TITLE SHEET T-1 DESCRIPTION DWG. REPLACE MAIN DUE TO POOR PRESSURE. ABANDONMENT FOR THIS PROJECT WILL BE DEFERRED. SHEET INDEX PROJECT DESCRIPTION O-1 OVERVIEW SHEET SCALE: N.T.S. VICINITY MAP PROJECT INFORMATION DRAWING TITLE: TITLE SHEET ENVIRONMENTAL PLAN NARRATIVE ENV-1 DRAWING NO: T-1 PROJECT SUMMARY TABLE REVISIONS DATE DESCRIPTION REV. # 0 06/21/2019 DRAWING CREATED 1 07/11/2019 PEER REVIEW COMMENTS PROPOSED GAS SERVICES ESTIMATED GAS SERVICES TIE OVERS REPLACEMENTS METER OUTS TOTAL SERVICES 75 32 107 159 PROPOSED INSTALLATION PROPOSED ABANDONMENT LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE 975' 2" PHMP 0' 3,317' 6" PHMP 4,292' TOTAL INSTALLATION (FEET) 0 TOTAL ABANDONMENT (FEET) JOB TYPE: MAINS LEAKAGE ELIMINATION (557) INSTALLATION ORDER NUMBER OAKLAND ST - POOR PRESSURE REMEDIATION COLUMBIA GAS OF MASSACHUSETTS 1-800-525-8222 NONE ABANDONMENT ORDER NUMBER PROJECT ID 18-52620 Know what's below. before you dig. Call R SITE NAME: INST# PROJECT ID# ABAN# OAKLAND ST - POOR PRESSURE REMEDIATION SPRINGFIELD, HAMPDEN 18-0822617-00 NONE 18-52620 DESIGNED BY NAME DATE PHONE # DRAWN BY CHECK'D BY AS-BUILT BY RAS 06/21/2019 413-302-5853 RAS 06/21/2019 413-302-5853 BJM 07/10/2019 413-326-0636 PROPOSED REVISIONS DATE DESCRIPTION REV. # 0 06/21/2019 DRAWING CREATED 1 07/11/2019 PEER REVIEW COMMENTS FIELD ENGINEER/TECHNICIAN: CITY PERMIT PERMITS: CONSTRUCTION FLL: MAP/GRID NUMBER: COUNTY: TAX DISTRICT/TOWNSHIP ID: 24 HR. EMERGENCY LINE: TCC/LOA: SYSTEM NUMBER(S): RICHARD SALVAREZZA LANCE HEDGE / MARK BRONNER / DAVID BAYEUR RICK ROSS 23 / 24 HAMPDEN (013) 0000244 8200 80003048(MP - 60PSIG) N 4/25/19 18-0822617-00 L-1 - L-6 MI LAYOUT PLANS D-1 - D-3 CONSTRUCTION DETAILS GENERAL NOTES GN-1 7/22/2019

Upload: others

Post on 03-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

TITLE SHEETT-1

DESCRIPTIONDWG.

REPLACE MAIN DUE TO POOR PRESSURE.ABANDONMENT FOR THIS PROJECT WILL BE DEFERRED.

SHEET INDEX

PROJECT DESCRIPTION

O-1 OVERVIEW SHEET

SCALE: N.T.S.

VICINITY MAPPROJECT INFORMATION

DRAWING TITLE:

TITLE SHEET

ENVIRONMENTAL PLAN NARRATIVEENV-1

DRAWING NO:

T-1

PROJECT SUMMARY TABLE

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

PROPOSED GAS SERVICES

ESTIMATED GAS SERVICESTIE OVERSREPLACEMENTS METER OUTSTOTAL SERVICES

75 32 107 159

PROPOSED INSTALLATION PROPOSED ABANDONMENT

LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE

975' 2" PHMP 0'3,317' 6" PHMP

4,292' TOTAL INSTALLATION (FEET) 0 TOTAL ABANDONMENT (FEET)

JOB TYPE: MAINS LEAKAGE ELIMINATION (557)

INSTALLATION ORDER NUMBER

OAKLAND ST - POOR PRESSURE REMEDIATION

COLUMBIA GAS OF MASSACHUSETTS1-800-525-8222

NONEABANDONMENT ORDER NUMBERPROJECT ID 18-52620

Know what'sbelow.before you dig.Call

R

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

FIELD ENGINEER/TECHNICIAN:

CITY PERMITPERMITS:

CONSTRUCTION FLL:

MAP/GRID NUMBER:

COUNTY:

TAX DISTRICT/TOWNSHIP ID:

24 HR. EMERGENCY LINE:

TCC/LOA:

SYSTEM NUMBER(S):

RICHARD SALVAREZZA

LANCE HEDGE / MARK BRONNER / DAVID BAYEURRICK ROSS

23 / 24

HAMPDEN (013)

0000244

8200

80003048(MP - 60PSIG)

N

4/25/19

18-0822617-00

L-1 - L-6 MI LAYOUT PLANS

D-1 - D-3 CONSTRUCTION DETAILS

GENERAL NOTESGN-1 7/22/2019

Page 2: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

GENERAL NOTES

DRAWING NO:

GN-1

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

General Notes

1. The proposed gas main location shown is approximate and is subject to change.

2. Property lines, structures, street lines, etc. were compiled using the NiSource GIS and are to be considered approximate.

3. Existing utilities, where shown, have been compiled from above ground evidence only and are to be considered approximate.NiSource does not guarantee the location of the underground utilities shown or that all existing utilities and/or subsurfacestructures are shown.

4. This project will adhere to all applicable federal, state or local permitting requirements for abandonment and installation of naturalgas pipelines. All Federal, State, and Local codes and standards will be adhered including, but not limited to, the following:

Code of Federal Regulations (CFR)49 CFR 192 Pipeline Safety Regulations29 CFR 1910 Occupational Safety and Health Administration (OSHA)

American Society of Mechanical Engineers (ASME)ASME B31.8 Gas Transmission and Distribution Piping Systems

5. All NiSource design codes and standards will be adhered to as applicable. These standards include but are not limited to thefollowing (note state-specific designations where applicable):

GS 1100.010(IN, KY, MA, MD, OH, PA, VA) Locating Gas FacilitiesGS 1100.040(MA and VA only) Damage Prevention When Using Conventional Excavation TechnologiesGS 1100.050(IN, OH, VA) Damage Prevention - Using Trenchless TechnologyGS 1170.010(IN) Gas Control Room ManagementGS 1210.010(MA) Nondestructive Testing And Visual InspectionGS 1300.010 Fusion And Mechanical JoiningGS 1301.010 Plastic Pipe Fusion And Mechanical Joining Qualification Of PersonnelGS 1302.010(VA) Butt Fusion JoiningGS 1304.010 Electrofusion JoiningGS 1320.010 Mechanical Coupling ConnectionsGS 1323.010 Flange ConnectionsGS 1400.010 Corrosion Control - GeneralGS 1410.010(VA) Metallic Pipeline ExposuresGS 1420.035 Coating Repair Methods For Mill Applied CoatingsGS 1420.040 Coating Methods For Girth Welds, Fittings, Risers & Other Below Grade AppurtenancesGS 1420.410 Corrosion Control - Inspection Of Steel Pipe CoatingGS 1420.510 Installation Of Galvanic AnodesGS 1420.520 Installation Of Test StationsGS 1430.320 Ultrasonic Thickness GaugeGS 1500.010(MA, OH) Pressure TestingGS 1670.020(IN, KY, MA, MD) Odor Level MonitoringGS 1670.040 Pipeline Conditioning New PipelinesGS 1680.010 Tie-Ins And Tapping Pressurized PipelinesGS 1680.020 Plastic To Steel Transition ConnectionsGS 1680.040 Squeeze Off Procedure For Plastic PipeGS 1680.050 Squeeze Off Guidelines For Steel PipeGS 1690.010 PurgingGS 1708.020(IN, KY, MA, MD, PA) Leakage SurveysGS 1740.010(MA, OH, PA, VA) Abandonment Of FacilitiesGS 1740.012(MA, PA) Abandoning Facilities - Service Tee RemovalGS 1742.010(VA) Discontinuing Gas ServiceGS 1754.010(KY, OH) Operation And Maintenance Of Pressure GaugesGS 1770.010 Prevention Of Accidental IgnitionGS 1782.010(MA) Protecting Cast Iron PipelinesGS 3000.020(VA) Inspection Of MaterialsGS 3000.900 Work Site RestorationGS 3010.030 Bends And ElbowsGS 3010.050(IN, MA) Installation Of Pipe In A DitchGS 3010.060(IN) Installation Of Plastic PipeGS 3010.080(MA, OH, VA) Underground ClearanceGS 3010.090(IN, MA, PA, VA) CoverGS 3010.100(VA) Transmission Lines And Distribution Mains - Trenchless TechnologyGS 3010.102(VA) Directional BoringGS 3010.210(MA only) Use Of End Caps On Steel PipeGS 3020.030 Service Line Connections To Main PipingHSE 4100.010 Hazardous Atmosphere ConsiderationsHSE 4100.020 Work Zone Traffic ProtectionHSE 4100.040 Excavation (Trenching) SafetyHSE 4120.010 Welding And CuttingHSE 4200.020 Protective FootwearHSE 4200.030 Eye And Face ProtectionHSE 4200.040 Hand ProtectionHSE 4200.050 Head ProtectionHSE 4440.030(KY, MA, MD, OH, PA, VA) Spoil Handling During ExcavationsON 18-09 Additional Requirements For Tie-Ins Involving Low Pressure FacilitiesWM Columbia Gas Welding Manual

6. Prior to beginning any excavation on site, the person responsible for earth moving shall notify utility owners of their intent toexcavate and to have the exact locations of the utility lines marked by contacting the one call center in their state subject to anyapplicable state advance notification requirements.

7. Proposed or completed gas facility installation location references may be indicated by a combination of the following codes:

F - FRONTBK - BACKL - LEFTR - RIGHTB - BUILDING EDGECLP - CENTER OF PAVEMENTCLR - CENTER OF RIGHT-OF-WAYCEL - CENTER OF EASTBOUND LANECWL - CENTER OF WESTBOUND LANECNL - CENTER OF NORTHBOUND LANECSL - CENTER OF SOUTHBOUND LANECU - CURBD - DRIVEWAY EDGEEP - EDGE OF PAVEMENTES - EDGE OF SIDEWALKPL - PROPERTY LINE

DRAWING LEGEND

Fire Hydrant

Drain Manhole

Sewer Manhole

Utility Pole

Telephone Manhole

Catch BasisElectric Manhole

Regulator Station

Gas Valve (Gate - GV, Plug - PV, PE Ball - BP, ST Ball - BV)

Reducer

Meter

Cast Iron Gas MainCoated Steel Gas Main

Wrought Iron Gas MainBare Steel Gas Main

High Density Polyethylene Gas MainEnd CapTransition

Proposed Gas MainExisting Gas Main to Be Abandoned

Gas Service ReplacementGas Service Tie-over

Meter Move Out

R

M

R Single Customer Regulator

Meter with RegulatorTest Point (Station)

MR

MMO

(E)(P)

ExistingProposed

Medium Density Polyethylene Gas Main

Existing Gas Main

CI*CS*

WI*BS*

PH*PM*

Proposed Gas Main Uprate

W Test Well

Low Pressure*LPIntermediate Pressure*IPMedium Pressure*MPHigh Pressure*HP

Bridge HangerAttached

Building HangerDirectional Bore

BHAT

BLGHDB

InsertedISOpen CutOCPneumatic BorePBPlowedPLRoof TopRT

Critical Gas ValveHigh Volume Tapping Tee

Electronic MarkerEM

T

R

TDE

S

TP

Flush-mounted Tracer Wire StationTWS

Post Pipeline Marker with Tracer Wire

Riser

Gas Main Marker without Tracer WireMM

Gas Main Symbology

Gas Main Material/Pressure Label References

Gas Main Installation Method Label References

Gas Facility Symbology

Swing Tie Symbology

Pressure Control Fitting - ShortStopp Tee

E

TCU

WG

WB

Water Gate

Telephone Pedestal

Water Box

Electric Pedestal

Property Marker

Unknown ManholeTelevision Pedestal

Iron PinLight Pole

IP

Pressure Control Fitting - Spherical TeePressure Control Fitting - Mueller Bottom-outPressure Control Fitting - Mueller Side-outPressure Control Fitting - Mueller Flange TeePressure Control Fitting - ShortStopp

Polytapp Side Saddle Fitting

4"GV4"PV2"HVTT2"SST4"SPH6"MF-BO6"MF-SO4"MF-FT4"SS4"MF Pressure Control Fitting - Mueller Stopper6x4 POLYTAP

MATERIAL CODES

PRESSURE CODES

MISCELLANEOUS CODESService*-SERRiser*-RTransmission Class(TC)

Gas Main Tie-in Location

Gas Main Abandonment Location

Weld LocationW1

T1

A1

Know what'sbelow.before you dig.Call

R

7/22/2019

Page 3: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

ENVIRONMENTALNARRATIVE

DRAWING NO:

ENV-1

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

Environmental Plan Narrative

1. There is no Site-Specific Erosion Control plan requirement for this project. This plan narrative, with the project EnvironmentalCompliance Plan (ECP), provide information regarding all environmental requirements. All NiSource construction activities must beperformed in accordance with the NiSource Environmental Construction Standards (ECS) and the project ECP.

2. The project ECP must be reviewed with construction and contractor personnel prior to the start of construction activities. Thisincludes any tree clearing activities required prior to the start of pipeline construction.

3. All NiSource construction projects must have a clearly defined work area or limits of disturbance (LOD). The LOD includes thepermitted project area and any additional work space needed for laydown yards, soil stockpiling areas, access routes, etc. NotifyNRP of any additional work space that may be needed outside of what is shown on this job order sketch.

Description and Minimum Requirements for Erosion and Sediment Control Measures

The information provided below outlines the purpose of common measures and how and when they shall be applied to the site. Figuresshowing installation details are provided in the NiSource ECS manual.

Perimeter Barriers: Perimeter barriers, such as silt fence and compost filter sock may be installed along the outside of the project areaor around sensitive areas to slow and filter sediment laden runoff before it leaves the work area.

These measures are required in the following areas:1. When work is occurring adjacent to streams, wetlands or other sensitive areas.2. Around HDD bore pits adjacent to streams, wetlands or other sensitive areas.3. Around soil stockpiles that will remain uncovered for greater than one working day.4. Where any work areas or excavations will remain disturbed (unstabilized) for longer than one working day.

Inlet Protection: Storm drain inlet protection, both curb and drop inlets, are required in active work areas where there is functioningstorm sewer to slow and filter water draining into the system. In areas where the work area is adjacent to, or water from the site flowsonto a paved roadway, inlet protection will be placed in all functioning outlets.

Check dams: Rock check dams may be installed in areas of concentrated flow in a ditch line to slow runoff and allow sediment to settleprior to discharge. Check dams may also be used as a break in a perimeter barriers where runoff is concentrated and perimeter barriersare insufficient to detain runoff. Check dams are required when working in ditch lines where work will remain active for more than 1 dayand as a supplementary measure determined to be needed during construction.

Dewatering Devices: A filter bag, or other approved dewatering device, must be used during all dewatering activities to removesuspended sediment from the water prior to discharge into the environment. Dewatering devices must be used in areas including, butnot limited, to trench or pit dewatering and treatment of excess HDD mud.

Construction Entrances: In cases where vehicular access from the work area occurs at a single point for multiple days, a rockconstruction entrance must be installed. A stabilized construction entrance may not be feasible during construction within orimmediately adjacent to a roadway as the construction project moves linearly along the road. In these cases, care should be taken tominimize vehicular access and the roadway shall be regularly cleaned of tracked sediment throughout the work day. Alternatives to rockentrances include the placement of timber mats or similar non erodible materials. Use of these alternatives must be approved by theNRP group or environmental inspector.

Trench Plugs/Breakers: Trench breakers consist of sand or earth filled sacks placed at intervals along the pipeline trench. Trenchbreakers may be installed at intervals within the trench to reduce water velocity along the pipeline bedding that can result in erosionduring construction and after backfilling. Trench plugs consist of clay, bentonite or other impermeable material and are requiredadjacent to stream and wetland crossings to ensure that the flow of water along the trench line does not impact the waterbody.

Temporary Stabilization: Temporary stabilization includes the placement of an annual or cover crop and a straw or other mulchcovering to protect disturbed areas from precipitation. In certain cases where redisturbance will occur prior to a normal germinationperiod, temporary stabilization with mulch or other covering may be completed without the application of seed.

Temporary stabilization will be completed on the following areas to reduce erosion from bare ground during rainfall events:1. Any areas, including stockpiles or tie-in pits, which will remain open overnight without perimeter controls.2. Any work area that will remain bare/disturbed longer than 7 days (4 in PA) without being actively worked within that time. Seeding

must be completed within this time window.

Permanent Stabilization: Includes the placement of a permanent seed mix and a straw or other mulch covering to permanentlystabilize the disturbed areas. Proper ground/ seed bed preparation (e.g. topsoiling, raking, decompaction) shall be completed asappropriate to the existing site area to provide a sufficient surface for seed germination.

Permanent seeding shall be completed immediately after work completion in all work areas without structural controls; regardless ofwhether the surrounding area is vegetated. Permanent seeding shall be applied within 7 days (4 days in PA) of work completion inareas all other areas; with the exception of work area protected by adequate structural controls where the surrounding area is an activeconstruction site and was not vegetated prior to the start of work.

Erosion Control Blanket/Matting: Erosion control blanket is a straw matting that can be rolled out over a disturbed area and securedusing pins or stakes. This blanket may be required on steeper sloped areas to hold seed and mulch in place. Erosion control blanketcan also be useful in protecting the seed and holding moisture in dry, windy areas. Erosion control blanket must be used in restorationadjacent to streams or wetlands. It should also be used in areas with high erosion potential (e.g. steep slopes, embankments, ditchlines).

Maintenance: The job site shall be inspected by construction personnel at the end of each day to ensure that any controls arefunctioning and that the work area is sufficiently contained. Required maintenance of NiSource installed controls or corrective actionsshall be performed immediately or within the time frames noted by an Environmental Inspector.

Measures previously installed by third parties shall be maintained by NiSource under the following circumstances:1. The control is not properly functioning and is being used to contain sediment and prevent erosion immediately adjacent to

NiSource work.2. Damage to the control is the result of work performed by NiSource.

Projects Within Third Party Construction Sites:

In situations where NiSource projects are being completed within a larger project or development area, NiSource is still responsible forensuring our work is in compliance with all laws and regulations. This must be documented under one of the following scenarios:1. Prior to the start of construction activities, a qualified NiSource representative will verify that all NiSource work activities will be

covered under the third party's approved site plan and/or SWPPP and that the appropriate EC measures are installed andfunctioning. This review will be documented and retained in the project records.

2. If the EC measures required by the third party's approved site plan are not present or functioning, NiSource construction activitiesmay commence under the following conditions:a. All disturbed NiSource work areas are stabilized at the end of the work day.b. Any NiSource work areas requiring disturbance over one working day (e.g. stockpiles, tie-in pits) will require perimeter

controls or temporary mulching or covering on a daily basis.c. The overall project SWPPP is present/available and all NiSource activities remain within compliance of all outlined

requirements.d. Any additional permits required for the NiSource work are obtained.e. The third party permit holder is informed of the site deficiencies and NiSource's plan to complete the work.

Final stabilization measures shall be completed as described in the applicable Temporary or Permanent Stabilization sections above tomatch the adjacent conditions of the third party project.

In addition to the preceding methods, the following erosion control measures will be used on a daily basis regardless of whether thework area is inside third party controls:· Perimeter barriers around bore pits at wetland/ stream bores· Dewatering activities using a filter bag or other approved method· Roadway cleaning daily for sediment tracked onto paved surfaces

Wetland and Stream Crossings, Sensitive Areas:

All wetlands, stream crossings and other sensitive areas (e.g. managed lands, parks, and endangered species habitat areas) must bemarked in the field with caution flagging prior to the start of clearing activities and/or land disturbing activities.

Any requirements for construction within these areas will be outlined within the ECP and the attached permit documents. These permitsmust also be reviewed prior to the start of construction.

IP

SW

CD

DW

ST

TB

Dewatering Device

Check Dam

Inlet Protection

Straw Wattle

CD

Sediment Trap

Check Dam

Trench Breaker

Temporary Stabilization

Permanent Stabilization

Erosion Control Matting

Construction Entrance

Silt Fence

Filter Sock (12")

Filter Sock (18")

Filter Sock (24")

Environmental Impacted Area(on Env-Impact layer)

Wetlands Area(on Env-Wetlands layer)

Stream Line(on Env-StreamLine layer)

Tree Protection(on Env-TreeProtection layer)

Tree Line(on Env-TreeLine layer)

Limits of Disturbance(on Env-DisturbanceLimit layer)

ENVIRONMENTAL EROSION CONTROL BLOCKS(on Env-ErosionControl layer)

ENVIRONMENTAL EROSION AND SEDIMENT CONTROL SYMBOLOGY

TS

PS

SF

Know what'sbelow.before you dig.Call

R

Page 4: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

E

S

S

S

S

E

S

S

E

E

E

S

SS

E

S

E

E

S

E

E

S

S

E

E

S

S

E

S

S

S

S

S

S

E

E

S

S

S

S

S

SS

S

E

S

20 24-26

E S ALLEN ST

9328

324

320

321

325

335

341

347

WS OAKLAND ST

315

311

307

306

310129-131

E S

271

170-180

276-280

285-189

258-262

254

253-255

261

236

230-232

254

228

222 217-219

225

11-9

W S

72

67-69

73

75

24

9096

89

43-45

ES

401-403

399

393

387

381-383

375-377

371-373

367

361

355-357

351

298

294

290

284

286

291

283

246

251

E S

18 24-26

28

3642

46-48

50-5254-56

62

68

63

5951

S S

95101

106

118-120

128-130

119

109-111107

121-123

34-36

24

N S

146

16

10-12

15-17

24

W S

152

158162

157161

35

39

45-47

49

55

40-42

44-46

52

56-58

66-68

70-72

76-78

82-84

86-88

69-71

75

79-81

163

174

142-144

141-143

151

145141

163

167 173-175

174-176

108

107

115

E

E

E

S

E

E

E

E

E

E

E

E

E

E

E

E

ALLEN ST

OA

KLA

ND

ST

MA

LDE

N S

T

OA

KLA

ND

ST

MA

LDE

N S

T

OA

KLA

ND

ST

SHAMROCK ST

NOEL ST

NOEL ST

ORANGE ST

OA

KLA

ND

ST

KENSINGTON ST

KENSINGTON ST

KENSINGTON ST

EA

RL S

T

RA

NN

EY S

T

RA

NN

EY S

T

PA

SA

DE

NA

ST

6"x0.5" TAPPING TEE0.5" EF COUPLING

~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

G

2"x1.25" TAPPING TEE1.25" EF COUPLING

~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER

1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING

~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER

1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

G

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

GG

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

G

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

G

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

G

T1

T3

T4

T5

T6

T7

T7

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

DRAWING TITLE:

OVERVIEW SHEET

DRAWING NO:

O-1

N

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Feet

0 130 260

4/25/19

Know what'sbelow.before you dig.Call

R1234

5 6

1234

5 6

KEY PLAN

7/22/2019

Page 5: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

E

S

S

12" COMBINED SEWER/STORM

12" COMBINED SEWER/STORM OVERFLOW12" WATER MAIN

6" W

ATE

R M

AIN

24" W

ATE

R M

AIN

18" C

OM

BIN

ED

SE

WE

R/S

TOR

ME

S

6" WA

TER

MA

IN24" W

ATE

R M

AIN

18" CO

MB

INE

D S

EW

ER

/STO

RM

E

20 24-26

WS OAKLAND ST

ES

401-403

399

393

387

381-383

375-377

371-373

E

E

E

S

6" EF COUPLING

OC~1,872'-6" PHMP

2'±

(2)6" 90° ELL

2'±

16" CIIP

6" CILP8" PHMP

6" PHMP

6" CILP

ALLEN ST

OA

KLA

ND

ST

MA

LDE

N S

T

T1

N

Feet

0 30 60

4/25/19

DRAWING TITLE:

LAYOUT SHEET

DRAWING NO:

L-1

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Know what'sbelow.before you dig.Call

R

MATCHLINE - SHEET L-2 MATCHLINE - SHEET L-2

1234

5 6

KEY PLAN

7/22/2019

Page 6: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

MATERIALINFORMATION

DRAWING NO:

L-1 MI

MATERIAL INFORMATION(TO BE COMPLETED DURING CONSTRUCTION)

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL

(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER

PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL

STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS

CONTROLLABLE FITTINGS

NONCONTROLLABLE FITTINGS

FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE

LABEL4" MF-BO4x2 HVT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST

FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR

INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)

LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R

SYMBOLN/A^N/A^

N/A*

N/A^

N/A^N/A*N/A*

SYMBOL

FITTING LEGEND

VALVE INSTALLATION DATAVALVE TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

Know what'sbelow.before you dig.Call

R

1234

5 6

KEY PLAN

Page 7: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

S

6" WA

TER

MA

IN24" W

ATE

R M

AIN

15" CO

MB

INE

D S

EW

ER

/STO

RM

E

E

S

6" WA

TER

MA

IN24" W

ATE

R M

AIN

12" CO

MB

INE

D S

EW

ER

/STO

RM

10" COMBINED SEWER/STORM

6" WATER MAIN

SS

E

10" COMBINED SEWER/STORM

6" WATER MAIN

9328

324

320

321

325

335

341

347

315

371-373

367

361

355-357

351

E

VENTEDSTRUCTURE

OC~1,872'-6" PHMP

3'±

12'± 2'±

2'±

2'±

2" BP - 219622" EF END CAP

6"x2" HVT

OC~60'-2" PHMP

2" BP - 219612" EF END CAP

6"x2" HVT

OC~60'-2" PHMP

6" CILP

6" CILP

6" CILP

4" CILP

OA

KLA

ND

ST

MA

LDE

N S

TSHAMROCK ST

NOEL ST

T3

T4

N

Feet

0 30 60

4/25/19

DRAWING TITLE:

LAYOUT SHEET

DRAWING NO:

L-2

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Know what'sbelow.before you dig.Call

R

MATCHLINE - SHEET L-3 MATCHLINE - SHEET L-3

MATCHLINE - SHEET L-1 MATCHLINE - SHEET L-1

1234

5 6

KEY PLAN

7/22/2019

Page 8: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

MATERIALINFORMATION

DRAWING NO:

L-2 MI

MATERIAL INFORMATION(TO BE COMPLETED DURING CONSTRUCTION)

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL

(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER

PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL

STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS

CONTROLLABLE FITTINGS

NONCONTROLLABLE FITTINGS

FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE

LABEL4" MF-BO4x2 HVT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST

FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR

INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)

LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R

SYMBOLN/A^N/A^

N/A*

N/A^

N/A^N/A*N/A*

SYMBOL

FITTING LEGEND

VALVE INSTALLATION DATAVALVE TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

Know what'sbelow.before you dig.Call

R

1234

5 6

KEY PLAN

Page 9: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

6" WA

TER

MA

IN

24" WA

TER

MA

IN10" C

OM

BIN

ED

SE

WE

R/S

TOR

M6" W

ATE

R M

AIN

24" WA

TER

MA

IN10" C

OM

BIN

ED

SE

WE

R/S

TOR

M

S

E

E

S

E

E

S

S

12" WATER MAIN

12" WATER MAIN

E

36" COMBINED SEWER/STORM

45" COMBINED SEWER/STORM

12" WATER MAIN

8" C

OM

BIN

ED

SE

WE

R/S

TOR

M

6" W

ATE

R M

AIN

24" W

ATE

R M

AIN

E

311

307

306

310129-131

E S

271

170-180

276-280

285-189

258-262

254

253-255

261

298

294

290

284

286

291

283

2'±

3'±

3'±

OC~1,872'-6" PHMP

FIELD BEND

6" 45° ELL

OC~1,872'-6" PHMP

(2) 6" 90° ELL

4" CILP

6" CILP

6" CILP

6" CILP

OA

KLA

ND

ST

NOEL ST

ORANGE ST

6" BP - 21964

6" BP - 21963

N

Feet

0 30 60

4/25/19

DRAWING TITLE:

LAYOUT SHEET

DRAWING NO:

L-3

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Know what'sbelow.before you dig.Call

R

MATCHLINE - SHEET L-4 MATCHLINE - SHEET L-4

MATCHLINE - SHEET L-2 MATCHLINE - SHEET L-2

1234

5 6

KEY PLAN

7/22/2019

Page 10: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

MATERIALINFORMATION

DRAWING NO:

L-3 MI

MATERIAL INFORMATION(TO BE COMPLETED DURING CONSTRUCTION)

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL

(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER

PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL

STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS

CONTROLLABLE FITTINGS

NONCONTROLLABLE FITTINGS

FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE

LABEL4" MF-BO4x2 HVT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST

FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR

INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)

LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R

SYMBOLN/A^N/A^

N/A*

N/A^

N/A^N/A*N/A*

SYMBOL

FITTING LEGEND

VALVE INSTALLATION DATAVALVE TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

Know what'sbelow.before you dig.Call

R

1234

5 6

KEY PLAN

Page 11: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

S

S

12" C

OM

BIN

ED

SE

WE

R/S

TOR

M

6" W

ATE

R M

AIN

24" W

ATE

R M

AIN

18" C

OM

BIN

ED

SE

WE

R/S

TOR

M

6" W

ATE

R M

AIN

24" W

ATE

R M

AIN

E

S

6" WATER MAIN

15" COMBINED SEWER/STORM

S

236

230-232

254

228

222 217-219

225

11-9

W S

246

251

E S

18 24-26

28

3642

46-48

50-52

S S

E

E

E

2'±

5'±11'±

10'±

6" INLINE TEE

6" BP - 29165

6" BP - 21966

6" EF END CAPEND OF TIE IN 1

OC~1,872'-6" PHMPOC~1,745'-6" PHMP

6" INLINE TEE6"x4" REDUCER4"x2" REDUCER

OC~51'-2" PHMP2" EF END CAP

6" BP - 21967OC~1,745'-6" PHMP

4'±6'±

OC~1,745'-6" PHMP

6" CILP

6" CILP

4" CILP

OA

KLA

ND

ST

KENSINGTON ST

6" 45° ELL

6" EF END CAP

T7

N

Feet

0 30 60

4/25/19

DRAWING TITLE:

LAYOUT SHEET

DRAWING NO:

L-4

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Know what'sbelow.before you dig.Call

R

MAT

CH

LIN

E - S

HEE

T L-

5M

ATC

HLI

NE

- SH

EET

L-5MATCHLINE - SHEET L-3 MATCHLINE - SHEET L-3

1234

5 6

KEY PLAN

7/22/2019

Page 12: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

MATERIALINFORMATION

DRAWING NO:

L-4 MI

MATERIAL INFORMATION(TO BE COMPLETED DURING CONSTRUCTION)

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL

(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER

PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL

STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS

CONTROLLABLE FITTINGS

NONCONTROLLABLE FITTINGS

FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE

LABEL4" MF-BO4x2 HVT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST

FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR

INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)

LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R

SYMBOLN/A^N/A^

N/A*

N/A^

N/A^N/A*N/A*

SYMBOL

FITTING LEGEND

VALVE INSTALLATION DATAVALVE TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

Know what'sbelow.before you dig.Call

R

1234

5 6

KEY PLAN

Page 13: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

S

6" WATER MAIN

15" COMBINED SEWER/STORM

S

S

6" WA

TER

MA

IN

10" CO

MB

INE

D S

EW

ER

/STO

RM

6" WA

TER

MA

IN

10" CO

MB

INE

D S

EW

ER

/STO

RM

S

E

E

S

6" WATER MAIN

12" COMBINED SEWER/STORM

72

67-69

73

75

24

9096

89

43-45

50-5254-56

62

68

63

5951

95101

106

118-120

128-130

119

109-111107

121-123

N S

10-12

142-144

E

VENTEDSTRUCTURE

EVENTEDSTRUCTURE

10'±

9'±

6'±5'±

4'±

6'±4'±

6'±4'±

10'±

OC~1,745'-6" PHMP

OC~1,745'-6" PHMP

OC~1,745'-6" PHMP

6" BP - 21968

6"x2" HVT6"x2" HVT

2" EF END CAP

2" EF END CAP

2" BP - 21970

OC~38'-2" PHMP

OC~160'-2" PHMP

2" BP - 21969

6" CILP

6" CILP

6" CILP

6" CILP

KENSINGTON ST

EA

RL S

T

RA

NN

EY S

T

T5

T6

N

Feet

0 30 60

4/25/19

DRAWING TITLE:

LAYOUT SHEET

DRAWING NO:

L-5

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Know what'sbelow.before you dig.Call

R

MAT

CH

LIN

E - S

HEE

T L-

6M

ATC

HLI

NE

- SH

EET

L-6

MAT

CH

LIN

E - S

HEE

T L-

4M

ATC

HLI

NE

- SH

EET

L-4

1234

5 6

KEY PLAN

7/22/2019

Page 14: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

MATERIALINFORMATION

DRAWING NO:

L-5 MI

MATERIAL INFORMATION(TO BE COMPLETED DURING CONSTRUCTION)

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL

(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER

PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL

STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS

CONTROLLABLE FITTINGS

NONCONTROLLABLE FITTINGS

FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE

LABEL4" MF-BO4x2 HVT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST

FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR

INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)

LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R

SYMBOLN/A^N/A^

N/A*

N/A^

N/A^N/A*N/A*

SYMBOL

FITTING LEGEND

VALVE INSTALLATION DATAVALVE TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

Know what'sbelow.before you dig.Call

R

1234

5 6

KEY PLAN

Page 15: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

S

S

6" WA

TER

MA

IN

10" CO

MB

INE

D S

EW

ER

/STO

RM

8" WATER MAIN

12" COMBINED SEWER/STORM

S

S

10" CO

MB

INE

D S

EW

ER

/STO

RM

6" WA

TER

MA

IN

SS

8" WATER MAIN

10" COMBINED SEWER/STORM

34-36

24

146

16

10-12

15-17

24

W S

152

158162

157161

35

39

45-47

49

55

40-42

44-46

52

56-58

174

E

E

5'±

9'±

5'±9'±

5'±5'±

10'±

5'±

9'±

OC~1,745'-6" PHMP

6"x4" REDUCER4"x2" REDUCER

6" INLINE TEE6"x2" HVT

2" EF END CAP

2" BP - 21971

OC~160'-2" PHMP

6" BP - 21972OC~50'-6" PHMP

6" EF END CAP

2" BP - 219732" END CAP

OC~376'-2" PHMP

6" CILP

6" CILP

6" CILP

KENSINGTON ST

RA

NN

EY S

T

RA

NN

EY S

T

PA

SA

DE

NA

ST

T7 N

Feet

0 30 60

4/25/19

DRAWING TITLE:

LAYOUT SHEET

DRAWING NO:

L-6

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

Know what'sbelow.before you dig.Call

R

MAT

CH

LIN

E - S

HEE

T L-

5M

ATC

HLI

NE

- SH

EET

L-5 1

234

5 6

KEY PLAN

7/22/2019

Page 16: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

DRAWING TITLE:

MATERIALINFORMATION

DRAWING NO:

L-6 MI

MATERIAL INFORMATION(TO BE COMPLETED DURING CONSTRUCTION)

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS

PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL

(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER

PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL

STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS

CONTROLLABLE FITTINGS

NONCONTROLLABLE FITTINGS

FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE

LABEL4" MF-BO4x2 HVT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST

FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER

^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR

INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)

LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R

SYMBOLN/A^N/A^

N/A*

N/A^

N/A^N/A*N/A*

SYMBOL

FITTING LEGEND

VALVE INSTALLATION DATAVALVE TYPE SIZE (IN) STORES ITEM NUMBER

(PO NUMBER IF NON-STOCK)MATERIAL

(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS

Y or N

Know what'sbelow.before you dig.Call

R

1234

5 6

KEY PLAN

Page 17: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

E

S

S

20

E

E

6"x0.5" TAPPING TEE0.5" EF COUPLING

~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

G

T1

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP E

S

2"x1.25" TAPPING TEE1.25" EF COUPLING

~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER

1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

E

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

G

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

T7

SS

E

324

320

2"x1.25" TAPPING TEE1.25" EF COUPLING

~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER

1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

G

DRAWING TITLE:

CONSTRUCTIONDETAILS

DRAWING NO:

D-1

CONSTRUCTION DETAILS

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

Know what'sbelow.before you dig.Call

R

T1 T3

T4 T1

T2

7/22/2019

Page 18: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

S

S

35

E

E

6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

G

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

T7

EA

RL S

T

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

SE

24

89

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

GG

6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" PERMASERT CAP

T5

S

10-12

24

RA

NN

EY S

T

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

DRAWING TITLE:

CONSTRUCTIONDETAILS

DRAWING NO:

D-2

CONSTRUCTION DETAILS

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

4/25/19

Know what'sbelow.before you dig.Call

R

T7

T5 T5

T7

T6

T2

7/22/2019

Page 19: INSTALLATION ORDER NUMBER ABANDONMENT ORDER …

KENSINGTON ST

PA

SA

DE

NA

ST

2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" PERMASERT CAP

DRAWING TITLE:

CONSTRUCTIONDETAILS

DRAWING NO:

D-3

CONSTRUCTION DETAILS

REVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED

1 07/11/2019 PEER REVIEW COMMENTS

SITE NAME:

INST#

PROJECT ID#ABAN#

OAKLAND ST - POOR PRESSURE REMEDIATIONSPRINGFIELD, HAMPDEN

18-0822617-00NONE

18-52620

DESIGNED BY

NAME DATE PHONE #

DRAWN BYCHECK'D BYAS-BUILT BY

RAS 06/21/2019 413-302-5853RAS 06/21/2019 413-302-5853BJM 07/10/2019 413-326-0636

PROPOSEDREVISIONS

DATE DESCRIPTIONREV. #

0 06/21/2019 DRAWING CREATED