database & log report setup with Martin

Distribution / Installation Files for Linux & XP/Vista Platform independence Final installation files with Installation Wizard

Planned Run9 HV System Installation: DEC 1st, 9AM ++ Preparation Tests in PHENIX continue until the second half shipped (approx. Dec 10 th)

HBD HV Control & Monitoring System Manuel Proissl Page 8 of 8

Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008