Inception to Implementation AASHE 2011 Conference
Moe Tabrizi, DirectorOffice of Sustainability
Live Green
• Inception• Implementation• Success• Challenge
Steps
Campus Goals
• Governor’s Executive Orders for “Greening of State Government” by 2012– Reductions in energy, water, Zero waste goals, paper and
waste from construction and demolition, and fleet petroleum
• Long-term campus commitment to reach carbon neutrality– Energy conservation– Large scale renewable energy – New technologies
• Challenges: Tangible steps towards our goal but unable to show date certain CO2 neutrality
Governor’s Goals
BASE ACTUALSTARGE
TGoals FY06 FY07 FY08 FY09 FY10 FY11 FY12-20% ELECTRICITY 13.75 13.62 13.47 12.77 12.43 12.19 11.00
(kWh/ft2 ) -0.95% -2.04% -7.13% -9.60% -11.35% -20.00%
-20% STEAM 68.35 68.11 59.92 55.6 58.73 51.95 54.68 (lbs/ft2) -0.35% -12.33% -18.65% -14.07% -23.99% -20.00%
-20% CHILLED WATER 3.31 2.53 2.06 2.39 2.33 2.50 2.65 (ton-hr/ft2) -23.56% -37.76% -27.79% -29.61% -24.47% -20.00%
-10% WATER 35.81 30.63 31.94 28.43 25.09 23.57 32.23 (gals/ft2) -14.47% -10.81% -20.61% -29.94% -34.18% -10.00%
-25% PETROLEUM 103,043 110,582 102,013 104,799 100,607 95,027 77,282 (gals) 7.32% -1.00% 1.70% -2.36% -7.78% -25.00%
-20% PAPER * 6,073 7,747 8,703 4,406 4,814 4,858 (cases) 27.56% 43.31% -27.45% -20.73% -20.00%
-20% TOTAL ENERGY 158,677 145,549 144,480 132,055 131,341 126,597 126,942(btu/ft2) -8.27% -8.95% -16.78% -17.23% -20.22% -20.00%
* Reflects actual FY07 cases of paper purchased. Comparable data did not exist until the finalization of the Corporate Express contract in FY07. The FY12 20% reduction is calculated based on the available and more accurate FY07 numbers.
Big Picture Sustainability
Fac
ulty
Sta
ffS
tudents
People
Profit Planet
Why LEED?
• Leadership in Energy and Environmental Design (LEED) is a set of progressive and best practice recommendations/standards set forth by U.S. Green Building Council (USGBC) to promote sustainable building design and construction.
• Shifts discussion from initial costs to long-term operating costs
LEED Gold “Plus” Strategy
• To support our near term goal of energy conservation and long-term goal of carbon neutrality, it makes sense to continue with our goal of LEED Gold and go deeper into the category of Energy and Atmosphere (>45% better than ASHRAE 90.1) during current period of campus expansion.
Green BuildingsBuildings – CompleteArnett Hall GoldAndrews Hall GoldATLAS GoldLeeds Business School Addition GoldUniversity Memorial Center SilverVisual Arts Complex GoldWolf Law GoldBuckingham Hall Gold
Projects under construction/renovation and on track to receive at least LEED gold – Campus benefits from LEED standards – minimal design and construction costs result in energy savings of 25% - 35%; investment payback to achieve Gold standard takes roughly 1-2 years.
Buildings – Expecting Basketball/Volleyball Practice Facility G/PCenter for Community GHallett Hall GInstitute for Behavioral Science GJILA Addition GSmith Hall GSystems Biotechnology G/PWilliams Village North G/P
Credits Description CostSS c4.4: Alternative Transportation - Parking Capacity 1,200 SS c7.1-7.2: Heat Island Effect: Reductions 7,500 WE c2: Innovative Wastewater 1,250 EA c1: Optimize Energy Performance 48,050 MR c2: Construction Waste Management 100,000 MR c7: Certified Wood 48,000 IEQ c1: Outdoor Air Delivery Monitoring 12,500 IEQ c3.1: Construction IAQ Management Plan: During Construction 4,800 IEQ c4.1-4.4: Low emitting materials: Adhesives & Sealants, Paints &
Coatings, Carpet Systems, Composite Wood & Agrifiber Products
16,000
IEQ c5: Indoor Chemical and Pollutant Source Control 4,000 IEQ c7.1-7.2: Thermal Comfort : Design and Verification/ASHRAE55 12,000 ---- LEED Consultant, energy and daylight modeling and
project registration costs75,000
LEED/Gold total cost premium $320,350 1% of Total Project Budget $470,000
Wolf Law School – LEED Gold
Campus benefit from LEED
Average for campus building Total Usage Usage per ft² Cost(183,609 ft² ) ELEC 2,369,498 kWh 12.9 kWh/ft² 273,440
STEAM 11,403 Klbs steam 62.08 lbs/ft² 232,372
WATER 5,867 Kgal + sewer 31.94 gal/ft² 38,134
Total $543,946
Wolf Law Total Usage Usage per ft² Cost(183,609 ft² ) ELEC 1,789,226 kWh 9.74 kWh/ft² 206,477
STEAM 3,018 Klbs steam 16.43 lbs/ft² 61,497
WATER 3,805 Kgal + sewer 20.72 gal/ft² 24,733
Total $292,707
Utility savings from Wolf Law compared with average campus building $251,240
Cost Premium for LEED/Gold $330,300
Payback in years 1.31
Campus Renewable Energy
100% financing of Solar PV by campus and 3rd party venture capitalists using: • Amendment 37 incentives, • Xcel rebates, • Tax credits, and • Accelerated depreciation charges.
Williams Village North – This summer the Solar PV panels on the parking car ports begin adding 140,000 kWh of energy per year.
Center for Innovation and Creativity – 370 newly installed Solar PV Panels at the CINC building will produce approximately 10% of the building’s annual energy needs – enough energy for 20 regular sized homes.
Campus Renewable EnergyMountain Research Station
Coors Event Center
Wolf Law School – live monitoring
Housing Maintenance Facility
Challenges: Expanding on-site renewable energy; space (land/roof); declining rebates and incentives and price point.
Energy/Water Conservation in Research Labs
Why do you focus on
Research labs?
Labs are 5-7 times more energy and water
intense than campus classrooms or general
offices.
CU Green Labs ProgramFocusing on:• Major plug loads and large equipment• Incentive programs to retire or upgrade old energy and water inefficient lab equipment and appliances (Fume hoods, refrigerators, ultra cool freezers, etc.)• Offer free timers, freezer/refrigerator maintenance program• Identifying EcoLeaders• Behavioral Change: Education, Communication program, posters, etc.
Challenge: Getting the information to the researcher, speaking their language, accomplish without incentives.
Faculty Engagement – Peak to Peak Project
• 50 faculty members signed up for a two day sustainability work shop.
• Attendees will each receive a $500 stipend after showing they’ve incorporated sustainability into at least one of their upcoming courses.
• CU-Boulder faculty and staff were the speakers at the workshop.
Integrated Pest ManagementTask Force
Goal: Turf and landscape areas synthetic pesticide free by 2016
• Collaboration between students, the Environmental Center, Facilities Management and Housing and Dining Services
Reductions in the highest student use areas first, Significant reduction in chemical exposure to
students, faculty and staff in its first year of implementation,
Substantial environmental and ecosystem benefits realized within the first five years of the program.
Challenges: Perceptions, logistics, implementing a project
with no direct cost benefit.
Conservation Opportunities and Deferred Maintenance (DM)• Deferred Maintenance refers to opportunities to repair of replace building systems in
need of attention. • Significant investment to stay current. Most campuses unable to maintain the
needed investment.• There are strong correlations between attending to deferred maintenance backlog
and achieving resource conservation goals.• Combine DM Funds and Conservation funds in favor of reducing DM level where
possible.• Examples of DM opportunities in an old building
• Lighting control improvement• Motors• HVAC controls• Building Envelope
Challenges: Problem scale; ongoing collaboration between operations and conservation groups; age of buildings.
Total Electricity Usage
Total Electricity Usage/SqFt
Total Potable Water Usage
Total Potable Water Usage/SqFt
Telling the story…
Campus Sustainability Map
Summer Printing Initiative
Zero Waste Initiative
Grassroots
Challenges: Pre-conceived perceptions, cultural values, keeping the message exciting and new.