IET 120 Construction Project. Name: Clarence Hunt. Dwelling. Single floor plan 1-Commons Area: 1036.5 ft 2 3-Hallways: 586.8 ft 2 1-Laundry/Utility: 150.3 ft 2 2-Bathrooms: 312.9 ft 2 12-Dorm Rooms: 1993.5 ft 2. Square Footage. Square footage of each floor 4,080 ft 2 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IET 120 Construction Project

IET 120CONSTRUCTION PROJECTName:Clarence Hunt

Page 2: IET 120 Construction Project

Dwelling

Single floor plan

1-Commons Area: 1036.5 ft2

3-Hallways: 586.8 ft2

1-Laundry/Utility: 150.3 ft2

2-Bathrooms: 312.9 ft2

12-Dorm Rooms: 1993.5 ft2

Page 3: IET 120 Construction Project

Square Footage

Square footage of each floor 4,080 ft2

Square footage total 4,080 ft2

Page 4: IET 120 Construction Project

Location

3 Hummingbird Lane, Morehead KY14 miles for Morehead State University

Page 5: IET 120 Construction Project

Building Materials

Metal roof, Spray foam insulation, weather treated wood members.

Geothermal HVAC system, continuous water heating system.

These products are used to make the building as green as possible, but keeping within the initial budget that was planed.

Page 6: IET 120 Construction Project

Building Materials

EcoRock (green alternative to drywall) Versi-foam insulation Porous Concrete Skylights Concrete block Recycled carpet tiles Cork/bamboo flooring

Page 7: IET 120 Construction Project

Floor Plan Layout

I chose dorm style bedrooms to accommodate 24 students. I chose to have a small kitchen area, and commons area together where students can socialize and fix food if they want. I chose to include two bathrooms. Due to having multiple genders in the building. I included one laundry room that is easily assessable for the students.

Page 8: IET 120 Construction Project

Timeline

Initial buying of property 1-2 weeks Prepping the land- 2 weeks Developing the blueprints- 2 weeks Obtaining all the necessary permits- 2 weeks

min. Installing plumping and electrical wiring to

the house. 2- weeks Inspection of plumbing and electrical -1day Digging and forming the foundation -1 week

Page 9: IET 120 Construction Project

Timeline

Pouring concrete for the foundation-2 days Laying of concrete block/brick veneer- 4

weeks Installing of rafters- 1 week Applying sheeting to roof- 1week Installing metal roofing- 1 week Building interior walls- 3 to 5 weeks Installing electrical, plumbing, and HVAC-2 to

3 weeks Hanging EcoRock and finishing it 5 weeks

Page 10: IET 120 Construction Project

Timeline

Installing doors and windows- 1 week Installing flooring- 3 weeks Installing trim work- 3 to 4 weeks Painting of the walls and ceilings- 3 to 4

weeks Installing furniture and appliances- 1

week total time to build the project: 45 weeks

or about11 months maximum.

Page 11: IET 120 Construction Project

Conclusion

My conclusion is it took a lot of time to plan and developed a design. Meeting the square footage allow was difficult and made me think new and creative ways to fit enough space in so that it could accommodate all students in the class. There was a initial budget set at 1.5 million dollars, but do to green technology and better building standards, the project came in at a total of $553,746.

Yes, this project had me learning about and finding new and green materials that can be used as building materials.