hywind experience from offshore...

30
Hywind Experience from offshore operation Classification: Internal 2012-10-01

Upload: others

Post on 11-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Hywind Experience from offshore operation

Classification: Internal 2012-10-01

Page 2: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Topics

Statoil and Renewables

Wind Portfolio

Wind Farm Operation

Hywind Experience

Hywind Next Step

Classification: Internal 2012-10-01 2

Page 3: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 3

- Technology driven energy company – 20.000 employees in 37 countries

- Equity oil and gas production – 1.85 million boe/d (2011)

- Operate 80% of all oil and gas production in Norway

- World’s third largest crude oil seller

- Second largest gas exporter to Europe

- World’s largest operator in waters deeper than 100 meters

- World leader – carbon storage and CO2 efficiency in oil and gas production

Classification: Internal 2012-10-01 3

Page 4: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 4

Stepwise growth in renewable energy and low

carbon technologies

Based on our core competences we have selected the following

main areas,

• Offshore Wind

• Carbone Capture and Storage

• Geothermal Energy

4

Page 5: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 5

Topics

Statoil and Renewables

Wind Portfolio

Wind Farm Operation

Hywind Experience

Hywind Next Step

Classif

ication

:

Intern

al

2012-

10-01

5

Page 6: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 6

Statoils area of interest

Fixed wind turbines

• Further develop prospects in areas with adequate incentive schemes

Floating wind turbines

• Use demonstration parks in US, UK or Japan, to refine the concept and mature

supply-chain. This will ensure local content and pave the way for full scale

commercial wind farms.

• Commercialize the Hywind technology.

Classification: Internal 2012-10-01 6

Page 7: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 7

UK

• Sheringham shoal

• Dogger bank

• Hywind

East Anglia

Hornsea

Dogger

Bank zone

Rampion

Isle of Wight

Irish sea

Atlantic Array

Triton Knoll Dudgeon

Thanet

Greater Gabbard Galloper

London Array Kentish flats

Gunfleet sands

Beatrice/Moray Firth

Firth of Forth Neart na

Gaoithe

Sheringham

shoal

Classification: Internal 2012-10-01 7

Page 8: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 8

Dogger Bank

Nøkkeltall • Kapasitet:

9 – 13 GW • Investeringer:

~300 mrd NOK • Areal:

~9000 km2

• Avstand fra land

125-290 km • Vanndybde: 18-63 m • Vindhastigheter >10 m/s • Kan dekke mer enn 10% av

Storbrittanias kraftforbruk

Classification: Internal 2012-03-24

8

Page 9: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 9

Germany

Classification: Internal 2012-10-01 9

Page 10: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 10

Sheringham shoal offshore wind farm;

Statoil og Statkraft eier Scira

• Capacity: 317 MW

• # turbines: 88

• Area: 35 km2

• Distance: 20 km from shore

• Waterdepth: 20 meter

• Production: 1.1 TWh/år =

1,1 mrd. KWh

220.000 homes

• Investment: ca. 2 mrd. USD

• Operational: 2012

Classification: Internal 2012-10-01 10

Page 11: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 11

Topics

Statoil and Renewables

Wind Portfolio

Wind Farm Operation

Hywind Experience

Hywind Next Step

Classif

ication

:

Intern

al

2012-

10-01

1

1

Page 12: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 12

Operation Principles

Wind Operating

Model

Visible

Leadership

Performance

Management

Decision

Structure

Team Based

Organisation

Best Practice

Work

Processes

Critical

Processes

Classification: Internal 2012-10-01 12

Page 13: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 13

Key challenges in wind operation

Organisation Contractual obligation must reflect organisational capabilities for both OEM’s and Owner

Both parties must recognize each others capabilities

Technology Asset owner must take responsibility for technical integrity and increase internal knowhow

of the systems

Cooperation Force lean thinking, component reliability on the suppliers through new standards both in

production and operation

OEM’s

Work should be carried out in accordance with recognised standards with transparency at

all levels

Owner should have an active retrofit program

Maintenance is one of the largest controllable operating costs in capital intensive industries Maintenance influence: Commercial risk; Production; Safety; Cost

Classification: Internal 2012-10-01 13

Page 14: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 14

Topics

Statoil and Renewables

Wind Portfolio

Wind Farm Operation

Hywind Experience

Hywind Next Step

Classif

ication

:

Intern

al

2012-

10-01

1

4

Page 15: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 15

• In operation from September 2009

• Actual movements confirmed

simulation model

• Floater motions have no negative

impact on turbine performance

• Capacity factor 50% in 2011

• Access and inspection confirmed to

be satisfactory

• Technically verified

Hywind Demo - concept verified

Classification: Internal 2012-10-01 15

Page 16: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 16

Hywind Performance

• Reduction of downtime with 1870 hr

by better planning and quicker

response

• Only one unscheduled stop in

second operational year

• 50% production increase

• Average wind speed

• 2nd year was 9,1 m/s, 3%

below normal

• 1st year was 12% below

normal

• Overall availability 94,5 %

• Capacity factor at 47,3%

• 4390 full load hours for 2011

(average in Norway ~2100)

0

500

1000

1500

2000

2500

2010- 2011 2009-2010

Downtime [hr]

Other

Wind out ofspec.

Grid

Turbine

9,5

6,4

2010- 2011 2009-2010

Production [GWh] November - November

94.6 90.3

47.3

31.6

2010- 2011 2009-2010

Availability% Cap.Fact%

Classification: Internal 2012-10-01 16

Page 17: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 17

Downtime November 2010 – November 2011

• Vibration alarm was eliminated in Mars

2010, through effective root cause

analysis

• Manuel stop is decided by owner and

can be minimised by preventive

maintenance

• The two other major losses left are

related to increased pitching at

extreme waive and wind conditions.

Better cooling system will be installed

to eliminate the loss.

Classification: Internal 2012-10-01 17

Page 18: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 18

Production in heavy seas • 24 hour trendperiode during

the «Dagmar» storm last

Christmas.

• Avg. wind speed: 16 m/s

• Max wind speed: 28 m/s

• Avg. significant wave height:

4,7 m

• Max significant wave height:

• 7,1 m

• Power production for the

periode: 96,7% of rated

power.

Classification: Internal 2012-10-01 18

Page 19: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 19 19 - Classification: Internal 2011-03-04

FOCUS ON HEALTH AND SAFETY (HSE)

• Same HSE standard as on all Statoil installations

• Focus on:

− Work permit system

− Boat landing, access , egress and PPE

− Lifting equipment

• No serious accidents

• Mitigating actions:

− Hands-on follow-up of Statoil and Siemens equipment and procedure

− Safety Job Analyses

− Table top workshops - Defined situations of hazards and accidents (DSHA)

− Safety training of personnel on-board Hywind

Classification: Internal 2012-10-01 19

Page 20: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 20

Rescue from hub

– use of milan and 2 metre rope

Classification: Internal 2012-10-01 20

Page 21: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 21

Rescue from nacelle – outside tower

Classification: Internal 2012-10-01 21

Page 22: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 22

Rescue outside

Classification: Internal 2012-10-01 22

Page 23: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 23

Other HSE activities at Hywind in June

Classification: Internal 2012-10-01 23

Page 24: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 24

Observations and ideas - rescue from nacelle

• Training is necessary to prepare the team and boost confidence

− Practice on internal rescue as space is limited

− Develop training packages together with service provider

− Use Hywind for training purposes

− Enable training on rescue tools, i.e. use of Milan rescue kit and fall arresters

• Attach Milan rescue kit to injured when possible

• Possible rescue time can be less than 1 hour for outside rescue

• Time from nacelle to boat based on speed with Milan Hub rescue is about 1:30min

• Helicopter rescue will reduce transport time to hospital but not necessarily rescue

time form nacelle

Classification: Internal 2012-10-01 24

Page 25: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 25

Topics

Statoil and Renewables

Wind Portfolio

Wind Farm Operation

Hywind Experience

Hywind Next Step

Classif

ication

:

Intern

al

2012-

10-01

2

5

Page 26: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 26

From Idea to Commercial Concept

Large Parks, 500-1000MW <10 years

Pilot Park, 3-6 turbines <5 years

Concept 2001

Model test 2005

Full-scale prototype 2009

• The technical concept is considered proven

• Next step: Pilot parks to demonstrate improvements and cost reductions

• Large parks 500-1000MW is the end game objective

Cost competitive with bottom fixed in 2020’s

Classification: Internal 2012-10-01 26

Page 27: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 27

Hywind Pilot Park objective to demonstrate

cost efficient and low risk solutions for

commercial scale parks

• 12 – 15 MW

• Production start 2016

• Multiple units in park-configuration

• Verify scaled up, lighter design

• Optimise assembly and installation

• Reduce construction risk for future full scale

park

Hywind Demo Hywind II

Alternative locations for Pilot Park in

or Maine, US or Scotland

Classification: Internal 2012-10-01 27

Page 28: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 28

• Scaled-up conceptual design (5+ MW) reduced cost/MW

• Standardisation and mass production reduced unit cost

• Optimised fabrication lines higher productivity

• Assembly, transportation and installation higher productivity

• Combined mooring systems, sub station reduced unit costs

• Better and more stable winds higher income

• Easier decommissioning reduced cost

Floating wind will be cost efficient in a mature market

Hywind II Hywind III

Windflip installation concept

Classification: Internal 2012-10-01 28

Page 29: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Copyright©Statoil 2011.02.23 Corporate presentation: Crossing energy frontiers / 29

Kyoto

Osaka

Tokyo

Fukushima

Jeju Island

Floating Wind

~250 000 Sqkm

10% of this:

50Gw or 200Twh

or about total nuclear

Classification: Internal 2012-10-01 29

Page 30: Hywind Experience from offshore operationconventor.no/vindkraft/pdf/Vindkraft_2012_1130_Sverre... · 2012-10-15 · Hywind Experience Hywind Next Step 2 Classification: ... •Power

Presentation title

Presenters name

Presenters title

E-mail address ……@statoil.com

Tel: +4700000000 www.statoil.com

Classification: Internal 2012-10-01 30