KEK Status Report. Kirk. STF/CFF Status. STF-2 Cryomodule (CM-1; 8 cavities & Q-magnet, CM-2a; 4 cavities) CM-1 assembly was already done CM-2a (half size) assembly is on going and will finish by end of May Cavity string assembly for MHI-23~-26 was done - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: KEK Status Report

KEK Status Report

Kirk30/Apr/20141 LCC 4th SCRF Meeting

Page 2: KEK Status Report

• STF-2 Cryomodule (CM-1; 8 cavities & Q-magnet, CM-2a; 4 cavities)‒ CM-1 assembly was already done

‒ CM-2a (half size) assembly is on going and will finish by end of May‒ Cavity string assembly for MHI-23~-26 was done

‒ First cool-down will start from Autumn

• 9-cell Cavity‒ First vertical test for KEK-01 will be done tomorrow (Saeki-san)

‒ MHI-D cavity will be fabricated/tested for check of technology improvement delayed

‒ MHI-27~-30 will be fabricated/tested after above check delayed

• Others (1-cell cavity and magnetic shield study)‒ Magnetic shield study is on going in vertical cryostat (Tsuchiya-san/Masuzawa-san)

‒ V.T. for large grain 1-cell cavity (In-house) was done twice (Umemori-san/Kubo-san)

‒ Yamanaka-san presented the plan for cavity fabrication in F.Y. 2014.

STF/CFF Status

30/Apr/20142 LCC 4th SCRF Meeting

Page 3: KEK Status Report

CM1+CM-2a attachment check

30/Apr/20143 LCC 4th SCRF Meeting

CM-1+CM-2a in STF-2

CM-2a

CM-1Injector CM

Page 4: KEK Status Report

Cavity string + Gas return pipe

30/Apr/20144 LCC 4th SCRF Meeting

Assembly of CM-2a

Cavity string Tuner setting

Gas return pipe

Page 5: KEK Status Report

Magnetic Shield Study at STF

30/Apr/20145 LCC 4th SCRF Meeting

K. Tsuchiya/M. Masuzawa

Page 6: KEK Status Report

30/Apr/20146 LCC 4th SCRF Meeting

Result of Magnetic Shielding

1. Vendor A : 2~2.8 mG @4K

2. Vendor B : 5~14 mG @4K

3. Double shield : ~2 mG @4K

※Geomagnetic field : 500~650 mG @R.T.※There is no difference between 4K and 2K.

K. Tsuchiya/M. Masuzawa

Page 7: KEK Status Report

T=2.0 K

T=1.8 K

T=1.7 K

T=1.6 K

T<1.4 K

In-house production of large-grain 1-cell cavity

preliminary

T. Kubo30/Apr/2014 LCC 4th SCRF Meeting7

KEK-R1

Page 8: KEK Status Report

30/Apr/20148 LCC 4th SCRF Meeting

Yamanaka-san’s plan for CFF

M. Yamanaka

Cavity name Cavity type Comment

KEK-0 9-cell Prototype, w/o HOM couplers

KEK-1 9-cell 1st V.T. will be done tomorrow

KEK-2 9-cell In plan, full cavity package, HPC

KEK-3 9-cell In plan, full cavity package, HPC

KEK-R1 1-cell (L.G.) V.T.s were done twice

KEK-R2 1-cell Almost same as KEK-R1, but F.G.

KEK-R3 3-cell Improvement for dumbbell fabrication

KEK-R4 1-cell Nb sheet by new vendor is used

KEK-R5 1-cell (L.G.) Low RRR (<200) sheet is used

KEK-W1 Seamless CBP was done at FNAL

KEK-W2 Seamless Under fabrication

KEK-U4 Seamless In plan