HSE committee meeting May 3 ,2011 YANBU EXPORT REFINERY YANBU EXPORT REFINERY PROJECT PROJECT 3353 3353- -SP1 SP1- -Tank Farm Tank Farm Package Package

Upload: khaled-ismail

Post on 08-Apr-2018

246 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 1/26

HSE committee

meetingMay 3 ,2011

YANBU EXPORT REFINERYYANBU EXPORT REFINERY

PROJECTPROJECT33533353--SP1SP1--Tank FarmTank FarmPackagePackage

Page 2: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 2/26

Meeting Agenda} Introduction by ENPPI construction manager Eng. Ahmed Fawzy (5 min )

} Safety Video ( fatal accidents) (15min)

} HSE goals &statistics by Eng. Khaled Ismail ENPPI HSE manager(10 min)} Heat stress presentation by Eng. Salah Abd Al Diem PTJ HSE Manager(10 min)

} Minutes of meeting ( 20 min )

} Safety award Distribution ( 5 min )

Meeting Agenda

Page 3: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 3/26

By

Eng/ Ahmed Fawzy

Construction Manager 

Introduction

Introduction

Page 4: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 4/26

Construction HighlightsConstruction Highlights

�� 190,000 m190,000 m22 Soil improvementSoil improvement�� 46 Storage Facilities:46 Storage Facilities:

�� 9 fixed Dome Roof9 fixed Dome Roof�� 11 Internal Floating Roof11 Internal Floating Roof�� 13 External Floating Roof13 External Floating Roof�� 9 Spheres9 Spheres�� 4 Spheroids4 Spheroids

�� 16 Pump Stations (59 Services)16 Pump Stations (59 Services)

�� 16200 m x 2m height Dike walls16200 m x 2m height Dike walls�� 10,000 m U/G (RTR)10,000 m U/G (RTR)�� 2 Substation Buildings2 Substation Buildings�� 50,000 m50,000 m22 RoadsRoads

Page 5: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 5/26

Page 6: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 6/26

Unit 143

2 Feed tanks, 2 MMBD

Unit 143

18 Intermediate tanks

Unit 1727 Gasoline/ Diesel/ Benzene

Export tanks

142 SWS

2 Tanks

Unit 143

4 Products tanks

Unit 1439 Spheres (Product)4 Spheroids

(Intermed)

Page 7: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 7/26

Fatal Accidents

Safety Video

Page 8: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 8/26

HSE goals &statistics

By

Eng. Khaled Ismail ENPPI HSE manager 

Page 9: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 9/26

Project HSE Policy

HSE Goals & objectives

Page 10: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 10/26

HSE Goals

} The project HSE goals and Objectives as follow :-

}No accidents ,}No harm to people}and No damage to the environment}achieve safe work man-hours without LTI}Provision of safe working environment.}Identification of sources of hazards and

assessment of risks.

Page 11: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 11/26

HSE Statistics.,

S.N Title cumulative

1 Total safe Man Hours 42310

2 Fatality Case (Fatal) 0

3 Lost Workday Case (LWC) 0

4 Restricted Workday Case (RWC) 0

5 Medical Treatment Case (MTC) 0

6 First Aid Case (FAC) 2

7 Property Damage (PD) 0

8 Near Miss (NM) 1

9Unsafe Acts/Conditions

7710 Total Recordable Incident

Rate (TRIR)0

Page 12: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 12/26

positive

Area of imporovement0

10

2030

40

50

60

70

12

113

30 34

64

Safety Observations

Total No. = 77

Page 13: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 13/26

Unsafe acts / Conditions By type

1

12

1 1

26 5

3

10

2 2

7

3 2

8

21 1 1

31 1 1 1

0

5

10

15

20

25Area of Improvment

Positive Observations

Safety Observations

Page 14: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 14/26

303.932

389

27 48 27 30

0

200

400600

T.B.T Orientation Excavation Flag man fire fighting Defensive

Driving

Training HRs

Training HRs

HSE Training Sessions

0

1020304050 41.62

15.51

7.26 6.936.937.26

32.082

7.1

33.53

7 7

29.24

12.216.93

10.913.537.26 6.93 8.258.25

22.12

T.B.T

Hrs

Page 15: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 15/26

Heat stress

byEng. Salah Abd Al Diem PTJ HSE Manager 

Heat stress

Page 16: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 16/26

High temperature

levels

Low levels of air 

movement

Heat sources in the area

The physical

activity carried out

The type of 

clothing worn

High humidity

levels

Sheet 1 ± The causes of heat stress

Heat stress

Page 17: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 17/26

Sheet 2 ± Types of heat stress

In order of severity, heat stress includes:

y heat rash;

y heat collapse;

y heat cramps;

y heat exhaustion; and

y heat stroke.

The most severe form of heat stress is heat stroke.

Heat stress

Page 18: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 18/26

Adapt work schedules

Reduce heat exposure

Increase air flow

Drink water frequentlyAdapt to the heat and

humidity

Have frequent rest breaks

Wear protectiveclothing

Monitor yourself and

your environment

Sheet 3 ± Preventing heat stress

Heat stress

Page 19: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 19/26

A person suffering from heat stroke requires medical attention urgently

and emergency services should be contacted as soon as possible.

Do not give the patient any stimulants.

Sheet 4 ± Treating heat stroke

While waiting for emergency services

to arrive you should:

y

move the patient to a coolenvironment;

y soak the patient¶s clothing withwater ;

y apply cold packs continuously;

y place them in a tub of cool water;

andy circulate the air around the patient.

Heat stress

Page 20: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 20/26

Sheet 5 ± Heat stress Index

Heat stress

Page 21: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 21/26

 Heat stroke can result in death.

First aid experts should be calledimmediately to treat those suffering

from heat stroke.

 Heat stress occurs when the body is

stressed because of overheating.

Heat stress includes, heat rash, heat

collapse, heat cramps, heat exhaustion

and heat stroke.

Sheet 6 ± Summary

 Heat stress can be prevented

by:

y adapting work schedules;

y reducing heat exposure;(heat

shelters )

y increasing air flow;

y drinking water frequently;

y adapting to the heat;

y having frequent rest breaks;

y wearing protective clothing;

and

y monitoring yourself and your 

environment.

Heat stress

Page 22: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 22/26

HSE Minutes of meeting

MINUTES OF MEETING

Page 23: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 23/26

MINUTES OF MEETING

(Contd)

ITEM No DESCRIPTION OF DISCUSSION ACTION BY DATE

Meeting purpose

Monthly committee meeting will held between sitemanagement and hourly employees at site , to

share , discuses all HSE highlights at month like unsafeactions/conditions, Near misses and incidents lessons

learnt in addition to aware all site stuff by HSE plansand rules

1.0 Work permit procedure:

ENPPI highlighted that ENPPI Work permit procedure

are implemented at site. Permit is signed by area

authority and performing authority after joint site

inspection to work area and HSE comments

Permit type : Hot/cold work permitExcavation work permit

Confined Space Entry Permit

Radiography Work permit

Subcontractors 

MINUTES OF MEETING

Page 24: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 24/26

2.0 Night shift Requirements :

ENPPI declared that work at night shall not startbefore comply with the following :-1. Night shift safe method of statement shall be

prepared

2. Royal commission permit ²required

3. HSE team at night

4. Nurse ²ambulance at night

5. Provide flood lighting for work areas and

access road

Subcontractors

3.0 Summer plan Implementation:-

ENPPI highlighted that all subcontractors shall

comply with summer plan:-

1. Provide adequate No. of heat shelters

2. Provide cold water stations

3. Ice supply and storage

4. Electrolyte replacement drinks

5. Supervision and monitoring

6. Work time reschedule

Subcontractors

MINUTES OF MEETING

Page 25: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 25/26

4.0 Safety observation Reports

All subcontractors personnel requested to report

any unsafe actions/conditions at site

Subcontractors

5.0 Near-Miss lessons learned:

Release of pressurized Water hose. All pressurized

hoses connections shall be secured by whip chains

to avoid random squeezing

Subcontractors

Additional items 

MINUTES OF MEETING

Page 26: HSE Committee Meeting Rev1

8/6/2019 HSE Committee Meeting Rev1

http://slidepdf.com/reader/full/hse-committee-meeting-rev1 26/26

Thank you

BY: