\ Proiect -Quarterly Progress Report Promoter's Name Tamilnadu Slum Clerance Board Project Name Construction 480 (G+3) tenements at Reddiyarpatti Phase-I scheme including internal water supply, sanitary and electrification arrangements at Tirunelveli Corporation in Tirunelveli District under PMAY-HFA -AHP Project Registration No TN/26/Buliding/0011/2021 dt.11.01.2021 Quarter Ending June 2021 Sl.No. Description I Cumulative No.ofUnitsuptotheQuarter Total Area 1. Plots/Flats Bookedsize wise (As given in Carpet Area Statement while registering) 2. Parking Lots 3. UDS Registered in Sq.in. 8. Construction Sl.No. Description Block/Tower No. Status 1. Stage of construction of each 15 blocks Finishing level Block/Tower,Floor wise 2. Status of common Amenities for Sump and Pump Finishing level each Block/Tower, Item wise room, Dewats,Externalwatersupply,StormWaterDrain,Road,Pavementaroundblocks Sl.No. Description Percentage 1. Percentage of Completion i) Physical 90% ii) Financial (Enter Anticipated Project Cost in Lakhs) 90% (Rs.600lakhs)

Upload: others

Post on 27-Aug-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: internal water supply, sanitary and - Government of Tamil Nadu...internal water supply, sanitary and electrification arrangements at Tirunelveli Corporation in Tirunelveli District

\ Proiect -Quarterly Progress Report

Promoter's Name Tamilnadu Slum Clerance BoardProject Name Construction 480 (G+3) tenements at

Reddiyarpatti Phase-I scheme includinginternal water supply, sanitary andelectrification arrangements atTirunelveli Corporation in TirunelveliDistrict under PMAY-HFA -AHP

Project Registration No TN/26/Buliding/0011/2021 dt.11.01.2021Quarter Ending June 2021

Sl.No. DescriptionI Cumulative No.ofUnitsuptotheQuarter

Total Area

1. Plots/Flats Bookedsize wise (As

given in Carpet Area Statementwhile registering)

2. Parking Lots

3. UDS Registered in Sq.in.

8. Construction

Sl.No. Description Block/Tower No. Status

1. Stage of construction of each 15 blocks Finishing level

Block/Tower,Floor wise2. Status of common Amenities for Sump and Pump Finishing level

each Block/Tower, Item wise room, Dewats,Externalwatersupply,StormWaterDrain,Road,Pavementaroundblocks

Sl.No. Description Percentage

1. Percentage of Completion

i) Physical 90%

ii) Financial (Enter Anticipated Project Cost in Lakhs) 90% (Rs.600lakhs)

Page 2: internal water supply, sanitary and - Government of Tamil Nadu...internal water supply, sanitary and electrification arrangements at Tirunelveli Corporation in Tirunelveli District

C. Details of Clearances

1. Completion Certificate No .------------------ (only CC No. in Text Fo

2. Compliance Report, if any (Kindly Specify) -------------- (in PDF Format)

3. Annual Audit Report of Special Account in Form 7-Not applicable

D. Latest Photo with Date (Atleast from 2 angles) --------------- (jn PDF Format)

Tamil N lum Clearanee

5#2)7(:neivctl"vis,on

Page 3: internal water supply, sanitary and - Government of Tamil Nadu...internal water supply, sanitary and electrification arrangements at Tirunelveli Corporation in Tirunelveli District

Project -Quarterlv Progress ReportName Executive Engineer, Tamilnadu Slum

clearance BoardProject Name Construction of 768 (G+7) tenements at

Reddiyarpatti Phase -11 scheme includinginternal water supply, sanitary andelectrification arrangements inTirunelveli District under PMAY -HFA -AHP

Project Registration No TN/26/Building/0011/2021, Dated:11.01.2021

Quarter Ending June 2021A. Sales

Sl.No. Description Cumulative No.ofUnitsuptotheQuarter Total Area

1. Plots/Flats Booked size wise (As

given in Carpet Area Statementwhile registering)

2. Parking Lots

3. UDS Registered in Sq.in.

8. ConstructionSl.No. Description Block/Tower No. Status

1. Stage of construction of eachBlock/Tower, Floor wise

BIock -1 Fourth Floor roofcompleted

Block -2 Fourth Floor roofcompleted

Block -3 Ground FloorColumncompleted

Block -4 Ground FloorColumncompleted

Block -5 Fifth Floor roofcompleted

Block -6 Ground FloorColumncompleted

2. Status of common Amenities Sump and Pump Completed

for each BlockFTower, Item room -3 moswise

Page 4: internal water supply, sanitary and - Government of Tamil Nadu...internal water supply, sanitary and electrification arrangements at Tirunelveli Corporation in Tirunelveli District

Sl.No. Description Percentage1. Percentage of Completion

i) Physical 35%ii) Financial (Enter Anticipated Project Cost in Lakhs) 35%(Rs.2248.00lakhs)

C. Details of Clearances1. Completion Certificate No .------------------ (only CC No. in Text Format)

2. Compliance Report, if any (Kindly Specify) -------------- (in PDF Format)

3. Annual Audit Report of Special Account in Form 7 -Not applicableD. Latest Photo with Date (Atleast from 2 angles) --------------- (in PDF Format)