interim evaluation by imed c114southwest.bwdb.gov.bd/files/report/883bd04fd40b0caa3b1b... · 2018....
TRANSCRIPT
-
30000 25000 20000 15000 10000
5000 0
30,000,000
i! 25,000,000
c 20,000,000
3 15,000,000
10,000,000
1.2 5,000,000
0 1'1 PVerf,044V54V4WAW NOAVAWAAVA,44 O0 44
WMG capital in bank accounts
iisteeeNOW,§44444I*n'p^' sgi'vcipWAW;#4.40/A44,#•
Time
2-3. Dadwie Beet & Ks 'eel at Faridpur F
CCha tlar-rakurtiat
atFaridpur
ri. Bamonkhali-Ba
Ongoing Narail Sub-project
Field Demonstration Farmers Field School Field School of Fisheries Pond Demonstration
WMO Activities:
t#
Project Financing Name of Develooment Partners Amount
Asian Development Bank US $ 20.0 million (Loan)
Government of the Netherlands US $ 10.50 million (Grant)
Government of Bangladesh ➢ US $ 10.90 million (Grant)
DPP Cost (Revised) Total DPP Cost Taka 30503.50 lac
[PA: Taka 24721.05 lac, RPA: Taka 20628.89 lac & GoB: Taka 5782.45 lac]
Project Implementation Period Commencement > April 2006
Completion (Revised) > June 2015
Status of Project Components
a. Civil works: Embankment construction/re-sectioning: 30.20km, Khal Re-excavation: 257.30 km, Rehabilitation/Repair of Regulators: 15 nos., Construction of Regulators: 5 nos., Foot Bridge: 37 nos., Inlet and Outlet Structures: 13 nos. River Bank Protection Work: 3.100 kin,. WMA/WMG Training Centre: 32 nos., Arsenic Free Deep Tube Well for Safe Drinking Water: 122 nos., Rehabilitation of Irrigation Scheme: 2 nos, Upgrading of Rural Road: 17.48 km & Aila-2009 Damaged Rehabilitation Works for Polder 5, 15, 31 & 32;
b. Participatory Planning and WMO Formation: Formation of Sub-Unit Implementation Plan (SIP): 14, WMG: 102 nos., WMA: 14 nos. & Joint Management Committee, JMC: 2 nos.
All WMGs are registered by the Department of Co-operative (DoC).
c. Management Transfer of SIP for O&M: Total no. of SIP: 14, Handed over to WMA (upto June'14): 13
Project Progress (upto June 2014) Physical Progress ➢ 97%
Financial progress ➢ Taka 26951.36 lac
Program for 2014-15: I. Strengthening of financial & institutional capacity for WMGs & WMAs;
2. Increase participation in Integrated Water Resources Management for sustainable O&M of the project;
3. Class room training on Participatory O&M and hand held practice for sustainable O&M;
4. Technology transfer to WMG members through Farmers Field School (FFS) for agriculture & Field School of Fisheries (FSF) for fish culture and application of interventions for increased agriculture and fish production;
5. Installation of deep tube wells for supply of arsenic free drinking water;
6. Improvement of Management Information System (MIS).
Interim Evaluation by IMED 1. Project area is protected against flood & drainage congestion problems have been
improved due to re-excavation of khal;
2. Agriculture production increased roughly twice & annual incremental fish production is roughly 2900 MT due to project intervention, increased cost is about BDT 229.00 Crores & BDT 29.00 Crores respectively for agriculture & fish production;
3. WMAs have taken over the management responsibility of Sub-Unit Implemented areas for sustainable O&M;
4. WMGs are involved with income generating activities (IGA) to facilitate O&M activities & to enhance their livelihood;
5. Livelihood enhancement of WMG members' upto June 2013 is about 30% against target of 40%.
Impact of Project Implementation 1. 120,000 ha of land in Narail, Jesssore, Khulna & Satkhira District would be
protected from flood; drainage congestion problems would also be solved;
2. Agriculture & fish production would be increased compared to pre-project condition due to project interventions of better technology, good seed etc. ;
3. Construction of pucca road over flood control embankment and foot bridges over canal will improve communication system in the project area;
4. Installation of arsenic free DTW will facilitate supply of palatable drinking water
5. Utilization of river water will be increased for irrigation through operation of Regulators; use of groundwater will be reduced.
Photographs of civil works
Constructed Embankment Re-excavated Khat Repaired Regulator WMG Training Center
Photographs of gender & livelihood
WMG Training Center Arsenic Free DTW Mother & Child Care Cow Rearing
Graphical presentation of WMO formation & share savings
Status of 102 nos. WMO Members Status of Share Savings by Members
Ongoing 2 nos. &. Proposed 11 nos. Sub-project
Project Consultant DH-BV, The Netherlands in association with DevCon Bangladesh & Design, Planning & Management Consultant, Bangladesh
91-t c114 Bangladesh Water Development Board
4.1 via`1-9rf;t"g1r8417 4114 9rft- =r-PR 4-slx Southwest Area Integrated Water Resources Planning &
Management Project
-
444 fita11 131 9tft- 9ft-sig-4 4-Ing
•Icti 7rt
kci% e'VO ftl-\-6 I 4 zlsOff 9S-74 7514-gliT t5:114-, ac5t191711514, two PS t Sg4 C11t1.11141 C I 4 75T*074 o% 1\% 4111431
f4GI 44k zRittt 11% 4 -4-1/N. 'StI 3 zli417 1- I C140151 1),111'43(.414 Gt•il FAP-4 '31143*4 441'4'151 zri\sv514 Nflf4I-91SITIVOIIT 751f-1\5 911fd 9ft-4-ZI9.1 1 414744I9Mt
131."1'11 PPTA 4A111.1 tffTF .43T (ADB) a4 .:111144 )12111\51II l'F'4iff Oct kirf I FAP-4 4'444 2(A, 7 9111 ^f1 3 9-17-4 --tcGT 11:iiftMf5t
4.4)1151,11C‘,61G6/11 4G4 Water Management Group (WMG), Water Management Associa-
tion (WMA) :1144' 7fk"41 Zz