BARBARA AVAL HYDROELECTRIC POWER PLANT IN TUNISIA
2
GENERAL INFORMATION
Location Oued Zakai / Tunisia
Client STEG
Start date 2003
Closure date 2005
Net Head 46,7 m
Flow 14 m3/s
Installed capacity 5,7 MW
PROJECT DESCRIPTION
Generation plant :
The Barbara Aval project takes advantage of the water of Zakkai river and Zoutina
dam. The water stored in the dam is pumped by a canal until the intake in Zakkai
river. From this point, a canal allows a connection between the intake and an
accumulation dam. The water arrives to the power house through a penstock. This
house is equipped with two Francis turbines.
Scope :
Basic engineering
CANALROYA HYDROELECTRIC POWER PLANT IN SPAIN
3
GENERAL INFORMATION
Location Canfranc / Huesca / Aragón / Spain
Client ERZ, GRUPO ENDESA
Start date 1996
Closure date 1998
Net Head 160 m
Flow 4,8 m3/s
Installed capacity 6,8 MW
PROJECT DESCRIPTION
Generation plant :
It is a typical mountain power plant of 5.6 MW with a flow of 4.8 m3/s and a net head
of 160 m.
The two horizontal Francis turbines are connected to the same generator.
Scope :
Revamping. Automation and remote control engineering. Work supervision and start up.
CHAPARANO HYDROELECTRIC POWER PLANT IN CHILE
4
GENERAL INFORMATION
Location Chaparano River/ Llaquepe / Chile
Client SA HULLERAS VASCO - LEONESA
Start date 1999
Closure date 2001
Net Head 160 m
Flow 18,8 m3/s
Installed capacity 26,6 MW
PROJECT DESCRIPTION
Generation plant :
It is a run of river project with a 11-meter-height weir in its intake to divert the flow
into a sand trap that acts as a forebay. The water arrives to the power house through
a 4237-meter-long penstock and 3.6 m in diameter. Inside the power house there are
two horizontal Francis turbines.
Scope :
Basic engineering.
CHURO HYDROELECTRIC POWER PLANT IN PERU
5
GENERAL INFORMATION
Location Cañete –Huantan River/ Yauyos / Lima / Peru
Client JENNER RENEWABLES
Start date 2013
Closure date 2013
Net Head 200 m
Flow 25 m3/s
Installed capacity 44 MW
PROJECT DESCRIPTION
Generation plant :
The Churo project has two water intakes. One is in the Huatan River which collects its
waters to take them to the Cañete river intake. From here, the water is carried
through box-culvert type canals (4-km-long) and tunnels to the forebay. The
penstock is 400-meter-long and 2.6 m in diameter. The power house is equipped
with three horizontal Francis turbines.
Scope :
Due Diligence.
CUAJILOTE HYDROELECTRIC POWER PLANT IN MEXICO
6
GENERAL INFORMATION
Location Blanco River/ Veracruz / Mexico
Client IMPULSA GENERACIÓN RENOVABLE, S.A de C.V
Start date 2013
Closure date -
Net Head 74 m
Flow 44 m3/s
Installed capacity 28,5 MW
PROJECT DESCRIPTION
Generation plant :
The generation project of Cuajilote has an intake with an 8-meter-height weir in the
Blanco River. There is a 1700-meter-long free foil canal until the forebay. After it, and
until the power house, there is a 5220-meter-long penstock and 3 m in diameter. The
power house is equipped with two vertical Francis turbines.
Scope :
Basic and construction engineering.
7
EL CERCADO HYDROELECTRIC POWER PLANT IN COLOMBIA
GENERAL INFORMATION
Location Rancheria River/ La Guajira / Colombia
Client UTE MIESA- HIDROPROYECTOS
Start date 2010
Closure date 2016
Net Head 106,9 m
Flow 21 m3/s
Installed capacity 19,8 MW
PROJECT DESCRIPTION
Generation plant :
The Cercado Project is a dam-toe project. It has been designed a 380-meter-long
penstock and 2.4 m in diameter until the power house. In it, there are two vertical
Francis turbines.
Scope :
Basic, detailed and construction engineering. Work supervision and start up.
ESCALONA HYDROELECTRIC POWER PLANT IN MEXICO
8
GENERAL INFORMATION
Location Minas River/ Veracruz / Mexico
Client TERRABRIO, S.A de C.V
Start date 2010
Closure date 2016
Net Head 359,07 m
Flow 4,75 m3/s
Installed capacity 15 MW
PROJECT DESCRIPTION
Generation plant :
The Escalona hydropower plant is in the Minas River downstream of the CH-Minas
plant. The water intake is a run of river type and the flow arrives until the power
house through a 5250-meter-long penstock and 1.4 m in diameter. The power house
has two two-injector horizontal Pelton turbines.
Scope :
Basic, detailed and construction engineering. Work supervision and start up.
FRUTEIRA HYDROELECTRIC POWER PLANT IN BRAZIL
9
GENERAL INFORMATION
Location Brazil
Client ESCELSA, Espiritu Santo Centrais Electricas
Start date 1999
Closure date 2001
Net Head 205 m
Flow 2,25 m3/s
Installed capacity 4,015 MW
PROJECT DESCRIPTION
Generation plant :
The Fruteira hydroelectric power plant dates to 1950. The modernization works
consist of: dismantling of all the existing equipment and facilities, review of the
hydrology of the basin, increase of the installed capacity because of the new
penstock, two new groups and a new electric substation.
Scope :
Basic and construction engineering. Work supervision and start up.
JUCU HYDROELECTRIC POWER PLANT IN BRAZIL
10
GENERAL INFORMATION
Location Brazil
Client ESCELSA, Espiritu Santo Centrais Electricas
Start date 1999
Closure date 2001
Net Head 52 m
Flow 7,7 m3/s
Installed capacity 3,5 MW
PROJECT DESCRIPTION
Generation plant :
The old Jucu hydroelectric plant was owned by Espiritu Santo Centrais Electricas and
dates to 1948. Considering the hydrological capacity of the basin, a revamping of the
gross head was planned by the modifying of the canal, the penstocks and the
installing of two Francis turbines of 3.5 MW.
Scope :
Basic and construction engineering. Work supervision and start up.
IP HYDROELECTRIC POWER PLANT IN SPAIN
11
GENERAL INFORMATION
Location Canfranc / Huesca / Aragon / Spain
Client ERZ, GRUPO ENDESA
Start date 1996
Closure date 1998
Net Head 935 m
Flow 10 m3/s
Installed capacity 88,9 MW
PROJECT DESCRIPTION
Generation plant :
It was built in the fifties by Eléctricas Reunidas of Zaragoza, ERZ. It was one of the
most complex works for the regulation and hydroelectric use of the upper Aragon
River. The power house is equipped with three group of turbine-pump with an
installed capacity of 38.2 MW.
Scope :
Revamping. Automation, control and remote control engineering. Work supervisionand start up.
MARAÑON HYDROELECTRIC POWER PLANT IN PERU
12
GENERAL INFORMATION
Location Marañon River/ La Union / Huanuco / Peru
Client MOTA-ENGIL ENERGY
Start date 2014
Closure date 2014
Net Head 90 m
Flow 110 m3/s
Installed capacity 90 MW
PROJECT DESCRIPTION
Generation plant :
The Marañon Project is a 21-meter-height diversion dam. It allows to divert a flow of
110 m3/s trough an intake and a 1400-meter-long canal until the forebay. The water
flows to the power house through two 250-meter-long penstocks and 3.7 m in
diameter. The power house holds two vertical Francis turbines with a unit capacity of
45 MW.
Scope :
Due Diligence of civil Works and equipment.
PASO SEVERINO HYDROELECTRIC P P IN URUGUAY
13
GENERAL INFORMATION
Location Rio Santa Lucia / Florida / Uruguay
Client ABENGOA-TEYMA
Start date 2013
Closure date -
Net Head 16 m
Flow 30,5 m3/s
Installed capacity 4,3 MW
PROJECT DESCRIPTION
Generation plant:
Paso Severino dam was built in 1986 and is located in the lower course of Santa Lucia
Chico River in the province of Florida, Uruguay. From the dam and through two 50-
meter-long penstocks with 0.2 m in diameter, the water arrives at the power house.
The power house has two vertical Kaplan turbines with 2 MW of capacity.
Scope :
Basic and construction engineering.
PEDREZUELA HYDROELECTRIC POWER PLANT IN SPAIN
14
GENERAL INFORMATION
Location Lozoya River/Pedrezuela/ Spain
Client HIDRAULICA SANTILLANA, S.A
Start date 2003
Closure date 2006
Net Head 36,5 m
Flow 3 m3/s
Installed capacity 1,1 MW
PROJECT DESCRIPTION
Generation plant :
The Pedrezuela reservoir is operated by the Canal Isabel II to provide water to the
Community of Madrid. Until 2003, the releasing of the dams were made by a load
rupture camera. A hydroelectric plant was designed to recover this waste energy to
supply it to the network and to operate in an “isolated network”. Also, to maintain
the dam’s emergency services.
Scope :
Basic and construction engineering.
P.H.1 HYDROELECTRIC POWER PLANT IN MEXICO
15
GENERAL INFORMATION
Location Jalacingo River/Jalacingo/State of Veracruz/Mexico
Client IMPULSA GENERACIÓN RENOVABLE
Start date 2011
Closure date 2015
Net Head 212,57 m
Flow 1,1 m3/s
Installed capacity 2 MW
PROJECT DESCRIPTION
Generation plant :
The PH-1 project has a run of river intake and a 2275-meter-long penstock and 0.7 m
in diameter. The generation group of the central is in the same power house as the
PH-Cuetzalin project but, in this case, there is a two-injector horizontal Pelton
turbine.
Scope :
Basic, detailed and construction engineering.
P.H.CUETZALIN HYDROELECTRIC POWER PLANT IN MEXICO
16
GENERAL INFORMATION
Location Nixtamalapa River/State of Veracruz/Mexico
Client IMPULSA GENERACIÓN RENOVABLE
Start date 2012
Closure date 2016
Net Head 112,11 m
Flow 1,1 m3/s
Installed capacity 1 MW
PROJECT DESCRIPTION
Generation plant :
The PH-Cuetzalin project has a run of river intake along the Nixtamalapa River, a
1400-meter-long free foil canal, a 1270-meter-long tunnel and a 774.30-meter-long
penstock. This project shares the power house with the PH-1 project. The turbine of
PH-Cuetzalin is a horizontal Francis.
Scope :
Basic, detailed and construction engineering.
P.H.OCAMPO HYDROELECTRIC POWER PLANT IN MEXICO
17
GENERAL INFORMATION
Location Jalacingo River/Jalacingo/State of Veracruz/Mexico
Client IMPULSA GENERACIÓN RENOVABLE
Start date 2012
Closure date 2016
Net Head 314,11 m
Flow 3,75 m3/s
Installed capacity 10,4 MW
PROJECT DESCRIPTION
Generation plant :
The Ocampo Project is located downstream the PH-1 and PH- Cuetzalin projects. It is
a run of river water intake and the water flows to the power house along a 3230-
meter-long penstock and 1.3 m in diameter. The power house has two horizontal
Pelton turbines.
Scope :
Basic, detailed and construction engineering.
P.H.3 HYDROELECTRIC POWER PLANT IN MEXICO
18
GENERAL INFORMATION
Location Jalacingo River/Jalacingo/State of Veracruz/Mexico
Client IMPULSA GENERACIÓN RENOVABLE
Start date 2011
Closure date 2015
Net Head 185,9 m
Flow 4,5 m3/s
Installed capacity 7,4 MW
PROJECT DESCRIPTION
Generation plant :
PH-3 project is a run of river intake on the Jalacingo River, downstream from the PH-
Ocampo power plant. The hydraulic circuit starts with a 1550-meter-long free foil
line, following with a tunnel of 1200 m and ending with an 840-meter-long steel
penstock. The power house has a horizontal Francis turbine.
Scope :
Basic, detailed and construction engineering.
PUEBLA HYDROELECTRIC POWER PLANT IN MEXICO
19
GENERAL INFORMATION
Location Ajajalpan River/ Puebla / Mexico
Client Banco Santander-COMEXHIDRO
Start date 2013
Closure date 2013
Net Head 357 m
Flow 20 m3/s
Installed capacity 60 MW
PROJECT DESCRIPTION
Generation plant :
The Puebla project consist of a 37-meter-height dam to get a flow of 10.5 m3/s
through a tunnel under pressure along 4450 m and a 650-meter-long penstock and
2.3 m in diameter. The project has a surge tank and a power house with two Pelton
turbines with a capacity of 30 MW each one. The energy generated is shared
between two different points of connection to the grid.
Scope :
Due Diligence
SAN JOSE DE MINAS HYDROELECTRIC PP IN ECUADOR
20
GENERAL INFORMATION
Location San José de Minas / Pichincha / Ecuador
Client UTE SAN JOSE DE MINAS
Start date 2003
Closure date 2005
Net Head 191,1 m
Flow 4 m3/s
Installed capacity 7 MW
PROJECT DESCRIPTION
Generation plant :
The Project has a 2.5-meter-height diversion weir that diverts the flow until a sand
trap and then to a 4720-meter-long canal. At the end of the canal, there is a forebay
from where the penstock start its way to the power house. The pipe is made of steel
and has a 1.07 m in diameter and 536-meter-long. The power house is equipped with
two horizontal Pelton turbines.
Scope :
Basic engineering.
SIERRA BRAVA HYDROELECTRIC POWER PLANT IN SPAIN
21
GENERAL INFORMATION
Location Sierra Brava / Zorita / Cáceres / Spain
Client CONFEDERACIÓN HIDROGRÁFICA DEL GUADIANA
Start date 2009
Closure date 2013
Net Head 33,65 m
Flow 10 m3/s
Installed capacity 3 MW
PROJECT DESCRIPTION
Generation plant :
Sierra Brava hydroelectric power plant is dam-toe type of central. The Sierra Brava
dam feeds a horizontal Francis turbine through a penstock of 2200 mm in diameter
and 400 m long. The discharge is used to feed an irrigation canal.
Scope :
Basic, detailed and construction enginerring. Work supervision and start up.
TOMATLAN DAM HYDROELECTRIC PP IN MEXICO
22
GENERAL INFORMATION
Location Cajon de la Peña / Tomatlan / Jalisco / Mexico
Client GRUPO MARSORI
Start date 2010
Closure date -
Net Head 23,40 m
Flow 22,00 m3/s
Installed capacity 4,54 MW
PROJECT DESCRIPTION
Generation plant :
The Cajon de la Peña reservoir dam-toe in the State of Jalisco, is projected to replace
the break load that currently takes place in the discharge tunnel of the dam. The
turbinated water returnes to the irrigation canal of the Tomatlan Irrigation
Community.
Scope :
Basic and construction engineering.
TOMATLAN CANAL HYDROELECTRIC PP IN MEXICO
23
GENERAL INFORMATION
Location Cajon de la Peña / Tomatlan / Jalisco / Mexico
Client GRUPO MARSORI
Start date 2010
Closure date -
Net Head 18,70 m
Flow 20,50 m3/s
Installed capacity 3,4 MW
PROJECT DESCRIPTION
Generation plant :
The irrigation canal of the Tomatlan Irrigation Community displays some rapids with
a difference of 20 meters and a stilling basin. The projected power plant recovers the
energy generated to supply it to the CFE network.
Scope :
Basic and construction engineering.
CUYAMECALCO HYDROELECTRIC POWER PLANT IN MEXICO
24
GENERAL INFORMATION
Location Santo Domingo River/ Cuyamecalco/ Mexico
Client TERRABRIO
Start date 2015
Closure date 2016
Net Head 69,52 m
Flow 63,5 m3/s
Installed capacity 39,75 MW
PROJECT DESCRIPTION
Generation plant :
It is a run of river type of hydropower plant with a lateral intake with a 9.5 m weir
that diverts the flow to the sand trap. At the end of the free foil canal there is the
forebay. After 5.2 km of tunnel in charge, the flow arrives at the valves house where
the change of tunnel to three penstocks takes place. These three pipes, inside the
power house, feed three vertical Francis turbines with 13.25 MW of capacity each
one.
Scope :
Basic engineering.
COYOLAPA HYDROELECTRIC POWER PLANT IN MEXICO
25
GENERAL INFORMATION
Location Coyolapa River/ State of Puebla/ Mexico
Client AUTLAN - GFM ENERGIA
Start date 2014
Closure date 2016
Net Head 136,77 m
Flow 14,50 m3/s
Installed capacity 17,90 MW
PROJECT DESCRIPTION
Generation plant :
The intake of the Coyolapa hydroelectric power plant consist of a gravity weir of
22 m of height. The intake is through a tunnel of 3 m in diameter upstream the
dam, submerged under 15 m of water. Following the tunnel there is the penstock
that flows the water along 1673.1 m and 2.1 m in diameter. The power house,
shared with the Atzalan project, is designed to hold two twin horizontal Francis
turbines with 8.95 MW of unit capacity.
Scope :
Construction engineering.
ATZALAN HYDROELECTRIC POWER PLANT IN MEXICO
26
GENERAL INFORMATION
Location Atzalan River/ Atzalan/ Mexico
Client AUTLAN – GFM ENERGIA
Start date 2014
Closure date 2016
Net Head 336,24 m
Flow 5 m3/s
Installed capacity 15,00 MW
PROJECT DESCRIPTION
Generation plant :
The Atzalan hydropower plant project was carried out along with the transfer of the
Huitzilatl river to the Atzalan river. The total flow has been directed, by conductions
on free foil along 3195.4 m, to a forebay that works as a union with the penstock. It
has 1207.86 m long and 1.2 m in diameter until it arrives at the power house. Inside
it there are two vertical Pelton turbines of four injectors with a unit capacity of 7
MW.
Scope :
Construction engineering.
QUIMIXTLAN HYDROELECTRIC POWER PLANT IN MEXICO
27
GENERAL INFORMATION
Location Huitzilapan River/ Quimixtlan/ State of Puebla/ Mexico
Client TERRABRIO
Start date 2015
Closure date 2016
Net Head 174,56 m
Flow 9,8 m3/s
Installed capacity 15,2 MW
PROJECT DESCRIPTION
Generation plant :
Quimixtlan project has a lateral water intake that makes the water flows to a 41.50-meter-
long sand trap. From it, there is a 2795.5-meter-long canal with a section by surface and
another in tunnel. At the end of the tunnel, there is a 25.10-meter-long forebay and a
surface 475-meter-long penstock. In the power house, there are two horizontal Francis
turbines of 7.6 MW.
Scope :
Basic engineering.
LAS MINAS HYDROELECTRIC POWER PLANT IN MEXICO
28
GENERAL INFORMATION
Location Minas River/ State of Las Minas/ Mexico
Client AUTLAN- GFM ENERGIA
Start date 2015
Closure date 2016
Net Head 449 m
Flow 5,1 m3/s
Installed capacity 21 MW
PROJECT DESCRIPTION
Generation plant :
The hydroelectric project of Las Minas has several water intakes divided into two
stages and linked together by means of pipes of different sections and
characteristics. All of them are joined in the forebay of 130 m long and 50 m width,
which has a spillway for the evacuation of the excess flow. This forebay feeds,
through a valves house, two penstocks with 915 and 771 mm in diameter and 898 m
of length. The power house is equipped with three Pelton turbines that, after the
revamping, have increase their unit power to 7 MW instead of 5 MW which they had
in their original design.
Scope :
Revamping. Construction engineering.
EL ENCANTO HYDROELECTRIC POWER PLANT IN MEXICO
29
GENERAL INFORMATION
Location Tomata River/ State of Veracruz/ Mexico
Client AUTLAN- GFM ENERGIA
Start date 2015
Closure date 2016
Net Head 92,49 m
Flow 24,75 m3/s
Installed capacity 20,32 MW
PROJECT DESCRIPTION
Generation plant :
A dam recovery has been studied for an increase of the electric generation capacity.
It uses the flow of the Tomata river through the installation of a gravity weir. In its
hydraulic circuit, it has a surge tank and a tower intake. The power house is equipped
with three horizontal Francis turbines with 7.1 MW of unit capacity.
Scope :
Revamping. Construction engineering.
GAYA HYDROELECTRIC POWER PLANT IN MEXICO
30
GENERAL INFORMATION
Location Apulco River/Zacapoaxtla/ State of Veracruz/ Mexico
Client TERRABRIO
Start date 2015
Closure date 2016
Net Head 156,07 m
Flow 13 m3/s
Installed capacity 18,3 MW
PROJECT DESCRIPTION
Generation plant :
The Gaya hydroelectric power plant has a lateral water intake with a 6-meter-height.
The water, through a small canal, arrives at a sand trap which is close to the river. The
sand trap has been designed with three cameras with 40 m of length and 10 m width.
From it, the water flows to a forebay with 19.8-meter-long and 5-meter-width. After
about 200 m of penstock, the water reaches the power house where there are installed
three Francis turbines of 6.1 MW each.
Scope :
Basic Engineering
TATATILA HYDROELECTRIC POWER PLANT IN MEXICO
31
GENERAL INFORMATION
Location Bobos River/ State of Veracruz/ México
Client AUTLAN - GFM ENERGIA
Start date 2015
Closure date 2015
Net Head 209,74 m
Flow 10 m3/s
Installed capacity 19 MW
PROJECT DESCRIPTION
Generation plant:
The generation project of Tatatila has a water intake with a 11.9-meter-height and
32-meter-long weir. The intake is carried out in a lateral way by two submerged
intakes. Through two pressure pipes, the water arrives at the 20-meter-long sand
trap. From the sand trap to the forebay the water flows along a canal, that includes a
1335-meter-long tunnel. The forebay has been designed with 10.5 m of length and
4.5 m of width. The water feeds the two horizontal Francis turbines with a penstock
of 1.9 m in diameter and 2161 m of conduction.
Scope :
Due Diligence.
COLCA HYDROELECTRIC POWER PLANT IN PERU
32
GENERAL INFORMATION
Location Quillón River/Colca/ Huancayo/ Perú
Client JENNER RENEWABLE
Start date 2016
Closure date 2016
Net Head 153,593 m
Flow 9,5 m3/s
Installed capacity 13,14 MW
PROJECT DESCRIPTION
Generation plant:
It is a run of river plant with a 4-meter-height weir and a lateral water intake. The
stored water starts its way through a box-culvert arriving at the sand trap. The sand
trap has two cameras and 38 m of length. After a canal, the flow reaches a forebay to
continue to a penstock with 1.80 m in diameter until reaches the power house. The
power house has two horizontal Francis turbines installed with 6.57 MW of capacity
each one.
Scope :
Due Diligence.
VIROC HYDROELECTRIC POWER PLANT IN PERU
33
GENERAL INFORMATION
Location Huaura River/ Lima/ Perú
Client SUBTERRA
Start date 2005
Closure date 2013
Net Head 235,6 m
Flow 8,4 m3/s
Installed capacity 17,44 MW
PROJECT DESCRIPTION
Generation plant:
The water intake is located on the Huaura river, where the captured water goes
through a sand trap to avoid the entrance of solid particles. Its conductions are
divided into three sections. The first and the second one consist of a 100 m of
waterway and a 3156 m of tunnel. The last section it is another waterway but this
time it is 200 m long that arrives at a forebay. From the forebay to the power house,
the water is directed through a 350 m of penstock. The water that arrived at the
power house is turbinated by two Pelton turbines.
Scope :
Due Diligence.
MAZATEPEC HYDROELECTRIC POWER PLANT IN MEXICO
34
GENERAL INFORMATION
Location Aculco River / State of Veracruz/ Mexico
Client AUTLAN - GFM ENERGIA
Start date 2015
Closure date 2015
Net Head 480,4 m
Flow 52 m3/s
Installed capacity 240 MW
PROJECT DESCRIPTION
Generation plant:
Mazatepec dam has an initial storage capacity of 60 Hm3
in which, currently, almost
47 Hm3
of them are occupied by sediments. By means of conduction directs the
water to the power house which has four vertical Pelton groups installed with six
injectors each one.
Scope :
Study of alternatives.
HIDROPROYECTOS ENGINEERING CONSULTANTS
37
SPAIN
P.A.E. Asuaran, Edificio Enekuri
48950 ERANDIO – VIZCAYA
Tel: +34 944 531 642
MEXICO
Paseo de la Reforma, 300, piso 17
06600 MEXICO D.F.
HIDROPROYECTOS LATAM
Ca. Almirante Lord Nelson 410
Miraflores
LIMA -PERÚ
www.hidroproyectos.com
CONTACTS