itp for main steelaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

4
document.xls INSPECTION &TEST PLAN FOR MAIN STEEL DOC NR. : 36009-912-03-013 ARAB STEEL FABRICATION CO. REV : 0 QUALITY CONTROL DEPT. DATE : 10/05/2008 PROJECT : SIDI KRIR / ELATF POWER STATION PROJECT NO : 36009 ITEM : STRUCTURAL STEEL CLINET : NEM HENGELO Inspected By 3- NEM client 4- OWNER AWS D1.1- 2004 (STEEL) ASME II -PART C- 2004 AWS D1.6 - 1999 (STAINLESS STEEL) EN10204 - 2004 NEM SPECS EN10025 ASME B30.20 (LIFTING STRUCTURE) Applicable Procedures VISUAL TEST PROCEDURE (ASF-VT) RADIOGRAPHIC TEST PROCEDURE (ASF-RT) BENDING /FORMING PROCEDURE(ASF-BF) MAGNETIC TEST PROCEDURE (ASF-MT) LIQUID PENETRANT TEST PROCEDURE (ASF-PT) ELECTRODE HANDLING PROCEDURE(ASF-EHP) ULTRASONIC TEST PROCEDURE (ASF-UT) PAINTTING PROCEDURE(ASF-PP) MATERIAL RECIVING PROCEDURE(ASF- MRP) Remarks REV.NO. PREPARED BY REVIEWED BY APPROVED BY 0 Eng : AMR ZIDAN Eng : Hossam Moustafa Eng : SIGN : SIGN : SIGN : DATE : 10/05/2008 DATE : DATE : DATE : Y 1-FABR.(ASF QC) 2- NEM (NEM supervision) Reference Codes Identefication Of Inspection Points HP : Hold Point DR : Dimentional Report MT : Magnetic Test PT : Penetrant Test WP : Witness Point VR : Visual Report HT : Hydro Test NDT :NonDestructive Testing RI :Random inspection MIR:Material Inspection Report VT : Visual Testing PO : Purchase Order RD : Review Document BVR :Becking/Holding Verification Report RT : Radiographic Test PWHT : Post Weld Heat Treatment

Upload: aymanmalah

Post on 20-Nov-2015

9 views

Category:

Documents


0 download

DESCRIPTION

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

TRANSCRIPT

STACK TRAVELLER INSPECTION &TEST PLAN FOR MAIN STEELDOC NR. : 36009-912-03-013QUALITY CONTROL PLANARAB STEEL FABRICATION CO.REV : 0QUALITY CONTROL DEPT.DATE : 10/05/2008PROJECT : SIDI KRIR / ELATF POWER STATIONPROJECT NO : 36009ITEM : STRUCTURAL STEELCLINET : NEM HENGELOInspected By1-FABR.(ASF QC)2- NEM (NEM supervision)3- NEM client4- OWNERReference CodesAWS D1.1- 2004 (STEEL)ASME II -PART C- 2004AWS D1.6 - 1999 (STAINLESS STEEL)EN10204 - 2004NEM SPECSEN10025ASME B30.20 (LIFTING STRUCTURE)Applicable ProceduresVISUAL TEST PROCEDURE (ASF-VT)RADIOGRAPHIC TEST PROCEDURE (ASF-RT)BENDING /FORMING PROCEDURE(ASF-BF)MAGNETIC TEST PROCEDURE (ASF-MT)LIQUID PENETRANT TEST PROCEDURE (ASF-PT)ELECTRODE HANDLING PROCEDURE(ASF-EHP)ULTRASONIC TEST PROCEDURE (ASF-UT)PAINTTING PROCEDURE(ASF-PP)MATERIAL RECIVING PROCEDURE(ASF- MRP)Identefication Of Inspection PointsHP : Hold PointDR : Dimentional ReportMT : Magnetic TestPT : Penetrant TestWP : Witness PointVR : Visual ReportHT : Hydro TestNDT :NonDestructive TestingRI :Random inspectionMIR:Material Inspection ReportVT : Visual TestingPO : Purchase OrderRD : Review DocumentBVR :Becking/Holding Verification ReportRT : Radiographic TestPWHT : Post Weld Heat TreatmentRemarksREV.NO.PREPARED BYREVIEWED BYAPPROVED BY0Eng :AMR ZIDANEng :Hossam MoustafaEng :SIGN :SIGN :SIGN :DATE : 10/05/2008DATE :DATE :DATE :CLIENT : NEM HENGELOPREPARED BY:Eng/ AMR ZIDANDATE : 10/05/2008STRUCTURE CODE : AWS D1.1REVIEWED BYEng/ Hossam MoustafaREV NO :0ITEM : STRUCTURAL STEELAPPROVED BY:No.DESCRIPTIONProcedureAcceptance criteriaVerifying document1234RemarksINSP. POINTSSIG.DATEINSP. POINTSSIG.DATEINSP. POINTSSIG.DATEINSP. POINTSSIG.DATEPre-inspection meetingPIM agendaMINUTES OF MEETINGHPHPHPHPEngineering & Materials Review And Pre-commencement approval1Review of TravellerNEM SPECSSIGNATURE ON TRAVELLERHPRDHPHP2preparation of WPS & Supporting PQR & weld typicalAWS D1.1AWS D1.1SEC.4NEM APPROVD WPS& PQR & weld typicalHPRDHP/RDHP/RD3Review / Approval OF procedures (Material&NDT&Conservation&fabrication& painting&Repiar procedure)NEM APPROVED PROSEDUREHPRDHPHP4Welders Qualification Incl. Identification on welds (Welders list)AWS D1.1SEC.4VALID CERTIFICATESHPRI5Nondestructive testing personal qualificationSNT-TC-1ALEVEL II OPERATORVALID CERTIFICATESHPRDRDRD6Check completeness order documentationPURCHASING REQUISITIONCOMPLETEPO. ACCEPTANCE FORMHPRDHPHP7Material Certification ReviewASF-MRP4EN10204&MATERIAL SPECS3.1&2.2 CERTIFICATES&MIRHPRDRDRD8Re-stamping of cut certified materialsNEM APPROVEDUNIQUE NUMBER WHICH REFER TO CERTIFICATE/ HEAT NO.INDELIABLE MARKHPRI9Storage &handelling of materials and/or welding consumableASF-EHPASME II -C / SUPLLIERS STDBVRHPRIfabrication sequencesICutting & drilling of hot rolled beams10DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRIIICutting Webs & flanges for B.U.S11DT/VTASF-DT/ASF-VT/ASF-BF5APPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRIIVWELDING ALL B.U.S PLATES (PREHEAT ACCORDING TO WPS BEFOR TACK WELDING AND WELDING)13weldingreviewed wps,swelding according to nem reviewed wps,sreviewed wps,sHPWPRIRIINTER PASS TEMERATURE WILL BE CHECKED14DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRI15All butt joint in plate sections of main columns are 100%UT and butt jointes for top and bottom girders shall be 100% RT OR UTASF- RT & ASF-UTAWS D1.1 -PART 6CRT & UT REPORTHPRDRDRDIIIFit up of B.U.S16DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSDRHPWPRIRIIVWELDING ALL B.U.S (PREHEAT ACCORDING TO WPS BEFOR TACK WELDING AND WELDING)17weldingreviewed wps,swelding according to nem reviewed wps,sreviewed wps,sHPWPRIRIINTER PASS TEMERATURE WILL BE CHECKED18DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRI19All Fillet joints shall be 10% PT or MTASF -PT OR ASF- MTAWS D1.1 -PART 6CPT OR MT REPORTHPRIRDRDVFIT UP FOR COLUMNS BASE PLATE, STIFFNER &ATTACHMENT20DT/VTASF-DT/ASF-VT5APPLICABLE DWG.&NEM SPECSDRHPWPRIRIVICOLUMNS BASE PLATE, STIFFNER &ATTACHMENT WELDING 9 , 1021weldingreviewed wps,swelding according to nem reviewed wps,sreviewed wps,sHPWPRIRIINTER PASS TEMERATURE WILL BE CHECKED22DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSVRHPWPRIRI23All Fillet joints shall be 10% PT or MTASF -PT OR ASF- MTAWS D1.1 -PART 6CPT OR MT REPORTHPRIRDRD24all full penetration joints 100%UTASF- UTAWS D1.1 -PART 6CUT REPORTHPRDRDRDVIICutting of welded plate girders25DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRIVIIIfit-up of welded plate girders26DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRIIXwelding of welded plate girders 6 , 9 , 1027weldingreviewed wps,swelding according to nem reviewed wps,sreviewed wps,sHPWPRIRIINTER PASS TEMERATURE WILL BE CHECKED28DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSSIGNATURE ON TRAVELLERHPWPRIRI29All Fillet joints shall be 10% PT or MTASF -PT OR ASF- MTAWS D1.1 -PART 6CPT OR MT REPORTHPRIRDRD30butt joint in top and bottom girders are 100% RT OR UTASF- RT & ASF-UTAWS D1.1 -PART 6CRT & UT REPORTHPRDRDRD31full penetration K- joints shall have UT -examinationASF- UTAWS D1.1 -PART 6CUT REPORTHPRDRDRDXtrial fit up of first goal post 7(TRIAL FIT OF FIRST GOAL POST AND A SECAND TRIAL FIT OF A PORTAL SHALL BE POINTED OUT BY NEM QC)32DT/VTASF-DT/ASF-VTAPPLICABLE DWG.&NEM SPECSDRHPHPHPHPXISurface Treatment33Surface preparation prior to painting or coatingNEM ACCEPTANCE&ASF-PPNEM SPECS(ikz09 205-10&21003-784-01)PAINTING REPORTHPRI34Surface protection for steel(Dry film thickness of painting)NEM SPECS (225999-784-01)&ASF-PPNEM SPECS(ikz09 205-10&21003-784-01)PAINTING REPORTHPRD/RIRDRDXIIBacking & Final inspection and documentation35Final visual and inspection of packing and shipping condition +shipping releaseNEM ACCEPTANCE(IKZ09-713-10)NEM ACCEPTANCEPACKING LISTHPWPHPHP36Document Review & Certificate of conformityNEM ACCEPTANCENEM ACCEPTANCETRAVELLAR& CERTIFICATEHPRDHPHP37NEM QC WRITTEN RELEASE NOTENEM ACCEPTANCENEM ACCEPTANCETRAVELLAR& CERTIFICATEHPHPHPHPREMARKES1-DURING INITIAL 10%EXAMINATION,ANY WELDS ARE REGECTED,ADDITIONAL 20%OF PRODUCTION SHALL BE EXAMINED,IF THIS REVEALS AN ADDITIONAL DEFECT THEN REMAINDER OF(WELDER,S)DAY-PRODUCTION SHALL BE 100%EXAMINED.FIRST SUBSEQUENT(WELDER,S)BATCH SHALL BE 20%EXAMINED.2-REPAIRS SHALL REEXAMINED BY THE SAME TECHNIQUE THAT REVEALED THE INITIAL DEFECT.3-LIFTING AND HANGING LUG WELD SHALL BE 100%MT.4-MATERIAL CERTIFICATES SHALL BE BUNDLED AND ACCOMPANIED BY A SUMMARIZING COVER SHEET,BEARING REFERANCE BETWEEN REQUISITION ITEM NUMBER AND HEAT / CERTIFICATE NUMBER .5-TWO SHOP-WELDED SPLICE ARE ALLOWED IN MAIN COLUMN6-FOR THICKNESS GREATER THAN 8 mm,RT MAY BE REPLACED BY UT AFTER BUYER PRIOR CONSENT7-IF THE TRIAL FIT FOR ONE PORTAL IS FOUND SUCCEFULL NO OTHER TRIAL FITS ARE REQUIRED,IF MAJER REPAIRS ARE REQUIRED THE TRIAL FIT IS REJECTED.AFTER REPAIRS A RE-TRIAL FIT FOR THE FIRST PORTAL IS REQUIRED AND A SECOND TRIAL FIT FOR THE OTHER SHALL BE DONE ,AND SO ON ,THE RE-TRIAL WILL NOT BE REIMBURSED BY NEM8-ASF WILL SUBMITE THERE PROCEDURE FOR UT ,BASED ON DIGITAL READ OUT9-WELD CROSSING AND T CROSSING WELDS 10% RT and All butt joint in main columns shall be 100% UT10-AFTER REMOVALE OF TEMPORARY WELDED ATTACHMENTS , THE AFFECTED AREA 100% MT.

&C&F

MBD0000FCAE.doc

MBD0000FCB3.doc

MBD000109FC.doc

MBD0000FCB1.doc

MBD0000FCAC.doc

MBD0000FCAD.doc

MBD0000FCAB.doc