idea sarl consultants - egreenpages.me it green lebanon - 2nd... · idea sarl consultants 2nd...

39
Green Logic by IDEA sarl consultants 2 nd annual Sustainability Solutions Conference Monroe Hotel March 28 th & 29 th , 2011 Beirut -- Lebanon

Upload: lelien

Post on 04-May-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Green Logic by

IDEA sarl consultants

2nd annual

Sustainability Solutions Conference

Monroe Hotel

March 28th & 29th , 2011

Beirut -- Lebanon

Page 2: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Presentation Outline

1. Contextualizing projects – Green & Sustainability Overview

2. Green Logic Concept

3. Project - R (winner of the Middle East Architect Award – Green project of the year 2009)

4. Haigazian University Heritage Building

Page 3: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Why Go Green?

Pollution at Olan Bator - Mongolia

“When we are at the

bottom of the hole we

start by stopping the

digging” Warren Buffet

Page 4: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Why Go Green?

The global governance of the environment The consciousness that our current life style and production

practices will destroy the future of our children if we continue in the same rhythm and actual mode of development is now global

What is evident nowadays took over 20 years to impose itself The outcome of the report “Club of Rome” published in 1972

was the first serious study highlighting the ecological danger related to the economic & demographic growth of the globe in addition to the foreseen penury of its fossil energetic resources

The conclusion was radical, it proposed to substitute the

growth logic by the equilibrium logic

Page 5: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Why Go Green?

The global governance of the environment The consciousness that our current life style and production

practices will destroy the future of our children if we continue in the same rhythm and actual mode of development is now global

What is evident nowadays took over 20 years to impose itself The outcome of the report “Club of Rome” published in 1972

was the first serious study highlighting the ecological danger related to the economic & demographic growth of the globe in addition to the foreseen penury of its fossil energetic resources

The conclusion was radical, it proposed to substitute the

growth logic by the equilibrium logic

Page 6: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Why Go Green?

Page 7: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

green logic

Page 8: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

white

blue

green

light

bright

grey

Page 9: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

green

is

you

Page 10: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Green Building

Green building is the practice of creating structures and using processes that are environmentally responsible and resource efficient throughout a building's life cycle.

Green building design and construction practices that meet specified standards will help resolve much of the negative impact that buildings have on their occupants and on the environment.

The term "green building" is often used as a synonym for sustainable construction and high-performance building.

In short, high-performance buildings are designed and built to minimize

resource consumption, reduce life cycle costs, maximize health and productivity for the building's occupants, and improve environmental performance.

Page 11: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Page 12: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Project R offers a disaster relief housing alternative for rural areas. Using destruction rubble for reconstruction, it develops the Gabion system into a full-fledged architectural system. Project R received wide media coverage, and a couple of awards Project R concept is adapted to built permanent housing in HAITI after the earthquake disaster. The system is still evolving to finding the best balance to accommodate local needs It is now being tested in Ghana, using local material to replace the steel mesh (bamboo) and the concrete rubble (dried mud)

Page 13: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

HAITI GHANA

Page 14: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

It involves entrapping rubble in wire mesh cages to build, at 40%-50% the cost of prefabricated houses, multipurpose single-story structures whose construction requires 2-3 weeks, minimal training and equipment, and employs local communities. The units, though designed for temporary relief, are durable. Environment-friendly, they can be recycled into nature. Project R can be propagated in modular fashion as part of a comprehensive community recovery strategy.

Page 15: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Page 16: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Page 17: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

The system’s vertical structure consists of steel mesh casing (Gabion) modules, each filled with one meter cube of concrete rubble. Modules are lined with gypsum boards from the inside; incorporating vertical modules for windows and doors. Gypsum is used for internal space subdivision. The system floor is the same as the vertical elements, complemented by pouring an 8cm slab as finish. The system roof is out-of-factory modular lightweight steel insulated sandwich panels over a primary light steel structure. No external finish is needed: the walls can be covered with greenery. From the remains of a 150m2 house, a 78m2 house can be built. The prototype built has passed that test, performing mechanically on heat exchange and water infiltration levels.

Construction Methodologies

Page 18: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

The units are capable of spatially accommodating different design needs and functional allocations as clinics, schools, or communal spaces. Though designed for temporary relief, the units are durable. Environment-friendly, they embody an example of green and sustainable architecture and can be dismantled for use in rehabilitating old quarries, riverbanks, as retaining walls or bridge embankments.

The System’s Flexibility

Page 19: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Page 20: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Page 21: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Project -R-

Page 22: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

Page 23: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

Built in the 1920 century, part of a heritage quarter in Ras Beirut, one of the most cultural and diversified area of Beirut.

Page 24: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Original building description:

-The building external and internal walls are sand stone bearing walls -The slabs are 15 cm reinforced concrete (mild steel) -Fer forger and decorative concrete balustrades, white Carrara marble tiles, colored patterned terrazzo tiles, wood shutters, wood windows, decorative concrete and stone ornamentations, pitched red tiles roof over a wood structure -The floor area is 235 m2; the story clear height is 485 cm -The number of floors is four with a pitched roof -The building has a basement of 75 m2with 220cm clear height -The building footings are continuous under all bearing walls and are cyclopean concrete with rubble stone.

Haigazian University Heritage Building

Proposed works:

-Keep the external walls. -Remove all the interior slabs and walls -Underpinning the external walls by 15 cm micro piles -Reclaim a full basement with 330cm clear height -Rebuild the building from the inside

-Retie the old to the new structure

-Incorporate a lift and state of the art modern equipments

-The resulting building will be designed to respect all applicable seismic, fire, handicapped accessibility norms

Page 25: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

North side

The building original function was a residential four story walk up yellow building with a central hall configuration.

Page 26: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

East side

The building was abused during the civil war by refugees, as it was close to demarcation lines.

Page 27: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

South-West side

The classified property was acquired by Haigazian University (HU) in 2006 to be part of its natural growth and extension for its administrative and academic spaces as a mixed program.

Page 28: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

East side during construction North side during construction

Construction Phase

Page 29: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

How sustainability was served in the project:

-External walls were kept -A width of 70 cm of all slabs and internal walls along the perimeter of the building was kept -Internal sand stone walls were sold to be recycled -Slabs mild reinforcement steel was sold to be recycled -Concrete ruble was given away to be recycled as part of the aggregates (40%) used for the precast concrete elements industry

Page 30: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

How sustainability was served in the project:

-All external balconies were kept -All steel and concrete balustrades were kept

Page 31: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

How sustainability was served in the project:

-What was left of the wood shutters and windows was sold to be recycled as spare parts for similar existing functional buildings. -All the roof wood structure was sold to be recycled

Page 32: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

How sustainability was served in the project:

-All existing colored patterned terrazzo tiles was reincorporated in the new building

Page 33: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

-Increase of the usable area within the same envelop by 63% (700 m2); the usable area within the original building was 1,200 m2, the executed design increased the usable space to 1,900 m2 (reclaiming the use under the pitched roof)

How sustainability was served in the project:

Page 34: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

-Increase of the usable area within the same envelop by 63% (700 m2); the usable area within the original building was 1,200 m2, the executed design increased the usable space to 1,900 m2 (new full basement)

How sustainability was served in the project:

Page 35: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

-All structural and architectural material used are recyclable (concrete, steel , aluminum, glass, stainless steel, gypsum, terrazzo tiles, wood shutters, EPDM waterproofing membrane , stone, roof insulation, etc)

How sustainability was served in the project:

Page 36: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

-All structural and architectural material used are recyclable (concrete, steel , aluminum, glass, stainless steel, gypsum, terrazzo tiles, wood shutters, EPDM waterproofing membrane , stone, roof insulation, etc)

How sustainability was served in the project:

Page 37: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

-The renovated building is equipped with a VRV air conditioning system which promotes energy saving -All bulbs used are energy saving bulbs -A building management system is installed -All mechanical and electrical equipments specified promotes energy saving -day light is brought into the core of the building

How sustainability was served in the project:

Page 38: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Haigazian University Heritage Building

Views from inside

Page 39: IDEA sarl consultants - egreenpages.me it green lebanon - 2nd... · IDEA sarl consultants 2nd annual Sustainability Solutions Conference Monroe Hotel March 28th & 29th, 2011 Beirut

Sustainability Solutions Conference March 2011

Thank you for your kind attention