SUCCESS STORY © 2015 Detr The Challenge To Develop the F execute vessel im on the riser guard the west face platform to prote Dry gas pipeline analysis is perform the riser guard is a the operational from the vessel. The Solution The Engineering created an engine after a detailed project scope. element model w based on the draw by the customer. assumed as rigid it is placed par riserguard. The so was used to analysis was ABA The team had discussions with Impact analysis o About the Client The client is a major EPC contractor for a global Oil corporation. Read more online at www.depusa.com roit Engineered Products(DEP), 850 East Long Lake Rd., Troy, Michigan 48085, USA e FE-Model and mpact analysis rd installed on of the XY ect the 16-inch from XY. The med to check able withstand impact load team at DEP eering process study of the The finite was generated wings provided The vessel is barrier & and rallel to the oftware which conduct the AQUS Simulia. very close customer to understand the load cases & boundary conditions. One of the load case happened to be that the structure is constrained in all degrees of freedom at the MUDLINE. As the system had to be commissioned immediately, there was a tight timeline to generate the results summary. DEP engineers formed the team and became accountable for the respective tasks and milestones of the project. The timeline was due diligently met as any other standard engineering projects at DEP & results were delivered to the customer which resulted in imm fabr cost on riser guard platform to protect the ga Th Th res & & wh com Th ge as cus mediate commissioning & rication of with significant t savings. as pipeline he Result he complete summary of the sults of the riser guard with without fillet was generated submitted to the customer hich resulted in faster mmissioning of the system. he results & practices enerated by DEP are still used the standard practice at the stomer end.

Upload: others

Post on 01-Apr-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Impact analysis on riser guard platform to protect the gas pipeline - DEP … · 2020. 2. 5. · Dry gas pipeline from XY analysis is performed to check the riser guard is able the

SUCCESS STORY © 2015 Detroit Engineered Products(DEP), 850 East Long Lake Rd., Troy, Michigan 48085, USA

The Challenge

To Develop the FE

execute vessel impact analysis

on the riser guard installe

the west face of the XY

platform to protect the 16

Dry gas pipeline from XY

analysis is performed to check

the riser guard is able

the operational im

from the vessel.

The Solution

The Engineering team at DEP

created an engineering process

after a detailed study of the

project scope. The finite

element model was generated

based on the drawings provided

by the customer. The vessel is

assumed as rigid barrier & and

it is placed par

riserguard. The software which

was used to conduct the

analysis was ABAQUS Simulia.

The team had very close

discussions with customer to

Impact analysis on riser guard platform to protect the gas pipeline

About the Client

The client is a major EPC

contractor for a global Oil

corporation.

Read more online at

www.depusa.com

© 2015 Detroit Engineered Products(DEP), 850 East Long Lake Rd., Troy, Michigan 48085, USA

The Challenge

evelop the FE-Model and

vessel impact analysis

on the riser guard installed on

the west face of the XY

platform to protect the 16-inch

Dry gas pipeline from XY. The

analysis is performed to check

able withstand

the operational impact load

The Engineering team at DEP

created an engineering process

detailed study of the

project scope. The finite

element model was generated

based on the drawings provided

by the customer. The vessel is

assumed as rigid barrier & and

it is placed parallel to the

riserguard. The software which

was used to conduct the

analysis was ABAQUS Simulia.

The team had very close

discussions with customer to

understand the load cases &

boundary conditions. One of

the load case happened to be

that the structure is

constrained in all degrees of

freedom at the MUDLINE. As

the system had to be

commissioned immediately,

there was a tight timeline to

generate the results summary.

DEP engineers formed the team

and became accountable for

the respective tasks and

milestones of the project. The

timeline was due diligently met

as any other standard

engineering projects at DEP &

results were delivered to the

customer which resulted in

immediate

fabrication of with significant

cost

Impact analysis on riser guard platform to protect the gas pipeline

The Result

The complete summary of the

results of the riser guard with

& without fillet was generated

& submitte

which resulted in faster

commissioning of the system.

The results & practices

generated by DEP

as the standard practice at the

customer end.

immediate commissioning &

fabrication of with significant

cost savings.

Impact analysis on riser guard platform to protect the gas pipeline

The Result

The complete summary of the

results of the riser guard with

& without fillet was generated

& submitted to the customer

which resulted in faster

commissioning of the system.

he results & practices

generated by DEP are still used

as the standard practice at the

customer end.