Status of KEK production

July 11, 2008 at SLAC

KEKT. Higo et al., Accelerator div.

T. Takatomi et al., Mech. Eng. Center

Page 2: Status  of KEK  production

Contents

• Quadrant– Assembly– Preparation for installation to Nextef

• Disk-based structures in 2009– C10, CD10– T24, TD24

• Other group to be involved

Page 3: Status  of KEK  production

Quadrant production since CLIC08

• Production of quadrants completed by Nov. 2008

• Assembly • Tuning• Cleaning and final assembly• Installation into chamber• Vacuum evacuation• Present status and following schedule

Page 4: Status  of KEK  production

Milled surface view

50 micron rounding seems well produced.

Reference planes were formed by milling in a few micron level within the same chucking for shaping cells.

Assembly should be within ten micron level so that the steps between mating surfaces does not make any significant field enhancement.

Page 5: Status  of KEK  production

Assembly experience of quadrants

• Natural alignment error by balls is more than ten microns.

• Ten micron level alignment was established by manually-forced final pressing procedure.

• Bolt pressing is at 1Nm with M5 screw.• Stacking is reproducible in a few micron level.

Page 6: Status  of KEK  production

Carry and storage

Edge inspection

First hanging

Check ball diameter

Prepare next quad approach

Second hanging

Page 7: Status  of KEK  production

Fine adjustment

Fixing by bolt

Completion of stack

Alignment checking

RF setup

Page 8: Status  of KEK  production

Tuning procedure

• Elastic tuning: tuning screw is kept pressing• Takatomi measurement on test pushing• Actual tuning done with Higo’s hand tuning

with maximum torque by watch screw driver

Page 9: Status  of KEK  production

Tuning test with dummy quadrant

Cell 3(×35)

Cell 3(×100)Cell3 deformation: 0.053mm

Cell 8(×35)

Cell 8(×100)Cell8 deformation: 0.167mm

Cell 10(×35)

Cell 10(×100)Cell10 no tuning

Page 10: Status  of KEK  production

Little flatness change due to tuning

Before tuning After tuning

基準A面

基準B面

-0.010

-0.005

0.000

0.005

0.010

0 50 100 150 200 250 300

ABC

-0.010

-0.005

0.000

0.005

0.010

0 50 100 150 200 250 300

ABCD

-0.010

-0.005

0.000

0.005

0.010

0 50 100 150 200 250 300

ABC

-0.010

-0.005

0.000

0.005

0.010

0 50 100 150 200 250 300

ABCD

Page 11: Status  of KEK  production

Tuning setup

Quad assembly configuration seen from input side

Tuning setup:Quad#5, bead string, linear stage driven by pulse motor, input divider, network analyzer

Measurement was performed using SLAC LabVIEW program by courtesy of Jim Lewandowski

Page 12: Status  of KEK  production

Tuning ball pushed by a rod

4mm stainless ball pushed by minus watch driver.Pushing by turning with Higo’s hand full force.Elastic deformation kept, meaning that the tuning pins are kept pushing the balls.

Page 13: Status  of KEK  production

Tuning history

• 090202 S11 measured before tuning• BP14@11422 initial stage• BP20@11420 after tune up half of the cells– Flatten the Sim pattern, especially 9~16 area

• BP-28@11420 after fine tuning• BP32@11420 after input match tune-2

Page 14: Status  of KEK  production

Tuning in practice

-0.5

0

0.5

1

0 5 10 15 20

S_Imaginary as tuning process

Sim 14Sim 20Sim 28

Sim 32

S_imaginary

LabVIEW Cell #

Page 15: Status  of KEK  production

Tuning in practice

3

3.5

4

4.5

5

0 5 10 15 20

Raw amplitude of bead pull measurementbead pull # 14-20-28-32

Amp 14amp 20Amp 28

Amp 32

Amplitude

LabVIEW Cell #

Page 16: Status  of KEK  production

Evolution of S11 near 11420MHz

090202 initial

090519 after cell tuning, BP-30

090519 after input match tuning

-50

-40

-30

-20

-10

0

11.4 11.41 11.42 11.43 11.44 11.45

Quad #5 Input matching090202 and 090519

S11+S12 [dB] 090202

S11 dB after BP30 090519

S11 dB after BP32 090519

S11 [dB]

Freq GHz

FinalAfter cell tuning to make amplitude smoothInitial

090520

-32dB at 11422MHz-35dB at 11420MHz

Page 17: Status  of KEK  production

Input matching after tuning

-40

-35

-30

-25

-20

-15

-10

-5

0

11.15 11.2 11.25 11.3 11.35 11.4 11.45 11.5

Quad Input matching after tuning 090519

S11 dB after BP32 090519

S11(freq) dB

Freq GHz

|S11|= -32dB at 11422MHz, -35dB at 11420MHzOperation at 11422MHz at 30C in vacuum is planned.22C in air 30C VAC makes 2MHz higher frequency.So the input match should be -35dB, good enough.

Page 18: Status  of KEK  production

Integration into chamber• Two 50liter/sec TMP’s in tandem. • Bare chamber was evacuated.– With pumping 5x10-5Pa– With baking 1x10-5Pa

• Chamber with assembled quads was evacuated– With water pipes etc. – With only evacuation 1x10-4Pa– After baking finally reached ~1x10-6Pa

Page 19: Status  of KEK  production

Quadrant chamber evacuation.

10-6

10-5

10-4

10-3

10-2

80 160 240 320 400 480

Chamber EvacuationCCG Vacant chamberChamber RRGBetween TMPCCG [Pa] with Quad structure 1stChamber FRG [Pa]Between TMPCCG [Pa] with Quad structure 2ndChamber FRG [Pa]Between TMP

CCG, FRG [Pa]

Evacuation period [hour]

as of 090622

Page 20: Status  of KEK  production

Installation into Nextef and plan • Installation trial

– Gaskets sticked to flanges could not connect input waveguides. – Flanges were re-cut at their edges, removing gasket copper

material and 0.14mm base stainless material.• Next schedule

– Re-installed into chamber.– RF checked in input matching. No change!– Evacuation will start next week, July 6~.– Installed into Nextef after July 14~.– In-situ baking will made at Nextef.– Start processing from late July or mid August.

Page 21: Status  of KEK  production

C10 and CD10 fabrication• Strategy

– Take the same design and procedure as T18 and TD18.– Want to freeze the basic design with CERN/SLAC supervision this time.– Each two sets are made and tested.

• Present status and plan– Started negotiation with our usual company.– Better machines will be used this time.

• Thanks to the economical situation!?• New turning lathe, Moore, will be used.• New milling machine, Sodic, will be used.

– Flatness and so on will be better.– Will be made by the end of Oct.– C10 will be earlier.

• SLAC process– Basically we assume SLAC will pursue the bonding, tuning and baking process.– Need to establish a practical schedule this time.– Need to ask SLAC to make a set of mode launchers for test at KEK.

Page 22: Status  of KEK  production

T24 and TD24 fabrication• Basically the same as C10 and CD10.• Strategy• Present status and plan– Will be made by the end of Dec.– T24 will be earlier.– Actual schedule should meet the strategy for

testing T24, TD24 according to CERN-CLIC demand.

• SLAC process– Should be confirmed this time.

Page 23: Status  of KEK  production

Some other activities• A group – will make a trial fabrication of CD10 this year under KEK-

Tohoku Univ. collaboration framework.• Multiple companies – are interested in machining quads, but KEK is thinking

whether to further go or stick to disk-based design.• Basic studies– Materials and breakdown mechanism are to be studied at

KEK. – Then, we hope to do more on basic material and preparation

studies.

Page 24: Status  of KEK  production

Conclusion • Quad structure– In progress, though encountered various problems.

Want to evaluate by late Sep.• C10, CD10– Become precursor, in machining, for T24, TD24 and

initiation of basic test for KEK. • T24, TD24– We understand the need to meet the required

time frame for CLIC important step next year.