Page 1: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located
Page 2: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

5 Alief Middle School• Overall Site Plan

• Gymnasium First Floor Plan

• Gymnasium Second Floor Plan

• Exterior Perspective – Before

• Exterior Perspective – After

• Exterior Perspective – HVAC Before

• Exterior Perspective – HVAC After

6 Holub Middle School• Overall Site Plan

• Gymnasium Floor Plan

• Exterior Perspective – Before

• Exterior Perspective - After

7 Olle Middle School• Overall Site Plan

• Gymnasium Floor Plan

• Exterior Perspective – Before

• Exterior Perspective - After

8 Project Schedule• Project Schedule

Contents Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS

2

1 Program Outline• Gymnasium

• Restrooms

• Storage rooms

• IDF

2 Finish Outline• Walls

• Flooring

• Ceiling

• Roof

3 MEP Outline• Plumbing

• Mechanical

• Electrical

4 Communication and

Security Guideline• Communication Guidelines

• Electronic Safety and Security

9 Project Budget• Project Budget

Page 3: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Architectural

Gymnasiumo 50’-0” x 84’-0” competition basketball courto Two cross courts with curtain dividero One main volleyball courto Two volleyball cross courts (centered in gymnasium with bleachers closed)o Six motorized forward folding basketball goalso Wall sports pads at two main basketball goalso One scoreboard – to be located at end opposite main entry dooro Motorized bleachers on one side with seating for 650o Movable scorer’s table at center court opposite bleacherso Portable stage (15’-0” x 30-0” x 18” high)

o Ceiling mounted projector with audio/video capabilityo Wall mounted wide projection screen (16’-0” wide) to be above scorer’s tableo Two 12’-0” x 4’-0” white marker boards, one at each end near bleachers

RestroomsWomens/Girlso Seven water closets

o Seven lavatoriesMens/Boyso Three water closetso Four urinalso Seven lavatorieso Two drinking fountains

P.E. Storage

o 150 square feet

IDF Roomo 50 square feeto One rack

Stage/Chair Storageo 450 square feeto Storage for 300 folding chairs

(on hanging rack)o Storage for portable stageo Wall space for local sound systemo Wall space for phone

Mechanical/Electrical200 square feet

Program Outline

3

Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS

Page 4: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Architectural Finish Guidelines

Wallso Interior walls to be painted CMUo Restroom walls to be 4” x 4” ceramic tile

o Exterior finish to be brick masonry to match existing as close as possibleo “R” metal walls panels at areas above existing gymnasium roof at Alief MS

Flooringo Second and better grade Northern Hard Maple at basketball courtso Third grade at remainder of gymnasium flooro Sealed concrete in restrooms, storage rooms, corridors, and vestibules

Ceilingo Exposed structural joists, acoustical deck, and ductwork in gymnasiumo Exposed structure in storage rooms and IDF roomso Lay-in acoustic (24” x 24”) panels in vestibules and corridorso Vinyl faced 1/2” gypsum board in 24” x 24” lay-in grid at restrooms

Roof SystemsAlief Middle School & Olle Middle Schoolo Three-ply modified bituminous roofing system, 20/30 FR roofing system

with mineral surfacing on finish layero Roof warranty to be 20 years, non-prorated, no dollar limit, full system,

plus product liability certificateo Roof drains shall be internal leaders tied into storm sewer at the existing gymnasium

and external gutters, downspouts, and scuppers at new gymnasiumHolub Middle School

o Standing seam sheet metal roof to match existingo Roof warranty to be 20 years, non-prorated, no dollar limit, full system,

plus product liability certificateo Roof drains shall be external gutters and downspouts

Finish Outline

4

Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS

Page 5: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Plumbing Guidelineso New restrooms will include wall hung water closets, urinals, and lavatories,

with Sloan flush valves and Chicago Faucets.o New domestic cold water sanitary lines will be tied into existing services.

Vent piping will be routed to the roof.

o New electric water heater shall be provided for the restrooms to provide tempered water at the student lavatories.

o The new roof shall be drained by gutters and downspouts.

Mechanical Guidelineso The new gymnasium and restroom will be conditioned by a new 75 ton roof-

mounted, packaged rooftop unit. Unit shall be located on the lower roof of the restroom and storage areas.

o The ductwork shall be routed through the exterior wall to serve the gym. Exposed supply duct in the gymnasium shall be double-wall with aluminum diffusers, routed tight to structure.

o New belt drive exhaust fans shall be provided for the new restrooms.

Electrical Guidelineso New 480v distribution panels shall be fed from the existing electrical service to

feed new equipment, panels and transformers in the addition. Electrical space shall be provided in storage areas within the new addition.

o Lay-in fluorescent or LED fixtures at 277 volts shall be used for general lighting. o The gymnasium space shall use high bay LED fixtures.

MEP Outline

5

Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS

Page 6: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Communication Guidelineso A new IDF room shall be provided as part of the addition.o Each gymnasium shall be provided with data drops, wireless access points, local

sound system, wireless microphones and projector. o Extend all existing PA and intercom from existing MDF to new IDF room.

Electronic Safety and Securityo Provide 2 video surveillance cameras and access control at 2 doors at new gym.o New fire alarm devices shall be provided for new addition.

Existing system shall be modified as needed for new device coverage.

Communication and Security

6

Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS

Page 7: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Alief Middle School

Overall Site Plan

7

Page 8: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Alief Middle School

First Floor Plan

8

Page 9: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Alief Middle School

Second Floor Plan

9

Added Scope:

Elevator/Locker Rmo New elevator required to

meet Texas Accessibility Standards for access to locker rooms on floor 2.

o New vestibule/storage room to make connection to existing locker room on floor 2. Vent piping will be routed to the roof.

o Add a new interior

corridor to connect the girl’s locker rooms to the elevator vestibule. Security/Access controls to control access.

o Renovate existing offices into storage rooms along the left side of plan.

o Renovate existing storage to office space in the middle between boys/girls locker room.

o Renovate boys/girls toilet rooms to meet Texas Accessibility Standards.

Page 10: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

10

Alief Middle School

Before Perspective

Page 11: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

11

Alief Middle School

After Perspective

Page 12: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Holub Middle School

Overall Site Plan

12

Page 13: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Holub Middle School

First Floor Plan

13

Page 14: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

14

Holub Middle School

Before Perspective

Page 15: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

15

Holub Middle School

After Perspective

Page 16: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Olle Middle School

Overall Site Plan

16

Page 17: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Olle Middle School

Floor Plan

17

Page 18: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

18

Olle Middle School

Before Perspective

Page 19: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

19

Olle Middle School

After Perspective

Page 20: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

20

Project Schedule Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS

Alief ISD 3 MS Gyms - Proposed Schedule Alief + Holub + Olle

2015 2016 May Bond Sale 2017 May Bond Sale

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Schematic Design: SD Approval (10/20)

Design Development: DD Approval (11/17)

Construction Documents: Complete (3/1)

Permit Review: Complete (4/1)

Bidding: GC $ Approval (4/19)

Complete (1/6)

Complete (8/31)

Complete (8/31)

QTR 3 QTR 4 QTR 1 QTR 2 QTR 3 QTR 4QTR 2 QTR 3 QTR 4 QTR 1 QTR 2

Construction (Gym #1)

Construction (Gym #2 & Gym #3)Construction (Gym #2)

Construction (Gym #3)

Page 21: How to use this template - Alief ISD / Homepage · o The new gymnasium and restroom will be conditioned by a new 75 ton roof-mounted, packaged rooftop unit. Unit shall be located

Questions?

21

Alief ISD

3 MS Gym Additions

Alief MS

Holub MS

Olle MS