iskandar malaysia - iges · iskandar malaysia in brief 2,217 sq km indicator 20062006 byby 2025...

21
Iskandar Malaysia Strong Sustainable Metropolis of International Standing Side Event on 2 nd East Asia Low Carbon Growth Partnership Dialogue Knowledge Platform for Low Carbon Development Low Carbon Society Blueprint for Iskandar Malaysia: From Science to Policy Implementation Presented by Boyd Dionysius Joeman 17 May 2013, Tokyo

Upload: others

Post on 20-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Iskandar MalaysiaStrong Sustainable Metropolis of International Standing

Side Event on 2nd East Asia Low Carbon Growth Partnership DialogueKnowledge Platform for Low Carbon Development

Low Carbon Society Blueprint for Iskandar Malaysia: From Science to Policy Implementation

Presented by Boyd Dionysius Joeman17 May 2013, Tokyo

Page 2: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Low Carbon Society Blueprint for Iskandar Low Carbon Society Blueprint for Iskandar y py pMalaysia: From Science to Policy Malaysia: From Science to Policy 

ImplementationImplementation

1)1) I k d M l iI k d M l i b i f i t d tib i f i t d ti1)1) Iskandar Malaysia Iskandar Malaysia –– a brief introductiona brief introduction

2)2) IRDA’s GreenIRDA’s Green‐‐focused Agendafocused Agenda

3)3) The LCS Project The LCS Project –– From science to regional policyFrom science to regional policy

4)4) LCSBPIM 10 ActionsLCSBPIM 10 Actions4)4) LCSBPIM 10 ActionsLCSBPIM 10 Actions

5)5) LCS 2013 LCS 2013 –– 10 proposed programmes10 proposed programmes

6)6) And And Finally ...Finally ...

Page 3: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Iskandar Malaysia at a GlanceIskandar Malaysia at a Glance

3

Page 4: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Iskandar Malaysia in brief Iskandar Malaysia in brief 

2,217 sq km Indicator Indicator  20062006 By 2025 By 2025 

Annual rate of Annual rate of change (%) change (%) 

Population Population  1.6 m 1.6 m  3.0 m 3.0 m  4.63%4.63%

SENAI ‐ SKUDAI

GDP per capita GDP per capita (PPP) in USD (PPP) in USD 

14,79014,790 31,10031,100 5.78%5.78%

Labour ForceLabour Force 0.624 m  0.624 m   1.46 m  1.46 m   7.00%7.00%

Projected Growth 2006 to 2025

E EmploymentEmployment 0.610 m  0.610 m   1.428 m  1.428 m   7.00%7.00%

BA D

JB CITY CENTRE

NUSAJAYA

EASTERN GATE DEVJB Central Business DistrictJB Central Business DistrictJB Conservation & Heritage ZoneJB Conservation & Heritage ZoneDangaDanga BayBay

A

C

BWESTERN GATE DEV

Kota Iskandar Kota Iskandar (Johor New State Admin. Centre)(Johor New State Admin. Centre)

EduCity@IskandarEduCity@IskandarMedini Iskandar MalaysiaMedini Iskandar Malaysia

BPort of Port of TanjungTanjung PelepasPelepas (PTP)(PTP)Free Trade ZoneFree Trade ZoneCC Free Trade ZoneFree Trade ZoneRAMSAR World Heritage ParkRAMSAR World Heritage Park

CTanjungTanjung LangsatLangsat Industrial ParkIndustrial ParkPasirPasir GudangGudang PortPortTanjungTanjung LangsatLangsat PortPort

DAirport CityAirport CityE

Page 5: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Green-focused Agenda - Rationale

IM VISION:IM VISION:

Iskandar Malaysia’s Strategic Environmental Policy ApproachIskandar Malaysia’s Strategic Environmental Policy Approach

IM VISION:IM VISION:STRONG, SUSTAINABLE METROPOLIS STRONG, SUSTAINABLE METROPOLIS

OF INTERNATIONAL STANDINGOF INTERNATIONAL STANDING

STRONGSTRONG SUSTAINABLESUSTAINABLE

PROSPEROUS, RESILIENT ROBUST

HEALTHY, GLOBALLY COMPETITIVE

LOW CARBON BUILT ENVIRONMENT & RESILIENT, ROBUST,

GLOBALLY COMPETITIVE ECONOMY

COMPETITIVE, KNOWLEDGEABLE

SOCIETY

ENVIRONMENT & SOCIETY

GREEN ECONOMY

GREEN EDUCATION & COMMUNITY

ENGAGEMENTS & CONSENSUS-

BUILDING

LOW CARBON LIFESTYLE

HUMAN CAPITAL DEVELOPMENT

LOW CARBON LAND USE PLANNING

BLUE & GREEN INFRASTRUCTURE & RURAL RESOURCES

GREEN BUILDINGS &

CONSTRUCTION

SUSTAINABLEWASTE

MANAGEMENT

GREEN TRANSPORTATION

GREEN ENERGY SYSTEMS

WALKABLE GREEN GROWTH

CLUSTERS

GREEN INDUSTRIES &

BUILDING WALKABLE, LIVABLE & SAFE

CITY DESIGN

SOURCE & SECURE

FUNDING

GREEN INCENTIVES

LOW CARBON

VILLAGES & R+D PARK FOR GREEN INDUSTRIES &

TECHNOLOGIESFUNDING VILLAGES &

RURAL TOWNS

GREEN TECHNOLOGY

Page 6: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Env’lEnv’lPolicyPolicy‐‐Maker’s Maker’s 

Env lEnv lPlanning Planning & & MngtMngt

Social & Social & CulturalCultural

Com & Com & Industry Industry  Talent

F dF d

ViewpointViewpoint

Cultural Cultural DevDev

yyPlanning Planning & Dev& Dev

Workforce;  Low carbon lifestyle

Value‐added products & services

CDPCDPFed Fed PolicyPolicy

IRDA’sIRDA’s

GreenGreen‐‐focusedfocused IntegratedIntegrated

T tT tEconomic Economic 

DD

NPPNPPIRDA s IRDA s BPsBPs

TODs

focused focused AgendaAgenda

Transport Transport DevDev

Modes Infrastructure 

LCSLCSGreen Green 

EconomyEconomy DPsDPs

SWMSWMRE & RE & ResourcesResources Reuse

Corridors Movements

FIT EE

Land Use Land Use PlanningPlanning

ResourcesResources Reuse Recycle Reduce Compost

FIT             EE blgs & areas Rainwater harvesting

Urban Decarbonising Decarbonising //

Urban Design, 

Phased Dev & DC

development/ development/ Development Development 

ProcessProcess

Page 7: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Rationale on why Iskandar Malaysia has Rationale on why Iskandar Malaysia has adopted the Greenadopted the Green‐‐Focused AgendaFocused Agendaadopted the Greenadopted the Green‐‐Focused AgendaFocused Agenda

Astute planning & management of resourcesAstute planning & management of resources –– ononAstute planning & management of resourcesAstute planning & management of resources on on Issues Issues of climate of climate change & global warming; change & global warming; setting setting t t f l bt t f l b f t i tf t i t d itid ititargets for a low carbon targets for a low carbon footprint; footprint; and positive and positive support and promotion of a green economy support and promotion of a green economy through increased investments in environmental through increased investments in environmental assets, green technology, innovation & production.assets, green technology, innovation & production.assets, green technology, innovation & production.assets, green technology, innovation & production.

Without the GREEN, there is no SUSTAINABLE Without the GREEN, there is no SUSTAINABLE ,,DEVELOPMENT.DEVELOPMENT.

Page 8: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Background

Development of Low Carbon Society Scenarios for Asian Regions

Research Team: Universiti Teknologi Malaysia (UTM), Kyoto University (KU), Okayama University (OU), NationalInstitute for Environmental Studies (NIES)

Joint Coordinating Committee: Iskandar Regional Development Authority (IRDA), Federal Department of Townand Country Planning (JPBD), Malaysia Green Technology Corporation (MGTC)

Sponsorship: Japan International Cooperation Agency (JICA) Japan Science and Technology (JST)Sponsorship: Japan International Cooperation Agency (JICA) , Japan Science and Technology (JST)

Period: 2011 ‐ 2016

Research Outputs:i.Methodology to create LCS scenarios which is appropriate for Malaysia is developed.

ii. LCS scenarios are created and utilized for policy development in IM.

iii. Co‐benefit of LCS policies on air pollution and on recycling‐based society is quantified in IMp p y g y q

iv. Organisational arrangement of UTM to conduct trainings on LCS scenarios for Malaysia and Asian countriesis consolidated, and a network for LCS in Asia is established

Page 9: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

LCS Research Groups

Development of Low Carbon Society Scenarios for Asian Regions

Ai Q lit & T t ti

IRDA

Energy

Air Quality& Transportation 

SWM

Education/ Consensus

Scenario Integration/ Land Use Planning

IRDA

Page 10: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Launching of the LCSBPIM Launching of the LCSBPIM –– COP18 DohaCOP18 Doha

Implementation of LCSBP Actions Implementation of LCSBP Actions –– 10 programmes in 201310 programmes in 2013

Page 11: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%
Page 12: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Development of Low Carbon Society Scenarios for Asian RegionsLCS Actions for IM by Three Main Themes

Action Names Themes

1 Integrated Green Transportation

Development of Low Carbon Society Scenarios for Asian Regions

1 Integrated Green Transportation

GREENGREEN ECONOMYECONOMY

2 Green Industry

3 Low Carbon Urban Governance GREENGREEN ECONOMYECONOMY3 Low Carbon Urban Governance 

4 Green Buildings & Construction

5 Green Energy System & Renewable Energy5 Green Energy System & Renewable Energy

6 Low Carbon LifestyleGREEN COMMUNITYGREEN COMMUNITY

7 Community Engagement & Consensus Buildingy g g g

8 Walkable, Safe, Livable City Design

9 Smart GrowthGREEN ENVIRONMENTGREEN ENVIRONMENT10 Green and Blue Infrastructure & Rural Resources

11 Sustainable Waste Management

12 Clean Air Environment

Page 13: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

PROPOSED 10 PROGRAMMES for 2013PROPOSED 10 PROGRAMMES for 2013PROPOSED 10 PROGRAMMES for 2013PROPOSED 10 PROGRAMMES for 2013

1.1. GovernanceGovernance

2.2. PasirPasir GudangGudang –– Green & Green & 

6.6. Johor Bahru City Council Johor Bahru City Council ––SWM, Energy EfficiencySWM, Energy Efficiency

Healthy City (covers air Healthy City (covers air quality, visual quality, visual h t i ti lih t i ti li

7.7. KulaiKulai District District : Eco: Eco‐‐Town Town ProposalProposal

characteristics, recycling, characteristics, recycling, waterwater‐‐related)related)

33 EE Lif Ch ll /Lif Ch ll /

8.8. Public Transport Public Transport –– BRT, BRT, electronic informationelectronic information

3.3. EcoEco‐‐Life Challenge/ Life Challenge/ UNESCO SchoolsUNESCO Schools

9.9. Green Green Economy Economy Guidelines/Green Guidelines/Green BusinessBusiness

4.4. CASBEECASBEE

5.5. Future Future City InitiativeCity Initiative10.10. Hybrid car parkingHybrid car parking

Page 14: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Green Economy: On‐going

Green Green TransportationTransportation

Low Carbon UrbanLow Carbon UrbanGovernanceGovernance

Green IndustryGreen Industry Green Building and Green Building and ConstructionConstruction

Green Energy Green Energy System and System and 

Renewable EnergyRenewable Energy

1) Public transport 1) Public transport system system 

improvementimprovement

Bas Iskandar Bas Iskandar 

LCSBPIM LCSBPIM Implementation Implementation Plan Plan –– at COP19 at COP19 

WarsawWarsaw

Promote the Promote the ecological & ecological & 

economic benefits economic benefits of greening existing of greening existing 

industriesindustries

Promote and Promote and Facilitate Green Facilitate Green Building in New Building in New ConstructionConstruction

Renewable EnergyRenewable Energy

Promotion of Promotion of RenewableRenewable Energy Energy 

for new for new MalaysiaMalaysia‐‐ social social 

routeroute

BeXTRABeXTRA‐‐ BAS BAS EKSPRES TRANSITEKSPRES TRANSIT‐‐express limitedexpress limited

Implementation of Implementation of ActionsActions

(Thru(Thru facilitation of facilitation of investment and investment and 

new development)new development)Danga Bay Danga Bay proposed proposed 

waterfront projectwaterfront project

developmentdevelopment

SEDA’s roleSEDA’s role

express, limited express, limited transit pointtransit point

2) Improve JB 2) Improve JB ‐‐Singapore, JBSingapore, JB‐‐KL KL ConnectivityConnectivity

Danga Bay Danga Bay proposed proposed 

waterfront projectwaterfront project

Training Training programmeprogramme

ConnectivityConnectivity

Page 15: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Green Community: On‐going

Low Carbon LifestyleLow Carbon Lifestyle

•• Enhancing general public Enhancing general public awarenessawareness

Community Engagement & Community Engagement & ConsensusConsensus‐‐BuildingBuilding

•• Input from Stakeholders andInput from Stakeholders and•• Enhancing school awareness Enhancing school awareness on going greenon going green

•• Promote Energy EfficiencyPromote Energy Efficiency

•• Input from Stakeholders and Input from Stakeholders and LCS Information Sharing with LCS Information Sharing with stakeholders in IM stakeholders in IM 

•• (FGD, Symposium, workshop, (FGD, Symposium, workshop, gy ygy y•• (Collaboration with other (Collaboration with other agencies)agencies)

( , y p , p,( , y p , p,engagements, meetings)engagements, meetings)

Page 16: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Green Environment: On‐going

Cl AiCl AiWalkable, Safe, Walkable, Safe, LivableLivable City City DesignDesign

D i i thD i i th

Smart Urban Smart Urban GrowthGrowth

Promote Promote C t U bC t U b

Green and Blue Green and Blue Infrastructure & Infrastructure & Rural ResourcesRural Resources

C ti fC ti f

Sustainable Sustainable Waste Waste 

ManagementManagement‐‐

Promote 3R inPromote 3R in

Clean Air Clean Air EnvironmentEnvironment

Promote low Promote low Designing the Designing the Safe City (from Safe City (from crime) crime) –– CCTV, CCTV, 

CPPCPP

Compact Urban Compact Urban DevelopmentDevelopment

Smart City Smart City 

‐‐ Conservation of Conservation of Mangrove Mangrove 

ForestsForests‐‐ RamsarRamsar

‐‐ Ecotourism and Ecotourism and R lR l lt llt l

Promote 3R in Promote 3R in schools, schools, householdhouseholdResearch Research 

d l td l t

emission vehicle, emission vehicle, low emission low emission 

technologies for technologies for industryindustryyy

Concepts  Concepts   RuralRural‐‐cultural cultural Tourism Tourism 

development development with UTMwith UTM

Pilot composting Pilot composting project with project with 

L l A h iL l A h iLocal AuthorityLocal Authority

Page 17: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Projects/proposals related to LCSProjects/proposals related to LCSj /p pj /p p

Launched Launched ‐‐ Iskandar Iskandar Malaysia Smart City Malaysia Smart City Framework, Nov Framework, Nov 20122012

Growing interests from Japanese Growing interests from Japanese companies companies to conduct to conduct pilots on smart pilots on smart city city concepts concepts –– Mitsui, Panasonic (Fujisawa Mitsui, Panasonic (Fujisawa 

Sustainable Smart Town), NikkeiSustainable Smart Town), Nikkei

LaunchedLaunched ‐‐ IskandarIskandar MalaysiaMalaysia Sustainability FrameworkSustainability FrameworkLaunched Launched  Iskandar Iskandar Malaysia Malaysia Sustainability FrameworkSustainability Framework

Page 18: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Excellent collaboration between Research + Policy‐Maker has led to the preparation of the LCSIMBP, launched at COP18 Doha

The Way Forward

Research:Research:

InstitutionsInstitutionsPolicyPolicy

(IRDA, LAs)(IRDA, LAs)

Visible Actions Visible Actions on the ground: on the ground: 

See and TouchSee and Touch

Quantification from LCS modeling assists better understanding on impact of proposed actions

AcademiaAcademia(IRDA, LAs)(IRDA, LAs)

LCSBPIMLCSBPIM

Quantification from LCS modeling assists better understanding on impact of proposed actions,sub‐actions and programmes.

Excellent baseline study, consensus‐building and the Low Carbon Society Blueprint for IskandarExcellent baseline study, consensus building and the Low Carbon Society Blueprint for IskandarMalaysia will help to develop an integrated climate resilient, low carbon framework for a city orregion.

Green cities or local carbon cities need to have a LOW CARBON SOCIETIES mindset/ behaviourand joint effort between different professions (planners, architects, engineers and relatedenvironmental professions)

Important to have an Asian and International platform for research collaboration betweenresearchers in LCS as well as capacity‐building opportunities.

Page 19: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Main Challenges Main Challenges in the in the implementation implementation >>>>>>>>>>>>>>>>

Governance Structure Governance Structure –– coordination of policies coordination of policies • Collaboration of all agencies in Malaysia to ensure policy dovetailing and acceptance

Public awareness & direct involvementPublic awareness & direct involvementPublic awareness & direct involvement Public awareness & direct involvement • Awareness, involvement and readiness of everyone in the implementation of LCS; stakeholders’ preparedness

Monitoring and review Monitoring and review • LCSBPIM Actions need regular monitoring and review to• LCSBPIM Actions need regular monitoring and review to ensure effectiveness and acceptance

Visible evidence to create champions of LCSVisible evidence to create champions of LCSVisible evidence to create champions of LCS Visible evidence to create champions of LCS • In order to ensure public readiness and acceptance for a high sustainability future and low carbon

19

Page 20: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

Iskandar Malaysia: Today and TomorrowIskandar Malaysia: Today and Tomorrowy

Sustainability

S

Tomorrow Iskandar MalaysiaTomorrow Iskandar MalaysiaLow Carbon Society, Higher Sustainability, Green Growth/ Economy

Today Iskandar Malaysia                    High Carbon Society, Lower Sustainability

YearPresent 2010

Future2025

Page 21: Iskandar Malaysia - IGES · Iskandar Malaysia in brief 2,217 sq km Indicator 20062006 ByBy 2025 Annual rate of change (%) Population 1.6 m 3.0 m 4.63%4.63%

THANK YOUTHANK [email protected]

Knowledge Platform for Low Carbon Development 17 May 2013Development 17 May 2013