högsåra island demonstration project ewec2007, milano, 9th may 2007 hisp merja paakkari, hafmex...

10
Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

Upload: julian-eaton

Post on 20-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

Högsåra Island Demonstration

Project EWEC2007, Milano, 9th May 2007

HISPMerja Paakkari, Hafmex Windforce Oy

Page 2: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

2HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Backgrounds

1. Project located on Högsåra island in Archipelago of SW Finland

2. Active local islanders as pioneers

3. New business possibilities to keep Archipelago inhabited and active

4. Utilize local pollution free energy production

5. Finland and EU policy to increase share of renewables and domestic production

6. Utilize vast nature reserve of near offshore wind conditions with installation on land

Page 3: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

3HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Why EU project

1. Challenging environment of Archipelago of SW Finland

– Rough terrain

2. Remote site with difficult access - behind two ferries

– Logistics

– Installation

3. Weak grid

No ready solutions available, high risks

EU project applied for Spring 2003: HISP

- Started Spring 2004

- Project ends Summer 2007

Page 4: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

4HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Project partners

1. Hafmex Windforce Oy (coordinator), Finland

2. Harakosan Europe BV, The Netherlands

(3. ABB, Switzerland – left the consortium Jan. 2006)

4. Roheline Ring, Estonia

5. VTT Technical Research Center of Finland

Page 5: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

5HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Innovation: Foundation

1. Counterweight from bedrock by anchors

2. Smaller construction and less material

3. No excavation below ground level

4. Transportation critical as continuous casting required

Page 6: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

6HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Innovation: grid connection

1. Connection to 20kV local distribution grid

2. Weak grid

– power limitations required

– compensation of reactive power

3. Special turbine/wind park control

4. Generator and Inverter from ABB Finland

5. Special filtering on transformer

6. Close cooperation with grid owner, Fortum

Page 7: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

7HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Högsåra 1.6.2005-31.5.2006monthly average wind speeds

0

1

2

3

4

5

6

7

8

9

10

Janu

ary

Febru

ary

Mar

chApr

ilM

ayJu

ne July

Augus

t

Septe

mbe

r

Octobe

r

Novem

ber

Decem

ber

win

d s

pee

d (

m/s

)

v 66m (m/s) v 51m (m/s) v 30m (m/s)

Measurements and follow-up

1. Meteorological measurements

– wind (3 levels), temperature, icing risk

2. Power performance

3. Load measurements on the foundation

4. Wind farm control in weak grid

Page 8: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

8HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Other aspects

1. Challenging environment

– Wind conditions studied

– Nature reservation areas nearby

– Visual aspects and noise

– erection on forested island

2. Public acceptance

– inhabitants and summer tourism

– local manpower and domestic production

3. Logistics

– ferry connection

– sea transportation

– narrow road through village

Page 9: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

9HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Conclusions

1. Three 2 MW gearless turbines on Archipelago

2. Partners gain valuable experience on

– remote conditions

– weak grid

– challenging environment

– new turbine technology

– test site for further needs

3. EU project a good way to demonstrate high risk innovations

4. Next towards FP7 !

Page 10: Högsåra Island Demonstration Project EWEC2007, Milano, 9th May 2007 HISP Merja Paakkari, Hafmex Windforce Oy

10HISP project Merja Paakkari, Hafmex Windforce Oy

ROHELINE RING OÜ

Let’s go up!

www.windforce.fi