30000 25000 20000 15000 10000 5000 0 30,000,000 i ! 25,000,000 c 20,000,000 3 15,000,000 10,000,000 1 . 2 5,000,000 0 1'1 PVerf,044V54V4WAW NOAVAWAA V A,44 O 0 4 4 WMG capital in bank accounts iisteeeNOW , §44444I* n 'p^' sgi'vcipWAW;#4.4 0/A 4 4 ,#• Time 2-3. Dadwie Beet & Ks 'eel at Faridpur F CCha tlar-rakurtiat at Faridpur ri. Bamonkhali-Ba Ongoing Narail Sub-project Field Demonstration Farmers Field School Field School of Fisheries Pond Demonstration WMO Activities: t# Project Financing Name of Develooment Partners Amount Asian Development Bank US $ 20.0 million (Loan) Government of the Netherlands US $ 10.50 million (Grant) Government of Bangladesh US $ 10.90 million (Grant) DPP Cost (Revised) Total DPP Cost Taka 30503.50 lac [PA: Taka 24721.05 lac, RPA: Taka 20628.89 lac & GoB: Taka 5782.45 lac] Project Implementation Period Commencement > April 2006 Completion (Revised) > June 2015 Status of Project Components a. Civil works: Embankment construction/re-sectioning: 30.20km, Khal Re-excavation: 257.30 km, Rehabilitation/Repair of Regulators: 15 nos., Construction of Regulators: 5 nos., Foot Bridge: 37 nos., Inlet and Outlet Structures: 13 nos. River Bank Protection Work: 3.100 kin,. WMA/WMG Training Centre: 32 nos., Arsenic Free Deep Tube Well for Safe Drinking Water: 122 nos., Rehabilitation of Irrigation Scheme: 2 nos, Upgrading of Rural Road: 17.48 km & Aila-2009 Damaged Rehabilitation Works for Polder 5, 15, 31 & 32; b. Participatory Planning and WMO Formation: Formation of Sub-Unit Implementation Plan (SIP): 14, WMG: 102 nos., WMA: 14 nos. & Joint Management Committee, JMC: 2 nos. All WMGs are registered by the Department of Co-operative (DoC). c. Management Transfer of SIP for O&M: Total no. of SIP: 14, Handed over to WMA (upto June'14): 13 Project Progress (upto June 2014) Physical Progress 97% Financial progress Taka 26951.36 lac Program for 2014- 15: I. Strengthening of financial & institutional capacity for WMGs & WMAs; 2. Increase participation in Integrated Water Resources Management for sustainable O&M of the project; 3. Class room training on Participatory O&M and hand held practice for sustainable O&M; 4. Technology transfer to WMG members through Farmers Field School (FFS) for agriculture & Field School of Fisheries (FSF) for fish culture and application of interventions for increased agriculture and fish production; 5. Installation of deep tube wells for supply of arsenic free drinking water; 6. Improvement of Management Information System (MIS). Interim Evaluation by IMED 1. Project area is protected against flood & drainage congestion problems have been improved due to re-excavation of khal; 2. Agriculture production increased roughly twice & annual incremental fish production is roughly 2900 MT due to project intervention, increased cost is about BDT 229.00 Crores & BDT 29.00 Crores respectively for agriculture & fish production; 3. WMAs have taken over the management responsibility of Sub-Unit Implemented areas for sustainable O&M; 4. WMGs are involved with income generating activities (IGA) to facilitate O&M activities & to enhance their livelihood; 5. Livelihood enhancement of WMG members' upto June 2013 is about 30% against target of 40%. Impact of Project Implementation 1. 120,000 ha of land in Narail, Jesssore, Khulna & Satkhira District would be protected from flood; drainage congestion problems would also be solved; 2. Agriculture & fish production would be increased compared to pre-project condition due to project interventions of better technology, good seed etc. ; 3. Construction of pucca road over flood control embankment and foot bridges over canal will improve communication system in the project area; 4. Installation of arsenic free DTW will facilitate supply of palatable drinking water 5. Utilization of river water will be increased for irrigation through operation of Regulators; use of groundwater will be reduced. Photographs of civil works Constructed Embankment Re-excavated Khat Repaired Regulator WMG Training Center Photographs of gender & livelihood WMG Training Center Arsenic Free DTW Mother & Child Care Cow Rearing Graphical presentation of WMO formation & share savings Status of 102 nos. WMO Members Status of Share Savings by Members Ongoing 2 nos. &. Proposed 11 nos. Sub-project Project Consultant DH-BV, The Netherlands in association with DevCon Bangladesh & Design, Planning & Management Consultant, Bangladesh 91 - t c114 Bangladesh Water Development Board 4. 1 via`1-9 rf ; t"g1r8 417 4 11 4 9 rft - =r-PR 4 - slx Southwest Area Integrated Water Resources Planning & Management Project

Upload: others

Post on 25-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • 30000 25000 20000 15000 10000

    5000 0

    30,000,000

    i! 25,000,000

    c 20,000,000

    3 15,000,000

    10,000,000

    1.2 5,000,000

    0 1'1 PVerf,044V54V4WAW NOAVAWAAVA,44 O0 44

    WMG capital in bank accounts

    iisteeeNOW,§44444I*n'p^' sgi'vcipWAW;#4.40/A44,#•

    Time

    2-3. Dadwie Beet & Ks 'eel at Faridpur F

    CCha tlar-rakurtiat

    atFaridpur

    ri. Bamonkhali-Ba

    Ongoing Narail Sub-project

    Field Demonstration Farmers Field School Field School of Fisheries Pond Demonstration

    WMO Activities:

    t#

    Project Financing Name of Develooment Partners Amount

    Asian Development Bank US $ 20.0 million (Loan)

    Government of the Netherlands US $ 10.50 million (Grant)

    Government of Bangladesh ➢ US $ 10.90 million (Grant)

    DPP Cost (Revised) Total DPP Cost Taka 30503.50 lac

    [PA: Taka 24721.05 lac, RPA: Taka 20628.89 lac & GoB: Taka 5782.45 lac]

    Project Implementation Period Commencement > April 2006

    Completion (Revised) > June 2015

    Status of Project Components

    a. Civil works: Embankment construction/re-sectioning: 30.20km, Khal Re-excavation: 257.30 km, Rehabilitation/Repair of Regulators: 15 nos., Construction of Regulators: 5 nos., Foot Bridge: 37 nos., Inlet and Outlet Structures: 13 nos. River Bank Protection Work: 3.100 kin,. WMA/WMG Training Centre: 32 nos., Arsenic Free Deep Tube Well for Safe Drinking Water: 122 nos., Rehabilitation of Irrigation Scheme: 2 nos, Upgrading of Rural Road: 17.48 km & Aila-2009 Damaged Rehabilitation Works for Polder 5, 15, 31 & 32;

    b. Participatory Planning and WMO Formation: Formation of Sub-Unit Implementation Plan (SIP): 14, WMG: 102 nos., WMA: 14 nos. & Joint Management Committee, JMC: 2 nos.

    All WMGs are registered by the Department of Co-operative (DoC).

    c. Management Transfer of SIP for O&M: Total no. of SIP: 14, Handed over to WMA (upto June'14): 13

    Project Progress (upto June 2014) Physical Progress ➢ 97%

    Financial progress ➢ Taka 26951.36 lac

    Program for 2014-15: I. Strengthening of financial & institutional capacity for WMGs & WMAs;

    2. Increase participation in Integrated Water Resources Management for sustainable O&M of the project;

    3. Class room training on Participatory O&M and hand held practice for sustainable O&M;

    4. Technology transfer to WMG members through Farmers Field School (FFS) for agriculture & Field School of Fisheries (FSF) for fish culture and application of interventions for increased agriculture and fish production;

    5. Installation of deep tube wells for supply of arsenic free drinking water;

    6. Improvement of Management Information System (MIS).

    Interim Evaluation by IMED 1. Project area is protected against flood & drainage congestion problems have been

    improved due to re-excavation of khal;

    2. Agriculture production increased roughly twice & annual incremental fish production is roughly 2900 MT due to project intervention, increased cost is about BDT 229.00 Crores & BDT 29.00 Crores respectively for agriculture & fish production;

    3. WMAs have taken over the management responsibility of Sub-Unit Implemented areas for sustainable O&M;

    4. WMGs are involved with income generating activities (IGA) to facilitate O&M activities & to enhance their livelihood;

    5. Livelihood enhancement of WMG members' upto June 2013 is about 30% against target of 40%.

    Impact of Project Implementation 1. 120,000 ha of land in Narail, Jesssore, Khulna & Satkhira District would be

    protected from flood; drainage congestion problems would also be solved;

    2. Agriculture & fish production would be increased compared to pre-project condition due to project interventions of better technology, good seed etc. ;

    3. Construction of pucca road over flood control embankment and foot bridges over canal will improve communication system in the project area;

    4. Installation of arsenic free DTW will facilitate supply of palatable drinking water

    5. Utilization of river water will be increased for irrigation through operation of Regulators; use of groundwater will be reduced.

    Photographs of civil works

    Constructed Embankment Re-excavated Khat Repaired Regulator WMG Training Center

    Photographs of gender & livelihood

    WMG Training Center Arsenic Free DTW Mother & Child Care Cow Rearing

    Graphical presentation of WMO formation & share savings

    Status of 102 nos. WMO Members Status of Share Savings by Members

    Ongoing 2 nos. &. Proposed 11 nos. Sub-project

    Project Consultant DH-BV, The Netherlands in association with DevCon Bangladesh & Design, Planning & Management Consultant, Bangladesh

    91-t c114 Bangladesh Water Development Board

    4.1 via`1-9rf;t"g1r8417 4114 9rft- =r-PR 4-slx Southwest Area Integrated Water Resources Planning &

    Management Project

  • 444 fita11 131 9tft- 9ft-sig-4 4-Ing

    •Icti 7rt

    kci% e'VO ftl-\-6 I 4 zlsOff 9S-74 7514-gliT t5:114-, ac5t191711514, two PS t Sg4 C11t1.11141 C I 4 75T*074 o% 1\% 4111431

    f4GI 44k zRittt 11% 4 -4-1/N. 'StI 3 zli417 1- I C140151 1),111'43(.414 Gt•il FAP-4 '31143*4 441'4'151 zri\sv514 Nflf4I-91SITIVOIIT 751f-1\5 911fd 9ft-4-ZI9.1 1 414744I9Mt

    131."1'11 PPTA 4A111.1 tffTF .43T (ADB) a4 .:111144 )12111\51II l'F'4iff Oct kirf I FAP-4 4'444 2(A, 7 9111 ^f1 3 9-17-4 --tcGT 11:iiftMf5t

    4.4)1151,11C‘,61G6/11 4G4 Water Management Group (WMG), Water Management Associa-

    tion (WMA) :1144' 7fk"41 Zz