iduction quarry se
TRANSCRIPT
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 1/19
Quarry Quarry- - South Eastern South Eastern
1West Bokaro – Q-SE
es es o aro o aro Mining Stream Mining Stream
West Bokaro Seam Wise Reserve 1.11.2008
West Bokaro
FRSDump
Dump
Banji
N
DURUN.E.BLOCK
KARMATIA
2West Bokaro – Q-SE
WASHERY
Sec_C
Sect._D
Quarry_SE
Housing
Dump
Dump
G.M. Office
CMC
Mine office
Quarry_AB
Qyarry_E
Central Side
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 2/19
Our Operations
Blasting Shovelling Dumping
Overburden Removal
Coal Loadin
Drilling
3West Bokaro – Q-SE
Coal CrushingCoal
BeneficiationDespatch
Coal Mining & Beneficiation
Measures
Earth filling
Afforestation
Raw Coal Production till FY’20
4West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 3/19
Box Cut 1 & 2
Quarry – SE Workings
5West Bokaro – Q-SE
Box Cut _3
Box Cut _4
Q-SE Equipment fleet
Excavators : 6666 ( 4 Shovels : 14.8 m3, 2 Loaders : 15.8 m3•
Rear Dumpers : 40404040 (95 T•
Rotary Drills : 7777 (150 mm•.
Graders : 2222 (16 H•
6West Bokaro – Q-SE
Dozers : 7777 TD and 2222 WD.
Explosive Used : SME (Orica•
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 4/19
Best Practices
• 7 days working.
• Staggered weekly day of rest and canteen breaks.
• Two grade system without supervisory level.
• Semi-mobile canteens and field offices.
7West Bokaro – Q-SE
• Ergonomically designed equipment.
• Competency mapping- 4Q Toyota Model
• Electronic Display Board.
• GPS Online Data Management.
EMPLOYEE SATISFACTION
- Reward & Recognition
- SHABASH
- Attractive Incentive Bonus
- SGA recognition
8West Bokaro – Q-SE
- Aspire / SIPs recognition
- Suggestion Reward
- Rewarding Performances in JDCs
- Long Service award ( 20, 25,30,35,40 Years)
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 5/19
ACHIVEMENT OF THE
TRAINING PROCESSES
REDUCED TRAINING PERIOD (18 TO 6 MONTHS)
GREEN TRAINEES TRAINED AS TRAINERS .
FIELD TRAINING TIME REDUCED DRASITICALLY
FROM SEVERAL MONTHS TO AVERAGE 3 WEEKS.
9West Bokaro – Q-SE
EASY ACCEPTABILITY TO WORLD’S BEST
OPERATING PRACTICES.
TRAINED TO HANDLE ALL POSSIBILE TYPES OF
EMERGENCIES.
ENABLER FOR ACHIEVING BENCHMARK
OPERATING PARAMETERS.
SIMULATOR BASED TRAINING
TRG. BY EXPERT INTERNTL’
TRAINERS + OJT.
GREEN TRAINING PROGRAMME
10West Bokaro – Q-SE
OUTDOOR ADVENTURE TRG.
BY TSAF.
TECHNICAL TRG. AT SNTI
HMV COURSE AT JSR.
PROCESS ORIENTED TRG. AT
WB.
TRAINING BY OEM’S
OUTDOOR ADVENTURE
TRAINING BY TSAF
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 6/19
SIMULATOR TRAINING
11West Bokaro – Q-SE
SIMULATOR TRAINING
• Teaches correct control procedures from safety, productionand machine wear and tear perspectives.
12West Bokaro – Q-SE
Starting the truck Reversing under a shovel Dumping
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 7/19
SIMULATOR TRAINING
Simulators...• Creates an environment very similar to a real machine at work
13West Bokaro – Q-SE
SIMULATOR TRAINING
• Exposes the operator to various simulated events… manytoo dangerous or difficult to test for real.
14West Bokaro – Q-SE
Dust or Fog Road Surfaces
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 8/19
SIMULATOR TRAINING
• Records the operator's reactions together with vital machine
operating information
15West Bokaro – Q-SE
SIMULATOR TRAINING
• Gives out an operator's detailed report, and can "play back"the operator's session to evaluate his performance.
16West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 9/19
Quarry Production in Process
17West Bokaro – Q-SE
Canteen
18West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 10/19
Locker Room
19West Bokaro – Q-SE
GREENERY AT SHOPFLOOR
20West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 11/19
Quarry SE at Night (Face)
21West Bokaro – Q-SE
Quarry SE at Night (Haul Road)
22West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 12/19
Quarry SE at Night (Dump yard)
23West Bokaro – Q-SE
Quarry SE at Night (Installations)
24West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 13/19
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 14/19
Location
27West Bokaro – Q-SE
A brief history
Management taken over by M/s West Bokaro (P)1952
Mine comes into existence as M/s Bokaro &
Ramgarh Ltd. Management of mine given to M/s
Anderson Wright
1947
28West Bokaro – Q-SE
West Bokaro becomes a Division of Tata Steel1972
Ltd., a wholly owned subsidiary of Tata Steel
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 15/19
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 16/19
Transportation of Material
31West Bokaro – Q-SE
Overland ConveyorOverland Conveyor RopewaysRopeways
Quick Loading Complex, Chainpur
32West Bokaro – Q-SE
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 17/19
EMPLOYEE SATISFACTION
- Joint consultation Fora’s
JCCM
(Apex Level)
Frequency
Quarterly
33West Bokaro – Q-SE
Joint Departmental Council
Central Joint Council
(Department Level)
(Divisional Level)
Monthly
Quarterly
CONDUCIVE WORK ENVIRONMENTCONDUCIVE WORK ENVIRONMENT
ISO 14001 Certified
Towards OHSAS 18000 certification
Adoption of Total Productive Maintenance (TPM)
34West Bokaro – Q-SE
Ergonomically Designed equipment
Review of Safety & Environment every Day
Haul Road Profile Mapping (ASI)
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 18/19
Quality of Life
• Free Electricity & Fuel
• Free Accommodation to employees
• Free Education
• Coaching & Career counseling
35West Bokaro – Q-SE
• c emes e mp oyees am y ene c eme an
Medical Separation Scheme
• Club, Recreation & Community Centers
• Parks & Gardens• 60 bedded hospital
Aspiration
To be the most admired unit in
36West Bokaro – Q-SE
……
7/30/2019 Iduction Quarry se
http://slidepdf.com/reader/full/iduction-quarry-se 19/19
End of Presentation
37West Bokaro – Q-SE