Interim Gu Inte Elec in th This is iss copies up date, or su Referenc Issue num Original 22 Novemb ide to Elect erim ctric he A sued as a C p to date. D uperseded ce Onlymber ber 2013 trical Permit Gui cal P Auck Controlled Distribution d sections m Prepared Reviewe Amende (P) M M (R) A. N t to Work in de t Perm kland d Docume is as per t must be d d (P) ed (R) ed (A) arshall Neilson n Auckland E o mit to d Ele ent. Holder the KiwiRa destroyed, Approve Ian C National and Risk Electrified A o Wo ectri rs are resp ail I&E docu or marked/ ed by Cotton Standards k Manager Area Nov 2 ork ( ified onsible for ument data /stamped Authori for relea Matt B General M Safety an 2013 EF2 d Are r maintaini abase. All Historica ised ase by R d Ballard Manager d People Page 1 01) ea ng their out of al Review date March 2014

Upload: vuongdang

Post on 11-Jan-2017

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Gu 

 

InteElecin th

This is isscopies update, or suReferenc

Issue num

Original 22 Novemb

ide to Elect

erim ctriche A

sued as a Cp to date. Duperseded

ce Only”

mber

ber 2013

trical Permit

Guical PAuck

ControlledDistribution d sections m

PreparedRevieweAmende

(P) M M(R) A. N

t to Work in

de tPermkland

d Documeis as per t

must be d

d (P) ed (R) ed (A)

arshall Neilson

n Auckland E

o mit tod Ele

ent. Holderthe KiwiRa

destroyed,

Approve

Ian CNational

and Risk

Electrified A

o Woectri

rs are respail I&E docuor marked/

ed by

Cotton   Standards  

k Manager 

Area Nov 2

ork (ified

onsible forument data/stamped “

Authorifor relea

Matt BGeneral MSafety an

2013

EF2d Are

r maintainiabase. All “Historica

ised ase by

Rd

Ballard Manager d People

Page 1

01) ea

ng their out of

al

Review date

March 2014

Page 2: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 2  

Table of contents Page

1. Overview .............................................................................................................. 2

2. What to do in an emergency ............................................................................... 3

3. The dangers ........................................................................................................ 3

4. Other Contact Numbers....................................................................................... 3

5. Definitions ............................................................................................................ 4

6. Planning your work .............................................................................................. 7

7. Approach distances ............................................................................................. 8

8. When do I need an Electrical Permit to Work .................................................... 10

9. Excavations / Digging ........................................................................................ 11

10. What to report ................................................................................................. 13

11. Work Site Limits.............................................................................................. 14

12. Issuing of EF201 and EF202 process steps ................................................... 15

13. Flowchart for issuing and return of EF201 and EF202 forms ......................... 17

14. Traction Safety Posters .................................................................................. 18

Note: Track changes have not been shown

1. Overview This interim guide is for working in the Auckland Electrified Area and the electrical procedures and responsibilities relating to this work. To be read in conjunction with the Rail Operating Rules and Procedures and other issued Traction documentation including Code Supplement E/CST/101 and KRNP-SA-0025 Safety Handout AEA AC Electrical Area.

Further documents detailing the electrical requirement for the Auckland Electrified Area, these may be obtained by contacting the KiwiRail Regional Traction and Signalling Manager.

Page 3: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Gu 

2. Wh

R

3. T

It

4. Ot

Tra Tra

Co

Kiw

ST

ide to Elect

hat to do

Rail E

State it isState youState yocrossingsRequest Keep a dkeeping c0.75m foAdvise otStay on actions to

The dang

t is dange for

equ to a

If you hit Ele Ex Da Da Be

Tr

ther Con

ain Control

action Con

orridor Acc

wiRail OLE

TTE Asset

trical Permit

o in an em

Emer

s an emerur name, cur locatios etc. to hfor emerg

distance oclear of anr emergenthers in ththe telep

o be taken

gers

erous anyone tipment llow any o

or get tooectrocutioxplosion amage to ramage to yeing hit by

reat al

tact Num

(Auckland

trol

cess Co-o

E Project

t Performa

t to Work in

mergenc

rgen

rgency company

on – use elp define

gency servf at least ny damagncy rescuhe vicinity phone unn

to touch

object to to

o close to on

railway eqyour equipa train

ll wires

mbers

d Desk)

ordinator

Manager

ance Man

n Auckland E

cy

ncy

and contarailway fe

e your locavices if re2 metres

ged tractioe to stay cl

ntil instruc

or to co

ouch or to

the overh

quipmentpment

s as li

ager - No

Electrified A

08Train C

act numbeeatures sation quired from the e

on equipm

ear ctions ha

me too c

o come too

head there

ve at a

(04)

(04)

(09

(09

orthern

Area Nov 2

800 8Control eme

er such a sta

emergencent/wires

ve been

close to l

o close to

e is a risk

all tim

) 498 3362

) 498 3347

) 270 524

) 583 963

(09) 270

2013

808 4ergency pho

ations na

cy/acciden

received

live overh

o live equip

of:

es

2

7 or (04) 49

48 (Bus hr

37 (Bus hr

5125 (Bu

Page 3

400 one

me, level

nt, always

on safe

head line

pment.

983348

s.)

s.)

us hrs.)

3

l

s

e

e

Page 4: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Gu 

5. De

ComTracneceand

Elepreeq

If cmapri

No

Eleequspe

Eleuse

ide to Elect

efinitions

mpetent Tction persessary knto the sta

ectrical Sevent peouipment a

currently qay also caimary ESO

Rail Site

ote: Electrrole w

ectrical Sauipment hecified loc

ectric Sered

to limielectr

when norma

trical Permit

s

Traction Pon who haowledge,

andard req

Safety Obple or equ

and follow

qualified, tarry out othO role incl

Safety ObProtector

rical Safetwith no dist

afety Obsehave beencations).

rvices Lim

it electric ically isolaelectric s

al destinat

t to Work in

Personneas been askills and

quired.

server (Euipment a

ws the dire

they her roles, uding

bserver orfor a site,

y Observetractions.

ervers aren isolated

mit Board

services fated areaervices artions.

n Auckland E

el (CTP) massessed d experien

ESO) Is a pproachinctions of t

ensuring

r , with only

ers / Rail

e not requ(i.e. the p

ds (ESL) t

from enter

re termina

Electrified A

means anby KiwiRa

nce to carr

Competenng closer tthe Site P

that they

y one spec

Safety Ob

ired whenpower is is

these boa

ring an

ated short

Area Nov 2

electricallail and hasry out trac

nt person the RMAD

Protector fo

do not co

cific activit

bservers m

n all electrsolated an

ards are

of their

2013

ly qualifieds currencyction work

whose taD to overhor rail safe

onflict with

ty.

must carry

rical lines nd earthed

Page 4

d y in the

k safely

ask is to head ety.

h the

y out their

and d at the

4

Page 5: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 5  

Rail Protection Officer (RPO)

The person with overall responsibility for:

providing rail protection for the Work Area Co-ordinating movement of rail vehicles within and through the Work

Area Responsible for communicating with Train Control.

Rail Reconstruction Site

A site where the rail has been removed for reconstruction of the track, with no adjacent, running lines. The RPO will arrange for the erection of site limit boards at either end of the reconstruction site and will communicate directly with the Works Supervisor until just before the rail is to be reconnected to the network, when a Site Protector will be appointed to ensure the rail safety of the site.

Rail Safety Observer

The person under the direction of the Site Protector, responsible for observing one activity. i.e. ensuring an activity taking place behind authorised fencing does not obstruct any running line. to preventing movements passing authorised fencing and or

people or equipment approaching closer than RMAD to overhead equipment. (power must be isolated and earthed, with EF201 issued).

Running Line

A line, which can be used by rail vehicles.

Site Protector

The person responsible for ensuring safe rail operations within a specific Work Site (includes rail vehicles movements within their Work Site).

Traction Control Room (Wellington)

The room from which all circuit breakers and motorised switches in an Electrified Area can be operated remotely

Work Area

The overall area encompassing one or a number of Work Sites and under a rail protection arrangement put in place by the Rail Protection Officer.

Page 6: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 6  

Work Site

The area of activity under the control of a single Site Protector. The limits of the Work Site shall be defined by Site Limit Boards.

Works Supervisor

The person responsible for managing the work activities within a Work Site including the occupational health and safety of the personnel (including contractor personnel) within the Work Site. There may be several Works Supervisors operating within a single Work Site under the direction of a Site Protector.

Works Supervisors must: Be current with their AC Electrical Awareness qualification Work to the agreed work methodology plan set out by the CTP/ESO in

the EF201 and manage the EF202 forms Directly supervise personnel to follow agreed work methodologies Inform the Site Protector when then they have received/transferred and

returned the EF201 issued to them Follow the directions of the CTP/ESO when on site. Have the authority to stop/amend work when directed by

The CTP / ESO or To comply with the requirements of the EF201.

Only return the EF201 and EF202 forms when the Traction Infrastructure is in a safe state, all plant and

equipment is well clear of the lines to requirements and all personnel have signed out of the work site.

Before the EF201 and EF202 are returned, must ensure that personnel and plant are clear of the Traction Infrastructure as it must be treated as alive

Page 7: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 7  

6. Planning your work Below is a flow chart showing the process

Page 8: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Gu 

7. ApElethe

25

Pe

Pl

Sc

WoEleon

Fig.a

ide to Elect

pproach ectrical Reere is a re

5kV AC

erson – (F

lant – (Fig

caffolding

orking comectrical Pewhen you

a

trical Permit

distanceegulationsquiremen

Fig.a)

g.b)

mpletely oermit to wou need to

t to Work in

es s require tt for minim

Minimumdistance

2

4

8(for erec

pre

outside of ork, howehave an E

n Auckland E

that whenmum appr

m Approae (MAD)

2 metres

4 metres

8 metresction withoecautions

the MAD ever it is imElectrical

Electrified A

working oroach dist

ch A

out site )

does not mportant tPermit to

Area Nov 2

on KiwiRaances as

Reduced Approach(RMAD)

1

2

Electricaadviceaccor

IEC

normally o read theWork.

2013

ail Infrastrushown be

Minimumh distance

1 metre

metres

al Engineee requiredrdance wi

C 62128-1

require ane next ins

Page 8

ucture elow

ering d in th

n truction

8

Page 9: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Gu 

Fig.b

ide to Electtrical Permit

t to Work inn Auckland EElectrified AArea Nov 22013 Page 99

Page 10: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 10  

8. When do I need an Electrical Permit to Work Electrical Permits to work (EF201 and EF202 forms) on KiwiRail Infrastructure are required as shown below

Minimum Approach distance (MAD)

Reduced Minimum Approach distance (RMAD)

Working completely clear of MAD and will not encroach 

No Permit to work required

Working close to and up to MAD

Prior to commencing work contact the CTP, for a site assessment, if there is any doubt of risk of contact

Working within MAD (not at or inside RMAD) 

CTP required to issue EF201 with ESO (power on) or Rail Safety Observer

(power off– isolated and earthed))

Working at or within RMAD

CTP to assess requirements for EF201 and issue with Rail Safety Observer

(power off – isolated and earthed) 

The Competent Traction Person may also apply restriction(s) to the work being carried out to protect the Traction infrastructure and personal safety.

Page 11: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Gu 

9. ExWhtrabef

Tra

Red

ide to Elect

xcavationhen there ction infrafore work

action infr

Cablesfeeders

Red Bowire coPET ca

Poles (page fo

d Bonds ar

trical Permit

ns / Diggis a poss

astructure commenc

rastructure

– 25kV fes onds – retontinuity boabinet bonsee NZEC

or minimum

re shown

t to Work in

ging ibility thatfeatures

ces.

e features

eeders, su

urn bondsonds, and

nds CP 34 diam distanc

in this pic

n Auckland E

t you needthen an E

s include:

ubstation

s, speciald

gram on fce)

cture

Electrified A

d to carryEF201 (an

to line

earth

following

Area Nov 2

out excavd EF202)

2013

vations or ) must be

Page 11

dig, near received

Page 12: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 12  

NZECP 34 page 6

Page 13: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 13  

10. What to report Immediately advise the Competent Traction Person of any of the following

touch or hit or damage to the Traction Infrastructure (includes wire, cantilevers, poles and bonds)

Near miss or close approach inside the agreed Traction approach distances

Changes required to the agreed work methodology plan (EF201) When any of the above have been reported, the EF201 must not be returned/cancelled by the Works Supervisor, until the CTP has checked the Traction Infrastructure and confirmed it is in a safe state.

Page 14: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 14  

11. Work Site Limits Work site must be completely protected by both electrical and track (rail movement) protection.

The Track Protection boundary should normally be greater than the electrical protection and an electrical safety buffer used to ensure that the electrical protection is not compromised.

See examples below

PlatformElectric passenger services terminated short of Protected work area

Track Protection greater than Isolated area (only diesel services running)

Traction isolated area

Traction isolated area

Work Site

Work Site

Note: When temporary earths are the limit of the safe working area, No work inside the MAD can happen when outside of the area covered by the earths

Page 15: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 15  

12. Issuing of EF201 and EF202 process steps

EF201 form when issued authorises activities (for electrical purposes

only) to occur within either the MAD or RMAD distances from Traction

Infrastructure.

Note: Working within the rail corridor also requires track protection to

be in place before starting to work

EF202 form supplies information on the hazards at the Work Site and

provides an acknowledgement of the Work site; risks and signing in /

signing out process.

1. RPO applies for Track Protection

2. CTP meets with Work Supervisors to prepare information

required for EF201 (and EF202) process and discuss hazards

within the agreed work site limits

3. CTP undertakes power isolation process

4. CTP advises RPO of Worksites and Works Supervisors whom

will receive EF201 forms

5. CTP issues EF201 and 202 forms to Works Supervisors

6. Works Supervisors travel to their Work Sites with the EF201,

EF202 forms

7. Works Supervisor on arrival at Work site,

shows the Site Protector the EF201 and EF202 forms

Briefs all personnel at the site and ensures all personnel

endorse the back of the EF202 form with their name,

initials and the time).

8. Site Protector advises RPO that EF201 is on site (RPO endorse

Mis74 form)

9. RPO authorises work to commence at site (if safe – no rail

movements)

10. Personnel temporarily leaving and returning to the Work Site

must sign out and sign in on their return on the issued EF202

form

see next page for End of Planned Work at Work Site

Page 16: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 16  

End of Planned Work at Work Site

11. All personnel sign out of the Work Site on the EF202

12. Works Supervisor returns EF201 and EF202 to CTP

13. CTP advises RPO when all EF201 and EF202 forms have been

returned

14. CTP undertakes power restoration

15. CTP advises RPO of power restoration

16. RPO removes Track Protection

Page 17: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 17  

13. Flowchart for issuing and return of EF201 and EF202 forms

Page 18: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 18  

14. Traction Safety Posters

 

Page 19: Inte Elec in th erim ctric he A Gui cal P Auck de t Perm kland o mit to

Interim Guide to Electrical Permit to Work in Auckland Electrified Area Nov 2013 Page 19