I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November 16, 2015

Upload: alexander-newman

Post on 30-Jan-2016

213 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

I Wear My “Safety” Glasses at Night:Maximizing Planning Tools to Reduce Utility Construction

Costs and Headaches

95Th Annual Conference

Raleigh, NC

November 16, 2015

Page 2: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

OverviewProject BackgroundProject

ManagementSafety is Job #1!!Minimize “headaches”

through effective: Stakeholder Engagement Risk Management

Planning

ToolsConstructionResults

Page 3: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Project BackgroundTechnical Aspects – Purpose, Need, Constraints

Page 4: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Project Background (continued)Identification of Stakeholders - Interests

Town of Chapel Hill Traffic (Willow and Conner)NCDOT (S. Estes)Town of Chapel Hill PoliceLocal businesses and residents

University Mall Banks Medical/Dental facilities Drug stores/retail Restaurants Offices Apartments

Page 5: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

OWASA’s goals Safety is JOB #1!!

Continuous stakeholder

engagement

Effective

Communications

Maximize construction

efficiency

Meet construction timing

constraints within budget

Page 6: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Keep everyone SAFE!!!!Workers

“Standard” safety practicesWorking in busy roadsWorking in intersections

DriversSafety in work zonesTake advantage of seasonal traffic

volumes

PedestriansAdequate provisions for sidewalks

When is the best time to work safely and efficiently?

Page 7: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Three phases of Stakeholder EngagementPlanning Phase

Collect Input, ask questions!What are your concerns?How will the project affect you?

Construction PhaseContinuous status reporting.Availability of information. Immediate and accurate responses

to questions Internal and external stakeholders.

Post ConstructionHow did we do?

Page 8: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

PlanningIdentify stakeholder

requirementsNCDOT encroachmentTown engineering

requirements

Identify potential construction issuesTree protectionStream buffersBus routesPedestrian accessEasementsEnvironmental concerns

Page 9: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Planning (continued)

Review previous construction projectsWater mainRoadwayStormwater

Review potential trenchless rehabilitation technologiesCIPPPipe bursting

Page 10: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Planning (continued)Night Construction

Minimize construction and shutdowns for businesses

Minimize trafficIncrease safe working conditionsMaximize available time for

constructionNoise ordinance considerationsImpact to residencesLimited OWASA operational

supportTown requirements

Page 11: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Design ToolsTopographic Survey

Subsurface Utility Engineering (SUE)Quality Level BQuality Level A

Page 12: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Design ConsiderationsOWASA Operations

preferencesMaintain public

accessibility

Minimize need for temporary services

Maintain trafficReduce conflicts with other

utilities

Page 13: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Design ConsiderationsMinimize water service shutdownsIsolation valves

Page 14: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Construction ToolsPrequalification of contractors

Eight (8) contractors approved

Full time construction observation

Bid resultsSix (6) bids receivedLow bid: $1.568 MillionAverage all bids: $2.182 MillionAverage of 3 low bids: $1.708 Million

Page 15: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

ConstructionConstruction start and progressNightly pavement repairsIssues

Page 16: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Construction

Page 17: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Construction CompletionSchedule

Bid – January 17, 2014Award – March 5, 2014Notice to Proceed – May 19, 2014Substantial Completion – October 29, 2014 Final Completion – December 1, 2014

Project CostsPlanning, design, construction services –

$387,167Original Const. Contract Amount –

$1,568,925Const. Change Orders –

($252,319)Final Const. Contract Amount – $1,316,605

Page 18: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

ResultsSafety

NO SAFETY INCIDENTS!

Stakeholder EngagementWe knew stakeholders’ needsDaily progress reports

Page 19: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Results (continued)Stakeholder feedback

During construction Only 4 phone calls (complaints) from citizens! We were able to share accurate daily status and schedule

Post construction surveys We typically receive between 4 and 6 responses We received 19 responses Our average rating was 4 out of 5 (our goal is above 4)

Local Government Partners“I drive this route every day to get to work and it was hard for me to tell there was a construction project in progress” – Lance Norris, Town of Chapel Hill Public Works Director

Project Planning, Design and Stakeholder engagement were key to our success.

Page 20: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

AcknowledgementsMoffat Pipe, Incorporated

Town of Chapel Hill

NCDOT, District 1

Page 21: I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November

Contact Information:

Jeremy Fireline, PE

[email protected]

919.537.4249

Ben Latino, PE

[email protected]

919.233.8091

QUESTIONS?