Page 1: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

INSPECTION NOTE OF

SHRI VIPIN SAXENA, IAS MEMBER

BOARD OF REVENUE, ODISHA, CUTTACK

ON THE OFFICE OF THE

COLLECTOR, NAYAGARH 25.10.2017

Page 2: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

INDEX SI. No. Subject Page No.

1 Introduction 1

2 Accommodation 1

3 Charge 1

4 Tour 2

5 Inspection 3

6 Court 7

7 Demand Collection Balance 12

8 Annual Verification of Tahasil Account 12

9 Lease 15

10 Sairat 17

11 Mutation and Correction of RoR 19

12 Irrigation 22

13 Alienation of Govt. Land 23

14 Certificate case 24

15 Encroachment 29

16 Bebandobasta 35

17 Distribution of Govt. waste land 36

18 Land acquisition 39

19 Land Reform 42

20 Land Revenue Administration report 47

21 Advance possession of Govt. Land 47

22 Judicial 49

23 District Rvenue Meeting 53

24 Forest Settlement 53

25 Establishment 54

26 Audit report(A/R & I/R) 67

27 Nizarat 68

28 R.T.I 70

29 Record Room 71

30 Registration 72

31 Election 74

32 Emergency 75

33 Library 78

34 Grievance Cell 78

35 District Social welfare 79

Page 3: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD

OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE

Date of inspection – 25th October 2017

INTRODUCTION:-

Nayagarh District has been bifurcation from puri District and started functioning as

a new district w.e.f 01.04.1993 vide Govt. in Revenue Deptt. Notification No-14218/R-Dt-

27.03.1993.

The geographical area of new Nayagarh district is 3890 Sq.kms with a population of

9,63,124 having 5,02,819 male and 4,60,305 female as per 2011 census. The district consist

of one Sub-Division namely Nayagarh, eight Tahasils, eight Blocks, five NAC, twelve police

stations, fifty RI Circles, 196 GPs & 1702 Revenue villages. This district having 1,36,390 S.C,

58,691 S.T & 7,68,043 others.

ACCOMMODATION

After bifurcation from puri District Vide Govt in Revenue Dept. Notification No-

14218/R.Dt-27.03.1993, the district of Nayagarh was started functioning w.e.f 01.04.1993.

The Office of the Collector, Nayagarh was functioning in the Sub-Collector building up to

04.01.2011. Now it is functioning in his own building from 05.01.2011.

Due to in-sufficient space in the existing building some offices like D.I.P.R.O, special

Land Acquisition & Excise are functioning in the rented houses.

Charge

Sri Arindam Dakua, IAS is now working as Collector & District Magistrate, Nayagarh

w.e.f. 20.05.2016 prior to him Sri Hemanta Kumar Padhi, OAS (SAG) was the Collector &

District Magistrate from 25.06.2014 to 20.05.2016.

Sri Prasanta Kumar Rath, OAS (S) is now working as ADM, Nayagarh w.e.f

07.06.2017 prior to him Sri Nrusingha Charan Swain, OAS (S) was the ADM from

09.05.2016 to 07.06.2017.

Sri Jitendra Kumar Sahu, OAS-I (SB) is working as Sub-Collector, Nayagarh w.e.f

07.06.2017.

There are nine nos of OAS & ORS officers working as officer -in-charge to look after

different sections. The details of the work distribution among the officers of the district are

indicated below:-

Sl

No.

Name of the Officer with

Designation

Date of

Joining

Work Assigned

Page 4: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Shri Sudarsan Das, OAS-I (JB) 09.05.2017 Bill, Budget & Establishment

2 Shri Nirmal Chandra Baral, OAS-I (JB) 11.03.2015 Touzi & SLR

3 Shri Kunja Bihari Badajena, ORS 08.01.2016 Gen. Misc & RTI

4

Shri Rajkishore Mahapatra, ORS 04.08.2017 Land Acquisition & Election

5 Shri Dillip Kumar Sahu, ORS 18.09.2017 Nizarat & Grievance

6 Miss Indurekha Paschimakabata, ORS 18.04.2016 Emergency, e-Governance &

Red Cross

7 Smt. Bijayita Samantasinghar, ORS 10.11.2016 Revenue, Birth & Death

Certificate

8 Miss Banani Mahapatra, ORS 10.08.2017 Audit,Judicial & Development

9 Shri Laxmidhar Sahoo, ORS 21.01.2016 Revenue Officer, Sub-

Collectors Office

TOUR

As per Book Circular 43, the Collector is required to perform 90 days tour in a year

with 45 days of night halt.

The tour performed by Collector from 01.01.2017 to 30.06.2017 is indicated below:-

Half yearly Tour No. of days spent on Tour

No. of night halt

Law & Order

01.01.17 to 30.06.17

72 0 1

STATEMENT OF TOUR DIARIES OF COLLECTOR, NAYAGARH.

Sl, No.

Month Letter No. & Date of submission of Tour Diary to RDC(CD) Cuttack

01 January-2017 55 Dated.13.02.2017 02 February-2017 Panchayat Election 03 March-2017 152 Dated.03.05.2017 04 April-2017 183 Dated.06.06.2017 05 May-2017 214 Dated.03.07.2017 06 June-2017 345 Dated.29.07.2017

The Collector should make at least four night halt in a month particularly in rural

area within the district.

The tour diary of Collector is required to be submitted to the RDC by the 10th of the

next month to which tour relates.

Page 5: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Tour Review of Sub-Collector

The tour diaries of the Sub-Collector have been reviewed by the Collector &

Communicated to RDC (CD), Cuttack as indicated below:-

Half yearly Tour No. of days spent on Tour

No. of night halt

Law & Order

01.01.17 to

30.06.17

51 03 02

STATEMENT OF TOUR DIARIES OF SUB-COLLECTOR, NAYAGARH

Sl. No.

Month Letter No. & Date of submission of Tour Diary to RDC(CD) Cuttack

01 January-2017 Lt. No- 1847/ Dated.05.06.2017 02 February-2017 Lt. No- 1847/ Dated.05.06.2017 03 March-2017 Lt. No- 1847/ Dated.05.06.2017 04 April-2017 Lt. No- 1847/ Dated.05.06.2017 05 June-2017 Lt. No- 2506/ Dated.31.07.2017

It appears that, the Sub-Collector is not making adequate no. of night halts. The Sub-

Collector should be instructed to ensure timely submission of tour diaries and ensure

disposal of pending Revenue cases during his tours.

INSPECTION

As per Govt. in Revenue Dept. Circular No-28594/Rdt-19.06.97, Govt. have fixed

periodically of inspection of offices by different rank of officers.

Sri Bikash Chandra Mohapatra, IAs., RDC(CD), Cuttack has inspected the Nayagarh,

Collectorate on 26.12.2014. The inspection note reveled vide L.No-3999/Dt-20.03.15 and

the compliance of the inspection report submitted to RDC (CD) Cuttack vide L.No-2257/Dt-

01.08.2015.

The inspection made by the Collector & A.D.M during the year 2015, 2016 &2017

are as follows:-

Inspection made by Collector

For the year 2015 Sl.

No. Name of the office Inspected Date of

Inspection Date of

release of Inspection

Note

Remarks

1 Itamati P.S 13.11.2015 27.11.2015

Page 6: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

2 Paradhipi G.P 04.08.2015 07.08.2015

3 Gania P.S 09.11.2015 24.11.2015

4 Sasan G.P 13.07.2015 16.07.2015

5 RanpurTahasil 23.07.2017 22.08.2015

6 Sarankul P.S 14.09.2015 24.09.2015

7 Certificate court of

TahasildarBhapur

13.10.2015 02.11.2015

8 Rasanga G.P 10.08.2015 26.08.2015

9 Nayagarh Tahasil 31.07.2015 29.08.2015

10 R.I office,Khandapada 20.08.2015 22.09.2015

11 Banigochha P.S 25.08.2015 03.10.2015

12 Certificate court of Tahasildar,

Odagaon

14.09.2015 26.09.2015

13 Brajarajpur G.P 28.09.2015 03.10.2015

14 R.I office Kulurukumpa 10.09.2015 09.11.2015

15 Sub-Jail,Khandapada 23.11.2015 24.11.2015

16 Nayagarh Sadar P.S 13.11.2015 26.11.2015

17 Sub-Tresury office Daspalla 14.10.2015 09.11.2015

18 I.C.D.S, Project Odagaon 14.09.2015 22.09.2015

19 Banigochha G.P 25.08.2015 26.08.2015

20 Dist. Treasury office Nayagarh 31.10.2015 09.11.2015

21 Excise office Nayagarh 30.11.2015 04.12.2015

22 Nadiali G.P 15.12.2015 31.12.2015

23 Dist. Employment Exchange,

Nayagarh

14.11.2015 04.12.2015

24 Khandapada,P.S 23.11.2015 24.11.2015

25 Godipada,G.P 15.12.2015 31.12.2015

26 Odagaon P.S 14.09.2015 05.10.2015

27 R.I office Adakata 08.12.2015 15.12.2015

28 Sub-Treasury Office, Ranpur 28.09.2015 29.09.2015

29 Badabanpur G.P 08.12.2015 18.12.2015

For the year 2016

Sl. No.

Name of the office Inspected Date of Inspection

Date of release of Inspection

Note

Remarks

1 Kujamendhi G.P 21.06.2016 21.06.2016 2 Bhapur G.P 29.06.2016 30.06.2016 3 Ikiri G.P 18.08.2016 18.08.2016 4 Khandapada Tahasil 02.12.2016 27.12.2016 5 Dist. Treasury office, Nayagarh 12.08.2016 17.08.2016

Page 7: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

6 N.A.C, office Khandapda 05.11.2016 15.11.2016 7 Sub-Jail,Daspalla 13.08.2016 22.09.2016 8 Sub-Treasury office, Daspalla 13.10.2016 13.10.2016 9 Dist. Employment

office,Nayagarh 30.11.2016 30.11.2016

10 Dist.Sub-Registrar office, Nayagarh

14.12.2016 31.12.2016

Inspection made by A.D.M

For the year 2015

Sl. No.

Name of the office Inspected Date of Inspection

Date of release of Inspection Note

Remarks

1 R.I,officeGoudaput 26.06.2015 01.07.2015 2 Kapatapalli G.P 26.06.2015 28.07.2015 3 R.I office Darpanarayanpur 30.06.2015 04.07.2015 4 Banigochha TRW School 10.07.2015 22.07.2015 5 GaniaTahasil office 15.07.2015 16.07.2015 6 Block office Odagaon 23.09.2015 15.10.2015 7 R.I office Sikharpur 23.07.2015 24.07.2015 8 Certificate court of Tahasildar,

Khandapada 29.10.2015 16.11.2015

9 Kishoreprasad G.P 14.10.2015 29.10.2015 10 BhapurTahasil 09.09.2015 15.10.2015 11 R.I office Sighapada 07.08.2015 07.09.2015 12 Sub-Jail Daspalla 11.08.2015 14.08.2015 13 Certificate court of

TahasildarDaspalla 11.08.2015 14.08.2015

14 Gourangpur G.P 16.09.2015 01.10.2015 15 Sub-Registrar office, Khandapada 03.09.2015 14.09.2015

16 Talkies, Nayagarh 07.09.2015 08.09.2015 17 Certificate court of Sub-Collector

office, Nayagarh 13.10.2015 05.11.2015

18 Kulurukumpa G.P 08.10.2015 02.11.2015 19 ICDS, Bhapur 07.10.2015 29.10.2015 20 Sub-Registrar office Nayagarh 10.09.2015 28.09.2015 21 DaspallaTahasil 30.10.2015 06.11.2015 22 Baunsiapada G.P 31.10.2015 09.12.2015 23 ICDS, Gania 17.10.2015 23.11.2015 24 Sub-Registrar office Daspalla 30.10.2015 02.11.2015 25 R.I office Jasodapur 27.11.2015 09.12.2015 26 Sub-Registrar office ,Odagaon 18.11.2015 10.12.2015 27 Ranpur Block 20.11.2015 10.12.2015 28 Bhapur Block 25.09.2015 17.10.2015 29 R.I office Dihagaon 08.10.2015 17.10.2015

Page 8: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

30 R.I office, Gania 14.10.2015 17.10.2015

For the year 2016

1 R.I. office Koska 25.05.2016 30.06.2016 2 R.I office Daspalla 29.07.2016 30.08.2016 3 RanpurTahasil office 12.08.2016 11.11.2016 4 TRW High School, Banigochha 29.07.2016 05.11.2016 5 Badapandusar G.P 09.08.2016 20.08.2016 6 Nayagarh Tahasil 10.08.2016 30.12.2016 7 R.I. office Fategarh 19.08.2016 31.12.2016 8 Sub-Registrar Office Odagaon 26.08.2016 09.09.2016 9 Sub-Registrar Office,

Khandapada 18.10.2016 05.11.2016

10 Sub-Registrar OfficeRanpur 07.12.2016 17.12.2016 11 R.I office Mahipur 20.12.2016 31.12.2016 12 ICDS, Project, Ranpur 07.12.2016 14.12.2016

For the year 2017(up to 31.08.2017)

1 R.I office Chadheyapalli 23.06.2017 23.09.2017 2 ICDS office Gania 28.06.2017 06.07.2017 3 Khandapada Tahasil 14.07.2017 20.10.2017 4 NAC office Ranpur 12.09.2017 18.10.2017 5 Sub-Jail Ranpur 12.09.2017 18.10.2017 6 Sub-Registrar office, Ranpur 12.09.2017 18.10.2017

It reveals from the inspection made by the Collector & A.D.M during the year 2015,

2016 and 2017 that, the inspection note has been released in time but the compliance has

not been made by the different offices. The collector & ADM should ensure timely

submission of compliance report.

COURT

COURT OF THE COLLECTOR & D.M

The table below indicates the institution, disposal & pending of cases for the year

2015, 2016 & 2017 (up to 31.08.2017) are as follows:-

Court of the Collector, Nayagarh (For the Year 2015, 2016 & 2017(Up to 31.08.17)

Name of the

Year

Sl.

No

Nature Of Cases

Cases pending at

the beginning of the year

Cases instituted

during the Year

Total Cases

pending for

disposal

Cases disposed of during the

Year

Balance

Page 9: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

2015

1 Lease 01 01 02 01 01

2 Encroachment --- 01 01 01 ---

3 Certificate 02 ---- 02 01 01

4 Others --- 08 08 04 04

Total 03 10 13 07 06

2016

1 Lease 01 --- 01 --- 01

2 Encroachment --- --- --- --- ---

3 Certificate 01 --- 01 --- 01

4 Others 04 24 28 07 21

Total 06 24 30 07 23

2017

1 Lease 01 --- 01 --- 01

2 Encroachment --- --- --- --- ---

3 Certificate 01 --- 01 --- 01

4 Others 21 20 41 13 28

Total 23 20 43 13 30

2. Year wise breakup of pending cases as on 31.08.17 in the Court of the Collector,

Nayagarh.

Nature of Case

2015 2016 2017 Total

Lease 01 --- --- 01

Certificate 01 --- --- 01

Misc 03 09 16 28

Total 05 09 16 30

REVIEW OF MISC. CASE NO. 05/2016

This case is instituted by virtue of the petition filed by Santosh Kumar Behera &

other inhabitants of Lembodi in connection with creation of hamlet Lembodi as a new

village being separated from main village Godiapada under Ranpur Tahasil.

The villagers have also filed W. P.(C) No. 7387/16 before the Hon’ble High Court for

the same purpose. Hon’ble High Court has passed order on dtd. 4.5.16 directing O.P. No. 4

(Collector, Nayagarh) to dispose of the representation filed by the petitioner under

annexure-5 dt. 3.6.15 within a period of six months from the date of production of a

certified copy of the order by passing a reasoned order in accordance with Law. Basing on

the order, the petitioner has filed this Misc. Case.

Page 10: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

On 8.7.16 Collector & D. M., Nayagarh has also initiated one BCP case and instructed

Tahasildar, Ranpur to expedite the matter within the time limit of six months. Two

adjournments are taken on 21.10.16 & 10.3.17 due to non receipt of report from the

Tahasildar.

On 26.9.17 the Tahasildar, Ranpur has furnished report stating that Hamlet Lembodi

deserves for declaration of a new village but due to shortage of staff & as the process

involves technicalities the matter will take some time. The Collector has not accepted the

plea taken by the Tahasildar as the matter is badly delayed due to inaction of the

Tahasildar. She is instructed to submit the proposal within 3 days.

On 3.10.17 the petitioner present and filed orders of Hon’ble High Court passed in

Contempt case No. 597/17 where in Hon’ble High Court directed Collector to comply the

order passed in W. P.(C) No.7387/16 within one month from the date of production of

certified copy.

Collector instructed the Tahasildar, Ranpur to submit the B.C.P. case on the same

day.

On 4.10.17 the original BCP case record bearing No. 1/16 is submitted by the

Tahasildar, Ranpur vide her letter No. 3255 dt. 4.10.17. order was passed to send case

record to Revenue Section for follow up action before submitting the same to Board of

Revenue, Odisha, Cuttack.

Accordingly the case was disposed of.

REVIEW OF MISC. CASE NO. 20/2017

This case is instituted on 20.07.17 after getting the orders passed by Hon’ble High

Court in W. P.(C) No. 16147/17. The Hon’ble High Court disposed of the case with a

direction to the O. P. No. (4) i.e. Collector, Nayagarh to dispose of the representation of the

petitioner within a period of 3 months from the date of production of certified copy of the

order. In the event the O. P. No. 4 comes to a conclusion that the petitioner belongs to BPL

category & is entitled to have a house under IAY. The necessary fund be sanctioned for

construction of house.

In this Misc. Case the B.D.O., Nayagarh has been noticed as O.P.

On 28.7.2017 both the parties are present, the B.D.O., Ranpur has submitted a report

vide letter No. 2460 dt. 27.7.2017. The Case was posted to 22.9.2017 for hearing.

Then on 22.9.2017 due to other engagement of the Collector, the court adjourned to

10.11.17 for hearing.

The petition filed by the petitioner before Hon’ble High Court and letter No. 2460 dt.

27.7.17 of B.D.O., Ranpur were examined. It is found that the contents of the petition has

Page 11: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

not been properly enquired into. Collector is instructed to give importance on the contents

of the petition as well as to the orders of the Hon’ble High Court. This case should be

disposed of within the time limit of 3 months as envisaged in the order of the Hon’ble High

Court.

COURT OF THE A.D.M

The table below indicated the different disposal and pending of cases for the year

2015-16,2016-17, 2017-18(Up to 31.08.2017) are as follows:-

For the year 2015-16,to 2017-18 up to 31.08.2017

Name of the year

Sl. No

Nature of cases

Cases pending as

on 01.04.2015

cases institution during the

year

Total cases pending for

disposal

cases disposed of during the year

Balance

2015-16

1 OLR Appeal 1 1 2 1 1

2 A.W. Appeal 1 1 2 1 1

3 OEA appeal 1 0 1 0 1

2016-17

1 OLR Appeal 1 5 6 4 2

2 A.W. Appeal 1 6 7 5 2

3 OPLE Revision 0 1 1 0 1

4 OEA Appeal 1 0 1 1 0

5 Bebandobasta 0 2 2 2 0

6 Under

valuation 0 1 1 1 0

7 OLR Revision 0 2 2 0 2

2017-18

1 OLR Appeal 2 0 2 1 1

2 A.W.Appeal 2 2 4 0 4

3 OPLE Revision 1 0 1 0 1

4 Bebandobasta 0 7 7 1 6

Page 12: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

5 OLR Revision 2 0 2 0 2

6 Under

Valuation 0 1 1 0 1

Total

7 10 17 2 15

CASE STUDY OF ADM COURT

B.B Appeal No. 02/2017

Perused the case record. The petitioner Sri Santosh Sahoo S/o Udayanath Sahoo of

Vill- Mahitama P.O.- Korada Dist- Nayagarh has filed appeal against the order dtd.

28.10.2002 passed by the Tahasildar, Nayagarh in Bebandabasta Case No. 1432/1999 he

has also filed a petition U/s 5 of the limitation for condonation of delay. Appeal is admitted

in view of Govt. of Odisha in Rev. & DM Deptt. Notification No. 3776 dtd. 02.02.2017

The brief history of the case is that the appellant is in possession of plot No.

367/3957 with an area of 0.16 dec. under Khata No. 673 of the village Korada under

Nuagaon Police station. He has purchased the said from one Sri Alekh Sahoo S/o- Mohana

Sahoo of village Korada vide RSD No. 950 dtd. 16.03.2005. The Tahasildar Nayagarh

without verifying properly the possession and papers had order for recording the same

along with other plots in Govt. Khata. The sub Collector, Nayagarh has also confirmed the

same and the land now stands recorded in AJA Khata of the village and the appellant

prayed for set aside the order dtd. 28.02.2002 of the Tahasildar, Nayagarh with a direction

to record the same in his favour.

The ADM, Nayagarh after perused the aforesaid order and the field enquiry

memorandum dtd. 28.10.2002 from the Tahasildar & the R.I report dtd. 24.08.1999 found

that the authorities have not conducted field enquiry properly, and also not given any

opportunity of hearing the persons in possession to keep their side. Hence violate the

principle of natural justice. The order of the lower court dtd. 28.10.2002 is not sustainable

and set aside the case.

The Tahasildar, Nuagaon (Prior to it was under Mother Tahasil, Nayagarh) directed to look into the matter afresh of enquiry reasonable opportunity to all persons in possession

and dispose the case within two months. COURT OF THE ADM, NAYAGARH

U.V REVIEWS CASE NO. 07/2013

Page 13: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

This is a remand case received from the court of the A.D.J, Nayagarh to the A.D.M,

Nayagarh with a direction to dispose of the matter with in three months from the date of

the receipt of the order giving reasonable opportunity to the appellant as the matter relates

to the year 2001.

The brief history of the case is that one, Rasmita Mishra, W/o- Radha Krishna

Bajpayee of PS/Dist- Nayagarh had purchased a piece of land measuring an area of

AC.0.14decs. Pertaining to Plot no- 515, Khata No-114 under village Nayagarh for a

consideration amount of Rs. 1, 40,000.00 vide RSD No. 966 dtd 14.02.2001. But the D.S.R,

Nayagarh estimated the market value of the plot as Rs.5,04,000.00 and demanded to

deposit the deficit stamp duty of Rs.53,508.00 and Rs.7280.00 towards registration fees

and subsequently referred the matter to the A.D.M -cum-Stamp Collector under Rule 23

of S.R 1952.

On receipt of U.V.Case record No. 217/02 the ADM-cum- Stamp Collector , Nayagarh

started suo motto U.V.Case No. 07/2003 and issued notice twice on dtd.24.04.2003 &

30.10.03 but notices returned under signed. The notice on 30.10.03 was served by affixture

On 09.01.04 the A.D.M passed order of DSR, Nayagarh directing the respondent to deposit

the deficit amount. Being aggrieved against the order of A.D.M, the respondent filed F.A.O

No. 03/70 of 2014/2004 and the A.D.J, Nayagarh in his final order/ judgment dtd.16.05.17

remanded the case the A.D.M, Nayagarh for re- enquiry & determination of market value of

the property in question, hence this case

The case has been posted to 01.11.17.

ANNUAL VERIFICATION OF TAHASIL ACCOUNTS

Sl. No.

Name of the Tahasil

Verifying officer Date of

verification

Date of release of

verification

1 Nayagarh Addl. District Magistrate,

Nayagarh 09.08.17 09.08.17

2 Ranpur Collector, Nayagarh 06.09.17 Not released

3 Nuagaon Sub-Collector, Nayagarh 26.09.17 do

4 Bhapur Addl. District Magistrate,

Nayagarh 22.09.17 do

Page 14: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

5 Daspalla Addl. District Magistrate,

Nayagarh 14.09.17 14.09.17

6 Gania Sub-Collector, Nayagarh 22.09.17 Not released

7 Odagaon Sub-Collector, Nayagarh 15.09.17 do

8 Khandapad

a Collector, Nayagarh 20.09.17 do

DEMAND, COLLECTION AND BALANCE

FOR THE YEAR 2015-16

Item Demand Collection Balance % of Collection

Arrear

Current

Total

Arrear

Current

Total

Arrear

Current

Total

Arrear

Current

Total

1 2 3 4 5 6 7 8 9 10 11 12

13

Rent 470510

193982

664492

45187

96435

141622

425323

97547

52287

0

9.60

49.71

21.31

Cess 111

4576 2391

914 350

6490 701194

1801581

250277

5

413382

590333

10037

15

62.91

75.32

71.38

N.Cess 109094

216484

325578

76474

180882

257356

32620

35602

68222

70.10

83.55

79.05

Sairat 186638

5085115

5271753

500 2824

059

282455

9

186138

2261056

24471

94

0.27

55.54

53.58

Misc. Revenue

2720975

65015562

6773653

7

214128

65015562

652296

90

2506847

0 25

06847

7.87

100.00

96.30

C.B.W.R. 200

5933 3079

263 508

5196 777193

2120874

289806

7

1228740

958389

21871

29

38.74

68.88

56.99

F.W.R. 134251

86555

220806

26083

28909

54992

108168

57646

16581

4

19.43

33.40

24.91

Total 674

1977 76068875

8281085

2

1840759

72068302

739090

61

4901218

4000573

89017

91

27.30

94.74

89.25

FOR THE YEAR 2016-17

Item Demand Collection Balance % of Collection

Page 15: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Arr

ea

r

Cu

rre

nt

To

tal

Arr

ea

r

Cu

rre

nt

To

tal

Arr

ea

r

Cu

rre

nt

To

tal

Arr

ea

r

Cu

rre

nt

To

tal

1 2 3 4 5 6 7 8 9 10

Rent 56668

6 19727

4 7639

60 599

69 172666

232635

506717

24608

531325

10.58

87.53

30.4

5

Cess 78631

2 24169

64 3203

276 510870

2040455

2551325

275442

376509

651951

64.97

84.42

79.6

5

N.Cess 75194 22057

9 2957

73 633

75 191587

254962

11819

28992

40811

84.28

86.86

86.2

0

Sairat 34201

1 71102

49 7452

260 336

28 629

1448 632

5076 308383

818801

1127184

9.83

88.48

84.8

7

Misc. Revenue

2028039

86063710

88091749

755425

8351513

7

8427056

2

1272614

2548573

3821187

37.25

97.04

95.6

6

C.B.W.R. 16501

45 30792

63 4729

408 958027

2480165

3438192

692118

599098

1291216

58.06

80.54

72.7

0

F.W.R. 84444 92891 1773

35 265

12 365

83 630

95 579

32 563

08 114240

31.40

39.38

35.5

8

Total 55328

31 99180

930 1047

13761 240

7806

9472804

1

9713584

7

3125025

4452889

7577914

43.52

95.51

92.7

6

FOR THE YEAR 2017-18 ( Up to 31.08.2017)

Item

Demand Collection Balance % of

Collection

Arr

ea

r

Cu

rre

nt

To

tal

Arr

ea

r

Cu

rre

nt

To

tal

Arr

ea

r

Cu

rre

nt

To

tal

Arr

ea

r

Cu

rre

nt

To

tal

1 2 3 4 5 6 7 8 9 10

Rent 566686

197274

763960

46384

29719

76103

520302

167555

687857

8.19

15.06

9.96

Cess 786312

2416964

3203276

248829

462905

711734

537483

1954059

2491542

31.65

19.15

22.22

N.Cess 751

94 2205

79 29577

3 218

28 4414

2 6597

0 533

66 1764

37 2298

03 29.03

20.01

22.30

Sairat 342011

7110249

7452260

0 1699

58 1699

58 342011

6940291

7282302

0.00

2.39

2.28

Misc. Revenue

2028039

86063710

88091749

167382

38358907

38526289

1860657

47704803

49565460

8.25

44.57

43.73

Page 16: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

C.B.W.R.

1650145

3079263

4729408

196779

323022

519801

1453366

2756241

4209607

11.92

10.49

10.99

F.W.R. 844

44 9289

1 17733

5 237

3 360 2733

82071

92531

174602

2.81

0.39

1.54

Total 553

2831 99180930

104713761

683575

39389013

40072588

4849256

59791917

64641173

12.35

39.71

38.27

Position of Revenue receipt against Target

year Unit Target Fixed (In lakhs) Achievemen

t % of Collection

2015-16

Land Revenue 1471.31 709.56 48.23

Water Rate 66.00 29.53 44.74

2016-17

Land Revenue 1873.33 936.35 49.98

Water Rate 66.00 35.01 53.05

2017-18

Land Revenue 2400.00 395.50 16.48

Water Rate 60.00 5.23 8.72

It reveals that arrear revenue collection against demand is only 27.30% and current

revenue collection is 94.74 % during the year 2015-16. Similarly, during the year 2016-17,

the arrear revenue collection is 43.52% and the current revenue collection is 95.51 %.

During the year 2017-18 (up to 31.08.2017), the arrear revenue collection against demand

is only 12.35% and current revenue collection is 39.71%. Though, the collection position in

respect of current revenue during the last two years is good but the collection position in

respect of arrear revenue during last two years is not satisfactory. Similarly, during present

financial year up to 3108.17, the arrear revenue collection is only 12.35 % which is not at

all desirable. The above position reveals that, the field functionaries are not being bothered

towards collection of arrear revenue on rent, sairat, Misc. revenue & F.W.R. and also on

Page 17: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

collection of current revenue towards sairat & F.W.R. during the year 2017-18 (up to

31.08.17).

The Collector should gear up the field functionaries meticulously for

enhancement of collection of Govt. revenue especially on collection of arrear revenue.

LEASE

The position of lease for the year 2015-16,2016-17 & 2017-18 (up to 31.08.2017) is

given below:-

For the year 2015-16

Sl. No.

Name of the Tahasil

Pending as on 1.4.15

Instituted during the year

Total cases for disposal

No. of cases disposed of during the year

Balance

Agri.

H.S. Agr

i. H.S.

Agri.

H.S. Agr

i. H.S.

Agri.

H.S.

1 2 3 4 5 6 7 8 9 10 11 12

1 Nayagarh 99 91 0 13

9 99 230 47 120 52 110

2 Ranpur 11 189 0 30 11 219 0 60 11 159

3 Daspalla 0 64 0 0 0 64 0 0 0 64

4 Khandapar

a 30 23 0 46 30 69 0 18 30 51

5 Nuagaon 12 8 0 6 12 14 0 12 12 2

6 Odagaon 0 2 0 30 0 32 0 32 0 0

7 Bhapur 5 17 0 44 5 61 0 0 5 61

8 Gania 0 88 0 0 0 88 0 88 0 0

Total:- 157 482 0 29

5 157 777 47 330 110 447

For the year 2016-17

Sl. No.

Name of the Tahasil

Pending as on 1.4.15

Instituted during the

year

Total cases for disposal

No. of cases disposed of during the

year

Balance

Agr

i.

H.S

.

Agr

i.

H.S

.

Agr

i.

H.S

.

Agr

i.

H.S

.

Agr

i.

H.S

.

1 2 3 4 5 6 7 8 9 10 11 12

Page 18: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Nayagarh 52 110 0 33 52 143 52 119 0 24

2 Ranpur 11 159 0 4 11 163 6 142 5 21

3 Daspalla 0 64 0 34 0 98 0 0 0 98

4 Khandapara 30 51 0 3 30 54 0 18 30 36

5 Nuagaon 12 2 0 120 12 122 0 27 12 95

6 Odagaon 0 0 0 76 0 76 0 18 0 58

7 Bhapur 5 61 0 3 5 64 5 3 0 61

8 Gania 0 0 0 26 0 26 0 5 0 21

Total:- 110

447 0 299 110 746 63 332 47 414

For the year 2017-18 (up to 31.08.2017)

Sl. No.

Name of the Tahasil

Pending as on 1.4.15

Instituted during the

year

Total cases for disposal

No. of cases disposed of during the

year

Balance

Agri.

H.S. Agri.

H.S.

Agri.

H.S. Agri

. H.S.

Agri.

H.S.

1 2 3 4 5 6 7 8 9 10 11 12

1 Nayagarh 0 24 0 2 0 26 0 14 0 12

2 Ranpur 5 21 0 5 5 26 0 0 5 26

3 Daspalla 0 98 0 0 0 98 0 22 0 76

4 Khandapara 30 36 0 2 30 38 0 5 30 33

5 Nuagaon 12 95 0 43 12 138 4 0 8 138

6 Odagaon 0 58 0 22 0 80 0 0 0 80 7 Bhapur 0 61 0 4 0 65 0 28 0 37

8 Gania 0 21 0 43 0 64 0 13 0 51

Total:- 47 414 0

121

47 535 4 82 43 453

The Collector should instruct to the concerned Tahasildar for early disposal pending

lease cases.

SAIRAT The position of Sairat sources of Nayagarh district during the year 2015-16, 2016-

17 & 2017-18 (up to 31.08.2017) are indicated below:-

FOR THE YEAR 2015-16

Sl.No

Name ot Tahasil

Total no. of Sairat Sources in the Tahasil

Balance for settlement

No of sources detected during the

Total for Settlement

No of sources settled during the year

Balance for settlement

Remark

Page 19: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

year

1 2 3 4 5 6 7 8 9

1 Nayagarh 739 45 0 45 0 45

2 Odagaon 761 63 1 64 28 36

3 Nuagaon 475 32 0 32 0 32

4 Khandapada 1392 48 0 48 6 42

5 Bhapur 32 24 3 27 0 27

6 Daspalla 451 13 1 14 1 13

7 Gania 7 7 0 7 5 2

8 Ranpur 506 104 0 104 3 101

Total:- 4363 336 5 341 43 298

FOR THE YEAR 2016-17

Sl.No

Name ot Tahasil

Total no. of Sairat Sources in the Tahasil

Balance for settlement

No of sources detected during the year

Total for Settlement

No of sources settled during the year

Balance for settlement

Remark

1 2 3 4 5 6 7 8 9

1 Nayagarh 739 32 0 32 11 21

2 Odagaon 762 56 0 56 7 49

3 Nuagaon 475 30 1 31 4 27

4 Khandapada 1392 45 0 45 11 34 5 Bhapur 32 24 5 29 7 22 6 Daspalla 451 13 1 14 7 7 7 Gania 7 7 0 7 7 0 8 Ranpur 506 104 0 104 12 92

Total:- 4364 311 7 318 66 252

FOR THE YEAR 2017-18 (UP TO 31.8.17)

Sl. No

Name of Tahasil

Total no. of Sairat Sources

in the Tahasil

Balance for

settlement

No of sources detecte

d during

the year

Total for

Settlement

No of sources settled during

the year

Balance for

settlement

Remark

1 2 3 4 5 6 7 8 9

Page 20: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Nayagarh 739 29 0 29 10 19

2 Odagaon 762 46 0 46 6 40

3 Nuagaon 475 11 1 12 4 8

4 Khandapad

a 1392 45 0 45 7 38

5 Bhapur 32 24 5 29 7 22

6 Daspalla 452 8 0 8 7 1

7 Gania 7 7 0 7 7 0 8 Ranpur 506 104 0 104 12 92

Total:- 4365 274 6 280 60 220

It is reveals that during the year 2015-16, out of 341 Sairat Sources, 43 sources have

been settled and 298 sources could not be settled in different Tahasils. Similarly during the

year 2016-17, out of 318 sources only 66 sources have been settled and 252 sources could

not be settled in different Tahasils. During the year 2017-18 (up to 31.08.2017) out of 280

sources, only 60 sources have been settled and 220 sources could not be settled. The field

officers are finally responsible for loss of Govt. revenue on the ground of non-settlement of

sources. This should be ensured by the Collector.

However the field functionaries should be instructed to be more vigilant for timely

settlement of the Sairat sources. In case of non-settlement of sairat sources for the reason

of negligence and ill motive of field functionaries, responsible as well as suitable action

should be taken and the supervising officers like Collector and Sub-Collector should be

more vigilant and undertake periodically check of sairat registers of Tahasil level in case of

non-settlement of sairat sources in time to mobilize for collection of Govt. revenue.

MUTATION AND CORRECTION OF ROR

The position of institution, disposal and pending of Mutation cases of Nayagarh

District for the year 2015-16, 2016-17, and 2017-18 (up to 31.08.2017) are given below:-

For the year 2015-16

Sl. No

Name of Tahasil

No of cases

pending at the

beginnin

No of cases

instituted during the year

Total cases

for disposa

l

No of cases

disposed of

during

Balance cases

for disposa

l

Percentage of

disposal

Page 21: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

g of the year

the year

1 2 3 4 5 6 7 8

1 Nayagarh 593 5517 6110 5405 705 88.46

2 Odagaon 739 4621 5360 3952 1408 73.73

3 Nuagaon 209 2081 2290 1990 300 86.90

4 Khandapara 374 1880 2254 1901 353 84.34

5 Bhapur 134 1477 1611 1243 368 77.16

6 Daspalla 149 1794 1943 1843 100 94.85

7 Gania 20 483 503 433 70 86.08

8 Ranpur 342 2692 3034 2834 200 93.41

Total 2560 20545 23105 19601 3504 84.83

For the year 2016-17

Sl. No

Name of Tahasil

No of cases pending at

the beginning of the year

No of cases

instituted during the

year

Total cases

for disposal

No of cases

disposed of during the year

Balance cases

for disposal

Percentage of

disposal

1 2 3 4 5 6 7 8

1 Nayagarh 705 5101 5806 5062 744 87.19

2 Odagaon 1408 5232 6640 5016 1624 75.54

3 Nuagaon 300 2000 2300 1879 421 81.70

4 Khandapara 353 1696 2049 1433 616 69.94

5 Bhapur 368 1729 2097 1722 375 82.12

6 Daspalla 100 1195 1295 1109 186 85.64

7 Gania 70 465 535 527 8 98.50

8 Ranpur 200 2784 2984 2837 147 95.07

Total

3504 20202 2370

6 19585 4121 82.62

For the year 2017-18(till end of 31.08.2017)

Sl. No

Name of Tahasil

No of cases pending at

the beginning of

the year

No of cases

instituted during the

year

Total cases

for disposal

No of cases

disposed of

during the year

Balance cases

for disposal

Percentage of

disposal

1 2 3 4 5 6 7 8

Page 22: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Nayagarh 744 3775 4519 3896 623 86.21

2 Odagaon 1624 3159 4783 3771 1012 78.84

3 Nuagaon 421 1303 1724 989 735 57.37

4 Khandapara 616 1351 1967 1120 847 56.94

5 Bhapur 375 1032 1407 1231 176 87.49

6 Daspalla 186 651 837 521 316 62.25

7 Gania 8 354 362 283 79 78.18

8 Ranpur 147 1662 1809 1245 564 68.82

Total 4121 13287 1740

8 13056 4352 75.00

The Collector should impress upon the Tahasildar to dispose of the pending

mutation cases at an early date.

CORRECTION OF ROR The position of correction of ROR during the year 2015-16, 2016-17 & 2017-18 (up

to 31.08.2017) are given below:-

For the year 2015-16

Sl. No

Name of Tahasil

No of cases pending for

correction at the beginning

of the year

No of cases received

during the year

Total cases for

correction

No. of ROR corrected during the

year

Balance cases

pending for

correction

1 2 3 4 5 6 7

1 Nayagarh 651 5813 6464 5371 1093

2 Odagaon 271 3752 4023 3637 386

3 Nuagaon 499 1629 2128 1405 723

4 Khandapara 326 1696 2022 1371 651

5 Bhapur 434 1023 1457 1122 335

6 Daspalla 486 1627 2113 1612 501

7 Gania 65 388 453 384 69

8 Ranpur 371 1835 2206 2109 97

Total:- 3103 17763 20866 17011 3855

For the year 2016-17

Sl.No Name of Tahasil

No of cases pending for

correction at the

beginning of the year

No of cases

received during

the year

Total cases for

correction

No. of ROR

corrected during

the year

Balance cases pending for correction

1 2 3 4 5 6 7

Page 23: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Nayagarh 1093 3938 5031 4952 79

2 Odagaon 386 5575 5961 5574 387

3 Nuagaon 723 1814 2537 2368 169

4 Khandapara 651 1401 2052 1703 349

5 Bhapur 335 1169 1504 854 650

6 Daspalla 501 1291 1792 1211 581

7 Gania 69 501 570 528 42

8 Ranpur 97 2326 2423 2059 364

Total:- 3855 18015 21870 19249 2621

For the year 2017-18(till end of 31.08.2017)

Sl.No

Name of Tahasil

No of cases pending for

correction at the beginning of the

year

No of cases received

during the year

Total cases for

correction

No. of ROR corrected during the

year

Balance cases

pending for

correction

1 2 3 4 5 6 7

1 Nayagarh 79 2796 2875 2770 105

2 Odagaon 387 2420 2807 2121 686

3 Nuagaon 169 1138 1307 1141 166

4 Khandapar

a 349 912 1261 1042 219

5 Bhapur 650 1279 1929 1134 795

6 Daspalla 581 652 1233 661 572

7 Gania 42 307 349 289 60

8 Ranpur 364 1018 1382 1164 218

Total:- 2621 10522 13143 10322 2821

It is seen from the above statement that, during the year 2015-16, 17763 cases were

instituted making a total of 20866 cases for correction of R.O.R and 17011 numbers of

cases were corrected leaving a balance of 3855 cases for correction of R.O.R.

Similarly during the year 2016-17, 18015 cases were instituted making a total

21870 cases for correction of R.O.R and 19249 numbers of cases were corrected leaving a

balance of 2621 cases for correction of R.O.R.

During the year 2017-18 (up to 31.08.2017), 10522 number of cases were received

for correction of R.O.R out of total 13143 cases, 10322 cases of R.O.R were corrected

leaving a balance of 2821 cases for correction.

Page 24: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

The Tahasildar should be instituted to dispose of the pending cases early for

correction of R.O.R. The Collector may during his normal tour to Tahasil/R.I offices verify

some cases to ascertain the actual position of correction of R.O.R and correction in the

corresponding map.

IRRIGATION

Irrigation project for the year 2015-16, 2016-17 & 2017-18 (Up to 31.08.2017) of

the district are as given below.

IRRIGATION PROJECT FOR THE YEAR 2015-16, 2016-17 & 2017-18 (UP TO 31.08.2017)

Name of

Tahasil

Source of Irrigation

Area Certified by

the Engineering

Deptt

Preliminary

Assessment 201

prepared in Form

'M'

Notice

issued in

Form 'N'

Area finally assessed in form

'O'

Balance area un-assessed

Re

ma

rks

Area to be assessed

Area dropped due

to unfit

Total

1 2 3 4 5 6 7 8 9 10

Nayagarh

Medium & M.I.P.

11975.9 11975.9 1197

5.9 6986.

58 0.00

4989.32

4989.32

Odagaon

Medium & M.I.P.

16914.31 16914.3

1 16914.31

14674.92

0.00 2239.

39 2239.39

Nuagaon

Medium & M.I.P.

1068.3 1068.3 1068.

3 968.3 0.00

100.00

100.00

Ranapur

M.I.P. 5556.21 5556.21 5556.

21 4434.

85 0.00

1121.36

1121.36

Daspalla

Medium & M.I.P.

13110.02 13110.0

2 13110.02

10289.18

0.00 2820.

84 2820.84

Gania Medium

& M.I.P. 0 0 0 0 0.00 0.00 0.00

Khandapada

M.I.P. 5563.83 5563.83 5563.

83 5563.

83 0.00 0.00 0.00

Bhapur

M.I.P. 1088.12 1088.12 1088.

12 1088.

12 0.00 0.00 0.00

Total 55276.69 55276.6

9 55276.69

44005.78

0.00 11270.91

11270.9

1

It appears that, out of AC 55,276.69 of area certified by Engineering Deptt.

AC.44,005.78 of land has been assessed to water rate leaving a balance of AC 11,270.91 of

land which are yet to be assessed.

ALIENATION OF GOVT, LAND

Quarterly Progress Report on disposal of alienation cases of Nayagarh District for the quarter ending 30.6.17

Page 25: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Sl. No.

Name of the Tahasil

No. of Cases pending at the

beginning of the quarter

No. of cases instituted during the

quarter

Total cases pending for

disposal

No. of cases disposed of during the

quarter

Balance cases

pending for disposal R

em

ark

s

1 2 3 4 5 6 7 8

1 Odagaon 10 18 28 1 27

2 Ranpur 72 5 77 1 76

3 Daspalla 10 6 16 0 16

4 Nayagarh 9 3 12 0 12

5 Khandapada 21 0 21 0 21

6 Bhapur 2 0 2 0 2

7 Nuagaon 26 0 26 0 26

8 Gania 8 0 8 0 8

Total:- 158 32 190 2 188

Alienation of Govt. Land

Sl. No.

Name of the Tahasil

No. of cases pending for disposal

1 2 3

1 Odagaon 27

2 Ranpur 76

3 Daspalla 16 4 Nayagarh 12

5 Khandapada 21 6 Bhapur 2

7 Nuagaon 26

8 Gani 8

Total:- 188

Out of 188 numbers of alienation cases, only 2 cases has been disposed of and all

cases are pending at Tahasil level.

CERTIFICATE CASE

The disposal of Certificate cases by the Certificate officer of the Nayagarh District

during the year 2015-16,2016-17 & 2017-18 (up to 31.08.2017) are indicated below:-

For the year 2015-16

Page 26: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Sl.

No.

Name of the Officer

No. of cases pending as on

01.4.15

No. of cases instituted during the

year

Total for disposal

No. of cases disposed of during the

year

Balance for disposal

No. Amount No

. Amou

nt N

o. Amount

No.

Amount

No.

Amount

1 2 3 4 5 6 7 8 9 10 11 12

1 Collector & Certificate Officer

1 461990

0.00 0 0 1

4619900.00

0 0 1 461990

0.00

2

Sub-Collector -Cum- Certificate Officer

1 149950

0.00 0 0 1

1499500.00

0 0 1 149950

0.00

3

Sri Laxmidhar Sahoo, ORS, Asst Collector-cum-Certificate Officer, Nayagarh

1032

24994015.62

37 9783

24

106

9

25972339.62

119

1335626

950

24636713.62

4

Srikanta Parija,ORS, Asst. Collector-cum-Certificate Officer, Nayagarh.

505 738973

.02 25

294604

530

1033577.02

5 2159.3

2 52

5 103141

7.70

5

Miss. Gayatri Devi, OAS, Addl. Sub-Collector-cum- Certificate Officer, Nayagarh.

622 184574

37.47 0 0

622

18457437.47

11

461681.55

611

17995755.92

6

G.M., D.I.C.-Cum-Certificate Officer

158 165204

91.68 3

874847

161

17395338.68

1 10987

9.3 16

0 172854

59.38

7 Tahasildar, Nayagarh

8 34909.

40 25

5 8276

3.6 2

63 117673

.00 2

42 87763.

2 21

29909.80

8 Tahasildar, Odagaon

2 3771.0

0 0 0 2

3771.00

2 3771 0 0.00

9 Tahasildar, Nuagaon

19 20870.

65 98

19262.3

117

40132.95

89

18615.95

28 21517.

00

10

Tahasildar, Khandapara

41 255827

.59 98

87473.15

139

343300.74

113

91074.35

26 252226

.39

Page 27: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

11

Tahasildar, Bhapur

8 13864.

65 14

2 1369

4.4 1

50 27559.

05 1

31 10577.

85 19

16981.20

12

Tahasildar, Daspalla

136 240770

.95 41

53710.75

177

294481.70

129

67728.39

48 226753

.31

13

Tahasildar, Gania

2 1665.5

5 0 0 2

1665.55

0 0 2 1665.5

5

14

Tahasildar, Ranpur

62 216483

.50 15

9 461837.8

221

678321.30

108

61341.65

113

616979.65

Total:- 25

97 67618

481.08 8

58 2866

517

345

5

70484998.08

950

2250218.56

2505

68234779.52

For the year 2016-17

Sl. No.

Name of the Officer

No. of cases pending as on 1.4.16

No. of cases instituted during the year

Total for disposal

No. of cases disposed of during the year

Balance for disposal

No. Amoun

t No.

Amount

No.

Amount

No Amou

nt No

Amount

1 2 3 4 5 6 7 8 9 10 11 12

1 Collector &

Certificate Officer

1 4619

900.00 0 0 1

4619900.00

0 0 1 4619900.00

2

Sub-Collector -Cum- Certificate Officer

1 1499

500.00 1

1830120

2 3329

620.00 0 0 2

3329620.00

3

Sri Laxmidhar Sahoo, ORS, Asst Collector-cum-Certificate Officer, Nayagarh

950

24636713.6

2 13

203273

963

24839986.6

2

124

1346293

839

23493693.62

4

Smt. Bijayita Samantasinghar, ORS, Asst. Collector-cum-Certificate Officer, Nayagarh.

525

1031417.70

21 79420.28

546

1110837.98

525

1031417.7

21 79420

.28

Page 28: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

5

Miss. Indurekha Paschimakabat, ORS Asst. Collector-cum- Certificate Officer, Nayagarh.

611

17995755.9

2 0 0

611

17995755.9

2 0 0

611

17995755.92

6

Sri Aswin Kumar Nayak, ORS, Asst. Collector-Cum-Certificate Officer, Nayagarh

0 0.00 21 2107

48 21

210748.00

0 0 21 21074

8.00

7

G.M., D.I.C.-Cum-Certificate Officer

160

17285459.3

8 0 0

160

17285459.3

8 0 0

160

17285459.38

8 Tahasildar,

Nayagarh 21

29909.80

89 2434

4.4

110

54254.20

84

27706.95

26 26547

.25

9 Tahasildar,

Odagaon 0 0.00 33

16224.4

33

16224.40

14

12006.7

19 4217.

70 10

Tahasildar, Nuagaon

28 21517.00

40 4792.

6 68

26309.60

57

13225.4

11 13084

.20

11

Tahasildar, Khandapara

26 252226.39

68 20842.45

94

273068.84

76

39431.1

18 23363

7.74

12

Tahasildar, Bhapur

19 16981.20

52 7346.

6 71

24327.80

62

9430.2

9 14897

.60

13

Tahasildar, Daspalla

48 226753.31

119

78057.1

167

304810.41

104

303710.65

63 1099.

76

14

Tahasildar, Gania

2 1665.

55 0 0 2

1665.55

0 0 2 1665.

55

15

Tahasildar, Ranpur

113

616979.65

36 4566.

8

149

621546.45

49

87052.5

100

534493.95

Total:- 2505

68234779.

52

493

2479735.6

3

2998

70714515.

15

109

5

2870274.

2

190

3

67844240.

95

Page 29: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

For the year 2017-18 (Up to 31.08.2017)

Sl. No.

Name of the Officer

No. of cases pending as on 1.4.17

No. of cases

instituted during

the year

Total for disposal

No. of cases

disposed of during the year

Balance for disposal

No.

Amount

No.

Amount

No.

Amount

No.

Amount

No.

Amount

1 2 3 4 5 6 7 8 9 10 1

1 12

1 Collector &

Certificate Officer 1

4619900.0

0 0 0 1

4619900.0

0 0 0 1

4619900.0

0

2 Sub-Collector -

Cum- Certificate Officer

2 3329620.0

0 0 0 2

3329620.0

0 0 0 2

3329620.0

0

3

Sri Laxmidhar Sahoo, ORS, Asst Collector-cum-Certificate Officer, Nayagarh

839

23493693.

62

20

376056

859

23869749.

62

64

1041970.0

6

795

22827779.

56

4

Smt. Bijayita Samantasinghar, ORS, Asst. Collector-cum-Certificate Officer, Nayagarh.

442

16703883.

32 0 0

442

16703883.

32 0 0

442

16703883.

32

5

Miss. Indurekha Paschimakabat, ORS Asst. Collector-cum- Certificate Officer, Nayagarh.

525

1031417.7

0 0 0

525

1031417.7

0 3

47159

522

984258.70

6

Sri Aswin Kumar Nayak, ORS, Asst. Collector-Cum-Certificate Officer, Nayagarh

40

286153.88

0 0 4

0 286153.88

0 0 40

286153.88

7

Kunja Bihari Badajena, ORS, Asst. Collector-Cum-Certificate Officer, Nayagarh

130

10645485.

47 0 0

130

10645485.

47 0 0

130

10645485.

47

8 G.M., D.I.C.-Cum-

Certificate Officer 1

60

17285459.

38 0 0

160

17285459.

38 4

505328.1

156

16780131.

28

9 Tahasildar,

Nayagarh 26

26547.25

55

15748.0

81

42295.31

49

19172.36

32

23122.95

Page 30: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

6

10

Tahasildar, Odagaon

19

4217.70

7 6003.35

26

10221.05

0 0 26

10221.05

11

Tahasildar, Nuagaon

11

13084.20

1 113

.2 1

2 13197.40

3 341.

95 9

12855.45

12

Tahasildar, Khandapara

18

233637.74

12

2216.3

30

235854.04

12

2216.3

18

233637.74

13

Tahasildar, Bhapur

9 14897.60

0 0 9 14897.60

0 0 9 14897.60

14

Tahasildar, Daspalla

63

210099.76

5 3664.2

68

213763.96

20

11735.65

48

202028.31

15

Tahasildar, Gania 2 1665.

55 0 0 2

1665.55

0 0 2 1665.

55

16

Tahasildar, Ranpur

100

534493.95

15

1475.75

115

535969.70

16

1610.55

99

534359.15

Total:-

2387

78434257.

12

115

405276.

86

2502

78839533.

98

171

1629533.

97

2331

77210000.

01

During the year 2015-16, 3455 cases involving am amounting to Rs.7,04,84,998.08

were pending for disposal in different courts leaving a balance of 2505 cases covering Rs

6,82,34,779.52. It appears that the cases with heavy amount are pending in the court of

Asst. Collector, Addl. Sub-Collector & G.M, D.I.C-cum-Certificate officer.

Similarly during the year 2016-17, 2998 cases involving an amounting to Rs 7, 07,

14,515.15 were pending for disposal in different courts leaving balance of 1903 cases

covering Rs 6, 78, 44,240.95. It appears that the cases with heavy amount are pending in

the court of Asst. Collectors & G.M, D.I.C-cum-Certificate Officer.

During the year 2017-18, (up to 31.08.2017) 2502 cases are involving an amounting

to Rs 7, 88, 39,533.95 were pending for disposal in different courts leaving balance of 2331

cases covering Rs 7, 72, 10,000.1. It appears that the cases with heavy amount are pending

in the court of Asst. Collectors & G.M, D.I.C-cum-Certificate Officer.

The Certificate officer should take adequate steps for disposal of pending certificate

cases covering heavy amounts. The Collector is directed to impress upon the certificate

courts to dispose of certificate cases in priority basis.

ENCROACHMENT

The position of the encroachment cases of the district in rural & urban relating to

the year 2015-16, 2016-17 & 2017-18 (up to 31.08.2017) are given below:-

For the year 2015-16(Rural)

Page 31: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Sl No.

Name of the Tahasil

Pendency as on

01.04.2015

cases instituted during the year

Total

No. of cases disposed of during the year Balan

ce for disposal

% of disposal

Settled Evicted

Rejected/ Dropped

Total

No. Area No. Area No. Are

a N

o. Ar

ea No.

Area

No.

Area

No.

Area

No.

Area

1 2 3 4 5 6 7 8 9 1

0 11

12

13

14

15

16

17

18

19

1Nayag

arh 373 16.89

423

20.96

796

37.85

45

1.59

653

29.

56 0

0.00

698

31.1

5 98

6.70

87.6

9

2Odaga

on 8 0.8

7 4

56 23

7.21 4

64

238.0

8 0 0.

00 4

55

237.06 0

0.00

455

237.06 9

1.02

98.0

6

3Nuaga

on 54 96.42

659

518.62

713

615.0

4 0 0.

00 4

48

412.76 0

0.00

448

412.76

265

202.28

62.8

3

4Khand

apada 699 24

7.48 4

92 61.24

119

1

308.7

2 0 0.

00 0

0.00

736

32.

39

736

32.3

9

455

276.33

61.8

0

5Bhapu

r 392 27.91

667

88.41

105

9

116.3

2 27

1.18

222

32.

08

291

25.

93

540

59.1

9

519

57.1

3

50.9

9

6Daspa

lla 557 46

5.08 7

03 36

1.85

126

0

826.9

3 0 0.

00 1

70

21.

94

650

246.11

820

268.05

440

558.88

65.0

8

7 Gania 224 30.04

280

68.76

504

98.8 0

0.00

251

64.

24 0

0.00

251

64.2

4

253

34.5

6

49.8

0

8Ranpu

r 354 318.7

698

204.01

105

2

522.7

1 0 0.

00 1

66

107.71

294

58.

51

460

166.22

592

356.49

43.7

3

Total 2661

1203.39

437

8

1561.06

703

9

2764.

5 72

2.77

236

5

90

5.35

1971

36

2.94

4408

1271.

06

2631

1493.

39

62.

62

For the year 2015-16(Urban)

Sl No.

Name of the

Pendency as

cases institute

Total No. of cases disposed of during

the year Balan

ce for %

of

Page 32: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Tahasil

on 01.04.2015

d during the year Settle

d Evicte

d

Rejected/ Dropped

Total

disposal

disposal

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

1 2 3 4 5 6 7 8 9 10

11

12

13

14

15

16

17

18

19

1 Nayag

arh

332

20.18

134

4.48

466

24.66 0

0.00

342

17.77 0 0

342

17.

77

124

6.89

73.

39

2 Odaga

on 0 0 0 0 0 0 0 0.

00 0 0 0 0 0 0.

00 0 0 0.

00

3 Nuaga

on 0 0 0 0 0 0 0 0.

00 0 0 0 0 0 0.

00 0 0 0.

00

4

Khandapada

197

15.81

159

12.3

356

28.11 0

0.00 0 0 6 1 6

1.00

350

27.

11 1.

69

5 Bhap

ur 0 0 0 0 0 0 0 0.

00 0 0 0 0 0 0.

00 0 0 0.

00

6 Daspa

lla 0 0 82

6.15

82

6.15 0

0.00

54

1.06 4

0.07

58

1.13

24

5.02

70.

73

7 Gania 0 0 0 0 0 0 0 0.

00 0 0 0 0 0 0.

00 0 0 0.

00

8 Ranp

ur 0 0 0 0 0 0 0 0.

00 0 0 0 0 0 0.

00 0 0 0.

00

Total

529

35.99

375

22.93

904

58.92 0 0

396

18.83

10

1.07

406

19.9

498

39.

02

44.

91

For the year 2016-17 (Rural)

Sl No.

Name of the Tahasil

Pendency as on 01.04.2016

cases instituted during the year

Total

No. of cases disposed of during the year

Balance for

disposal % of

disposal

Settled

Evicted

Rejected/

Dropped

Total

No.

Area No.

Area

No.

Area

No.

Are

a

No.

Area

No.

Area

No.

Area

No.

Area

1 2 3 4 5 6 7 8 9 1

0 1

1 12

13

14

15

16 1

7 18 19

1 Nayagar

h

98

6.7

41

4

16

.38

51

2

23

.08

25

0.7

5

41

0

18

.36

0

0.0

0

43

5

19

.11

77

3.9

7

84

.96

Page 33: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

2 Odagaon 9

1.0

2

10

68

41

5.6

4

10

77

41

6.6

6

4

0.1

6

93

3

41

5.1

0

0.0

0

93

7

41

5.2

6

14

0

1.4

87

.00

3 Nuagaon

26

5

20

2.2

8

57

9

44

3.4

3

84

4

64

5.7

1

0

0.0

0

60

6

60

1.4

4

0

0.0

0

60

6

60

1.4

4

23

8

44

.27

71

.80

4 Khandap

ada

45

5

27

6.3

3

50

6

12

1.2

3

96

1

39

7.5

6

0

0.0

0

0

0

66

1

63

.41

66

1

63

.41

30

0

33

4.1

5

68

.78

5 Bhapur

51

9

57

.13

55

1

40

.26

10

70

97

.39

0

0.0

0

66

0

61

.11

0

0.0

0

66

0

61

.11

41

0

36

.28

61

.68

6 Daspalla

44

0

55

8.8

8

54

8

22

5.9

8

98

8

78

4.8

6

22

0.8

9

59

7

99

.79

12

1

25

.81

74

0

12

6.4

9

24

8

65

8.3

7

74

.90

7 Gania

25

3

34

.56

27

5

23

.86

52

8

58

.42

0

0.0

0

38

1

54

.09

0

0.0

0

38

1

54

.09

14

7

4.33

72.16

8 Ranpur

59

2

35

6.4

9

38

0

75

.61

97

2

43

2.1

0

0.0

0

65

4

11

6.8

7

82

19

.46

73

6

13

6.3

3

23

6

29

5.7

7

75

.72

Total

26

31

14

93

.39

43

21

13

62

.39

69

52

28

55

.8

51

1.8

0

42

41

13

66

.76

86

4

10

8.6

8

51

56

14

77

.24

17

96

13

78

.54

74

.17

For the year 2016-17 (Urban)

Sl No

Name of the Tahasil

Pendency as on 01.04.2016

cases instituted during the year

Total

No. of cases disposed of during the year

Balance for disposal

% of disposal

Settled

Evicted

Rejected/ Dropped

Total

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

1 2 3 4 5 6 7 8 9 10

11

12

13

14

15

16

17

18

19

1 Naya

garh

12

4

6.8

9

10

3

4.1

1

22

7

11

0

0.0

0

22

7

11

.00

0

0.0

0

22

7

11

0

0

10

0.0

0

Page 34: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

2 Odag

aon 0

0

0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0

0

0

0.0

0

3 Nu

agao

n

0

0

0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0

0

0

0.0

0

4 Kh

and

apad

a

35

0

27

.11

95

13

.51

44

5

40

.62

0

0.0

0

0

0.0

0

12

6

8.7

0

12

6

8.7

31

9

31

.92

28

.31

5 Bh

apu

r 0

0

0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0

0

0

0.0

0

6 Das

pal

la

24

5.0

2

17

2.4

41

7.4

2

0

0.0

0

8

0.2

8

0

0.0

0

8

0.2

8

33

7.1

4

19

.51

7 Gan

ia

0

0

0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0

0

0

0.0

0

8 Ranp

ur

0

0

0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0

0

0

0.0

0

Total

49

8

39

.02

21

5

20

.02

71

3

59

.04

0

0

23

5

11

.28

12

6

8.7

36

1

19

.98

35

2

39

.06

50

.63

For the year 2017-18 (till 31.08.2017) (Rural)

Sl No

Name of the Tahasil

Pendency as on 01.04.2017

cases instituted during the year

Total

No. of cases disposed of during the year Balanc

e for disposal

% of dispo

sal Settled

Evicted

Rejected/ Dropped

Total

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

1 2 3 4 5 6 7 8 9 10 11

12 13

14 15

16 17

18 19

Page 35: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Nay

agar

h 77

3.9

7

17

4

5.2

1

25

1

9.1

8

0

0.0

0

67

2.2

8

0

0.0

0

67

2.2

8

18

4

6.9

0

26

.69

2 Od

agao

n

14

0

1.4

16

0.2

4

15

6

1.6

4

0

0.0

0

15

6

1.6

4

0

0.0

0

15

6

1.6

4

0

0.0

0

10

0.0

0

3 Nu

agao

n

23

8

44

.27

58

46

.3

29

6

90

.57

0

0.0

0

34

28

.41

0

0.0

0

34

28

.41

26

2

62

.16

11

.49

4 Kh

and

apad

a 30

0

33

4.1

5

17

8

16

.75

47

8

35

0.9

1

0.0

4

45

14

.02

15

0

12

.69

19

6

26

.75

28

2

32

4.1

5

41

.00

5 Bh

ap

ur

41

0

36

.28

95

6.6

3

50

5

42

.91

0

0.0

0

59

5.2

5

0

0.0

0

59

5.2

5

44

6

37

.66

11

.68

6 Das

pal

la

24

8

65

8.3

7

44

11

.6

29

2

66

9.9

7

0

0.0

0

51

11

.98

56

14

.36

10

7

26

.34

18

5

64

3.6

3

36

.64

7 G

ania

14

7

4.3

3

39

5

18

6

9.3

3

0

0.0

0

13

4

4.6

4

0

0.0

0

13

4

4.6

4

52

4.6

9

72

.04

8 Ran

pur

23

6

29

5.7

7

73

48

.37

30

9

34

4.1

4

0

0.0

0

0

0

7

1.2

0

7

1.2

30

2

34

2.9

4

2.2

7

Total

17

96

13

78

.54

67

7

14

0.1

0

24

73

15

18

.6

1

0.0

4

54

6

68

.22

21

3

28

.25

76

0

96

.51

17

13

14

22

.13

30

.73

For the year 2017-18 (till 31.08.2017)(Urban)

Sl No

.

Name of the Tahasil

Pendency as on

01.04.2017

cases institut

ed during

the year

Total

No. of cases disposed of during the year

Balance for disposal

% of dispo

sal Settle

d Evicted

Rejected/

Dropped

Total

Page 36: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

No

.

Are

a

No

.

Are

a

No

.

Are

a

No

.

Are

a

No

.

Are

a

No

.

Are

a

No

.

Are

a

No

.

Area

1 2 3 4 5 6 7 8 9 10 11 1

2 1

3 1

4 1

5 1

6 1

7 18 19

1 Nayagarh

0

0

0

0.0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0.0

0

2 Odagaon

0

0

0

0.0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0.0

0

3 Nuagaon

0

0

0

0.0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0.0

0

4 Khandapada

31

9

31

.92

20

2.2

2

33

9

34

.14

0

0.0

0

0

0.0

0

43

1.7

2

43

1.7

2

29

6

32

.42

12

.68

5 Bhapur

0

0

0

0.0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0.0

0

6 Daspalla

33

7.1

4

0

0.0

0

33

7.1

4

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

33

7.1

4

0.0

0

7 Gania

0

0

0

0.0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0.0

0

8 Ranpur

0

0

0

0.0

0

0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0

0.0

0

0.0

0

Total

35

2

39

.06

20

2.2

2

37

2

41

.28

0

0

0

0

43

1.7

2

43

1.7

2

32

9

39

.56

11

.56

During the year 2015-16 the performance for disposal of encroachment cases in

respect of rural of the District the Tahasil of Ranpur, Gania & Bhapur are poor. The

concerned Tahasildar should be instructed to take steps for early finalization of

encroachment cases. Similarly the perforamne of the Tahasildar in respect of Urban is very

poor. The concerned Tahasildar sholud be instructed to dispose of the pending cases early.

The Collector should keep watch & ensure for early disposal of pending cases.

During the year 2016-17, the performance for disposal of encroachment case in

respect of rural of the District, is very well as revealed from the above statement.On the

Page 37: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

oher hand in repset of Uraban by the Tahasildar Kahndapara and Daspalla are very

poor.The Collcetor may keep watch & ensure for early disposal of pending cases.

During the year 2017-18 (upto 31.08.2017) it is revealed that, the performance of

Rural encroachment cases of the District the Tahasil of Nuagaon, Bhapur & Ranpur are very

poor. The concerned Tahasildar should be instructed to take steps for early finalization of

pending cases. As regards the disposal of urban encroachment cases of the Tahasil of

Khandapara & Daspalla, the Collector should ensure for finalisation of Encroachment cases

as priority basis.

BEBANDOBASTA CASES

The position of institution, disposal and pendency of cases.

Bebandobasta cases for the year up to 31.08.2017

Sl.

No.

Name of the Tahasil

Total No. of cases utilized

at the end of the month

Total area covered (in

Acre)

Total No. of cases disposed

of up to the end of the

month

Area involved

Balance of cases

for disposal

Area involved

1 2 3 4 5 6 7 8

1 Nayagarh 228 147.94 0 0 228 147.94

2 Odagaon 829 953.69 0 0 829 953.69

3 Nuagaon 160 143.81 0 0 160 143.81

4 Daspalla 80 35.43 0 0 80 35.43 5 Gania 1 5.9 0 0 1 5.9

6 Khandapad

a 659 405.72 42 35.36 617 370.36

7 Bhapur 298 723.36 0 0 298 723.36

8 Ranpur 61 90.18 0 0 61 90.18

Total 2316 2506.03 42 35.36 2274

2470.67

It is revealed that, 2274 number of cases involving area of 2470.67 acer is pending

with the Tahasildars. The Tahasildar should be directed to take steps for early disposal of

pending cases.

Page 38: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

DISTRIBUTION OF GOVT. WASTE LAND

The position showing target & achievement made on distribution of Govt waste land

for house site purpose and Agriculture purpose for the year 2015-16,2016-17,2017-18 (up

to 31.08.2017) are indicated below:-

Distribution of Govt. Waste land for house Site purpose for the year 2015-16

Sl. No.

Name of the Tahasil

Target Fixed

Achievement of Beneficiaries

S.C S.T. Others Total

No. Area No. Area No. Area No. Area

1 Nayagarh 90 6 0.19 0 0.00 39 1.40 45 1.59

2 Nuagaon 13 7 0.28 8 0.32 5 0.20 20 0.80

3 Odagaon 63 3 0.10 4 0.16 10 0.36 17 0.62

4 Ranpur 42 0 0.00 0 0.00 24 0.96 24 0.96

5 Daspalla 12 0 0.00 0 0.00 0 0.00 0 0.00

6 Khandapada 32 33 1.06 0 0.00 12 0.36 45 1.42

7 Bhapur 39 2 0.08 0 0.00 20 0.80 22 0.88

8 Gania 9 17 0.60 7 0.28 7 0.28 31 1.16

Total 300 68 2.3

1 19

0.7

6 117

4.3

6 204

7.4

3

Distribution of Govt. Waste land for Agriculture purpose for the year 2015-16

Sl. No

.

Name of the Tahasil

Target Fixed

Achievement of Beneficiaries

S.C S.T. Others Total

No. Are

a No.

Area

No. Are

a No.

Area

1 Nayagarh 0 0 0.00 0 0.00 0 0.00 0 0.00

2 Nuagaon 0 0 0.00 0 0.00 0 0.00 0 0.00

3 Odagaon 0 0 0.00 0 0.00 0 0.00 0 0.00

4 Ranpur 0 0 0.00 0 0.00 0 0.00 0 0.00

5 Daspalla 0 0 0.00 0 0.00 0 0.00 0 0.00

6 Khandapada 0 0 0.00 0 0.00 0 0.00 0 0.00

Page 39: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

7 Bhapur 0 0 0.00 0 0.00 0 0.00 0 0.00

8 Gania 0 0 0.00 0 0.00 0 0.00 0 0.00

Total 0 0

0.0

0 0

0.0

0 0

0.0

0 0

0.0

0

Distribution of Govt. Waste land for house Site purpose for the year 2016-17

Sl. No.

Name of the Tahasil

Target Fixed

Achievement of Beneficiaries

S.C S.T. Others Total

No Are

a No

Area

No Are

a No

Area

1 Nayagarh 0 12 0.30 0 0.00 13 0.45 25 0.7

5

2 Nuagaon 0 16 0.53 6 0.24 0 0.00 22 0.7

7

3 Odagaon 0 6 0.24 0 0.00 41 1.54 47 1.7

8

4 Ranpur 0 0 0.00 0 0.00 0 0.00 0 0.0

0

5 Daspalla 0 0 0.00 0 0.00 0 0.00 0 0.0

0

6 Khandapad

a 0 1 0.02 0 0.00 0 0.00 1

0.0

2

7 Bhapur 0 0 0.00 0 0.00 0 0.00 0 0.0

0

8 Gania 0 0 0.00 5 0.20 1 0.04 6 0.2

4

Total 0 35 1.09 11 0.44 55 2.03 101 3.5

6

Page 40: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Distribution of Govt. Waste land for Agriculture purpose for the year 2016-17

Sl. No.

Name of the Tahasil

Target Fixed

Achievement of Beneficiaries

S.C S.T. Others Total

No Are

a No

Area

No Are

a No

Area

1

Nayagarh

0 0 0.00 0 0.00 0 0.00 0

0.0

0

2

Nuagaon

0 0 0.00 0 0.00 0 0.00 0

0.0

0

3

Odagaon

0 0 0.00 0 0.00 0 0.00 0

0.0

0

4

Ranpur

0 0 0.00 0 0.00 0 0.00 0

0.0

0

5

Daspalla

0 0 0.00 0 0.00 0 0.00 0

0.0

0

6

Khandapada

0 0 0.00 0 0.00 0 0.00 0

0.0

0

7

Bhapur

0 0 0.00 0 0.00 0 0.00 0

0.0

0

8

Gania

0 0 0.00 0 0.00 0 0.00 0

0.0

0

Total 0 0 0.00 0 0.00 0 0.00 0

0.0

0

Distribution of Govt. Waste land for house Site purpose for the year 2017-18 (up to 31.08.2017)

Sl. No.

Name of the Tahasil

Target Fixed

Achievement of Beneficiaries

S.C S.T. Others Total

No. Are

a No.

Area

No. Are

a No.

Area

1 Nayagarh 0 1 0.03 0 0.00 11 0.32 12 0.35

2 Nuagaon 0 0 0.00 0 0.00 0 0.00 0 0.00

3 Odagaon 0 0 0.00 0 0.00 0 0.00 0 0.00

Page 41: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

4 Ranpur 0 0 0.00 0 0.00 0 0.00 0 0.00

5 Daspalla 0 0 0.00 0 0.00 0 0.00 0 0.00

6 Khandapad

a 0 0 0.00 0 0.00 0 0.00 0

0.00

7 Bhapur 0 0 0.00 0 0.00 0 0.00 0 0.00

8 Gania 0 0 0.00 0 0.00 0 0.00 0 0.00

Total 0 1 0.03 0 0 11 0.32 12 0.35

Distribution of Govt. Waste land for Agriculture purpose for the year 2017-18 (Up to 31.08.2017)

Sl. No.

Name of the Tahasil

Target Fixed

Achievement of Beneficiaries

S.C S.T. Others Total

No. Are

a No.

Area

No. Are

a No.

Area

1 Nayagarh

0 0 0.00 0 0.00 0 0.00 0 0.0

0

2 Nuagaon

0 0 0.00 0 0.00 0 0.00 0 0.0

0

3 Odagaon

0 0 0.00 0 0.00 0 0.00 0 0.0

0

4 Ranpur

0 0 0.00 0 0.00 0 0.00 0 0.0

0

5 Daspalla

0 0 0.00 0 0.00 0 0.00 0 0.0

0

6 Khandapada

0 0 0.00 0 0.00 0 0.00 0 0.0

0

7 Bhapur

0 0 0.00 0 0.00 0 0.00 0 0.0

0

8 Gania

0 0 0.00 0 0.00 0 0.00 0 0.0

0

Total 0 0 0.00 0 0.00 0 0.00 0 0.0

0

During the year 2015-16 as against the target of 300 beneficiaries, lands measuring

AC7.43 have been distributed for house site among 204 beneficiaries. During the year

2016-17, land measuring AC 3.56 have been distributed among 101 beneficiaries and

during the year 2017-18 (up to 31.08.2017), land measuring AC 0.35 have been distributed

among 12 beneficiaries without fixed of target.

The position of distribution of Govt. waste land for agriculture purpose in the district

during the year 2015-16, 2016-17 & 2017-18 (up to 31.08.2017) are treated as nil as the

Page 42: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

target for the above period have not been received by the district office. No achievement

for the above period has been made in respect of all Tahasils of the district.

LAND ACQUISITION

Sri Raj Kishore Mohapatra, ORS, Asst. Collector is working as Land Acquisition

Officer, W.e.f 30.08.2017, Smt. Bijayita Samantasighar, ORS, Asst. Collector is working as

CALA for NH Projects w.e.f. 01.03.2017 and Sri Jitendra Kumar Sahoo, OAS-Gr-A (S.B.), Sub-

Collector is in-charge of Special land acquisition Officer for IDCO w.e.f 24.06.2017.

The disposal of pending of L.A cases during the year 2015-16, 2016-17 & 2017-18

(Up to 31.08.2017) are as follows:-

Year Cases pending at

the beginning of the year

Cases instituted during the year

Total cases for disposal

Cases disposed of

2015-16 11 1 12 1 2016-17 11 - 11 - 2017-18 11 1 12 -

Stage wise pending of balance 12 nos. of L.A cases pending at different levels are

indicted below:-

Year wise break up pending L.A. Cases

Year No. of cases of

State Govt. No of cases of Union Govt.

Total no of pending cases

Remarks

2015-16 10 1 11

2016-17 10 1 11 2017-18 10 2 12

Detailed position of pending L.A. Cases

Sl. No.

Case No. Name of the

village Area of

acquired land Present position of L.A. proceedings

1 2/2010 Laxmiprasad Ac.7.23 Disbursement of Compensation under

process.

2 09/201

1 Champatipur Ac.6.73 do

3 05/201

1 Panchumu Ac.3.35

Clarification regarding sanction of less amount has been sought for vide letter No.203 Dt.30.08.2016 from Department of Water Resources as per RFCTLA R&R Act, 2013.

4 8/2011 Majhiakhanda Ac.2.12 Clarification regarding sanction of less amount has been sought for vide letter No.203 Dt.30.08.2016 from Department of Water Resources as per RFCTLA R&R

Page 43: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Act,2013. 5 7/2011 Patulisahi Ac.4.11 Clarification regarding sanction of less

amount has been sought for vide letter No.203 Dt.30.08.2016 from Department of Water Resources as per RFCTLA R&R Act,2013.

6 6/2011 Kesharpur Ac.4.30 Clarification regarding sanction of less amount has been sought for vide letter No.203 Dt.30.08.2016 from Department of Water Resources as per RFCTLA R&R Act,2013

7 02/2012 Krushnaprasad Ac.2.81 Revised estimate has been submitted vide letter No. 365 dt. 18.12.2015 to Department of Water Resources as per RFCTLA R&R Act,2013

8 01/2012 Durudurapalli Ac. 21.41 Clarification regarding sanction of less amount has been sought for vide letter No.203 Dt.30.08.2016 from Department of Water Resources as per RFCTLA R&R Act,2013.

9 03/2012 Ranipada Ac.1.15 Revised estimate has been submitted vide letter No. 34 dt. 06.02.2016 to Department of Water Resources as per RFCTLA R&R Act,2013.

10 01/2013 Mayurjhalia Ac.1.18 Proposal u/S-6(1) of LA Act has been submitted vide letter No.171 Dt.18.06.14 to Govt. in Rev. & D.M. Department.

Sl. No.

Case No.

Name of the village

Area of acquired land

Present position of L.A. proceedings

11 01/2015 Widening of NH-57 from km 162/010 to 224/900 km.

AC. 2.110 Determination of amount payable as compensation is under process.

12 01/2017 Widening of NH -57 from km 239/900 to 294/300km.

Ac.1.070 Publication of Notification u/s-3(A) of NH Act under process.

4. Cash position of L.A. Section-

a. General Land Acquisition (Cash as on 11.10.2017)

Sl. No.

Cash details Amount

Page 44: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Bank (Savings+Flexi) 38,48,543.44 2 Cash in hand 7,507.00 3 Advance 12,771.00

Total 38,68,821.44

b. Special Land Acquisition for BGR Project (Cash as on 30.09.2017)

Sl. No. Cash details Amount 1 Bank (Savings+Flexi) 73,79,979.00 2 Cash in hand Nil 3 Advance Nil

Total 73,79,979.00

5. Amount of Civil Deposit-

Two separate Civil deposit registers are being maintained for General Land

Acquisition and Special Land Acquisition for BGR Project.

a. General Land Acquisition-Rs. 64,24,541.00 b. Special Land Acquisition-Rs. 10,08,02,532.00

6. Maintenance of cash Book of-

Two different cash books i.e. one for General Land Acquisition and another for

special Land Acquisition are being maintained in this section. The closing balance for

general land acquisition is Rs.38,68,821.44 and for special land acquisition is

Rs.73,79,979.00 till date.

7. Maintenance of Registers of Cheque issue and Received-

Two separate registers are being maintained for issue and receive of cheques.

8.Odisha Rehabilitation & Resettlement Policy-2006.

Rehabilitation and Resettlement has not been made in respect of any Land

Acquisition Project as no displacement has been made.

LAND REFORMS

Ceiling Surplus Land

Sl. No. Name of the Tahasil Area target for distribution

No. Area

Page 45: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Nayagarh 1391 1061.75

2 Odagaon 0 0 3 Nuagaon 0 0 4 Ranpur 1056 884.59 5 Daspalla 520 346.12 6 Gania 0 0

7 Bhapur 0 0

8 Khandapada 948 525.33

Total 3915 2817.79

THE POSITION OF REVIEW OF DROPPED CEILING CASES UP TO 31.08.2017

Sl. No

Name of the Tahasil

No. of dropped ceiling cases

No. of dropped ceiling cases reviewed by Balan

ce for Review

Collector

A.D.M.

Sub-Collecto

r

LRC

Other

Officer

Total

1 2 3 6 7 8 9 10 11 12

1 Nayagarh 62 42 6 14 0 0 62 0

2 Ranpur 45 0 0 36 0 0 36 9

3 Daspalla 59 12 0 43 0 0 55 4

4 Khandapa

da 6 0 0 0 6 0 6 0

5 Nuagaon 0 0 0 0 0 0 0 0

6 Odagaon 0 0 0 0 0 0 0 0

7 Bhapur 0 0 0 0 0 0 0 0

8 Gania 0 0 0 0 0 0 0 0

Total 172 54 6 93 6 0 159 13

Area under Ceiling Surplus Land distributed

Sl. No.

Name of the Tahasil

No of beneficiaries Total

SC ST Others

No Area No Area No Area No Area

1 Nayagarh 431 346.48 105

119.18

855 596.09 1391

1061.75

2 Odagaon 0 0 0 0 0 0 0 0

Page 46: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

3 Nuagaon 0 0 0 0 0 0 0 0

4 Ranpur 192 232.14 60 47.15 804 605.3 1056

884.59

5 Daspalla 320 210.51 27 25.68 173 109.93 520 346.12

6 Gania 0 0 0 0 0 0 0 0

7 Bhapur 0 0 0 0 0 0 0 0

8 Khandapada 356 164.28 137

69.19 455 291.86 948 525.33

Total 1299

953.41 329

261.2 2287

1603.18 3915

2817.79

The position of correction of RoR, detailed area demarcated & possession delivered among the beneficiaries

Sl No.

Name of the

Tahasil

No of beneficiaries Total

Correction of RoR

Detailed Area demarc

ated

possession

delivered SC ST Others

No.

Area

No.

Area

No.

Area

No.

Area

No.

Area

No. Ar

ea No.

1 Nayagarh

431

346.48

105

119.18

855

596.09

1391

1061.75

657

438.44

1061.75

1391

1061.75

2 Odaga

on 0 0 0 0 0 0 0 0 0 0 0 0 0

3 Nuaga

on 0 0 0 0 0 0 0 0 0 0 0 0 0

4 Ranpu

r 1

92 23

2.14 60

47.15

804

605.3

1056

884.59

1055

883.5

884.59

1056

884.59

5 Daspal

la 3

20 21

0.51 27

25.68

173

109.93

520

346.12

518

343.45

346.12

518

343.45

6 Gania 0 0 0 0 0 0 0 0 0 0 0 0 0

7 Bhapu

r 0 0 0 0 0 0 0 0 0 0 0 0 0

8 Khandapada

356

164.28

137

69.19

455

291.86

948

525.33

920

354.54

525.33

948

525.33

Total 1

299

953.41

329

261.2

2287

1603.18

3915

2817.79

3150

2019.93

2817.79

3913

2815.12

7 -

CASES UNDER SECTION 22 OF O.L.R. ACT FROM 01.04.2015 TO 31.08.2017

Page 47: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Cases pending as on 01.04.2015

Cases instituted during 01.04.2015 to 31.08.2017

Grand total

Total cases disposed of during 01.04.2015 to 31.08.2017

Balance cases

Area involved (in Acre)

SC

ST

Total

SC

ST

Total

SC

ST

Tota

l SC ST

Total

SC

ST

Total

SC ST Total

1 2 3 4 5 6 7 8 9 10 11 12 1

3 1

4 15 16 17 18

27

12

39 3

07 5

5 362

334

67

401

228 2

9 257

106

38

144

104.17

39.13

143.30

8 -

CASES UNDER SECTION 23 OF O.L.R. ACT FROM 01.04.2015 TO 31.08.2017

Cases pending as

on 01.04.2015

Cases instituted

during 01.04.2015

to 31.08.2017

Grand total

Total cases disposed of

during 01.04.2015 to

31.08.2017

Balance cases

Area involved (in Acre)

SC

ST

Total

SC

ST

Total

SC

ST

Tota

l SC

ST

Tota

l

SC

ST

Tota

l SC ST

Total

1 2 3 4 5 6 7 8 9 10 11

12 13

14

15

16 17 18

2 1 3 16

4 20 18

5 23

13 3 16

5 2 7 14.09

2.53

16.62

9 -

POSITION OF RESTORATION OF LAND UNDER SECTION 23 & 23(A) OF O.L.R. ACT.

Name of the court

No of cases disposed Physically restored Balance for restoration

Order for restoration

Rejected/ Dropped

No of beneficiaries

Area restored No. Area

1 2 3 4 5 6 7

Sub-Collector, Nayagarh

94 1742 162 32.11 0 0.00

Page 48: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Cases U/s 8 (A) of OLR Act for the year 2016-17 (upto 31.03.2017)

Sl No.

Name of the

Tahasil

No. of cases

pending as on

01.04.2016

No. of cases

instituted

Total

No. of cases

disposed of

Balance as on

31.03.2017

Amount collected

Total

amount

collected

Ur

ban Rural

Urban

Rural

Urban

Rural

Urban

Rural

Urban

Rural

Urban

Rural

1 Nayagarh

16 11

7 28

502

44 61

9 29

399

15 22

0 487881

4804772

5292653

2 Ranpur 2 57 22 20

2 24

259

23 21

9 1 40

364446

2995574

3360020

3 Daspalla

23 19 11

7 12

1 14

0 14

0 71 94 69 46

441774

722590

1164364

4 Khandapara

3 35 0 18

4 3

219

0 20

9 3 10 0

533044

533044

5 Nuagaon

0 7 0 14

2 0

149

0 13

2 0 17 0

1569188

1569188

6 Odagaon

0 95 0 35

5 0

450

0 40

9 0 41 0

2865775

2865775

7 Bhapur 0 95 0 61 0 15

6 0 72 0 84 0

335319

335319

8 Gania 0 18 0 69 0 87 0 75 0 12 0 2936

49 2936

49

Total 44 44

3 16

7 1636

211

2079

123

1609

88 47

0 129

4101 14119911

15414012

Cases U/s 8 (A) of OLR Act for the year 2017-18 (upto 31.08.2017)

Sl N

o.

Name of the

Tahasil

No. of cases pending as on 01.04.2017

No. of cases instituted

Total

No. of cases disposed of

Balance as on 31.08.2017

Amount collected

Total amount collected

Urban

Rura

l

Urban

Rura

l

Urban

Rural

Urban

Rura

l

Urban

Rura

l

Urban

Rural

1 Nayagarh

15 2

20 34

264

49 4

84 31

248

18 2

36 419273

3143021

3562294

2 Ranpu

r 1

40

17 94

18 1

34 18

85

0 49

316000

1970740

2286740

3 Daspal

la 69

46

43 33

112

79

77 52

35 27

294080

229448

523528

4 Khandapara

3 10

8 1

33 11

143

3 76

8 67

9925

225073

234998

5 Nuaga

on 0

17

0 29

0 46

0 34

0 12

0 332041

332041

Page 49: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

6 Odaga

on 0

41

0 2

98 0

339

0 2

11 0

128

0 399114

399114

7 Bhapu

r 0

84

0 48

0 1

32 0

16

0 1

16 0

54870

54870

8 Gania 0 12

0 25

0 37

0 10

0 27

0 131

83 131

83

Total 88 4

70 10

2 9

24 19

0

139

4

129

732

61 6

62 103

9278 636

7490 740

6768

During the year 2016-17, 123 cases have been disposed of in Urban area with

collection of premium of Rs12.94 lakhs in different Tahasils of the District. Similarly 1609

cases with an amount of Rs.141.19 lakh have been disposed of in rural area.

During the year 2017-18 (Up to 31.08.2017), 129 cases have been disposed of in

Urban area with collection of premium of Rs.10.39 lakh in different Tahasils of the District.

Similarly 732 cases with an amount of Rs. 63.67 lakhs have been disposed of in rural areas.

Steps should be taken for realization of premium in disposal of more nos. of cases

both in Urban and Rural areas.

ANNUAL LAND REVENUE ADMINISTRATION REPORT

Annual Land Revenue Administration report for nthe year 2013-14 has already

been sent to RDC(CD), Cuttack vide this office letter No.405/Rev. dtd08.03.2016 under

intimation to board of Revenue, Odisha. The same report for the year 2014-15 is under

process.

ADVANCE POSITION OF GOVT. LAND

ADVANCE POSSESSION OF GOVT. LAND

Sl. No.

Name of the Tahasil

Purpose of advance possession

Name of the Village

Area Involved

(in Ac.)

Year of possession

Present Position

1 2 3 4 5 6 7

1 Bhapur

Construction Rural works Section Office, Bhapur

Bhapur 0.55 2016

Alienation case No. 1/2016 is in process at Tahasil level

2 Ranpur

Affordable Health Care (MCH) of CHC, Ranpur

Ranpurgarh 0.65 2017 Alienation case

is in process at Tahasil level

Page 50: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

3 Daspalla

Construction of OPTCL 220/33 Grid Sub-station

Jhintikabari 15.00 2016

Tahasildar, Daspalla will submit the alienation case

4

Odagaon

Block Level Nursery of Horticulture Deptt.

Rabera 5.00 2016

De-reservation/Alienation case is under process at Tahasil level.

5

Construction of Odisha Adarsha

Vidyalaya under Odagaon

Block

Akhupadar 5.00 2017 Alienation case

is under process at Tahasil level.

6 Khandapa

da

Construction of 30 bedded MCH Hospital

Khandapada

1.63 2016 Alienation case

is under process at Tahasil level.

7

Nayagarh

Construction of Automated Driving Training Track, Nayagarh

Piasalia 2.00 2016

De-reservation proposal approved. Alienation case record will be submitted after over of stipulated objection period by the Tahasildar, Nayagarh.

8 Construction

of Old Age Home

Lekhanpur 1.00 2016

De-reservation proposal approved. Alienation case record will be submitted after over of stipulated objection period.

9

Construction of Railway Line of East Coast Railway

Badapandusar

0.17 2016

Alienation case is under process for change of classification.

10

Construction of Railway Line of East Coast Railway

Natugaon 0.04 2016

Alienation case is under process for change of classification.

Page 51: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

11

Construction of New Bus stand, Nayagarh

Kalahandi 3.50 2017 Alienation case

is under process at Tahasil level.

12

Construction of District Panchayat Office

Nayagarh 0.45 2017 Alienation case

is under process at Tahasil level.

13

Construction of D.I.C. Office, Nayagarh

Lekhanpur 0.22 2017

De-reservation/Alienation case is under process at Tahasil level.

JUDICIAL

CHARGE:- MISS. BANANI MOHAPTARA, ORS, ASST.-COLLECTOR, IS IN CHARGE OF THIS SECTION SINCE

29.08.2017. PRIOR TO HER SRI SUDARSAN DAS,O.A.S WAS WORKING AS SUCH. AS MISS. BANANI

MOHAPATRA, ORS, ASST. COLLECTOR OF JUDICIAL SECTION IS GOING IN OFFICIAL SHORT TERM TRAINING AT. ROT, GOTHPATANA, BHUBANESWAR FROM 09.10.2017 TO 27.10.2017 SRI RAJAKISHOE

MOHAPATRA..ASST. COLLECTOR IS IN CHARGE TILL 27.10.2017 .

STAFF THE FOLLOWING STAFFS ARE WORKING IN THIS SECTION: 1-SRI DHIREN KUMAR BEHERA, HEAD CLERK 2-SRI SUSANTA KUMAR JENA, SR. CLERK. 3-SRI SOVANA SUVADARSANA PATTANAIK,JR. CLERK 3-SRI DEBARAJ NAYAK , PEON CRIMINAL CASES PENDING IN DIFFERENT COURT ARE GIVEN BELOW:- THE TABLE BELLOW SHOWS THE DETAILS POSITION OF CASES DURING THE YEAR 2017 UP TO

30.09.2017. SL

NO NAME OF THE COURT NO OF

CASES AS

ON 1.1.17

CASES

INSTITUTED

DURING THE

YEAR

TOTA

L NO OF

CASES

DISPOSED

OFF UP TO

30.09.2017

BALANCE

FOR

DISPOSAL

1 S.D.M,NAYAGARH 53 72 125 59 66

2 REVENUE OFFICER, COURT,

NAYAGARH

118 194 312 223 89

3 TAHASILDAR RANPUR 02 36 38 30 08

4 TAHASILDAR KHANDAPADA 33 77 110 14 96

Page 52: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

5 TAHASILDAR, NAYAGARH 04 13 17 04 13

6 TAHASILDAR GANIA 14 21 35 04 31

7 TAHASILDAR ,DASPALLA 40 43 83 54 29

8 TAHASILDAR BHAPUR 62 56 118 40 78

9 TAHASILDAR NUAGAON 02 64 66 59 07

10 TAHASILDAR,ODAGAON 180 167 347 143 204

TOTAL 508 743 1251 630 621

PREVENTIVE SECTION OF CR.P.C WISE BREAK UP PENDING CASES IN DIFFERENT

COURTS ARE GIVEN BELOW.

SL. NO

NAME OF

OFFICER U/S-107

U/S-147

U/S-110

U/S-133

U/S-144

U/S- 145

U/S-97

TOTA

L

1 S.D.M, NAYAGARH

22 05 - 14 09 10 06 66

2

REVENUE

OFFICER

COURT, NAYAGARH

36 - 12 06 13 22 - 89

3 TAHASILDAR

RANPUR 08 - - - - - - 08

4 TAHASILDAR

KHANDAPADA 96 - - - - - - 96

5 TAHASILDAR,

NAYAGARH 11

- - - - 02 - 13

6 TAHASILDAR

GANIA 27

- - - 04 - - 31

7 TAHASILDAR

,DASPALLA 26

- - 03 - - - 29

8 TAHASILDAR

BHAPUR 75

- - - 03 - - 78

9 TAHASILDAR

NUAGAON 07

- - - - - - 07

10 TAHASILDAR

ODAGAON 170

- - - 34 - - 204

TOTAL 478

05 12 23 63 34 06 621

Page 53: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

YEAR WISE BREAK UP OF CRIMINAL CASES PENDING IN DIFFERENT COURT IS GIVEN

BELOW:-

YEAR

NAME OF THE COURT SDM,

NAYAGAR

H

REVENUE OFFICER

TDR DASPAL

LA

TAHASIL

DAR RANPUR

TAHASILD

AR KHANDAP

ADA

TAHASIL

DAR NAYAGA

RH

TAHASI

LDAR ODAGA

ON

TAHASI

LDAR BHAPU

R

TAHASI

LDAR GANIA

TAHASI

LDAR NUAGA

ON

TOT

AL

2008 - - - - - 1 - - - - 1

2012 - - - - 1 - - - - 1

2013 - 1 - - - - - - - - 1

2014 - 1 - - - - - - - - 1

2015 - 11 - - - - - - - - 11

2016 30 18 - - 14 1 37 - 09 - 109

2017 36 58 29 08 82 10 167 78 22 07 49

7

TOTAL 66 89 29 08 96 13 204 78 31 07 621

GRANT OF ARMS LICENSE THE TABLE BELLOW SHOWS THE DETAILS POSITION OF GRANT OF ARMS LICENSE DURING THE YEAR

2017 UP TO 30.09.2017. YEAR BALANCE OF GUN

LICENSE APPLICATION

PREVIOUS YEAR AS ON

01.01.2017

NO OF

APPLICATIONS

RECEIVED DURING

THE YEAR AS ON

30.09.2017

TOTAL TOTAL NO OF CASES DISPOSED OFF

DURING THE YEAR

BALANCE FOR DISPOSAL

GRANTED REJECTED

2017 NIL

10 10 01 05 04 (PENDING AT THE

OFFICE OF THE SUPDT. OF

POLICE, NAYAGRH FOR

POLICE VERIFICATION

REPORT) TOTAL NIL 10 10 01 05 04

GUN LICENSE:- POLICE STATION WISE REGISTERS ARE MAINTAINED TO WATCH FOR ISSUE OF LICENSE AND ITS

RENEWAL FOR TIME TO TIME. POLICE STATION WISE POSITIONS ARE GIVEN BELOW.

Page 54: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

SL NO NAME OF THE POLICE

STATION NO. OF LICENSE

HOLDER NO. OF LICENSE

(RENEWAL

VALID)

BALANCE FOR RENEWAL

1 FATEGARH 46 41 5 2 SARANAKUL 77 61 16 3 GANIA 38 22 16 4 RANPUR 190 144 46 5 KHANDAPADA 86 72 14 6 NUAGAON 148 118 30 7 DASPALLA 124 65 59 8 ODAGAON 116 80 36 9 NAYAGARH 105 78 27

10 NAYAGARH SADAR 132 114 18 11 ITAMATI 90 84 06 12 BANIGOCHHA 19 06 13

TOTAL 1171 885 286 THE SUPERINTENDENT OF POLICE HAS BEEN INSTRUCTED TO SEIZE THE WEAPONS

,IMMEDIATELY AND REPORT COMPLIANCE FOR CANCELATION OF THE 286 NUMBER OF NON RENEWAL GUN

LICENSE OF THIS DISTRICT.

UNDER SECTION 80 CPC NOTICE 46 NOS OF 80 CPC NOTICES HAVE BEEN RECEIVED DURING THE YEAR 2017 ALL NOTICES HAVE BEEN

SEND TO CONCERNED DEPARTMENTS FOR SUBMISSION OF PWC TO CONCERNED ADVOCATES.

LICENSE UNDER INDIAN EXPLOSIVE ACT:

TOTAL IN THIS NAYAGARH DISTRICT AT PRESENT THERE ARE 8 NO’S OF PERMANENT

FIREWORK LICENSE ARE ISSUED. 1. MANUFACTURING LICENSE = 02 NOS 2. SALE OF FIREWORKS LICENSE= 06 NOS

GRANT OF FIREWORKS LICENSE

DURING THIS YEAR DIWALI -2017 TOTAL 28(TWENTY EIGHT) NO’S OF TEMPORARY FIRE WORKS

LICENSE HAVE BEEN ISSUED.

PENDING NHRC CASES .

THE TABLE BELLOW SHOWS THE DETAILS POSITION OF NHRC CASES DURING THE YEAR 2017 UP TO

30.09.2017.

SL NO CASE TOTAL

CASES NO OF CASES DISPOSED

OFF UP TO 30.09.2017 BALANCE FOR DISPOSAL

1 NHRC 42 33 09

PENDING OHRC CASES .

Page 55: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

THE TABLE BELLOW SHOWS THE DETAILS POSITION OF OHRC CASES DURING THE YEAR 2017 UP

TO 30.09.2017.

SL

NO CASE TOTAL CASES

DURING THE YEAR

2017

NO OF CASES

DISPOSED OFF UP TO

30.09.2017

BALANCE FOR

DISPOSAL

1 OHRC

169 90 79

PENDING W.P.(C) CASES .

THE TABLE BELLOW SHOWS THE DETAILS POSITION OF WP© CASES DURING THE YEAR 2017 UP

TO 30.09.2017.

SL

NO CASE TOTAL CASES

RECEIVED DURING

THE YEAR

NO OF CASES

DISPOSED OFF UP TO

30.09.2017

BALANCE FOR

DISPOSAL

1 NHRC 62 34 28

DISTRICT REVENUE OFFICERS MEETING

For the year 2017

SI. No

Month Date of Meeting Letter No.& Date in which proceeding related

1 January 27.01.2017 424/dt.22.02.2017

2 February 28.02.2017 613/dt.21.03.2017

3 April 28.04.2017 1025/dt.26.05.2017

4 May 31.05.2017 1090/dt08.06.2017

5 June 30.06.2017 1362/dt13.07.2017

6 July 15.07.2017 1611/dt.03.08.2017

7 August 11.08.2017 1839/dt.11.09.2017

8 September 15.09.2017 2002/dt.04.10.2017

FOREST SETTLEMENT

SI No. Name of forest block Area 1 Ambaghati 81.05 Ha.

Page 56: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

2 Mahulaberena 50.0 Ha 3 Nuagaon 48.05 Ha. 4 Kerabari 37.8 Ha. 5 Nandagadu 35.0 Ha. 6 Arakhataila 247.0 Ha. 7 Sikharpanga 61.50 Ka. 8 Makarprasad 66.0 Ha. Total 626.40 Ha.

8 nos of proposal covering an area of 626.40 Ha and pending with dist forest

settlement office for necessary consideration. No forest Block have been modified u/s 4(1)

of the Odisha forest Act1972.

ESTABLISHMENT

Sri Sudarshan Das, OAS (JB) is working as officer in charge of Establishment Section

w.e.f 09.05.2017.

The staff position of Nayagarh district as on 20.10.2017 is given below:-

POSITION OF STAFF AS ON 25.10.2017

PROFORMA

Sl. No

Name of the Post sanctioned strength

Staff in position

No.of vacancies

Remarks

1 2 3 4 5 6 1 Collector 1 1 0

2 Addl. District Magistrate 1 1 0

3 Sub-Collector 1 1 0

4 Addl. Sub-Collector 1 0 1

5 Deputy Collector 5 2 3

7 Asst. Collector(ORS) 5 6 -1

8 Asst.Collector(ORS),Sub-Collector, Office

2 1 1

9 Tahasildar 8 5 3

10

Addl. Tahasildar( ORS) 10 10 0

11

Office Superintendent 1 0 1

12

P.A. 1 1 0

Page 57: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

13

Head Clerk 32 32 0

14

Senior Clerk 98 78 20

15

Junior Clerk 108 78 30

16

Senior Steno 3 1 2

17

Junior Steno 4 1 3

18

Drivers 24 11 13

19

Revenue Supervisors 8 8 0

20

Revenue Inspectors 55 48 7

21

Asst. Revenue Inspector 53 42 11

22

Amin 55 37 18

23

Daftary 4 2 2

24

Gardener(Male) 2 1 1

25

Peon( Including Collection Peon orderly)

111 62 49

26

Literate Peon 4 3 1

27

Khalasi 4 3 1

28

Choukidar-Cum-Sweeper 16 10 6

29

Process Server 21 9 12

30

Chainman 16 8 8

TOTAL 654 462 192

The Collector is advised to move Govt. in R&DM Department to obtain clearance to fill up

the vacancies. The other remaining promotional posts may be filled up by conducting D.P.C

immediately.

Page 58: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

BUDGET

2016-17

UNIT

PA

Y

DA

HR

A

OA

RC

M

TE

EL

EC

T.

TE

LE

M.V

O.C

WA

GE

S

20

00

2

FC

H

78

01

2

33

01

1

FA

Wat

er

Allotment

received

11

49

27

18

14

81

24

81

29

07

10

16

50

0

15

28

26

80

00

0

40

00

00

40

00

0

10

00

00

13

00

00

57

00

0

30

00

0

12

00

00

0

0

64

50

00

25

00

0

Expenditure as

incurred

11

43

97

95

14

66

90

91

28

42

50

16

08

3

15

28

26

80

00

0

40

00

00

40

00

0

10

00

00

13

00

00

54

84

0

30

00

0

12

00

00

0

0

64

50

00

25

00

0

Balance amount Surrendered

52

92

3

14

33

90

64

60

41

7

0

0

0

0

0

0

21

60

0

0

0

0

0

0

2017-18

UNIT PA

Y

DA

HR

A

OA

RC

M

TE

EL

EC

T.

TE

LE

M.V

O.C

WA

GE

S

20

00

2

FC

H

78

01

2

33

01

1

FA

Wat

er

Allotment received

14

60

00

00

13

44

00

00

24

00

00

17

00

0

90

00

0

90

00

0

50

00

00

60

00

0

20

00

00

10

00

00

14

10

00

25

00

0

72

00

0

10

00

0

0

72

00

00

0

Expenditure as incurred 8

05

89

65

76

26

31

0

17

83

14

11

55

5

50

00

0

48

90

50

00

00

0

0

99

97

6

11

56

20

25

00

0

0

0

0

64

50

00

0

Page 59: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Balance amount Surrendered 6

54

10

35

58

13

69

0

61

68

6

54

45

40

00

0

85

11

0

0

60

00

0

20

00

00

24

25

38

0

0

72

00

0

10

00

0

0

75

00

0

0

Departmental Proceeding Cases:-

The position of department proceeding cases against non-gazetted government

servants as on 24.10.2017 are given below:-

POSITION OF DEPARTMENTAL PROCEEDING CASES AGAINST NON-GAZETTED GOVERNMENT SERVANTS AS ON 25.10. 2017

Sl. No

Name & Designation of the Delinquent

Designation of the Inquiring

Officer

Reason for pending Date of service of charges

Whether under

suspension or not

1 2 3 4 5 6

1

Shri Dhinabandhu Sahoo, Sr.Clerk (Retired)Krushna Prasad Block, Puri District

Sri Kunjabihari Badajena, O.R.S., Asst. Collector, Nayagarh. No. 1150 dt.23.5.16

A criminal appeal case No.326/02 has been filed by the delinquent before the Hon'ble High Court, Orissa against the orders of Hon'ble C.J.M.,Puri in which he was awarded with imprisonment of 3 years with fine of Rs.5000/- in G.R.Case No.222/98

17.8.1988

Yes/22.8.87 reinstated on 21.1.94

2

Shri Banamali Swain, Ex-S.C.(Retired)Nayagarh Block

Nirmal Chandra Baral,O.A.S.(I)JB, Deputy Collector, Revenue, Nayagarh vide No.839 dt.18.4.16

Under re-enquiry stage 7.7.1996

No (Retired)

3

Shri Krushna Mohan Das, S.C., Ranpur Block( Retired)

Tahasildar, Ranpur. No. 2182 dt 06.10.12

Under enquiry stage

23.05.2006

Yes/24.9.04 & reinstated on 31.5.06

4 Shri

Benudhar Kalpataru

Behera, O.A.S, Enquiry complited.

Vigilance case No.16/14 28.1.20

05

Yes/31.05.03

Page 60: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Samantary,S.C.,Ranpur Block(Retired)

Ex-Tahasildar, Nayagarh.

is pending reinstated on 23.03.06

5

Raghupati Nanda, R.I. Ranpur Tahasil (Retired)

Smt. Gayatri Devi,OAS Ex- Addl. Sub- Collector, Nayagarh now Tahasildar, Ranpur order No.113 dt.10.01.2013

Under enquiry stage ,Vigilance case is pending

20.8.10

Reinstead vide O. No. - 533 dtd 8.4.2010

6

Ladukishore Mahapatra, R.I., Odagaon Tahasil (Retired)

Smt.BijayitaSamantasinghar,ORS,Asst. Collector, Collectorate, Nayagarh.Order No.2493 dt.24.11.16.

Under enquiry stage, Vigilance case is pending

20.08.10

Rrinstead vide No 1555 dt 9.9.2010

7

Biswambar Mahapatra, R.I.,

Ashoka Ku. Das, O.A.S., Revenue Officer, Collectorate, Nayagarh O.N. 3072/08.11.2011

Enquriry completed, vigilance P.S. caseNo. 46 dt. 30.08.10 is pending

26.07.11

Reinstead O.No. 3185 dt 23.11.11

8

Bijaya Kumar Swain, R.I. Bhapur Tahasil

Govinda Chandra Baskey, OAS, Deputy Collector, Nayagarh No. 2554 dt. 2.12.16

Under enquiry stage 31.01.12

Reinstead on 23.11.2011. Fategada P.S. Case No.89/28.6.11 is pending.

9

Sibanarayan Pradhan, R.I., Khandapara Tahasil

Aswini Kumar Nayak, ORS, Asst. Collector, Nayagarh No. 1146 dt.23.5.16

Enquiry Completed. P.S. Case No.109/19.11.1 is pending.

21.03.12

Yes/ reinstead vide o.No.560 dt 23.03.12. Khandapada P.S. Case No.109/19.11.1 is pending.

Page 61: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

10

Prassana Ku. Pattanaik, Senior Clerk , Nuagaon Block

Tahasildar, Nayagarh O.No.1750 dt 14.08.2012

Under enquiry stage 16.03.12

Instituted after Dismissal.

11

Rama Chandra Barik,Senior Clerk , Nuagaon Block

Tahasildar, Nuagaon O.No.1752 dt 14.08.2012

Under enquiry stage 02.05.12

Instituted after Dismissal.

12

Pradipta ku. Pattanaik, Junior clerk,Bhapur Tahasil

Padma Charan Sahoo, Asst.Collector, O/o-Sub-Collector

Enquriry completed, vigilance P.S. CaseNo.81/01.10.96

13

Manoranjan Behera, Senior Clerk, I.C.D.S., Bhapur

Tahasildar, Bhapur Dt. 15.12.2012

Under enquiry stage 09.08.2012

Yes/ reinstead vide O.No.1293 dt 20.06.12

14

Krushna chandra Pattanaik, Driver, Khandapara Block

Sri Pratap Chandra Beura,O.A.S. Tahasildar, Nayagarh No.1206 dt.01.6.16

Under enquiry stage. 25.06.12

No.

15

Bidyadhar Sahoo, R.I., Nayagarh Tahasil

Deputy Collector, Establishment, Collectorate, Nayagarh.No. 986 dt. 5.5.16

Enquiry completed. Vigilance P.S. case No. 7 dt. 24.3.15 is Pending

19.01.16

Reinstated in service.

16

Surendra Kumar Bihari, Ex-Sr.Clerk, Nayagarh Block.

Sub- Collector, Nayagarh, dt. 07.03.2017

Under enquiry state 07.08.15

Reinstated in service.

17

Sri Kailash Chandra Pradhan,

Night Watcher,

Collectorate, Nayagarh.

Deputy Collector, Establishment, Collectorate, Nayagarh

Enquiry completed. Nayagarh P.S. case No. 97 dt.22.4.2004 pending

15.03.05

Reinstated on 23.03.05.

Page 62: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

18

Purna Chandra Mahapatra, R.I. Nayagarh Tahasil

Nirmal Chandra Baral, OAS, Deputy Collector, Collectorate, Nayagarh. No. 2552 dt.2.12.16

Under enquiry stage. 25.05.16

19

Surendra Kumar Bihari, Head Clerk, Nuagaon Tahasil.

Sub-Collector, Nayagarh, dt. 16.12.2016

Under enquiry stage. 20.04.17

Reinstated vide order No.1609, dtd.19.07.16.

20

Sri Bijaya Kumar Giri, Ex- Head Clerk, Odagaon Block

Deputy Collector, Establishment, Collectorate, Nayagarh. No. 2527 dt. 29.11.16

Enquiry completed. Vigilance case is pending

26.10.16

Reinstated vide order No.462, dtd.24.03.17.

21

Ramesh Chandra Panda, Jr. Clerk, Nayagarh Tahasil

Smt. Bijayita Samantasinghar, ORS, Asst. Collector, Collectorate, Nayagarh Dt. 08.02.2017

Under enquiry stage 01.12.16

22

Jyotiprava Das, Sr. Clerk, I.C.D.S., Bhapur.

Sub- Collector, Nayagarh, dt. 21.03.2017

Under enquiry state 19.11.16

23

Krushna chandra Pattanaik, Driver, Khandapara Block

B.D.O., Khandapada has not framed draft charges.

Khandapada P.S. case is pending

Draft Charges have not yet been framed.

24

Ramesh Kumar Mishra,Sr.clerk, Khandapara Tahasil

Sub-Collector,Nayagarh dt-14.09.17

Under enquiry stage 19.7.17 Reinstated in service on 6.6.17.

25

Chittaranjan Das,Sr.clerk, Khandapara Tahasil

Draft Charges framed and served.

27.07.17

Reinstated in service on 6.6.17.

Page 63: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

26

Biswambar Mahapatra, R.I.,

Draft Charges framed by Vigilance Deptt. Vig. Case No. 37 dt. 26.8.16 is pending

Vigilance case is pending

06.03.17

Reinstated in service on 07.09.17.

27

Sanjaya Kumar Pattanaik, R.I., Khandapada Tahasil

Sub-Collector, Nayagarh, dt. 22.03.17

Under enquiry stage 16.01.17

28 Namita

Pradhan, RI, Gania Tahasil

Sub-Collector, Nayagarh, dt.05.07.17

Under enquiry stage 25.05.17

29

Anusaya Sahoo, Jr. Clerk, Odagaon Tahasil

Draft Charges framed, but not served

Reinstated in service Reinstated in service

on 4.9.2017

30

Lokanath Jani, Sr. Clerk, D.W.O., Nayagarh

Draft Charges framed, but not served

Under Suspension Under Suspension

31

Ramesh Ku. Nayak, J.C, I.C.D.S, Khandapara

Vigilance P.S.Case No-43 dt- 19.9.17 is pending

Under suspensin Placed under suspension on 20.09.17

It is ascertained that, out of 31 pending Departmental proceeding cases, 19 cases are

under enquiry by the inquiring officers. In this connection letter have been issued to the

inquiring officers to submit their report immediately.

PENSION

The detailed position of pending cases of Naygarh Collectorate is given below:-

UP TO DATE INFORMATION ON PENDING PENSION CASES AS ON 31.08.2017 OF COLLECTORATE, NAYAGARH

Sl.No

Name of the Retired Govt. Servant

Designation

Name of the Office Date of retirement/ Death

Resons for Pending

Date of reiminders

Office involved

1 2 3 4 5 6 7 8

1 Rabinarayan Das

Junior Clerk

Collectorate,Nayagarh

4.1.2002 (Death)

Pending due to Audit Recovery

Provisional pension sanction

Total Literacy Camp

Page 64: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

ed

2 Dinabandhu Sahu

Senior Clerk

I.C.D.S. Daspalla 31.05.2002

Pending due to criminal appeal case pending at Odisha High Court

Provisional pension sanctioned

B.D.O.,Krushna Prasad

3 Benudhar Samantaray

Senior Clerk

I.C.D.S., Ranpur 31.08.2006

Vigilance Case is pending

Provisional pension sanctioned

C.D.P.O., Ranpur

4 Debaraj Kar

Senior Clerk

Tahasil Office, Khandapada

31.03.2007

The Person concerned has not submitted the pension paper as reported by Tahasildar, Khandapada

Provisional Pension Sanctioned 1.D.O.No.2117 dt.7.10.2016 2.D.O.No.1628 dt. 21.07.2016 3. D.O. No.1384 dt. 30.06.2015

Tahasildar, Khandapada

5 Krushna Mohan Dash

Senior Clerk

Tahasil Office, Gania

31.08.2009

Pending due to proceeding case

Provisional Pension Sanctioned

Tahasildar, Gania

6 Ladu Kishore Mahapatra

Revenue Inspector

Tahasil Office, Khandapada

31.03.2011

Vigilance Case is pending

Provisional Pension Sanctioned

Tahasildar, Khandapada

Page 65: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

7 Bhagirathi Jani

Asst.Revenue Inspector

Tahasil Office, Nuagaon

31.01.2012

Head Office has not submitted pension papers

Provisional Pension Sanctioned 1.D.O.No.2117 dt.7.10.2016 2.D.O.No.1628 dt. 21.07.2016 3. D.O. No.1384 dt. 30.06.2015

Tahasildar, Nuagaon

8 Raghupati Nanda

Revenue Inspector

Tahasil Office, Nayagarh

31.05.2012

Vigilance Case is pending

Provisional Pension Sanctioned

Tahasildar, Khandapada

9 Arakhita Sahoo

Chainman

Collectorate,Nayagarh

28.02.2015

Pending in OAT Vide Case No.931/2015

Provisional Pension sanctioned Pending in OAT, Bhubaneswar due to wront entry of date of brith

Colllectorate, Nayagarh

10

Late Sankarsan Majhi

Junior Clerk

I.C.D.S., Nayagarh

22.04.2011

Head of Office has not submitted pension papers

Provisional Pension sanctioned D.O. No.2117 dt. 7.10.2016

C.D.P.O., Nayagarh

Page 66: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

11

Late Bhikari Charan Sahoo

Revenue Inspector

Tahasil Office, Khandapada

28.08.2016 (Death)

Head of Office has not submitted pension papers

Family Pension sanctioned 2232 dt. 20.10.2016

Tahasildar, Khandapada

12

Late Ananta Narayan Mishra

Revenue Supervisor

Tahasil Office, Bhapur

23.12.2016 (Death)

Head of Office has not submitted pension papers

Family Pension sanctioned L.No.2743 dt.31.12.2016

Tahasildar, Bhapur

13

Kusa Sethi

Head Clerk

Tahasil Office, Bhapur

31.03.2017

Head of Office has not submitted pension papers

Family Pension Sanctioned Letter No.580 dt.18.04.2017

Tahasildar, Bhapur

14

Abakash Dwari

R.I Tahasil Office, Nayagarh

30.06.2017

Head of Office has not submitted pension papers

Provisional Pension sanctioned L.No.1055 dt.30.06.2017

Tahasildar, Nayagarh

15

Debaraj Das

Peon Collectorate,Nayagarh

30.06.2017

Govt. Quarter not vacated

Provisional pension sanctioned

Colllectorate, Nayagarh

16

Sudarsan Bantha

Gardener

Collectorate,Nayagarh

31.08.2017

Pension paper will be submitted after pay fixation

Provisional pension sanctioned

Colllectorate, Nayagarh

On verification, it is seen that, most of this cases, pension papers are pending due to

pending vigilance case, proceeding case, criminal appeal case & non-submission of pension

papers by the concerned authority.

Page 67: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Information on Misappropriation Case

Sl. No.

Name & Designation of the incumbent

Nature and amount of misappropriation

Present status Remarks

1 2 3 4 5 1. Sri Brajabandhu

Pattanaik, OAS, Ex-Land Acquisition Officer, Nayagarh Collectorate

Land acquisition compensation money Amount-Rs-6,00,000.00

One departmental proceeding case No-19.OAS/2000 has been initiated against Sri Brajabandhu Pattanaik, OAS, Ex-Land Acquisition Officer, Nayagarh Collectorate under Rule-15 of the O.C.S (C.C.A) RULES, 1962 vide Rev. Deptt Letter No-32410/ R(C.S) DT-20.07.2000 basing on the criminal proceeding bearing G.R. Case No-151/2000 for misappropriation of land acquisition compensation money amounting to Rs.6,00,000.00 for which he was under judicial custody. Sri R.N.Pani, IAS, Secretary to Board of Revenue (O)Cuttack was appointed as Inquiring Officer vide Order No-768/R(CS)Dt-25.03.2003 of Government in Revenue Department.

In the meanwhile Sri Brajbandhu Pattanaik, OAS has been retired since 31.03.2001.

INFORMATION ON FILLING UP OF DIFFERENT CATEGORY OF POSTS

THROUGH DIRECT RECRUITMENT AND REHABILITATION ASSISTANCE

RULE, 1992 DURING LAST 03 YEARS i.e. 2015-16 TO 2017-18.

(a) Direct Recruitment The detail position of appointment made through Direct Recruitment is as below:-

Sl. No.

Recruitment Year

Name of the Post

No. of persons appointed

Remarks

1 2 3 4 5

Page 68: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 2016 Junior Clerk 14 Collector, Nayagarh 2 2016 Revenue

Inspector 01 OSSSC, Bhubaneswar

3 2016 Amin 18 OSSSC, Bhubaneswar 4 2017 Junior Clerk 02 OSSSC, Bhubaneswar

(b) Rehabilitation Assistance Rule, 1992

The detail position is as below: - Sl.

No. Name of the applicant Order No./Date Post against which

appointed

Remarks

1 2 3 4 5 1 Hadibandhu Khillo,

S/O- Jadunath Khillo, Ex-Peon

No.1751/

Dt. 10.08.2015

Junior Clerk

2 Saira Banu, D/O- Md. Mubarak

Ali, Ex-R.I.

No. 264/

Dt. 29.01.2016

Junior Clerk

3 Gouri Sankar Giri, S/O- Basanta

Ku. Giri, Ex-H.C.

No. 568/

Dt. 18.04.2016

Asst. Rev. Inspector

4 Susanta Ku. Barik, S/O- Basanta

Ku. Barik, Ex-Peon

No. 1837/

Dt. 25.08.2016

Asst. Rev. Inspector

ANNUAL ESTABLISHMENT REVIEW REPORT

The Annual Establishment Review Report for the Year 2017-18 has already been

submitted to RDC (CD), Cuttack vide Letter No. 342 dt. 06.03.2017.

MAINTENANCE OF SERVICE BOOK

Service Books are maintained for all permanent employees in the respective seat of

Establishment Section.

AUDIT REPORT (A/R & I/R)

Information on pending I/RS of A.G. Odisgha & Audit Report of Board of Revenue,

Odisha.

It is reported that, the inspection report of A.G. Odisha containing 48 paras are

pending in the district relating to the period from 1990-91 to 216-17. Similarly Audit

report of Board of Revenue, Odisha with 39 para are pending against the District for

compliance from 1987-88 to 2011-12.

Page 69: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

The pending inspection report & Audit reports are given below.

INSPECTION REPORTS

Sl. No.

No. & year of I/Rs

No. of paras involved

No. of paras No. of paras settled

Balance paras to be settled

Remarks Compliance report submitte

d

Pending for submission

of compliance

report.

01 256/90-91 10 10 - 9 1 The pending paras will be placed before the next Triangular Committee meeting to be held on 14&15 Nov.2017 for consideration.

02 1460/03-04 7 7 - 6 1

03 985/03-04 3 3 - - 3

04 1129/04-05 2 2 - 1 1

05 1107/05-06 7 7 - 6 1

06 883/07-08 9 9 - 7 2

07 535/10-11 11 11 - 9 2

08 153/11-12 10 10 - 1 9

09 539/16-17 28 24 4 - 28

Total 87 83 4 39 48

AUDIT REPORTS

Sl. No.

No. & year of A/Rs

No. of paras

involved

No. of paras No. of paras

dropped

Balance paras to

be settled

Remarks Compliance report

submitted

Pending for submission of

compliance report.

01 393/87-88 7 6 1 6 1 The pending paras will be placed before

02 203/91-92 8 8 - 6 2

Page 70: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

03 79-98-99 14 13 1 13 1 the next Triangular Committee Meeting to be held on 21 & 22 Nov. 2017 for consideration.

04 227/99-00 18 13 5 13 5

05 100/02-03 32 28 4 28 4

06 65/09-10 55 39 16 39 16

07 79/11-12 32 22 10 22 10

Total 166 129 37 127 39

The Collector should ensure for early compliance of the pending paras.

NIZARAT

Sri Dillip Kumar Sahu, ORS is functioning as Nizarat officer w.e.f 07.10.2017. Sri

Dhiren Kumar Behera, Head clerk is working as Nazir w.e.f 26.04.2013.

The main Cash Book shows closing balance Rs. 2,14,19,445/- as on 20.10.2017 as

follows:-

1. The detail cash position as on 20.10.2017 are as follows.

(a) In shape of Cash – Rs. 12,896/- (Double lock)

(b) In shape of pass book Rs. 1,89,64,452/-

(c) In shape of Revenue Deposit Rs. 6,25,720/-

(d) In shape of BD - Rs. 8,126/-

(e) In shape of Advance Rs. 5,16,367/-

(f) In shape of paid vouchers- Rs. 12,91,884/-

Total - Rs. 2,14,19,445/-

2. The cash balance of different subsidiary Registers are detailed below.

Sl.No. S.R.No. Name of the S/R Amount 1 S/R I Misc.Receipt 2,35,465/- 2 S/R

Brutanga Brutanga I.P 11,22,824/-

3 S/R IV Certificate Dues 1,33,321/- 4 S/R V Salary etc. of Staff 50,615/- 5 S/R VI Development Grants 54,932/- 6 S/R VIII Election & Census 18,77,384/- 7 S/R X Contigencies 13,73,783/-

Page 71: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

8 S/R XI Misc. Payment 1,01,09,536/- 9 S/R XII 64,61,585/- Toatl 2,14,19,445/-

3. Number of subsidiry registers for daily Transaction – 09 Nos.

4. Advance register :- An amount of Rs. 5,16,367/- as advance till 20.10.2017.

The register shows closing balance Rs. 5,16,367/- as on 20.10.2017. The details of

advance position on different pupose is as follows:-

SI No

Name of Cash Book Details Amount

1 S/R V T.A 5,057/- 2 S/R VIII Election 30,963/- 3 S/R VIII Certificate 3,14,161/- 4 S/R XI Misc. Payment 1,62,760/- 5 S/R XII Misc. Payment 3,426/-

Total 5,16,367/-

It is revealed that an amount of Rs 5,16,367/- remains unadjusted due to want of

allotment in different head. The Collector should ensure to reduce such heavy advance

position and take appropriate steps for receipt of the allotment for the purpose.

5. Vehichle information :- 3 Nos. of vehichle are used in this Collectorate as

follows.

(a) One for Collector bearing No. OR-25-1111 (Ambasador Car)

(b) One for ADM bearing No. OD-25-C-0001 (Indigo Ecs) (c) One for Sub-Collector bearing No.OD-25-2222 (Ambasador Car)

6. No of Telephone Available : 04 nos of Land phone are used in Collectorate and Sub-Collector Office.

7. Position of Circuit House :-

Circuit House, Nayagarh consists of 05 (Five) suits out of which 04 (four) suits are Air-conditioned and 01 (one) suit is not Air-conditioned. Except this, there are two garage rooms and three staff quarters in the Circuit House, Nayagarh. All the suits are well equipped.

8. Staff Position

SI. No

Name of the post Sanctioned strength (As per letter No.

37851/R&DM Dt.01.10.2013)

Staff in position

Vacancy

Page 72: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

1 Asst. Nazir 1 1 - 2 Khansama 1 1 - 3 Kitchen Helper 1 - 1 4 Room attendant 2 - 2 5 Gardner 1 1 - 6 Sweepeer 1 1 - 7 Choukidar/Watcher 1 1 -

RIGHT TO INFORMATION

Name of the P.I.O :- Sri KunjaBihariBadajena ORS, Asst. Collector,Collectorate,Nayagarh

Name of the 1st Appellate Authority:- Shri Prasant Kumar Rath,OAS(S), A.D.M, Nayagarh

Statement showing detailed pointier of Receipt , disposal and pendency of application under R.T.I. Act during 2015 to 2017 (up to 31.08.17 )

S

l. No

Year R.T.I. application pending at

the beginning of the Year

R.T.I. applicati

on received during

the Year

Total for

disposal

R.T.I. application

disposed of during the Year

Balance

pending

Reason for pending

Application Fees collected during the Year

1 2 3 4 5 6 7 8 9

1 2015-16 04 208 212 204 08 Subsequent

the pending Colum .7 have been disposed of in time

Rs. 1350/-

2 2016-17 08 281 289 287 02 Rs. 1520/-

3 01.04.2017

-to 31.08.2017

Nil 79 79 79 Nil Nil Rs. 410/-

Statement showing detailed portion of Receipt, disposal and pendency

of appeal under R.T.I. Act during 2015 to 2017 (up to 31.08.17 )

Sl. No.

Year

R.T.I Appeal pending at the beginning of the Year 2015-16

R.T.I Appeal received during the Year

Total for disposal

R.T.I Appeal disposed of during the Year

Balance pending

Reason for pending

1 2 3 4 5 6 7 8

1 2015-16 - 29 29 29 -

2 2016-17 - 29 29 29 -

3 2017-18 (Up to 31.08.17)

- 16 16 16 -

Page 73: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

RECORD ROOM 1. Name of the Officer-In-Charge: Sri. Nirmal Ch. Baral, O.A.S ( I) Date of Joining: Dt.21.03.2015

2. Name of the Record Keeper: Smt. Binapani Acharya Date of Joining: Dt.08.08.16

1. The position of Copy Application is given below:

Sl. No

Year No. of application pending at the

beginning of the year

No. of Copy Application

received

Total No. of Certified

Copies issued

Balance

1 2 3 4 5 6 7 1 2015 25 751 776 750 26

2 2016 26 646 672 667 5

3 2017(Up to

31.08.17)

5 326 331 324 7

2. COURT FEE REGISTER (For amount realized)

3. Position of consignment of Records / files

District Record Room, Collectorate, Nayagarh has not yet been constructed.

The existing Record Room is functioning in the Sub Divisional Office building which is in

dilapidated condition. The District Copies of Sabik khatians have not yet been received

from the Mother District Puri. Only the Sabik Khatians of Undivided Nayagarh Tahasil are

kept in this Record Room since long due to insufficient space in Nayagarh Tahasil. Now for

better public interest and quick delivery of public services steps are being taken for

transfer of sabik khatians to the concerned Tahasils i.e. Nayagarh, Nuagaon & Odagaon. The

District Copies of khatians will be obtained from Puri District Gradually. Due to insufficient

space in the Record Room consignment of Files and Records have not yet been done since

constitution of the District. As such huge number of files and registers are lying with the

Sl. No.

YEAR AMOUNT

1 2015 Rs.4045.00

2 2016 Rs.3320.00

3 2017 (Up to

31.08.17)

Rs.1680.00

Page 74: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Dealing Assistants for years together and there is apprehension of missing of files and

records. For which construction of District Record Room is badly essential for this District.

Govt. have been moved for construction of District Record Room. The Executive Engineer, R

& B, Nayagarh has been intimated to submit plan & estimate in this regard which is still

awaited.

REGISTRATION Name of the District Registrar Sri Surjya Narayan Samal, ORS & date of joining Dt.

15.04.2013.

Staff Position

Sl No.

Category of post

Sanctioned strength

staff in position vacancy

1 Head Clerk 1 1 0

2 Senior Clerk 2 1 1

3 Junior Clerk 9 7 2

4 Peon 1 1 0

Collection of Revenue for the year 2015-16 to 2017-18 (up to 31.08.2017)

Sl No. Year Units

Target (in lakh) Collection % of Collection

1 2015-16

Stamp 507.78 40991902 80.72

Fees 217.62 18048149 82.93

2 2016-17

Stamp 464.1 44717652 93.35

Fees 199 20200317 101.5

3 2017-18

Stamp 504 21780443 43.21

Fees 216 10533235 48.76

Collection of Under Valuation cases for the year 2015-16 to 2017-18

(upto 31.08.2017)

Page 75: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Total No. of under Valuation cases as on 31.08.2017

Disposal of cases

Pending for disposal

Stamp Duty

Regn. Fees Total Fees

682 255 427 6149089 2196332

8345421

Court-wise break up of pending Under Valuation Cases in different

courts as on 31.08.2017 Sl

No. Name of the Court No. of cases

Amount of stamp duty Regn. Fees

1 ADM, Nayagarh

2 Sub-Collector, Nayagarh

3 Dy.I.G.R. Cuttack 7 553220 138305

4 D.S.R. Nayagarh 6 191711 92083

5 Certificate officer 411 5333423 1936212

6 D.S.R. (Appeal) 3 70735 29732

Total 427 6149089 2196332

ELECTION

Sri Rajkishore Mohapatra , ORS, Asst. Collector is in-charge of Election Section.

Staff Position:

Sl. No.

Category Sanctioned Strength

Staff Position

Vacancy Remarks

1 Dy. Collector 01 - 01 OIC is from

Collectorate, Nayagarh

2 Head Clerk 01 01 -

3 Junior Clerk 01 01 -

4 Night watcher-cum-Peon

01 - -1 Vacant since

April 2015

Page 76: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

PARLIAMENTARY CONSTITUENCIES & ASSEMBLY CONSTITUENCIES

03 PCs 04 ACs 13-Kandhamal 119- Ranpur 14-Cuttack 120-Khandapada 17-Puri 121-Kandhamal(SC) 122-Nayagarh (a) Total No. of Assembly Constituencies : 04 (b) No. & Name of Assembly Constituencies : 119- Ranpur 120 – Khandapada 121- Kandhamal (SC) 122- Nayagarh (c) Total No. of Polling Stations : 849 (d) Total Population :

Population (Projected – 2017)

Male Female Total

5,39,584 4,94,969 10,34,553

(e) Total No. of Electors :

Total Electors Male Female Others

7,71,039 As per Draft roll 01.01.2017

4,08,730 3,62,263 46

EMERGENCY

Charge

Miss. Indurekha Paschimakabata, (ORS) Asst.Collector, Collectorate, Nayagarh is

now working as District Emergency Officer, with effect from 18.05.2016. Prior to her, Dr.

Kishore Kumar Mishra, OAS was in-charge of this section

I. NATURAL CALAMITIES OCCURRED DURING -2017

Sl. No

Kind of Calamities Amount Disbursed (in Rs.)

1 Fire Accident 33,46,500/-

2 Ex-gratia Assistance (Fire Accident ) 8,00,000/-

3 Cash in lieu of Clothing to the Fire victims 1,29,600/-

4 Cash in lieu of Utensil to the Fire victims 1,44,000/-

5 Asst. for Replacement of Drought /Milch Animal died due to Lightning & Fire

2,14,000/-

Page 77: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

6 Ex-gratia Assistance (Grievous injuries by fire) 12,700/-

7 Ex-gratia Assistance (Snakebite other than flood) 16,00,000/-

8 Ex-gratia Assistance(Drowning other than flood) 8,00,000/-

9 CMRF 26,57,500/-

10 Harischandra Sahayata 22,82,000/-

11 Payment of Ex-gratia Asst. to the NOKs of deceased who died due to Fire Accident at Sum Hospital Out of SDRF

4,00,000/-

12 Payment of Ex-gratia Asst. to the NOKs of deceased who died due to Fire Accident at Sum Hospital Out of CMRF

1,00,000/-

13 Payment of Ex-gratia Asst. to the NOKs of deceased who died due to Fire Accident at Sum Hospital Out of PMNRF

2,00,000/-

14 Payment of ex-gratia Asst. to the NOKs of deceased who died due to tragic road accident in Gania Block out of CMRF

8,00,000/-

Total Rs.1,34,86,300/-

II. ALLOTMENT POSITION UNDER DISBURSEMENT ITEMS OF EMERGENCY FOR THE

YEAR 2016-17 IS GIVEN BELOW:

Sl.No

Chart of Account or Head Allotment Received

Expenditure incurred

Remarks

1 DEOC Contingency 30000 30000 0 2 Telephone Charges 10000 10000 0 3 Broad Band Charges 15000 15000 0 4 Reimbursement of Mobile Charges used by

ADM/Dist.Emergency Officer 7000 7000 0

5 Asst. for replacement of Milch /Drought Animal died due to Natural Calamity

150000 150000 0

6 Cash in lieu of Utensil to the people affected by Fire

8000 8000 0

7 Cash in lieu of Clothing to the people affected by Fire

7200 7200 0

8 House Building Asst. to the fire victims 380400 380400 0 9 House Building Asst. to the people affected

by Hailstorm 22400 22400 0

10 Ex-gratia Asst. to the people who grievous injuries by lightning

4300 4300 0

11 Ex-gratia Asst. to the NOKs of deceased died due to Fire Accident

3200000 3200000 0

12 Ex-gratia Asst. to the people who grievous 12700 12700 0

Page 78: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

injures due to Fire Accident 13 Agriculture Input subsidy to the remaining

farmers affected by Drought-2015 135485080 135485080 0

14 Remuneration to the Data Entry Operator working at DEOC

108858 108858 0

15 POL/Hiring Charges of vehicle engaged at DEOC

216000 216000 0

16 Exgratia Asst. (Lightning) 28,00,000 2800000 0 17 Ex-gratia Asst.(Snake bite) 28,00,000 2800000 0 18 Ex-gratia Asst.(Drowning) 16,00,000 1600000 0 19 Ex-gratia Asst.(Wall Collapse) 1,50,000 150000 0 20 Ex-gratia Asst.Boat Accident (Decretal Dues 1,27,000 127000 0 21 Drawal of Salaries to the staff of Boat

Estt.(Pay, DA,HRA) 1,20,000 0 Rs.120000/-

(Funds already refunded to the SRC,Odisha by BDO, Gania)

22 CMRF 49,00,000/- 41,74,700/- UC submitted

23 Harischandra Sahayata Yojana 37,00,000/- 54,80,500/- (BF Bal:

26,06,500/-)

UC submitted

Total 14,72,53,938

14,71,33,938

1,20,000 (Surrender

ed)

III. ALLOTMENT POSITION UNDER DISBURSEMENT ITEMS OF EMERGENCY FOR THE

YEAR 2017-18 IS GIVEN BELOW.

No.Sl. No.

Chart of Account or Head Allotment Received

Expenditure incurred

Remarks

1 DEOC Contingency 20000 2 Telephone Charges 15000 677 3 Broad Band Charges 15000 2411 4 Reimbursement of Mobile

Charges used by ADM/Dist.Emergency Officer

12000

5 Asst.for replacement of Milch /Drought Animal died due to Natural Calamity

214000 214000 0

6 Cash in lieu of Utensil to the people affected by Fire

138000 80000 IOTMS bill is under process for drawal of Rs.58000 /- in favour of

Page 79: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Tdr,Odagaon/Gania 7 Cash in lieu of Clothing to the

people affected by Fire 124200 72000 IOTMS bill is under

process for drawal of Rs.52200 /- in favour of Tdr, Odagaon/ Gania

8 House Building Asst. to the fire victims

2372600 2372600 0

9 Ex-gratia Asst. to the NOKs of deceased died due to Fire Accident

800000 800000 0

10 Ex-gratia Asst. to the people who grievous injures due to Fire Accident

12700 12700 0

11 Remuneration to the Data Entry Operator working at DEOC

116700 59129 Balance Rs.57,572/- will be expenditure by March,2018

12 POL/Hiring Charges of vehicle engaged at DEOC

177920 36128 Balance Rs.141792/- will be expenditure by March,2018

13 Ex-gratia Asst.(Snake bite) 1600000 1600000 0 14 Ex-gratia Asst.(Drowning) 800000 800000 0 15 Purchase of Computer, Printer &

Furniture 70000 0 Under process

through tender 16 CMRF 30,00,000

/- 26,57,500/-

17 Harischandra Sahayata Yojana 20,00,000/-

22,82,000/-

(BF Bal: 8,26,000/-)

Total 11488120

10989145

LIBRARY

Sri Dhiren kumar Behera, Head clerk is now working as librarian. At present 571

numbers of books are available in the Collectorate Library. The following three register

are rquired to be maintained in the library.

(a) Stock register -One bound register is being maintained as per the ORM. The officer

in charge has verified the stock register.

(b) Catalouge:- One catalouge register has been maintained as per ORM.

(c) Issue Register :- The issue register indicates the position of receipt and issue of the

library books to the employee of the collectorate.

Page 80: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Verified the register and it is revealed that, 37 nos of books issued to the

staff/officers of the collectorate. Out of which 18 nos of above books have been returned to

the library and balance 552 nos of books are with the staff /officer.

GRIEVANCE CELL

1. Collector’s Grievance

Sl. No

No. of petitions pending as on 01.01.2016 to01.01.2017

No. of petitions received during 01.01.2017 to 30.09.2017

Total No. of petitions disposed of during the period

Balance for disposal

1 1028 1517 2545 1062 1483

2. Chief Minister’s Grievance

Sl. No.

No. of petitions pending as on 01.01.2016 to01.01.2017

No. of petitions received during 01.01.2017 to 30.09.2017

Total No. of petitions disposed of during the period

Balance for disposal

1 282 117 399 107 292

Remarks:- Most of the pending grievance petitions relate to sanction of PMAY/Mo

Kudia/BPGY/OAP/ODP/NFBS, issue of BPL/APL/AAY/Ration cards & allotment of houses to the homesteadless persons under Vasundhara Scheme. As these items require necessary inquiry before allotment from Govt., due procedure like Pallisabha etc. is required to be followed, hence much time is necessary for disposal at the field level. However, reminders are also being issued from time to time to the concerned Officers to expedite redressal of grievance petitions.

DISTRICT SOCIAL WELFARE OFFICE Name of the Officer: Sri Bhuleswar Kanhar, DSWO, Nayagarh Date of joining: 21.07.2017

1. SNP feeding Programme ICDS was launched on 2nd October, 1975 and today ICDS Scheme represents one of

the world’s largest and most unique programmes for yearly childhood development. There are 6 packages of services of ICDS namely Supplementary Nutrition Programme (SNP, Preschool Education, Immunization, Health Cheque up, referral Service & Nutrition and Health Education).

Page 81: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

SNP has 2 broad components (a) Morning Snacks & Hot cooked meal are provided to those who can come to the AWCs i.e. Children between 3-6yrs. (b) Take Home Ration (THR) Chhatua is provided to the children between 6ms-3yrs, Pregnant Women and Lactating Mothers & Severely Malnourished Children. The physical and financial progress under SNP feeding programme during

2017-18 is mentioned below:- Sl. No.

Name of the Dist.

Total funds sanctioned

Total amount spent

Balance funds available

Beneficiaries covered 6ms-

3yrs 3-6yrs PW/

NM Total

1 Nayagarh 80069000 57007931 23061069 37767 36008 15201 88976

Out of Rs.80,06,900/- allotted in respect of Nayagarh District a sum of

Rs.5,70,07,931/- has been released to 1584 AWC Joint Bank A/c towards implementation of SNP feeding programme during 20117-18, Released to WSHGs Joint Bank A/c towards payment of cost of Chhatua up to August, 2017 & payment of cost of Rice & Wheat for 1st & 2nd Qtr of 2017-18 and also payment of TC Bill to TA for 1st & 2nd Qtr. The Project wise status report on coverage of beneficiaries is enclosed at “Annexure-A”.

2. Supply of Uniform to Preschool Children

Preschool Education is a Crucial component of the packages of services Envisaged under the ICDS Scheme. It aims at universalization and qualitative improvement of Primary education by providing the child with the necessary preparation for primary school, especially in remote and socio economically backward areas. It brings young children together at the AWC where different activities related to physical, cognitive, Social emotional creative development of children are facilitated by the AWW. Uniform has a positively effect on children’s self esteem, attendance and discipline.

It has therefore been decided by Govt. to provide Uniforms to all the preschool

children enrolled in the AWCs to encourage their enrolment and retention. Each preschool child is being provided 2 pairs school uniforms @Rs.100/- per pair during each year. The AWW is purchasing the school uniform from the local market after due approval in the Janch Committee Meeting and distributing to the children in a public meeting.

The physical and financial progress under Supply of uniform to preschool children during 2017-18 is mentioned below:- Sl.

No. Name of the

Dist. Total funds sanctioned

Total amount spent

Balance funds available

Beneficiaries covered

1 Nayagarh 7025000 6520400 504600 (Surrender)

32602

The Project wise status report on Preschool education is enclosed at “Annexure-B”.

Page 82: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

3. Revitalization of WSHGs under Mission Shakti Mission Shakti groups are being brought into the fold of Odisha Livelihood Mission

(OLM) and support service like Micro Credit Linkage Hand Holding Support is being provided by OLM in 107 intensive Blocks. Considering this aspect Revitalization of WSHGs under Mission Shakti is taken up in the rest 207 non intensive Blocks of Odisha. Accordingly 1595 WSHGs have been provided financial assistance @ Rs.10000/- per WSHG towards Revitalization in Bhapur, Khandapada, Nayagarh & Gania non intensive Blocks under Nayagarh Districts during the year 2016-17.

The physical and financial progress under revitalization of WSHGs during 2017-18

is mentioned below:- Sl.

No. Name of the Dist.

Total funds sanctioned

Total amount spent

Balance funds

available

No. of WSHGs covered

1 Nayagarh 16547000 15950000 597000 1595

4. Mamata Scheme MAMATA: -

MAMATA scheme has been lunched on 7th Sept.2011 by Hon’ble Chief

Minister of Odisha with the noble intension of reducing maternal and infant mortality and

to improve the health and nutrition status of pregnant and lactating mothers and their

infants.

The main objective of the Scheme :-

- To provide partial wage compensation for pregnant and nursing mothers so that

they are able to rest adequately during their pregnancy and after delivery.

- To increase utilization of maternal and child health services, especially ante-natal

care, postnatal care and immunization.

- To improve mother and child care practices, especially exclusive breastfeeding and

complementary feeding of infants.

ELIGIBILITY OF BENEFICIARY:- In order to get the benefit under the scheme,

(i)One must be 19 years of age

(ii)Only for first two live births.

Page 83: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

(iii)Must not be an employee of Government /Public Sector undertaking *(central and

state) and their Wives.

DISBRUSEMENT ANALYSIS OF NAYAGARH DISTRICTFROM APRIL2016 TO MARCH

2017:-

The scheme started in September 2011 and disbursements were first done in

October 2011 by the State Govt. Odisha basing on the report of the CDPOs. From December

2011 onwards transfer of fund to beneficiary done in the project level by the CDPOs

through e-transfer. An amount of Rs 5000/- paid to eligible beneficiaries in 4 (four)

instalments. Now Vide L. No 337/ dt 06.01.2017 ,all eligible beneficiaries will receive in 2

instalments the total incentives. of Rs5000/-.The analysis report of MAMATA fund

disbursement in Nayagarh District during 2016-2017 shows as follows.

Sl no

Project name Allotment 2016-17

1st 2nd 3rd 4th Aww Awh Total expenditure

1 Bhapur

6734000 879 1308

1320 1361 1582 1314

6409300

2 Daspalla

7356000 962 1295

1307 1551 1618 1183

6685400

3 Gania 1986000 284 442 469 462 490 466 2164600

4 Khandapada 8626000 1055

1668

1656 1854 2365 1921

8259600

5 Nayagarh 8159000 1126

1681

1774 1944 2078 1846

8528700

6 Nuagaon 6237000 747 1247

1284 1490 1196 884 6092600

7 Odagaon 11500000

1413

2198

2076 2438 3239 2793

10857600

8 Ranpur 10445000

1542

1873

2113 2544 2852 2590

10608900

TOTAL 61043000

8008

11712

11999

13644

15420

12997

59606700

5. Status report on construction of AWC building The Project wise status report on construction of AWC building is enclosed at “Annexure-

C” .

6. The details of cash balance as per the Cash book on SR wise closing balance as on 20.10.2017.

The details of Cash balance is enclosed at “Annexure-D”.

Page 84: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Coverage of beneficiaries under SNP Feeding Programme during the month September, 2017

Sl.

No.

Name of the Project

Beneficiaries as per survey Beneficiaries covered

during the month Percentage of

coverage 6ms-

3 years

3yrs-6yrs

PW/NM

Total

6ms-3 years

3yrs-6yrs

PW/NM

Total

1 Bhapur 388

8

342

0 1653

896

1

388

8

336

3 1653

890

4 99.36

2 Daspalla 463

5

382

4 1870

103

29

463

5

332

9 1870

983

4 95.21

3 Gania 158

6

144

8 591

362

5

158

6

133

1 591

350

8 96.77

4 Khandapa

da

435

5

464

7 1724

107

26

435

5

423

3 1722

103

10 96.12

5 Nayagarh 588

3

401

1 2171

120

65

577

7

366

1 2154

115

92 96.08

6 Nuagaon 375

5

339

2 1458

860

5

375

5

310

0 1458

831

3 96.61

7 Odagaon 698

7

852

7 2664

181

78

696

8

795

8 2556

174

82 96.17

8 Ranpur 667

8

673

9 3070

164

87

656

7

629

0 2945

158

02 95.85

Page 85: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Total 377

67

360

08

1520

1

889

76

375

31

332

65

1494

9

857

45 96.37

Pre-School Education for the month of September, 2017

Sl No

Name of the ICDS Project

Anganwadis 3 to 6

years children as per survey

Pre-School Children Enrolled (3yrs to 6yrs)

Pre-School Children Attended (3yrs to 6yrs)

Percentage of attendance

Sanctioned

Functioning

Boys Gi

rls

Total

Boy

s

Girl

s

Total

1 Bhapur 153 153 3441 1776 1

665

344

1

163

5

144

2

307

7 89.42

2 Daspalla 229 229 4336 2278 2

058

433

6

186

2

167

5

353

7 81.57

3 Gania 82 82 1252 645 6

07

125

2

583

565

114

8 91.69

4 Khandapa

da 169 169 4539 2439

210

0

453

9

166

5

151

4

317

9 70.04

5 Nayagarh 224 224 4228 2021 1

804

382

5

184

5

161

9

346

4 90.56

6 Nuagaon 168 168 3605 1910 1

695

360

5

177

5

155

2

332

7 92.29

7 Odgaon 236 236 6511 3419 3

092

651

1

325

2

299

1

624

3 95.88

8 Ranpur 323 323 6268 3170 3

098

626

8

290

3

278

9

569

2 90.81

Total 1584 1584 34180 176

58

16119

33777

15520

14147

29667

87.83

Page 86: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

Block wise abstract on construction of AWC building list as on 30.09.2017

Sl No.

Name of the Project

No. of AWC Sanctioned

Total no. of AWC building sanctioned

Work Not Started

Stage of construction

Plinth Level

Lintel

Level

Roof

Level

Roof Laid

Finishing

Stage

Completed

1 Bhapur 153 87 25 5 2 3 0 4 48

2 Daspalla 229 122 41 10 5 7 8 3 48

3 Gania 82 44 6 5 4 2 4 1 22

4 Khandapada

169 107 30 5 3 3 10

5 51

5 Nayagarh 224 128 34 1 0 2 10

17 64

6 Nuagoan 168 115 36 9 3 8 8 7 44

7 Odagoan 236 141 33 3 7 7 4 4 83

8 Ranapur 323 177 67 8 2 10 5 12 73

Total 1584 921 272 46 26 42 49

53 433

Page 87: INSPECTION NOTEboardodisha.nic.in/sites/default/files/store/Collecotr...INSPECTION NOTE OF SHRI VIPIN SAXENA,IAS,MEMBER,BOARD OF REVENUE,ODISHA,CUTTACK ON NAYAGARH COLLECTORATE Date

ANNEXURE-D

Sl. No.

Name of the Cash Book

DCR

BC+BD

Pass Book

Term Deposit

Advances

Cash

Total

A/c no. Amount

1 2 3 4 5 6 7 8 9 10

1

Main Cash Book

- - SB A/c

No.11383060109

586340.65

901633

6.60 42.05

29348805.97

Current A/c

No. 11383057346

3389.00

SB A/c No.

1626010009669

10135754.00

SB A/c No.

11383060165 3299178.

67

SB A/c No.

1626010020891

114826.00

Current A/c

No. 11383056193

5634661.00

Current A/c- No.

910020039095660

469424.00

SB A/c No.

18460100013236

88854.00