Page 1: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Kinder Morgan Pipeline Assessment

Kinder Morgan Pipeline Assessment

June 16, 2008

Dr. Cathy Fitzgerald, P.E.

June 16, 2008

Dr. Cathy Fitzgerald, P.E.

THE PLANNING CENTER

Page 2: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

ISSUES

• Manual vs. automatic valves

• If the pipeline breaks, where will the product flow

• What happens in an earthquake

• What happens if product gets into the storm drain

Page 3: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

San Juan Hills HS

Kinder Morgan 16-Inch Pipeline

Page 4: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

San Juan Hills HS

Kinder Morgan 16-Inch Pipeline

Check Valve Elev. 331 msl

High Point Elev. 1,022 msl

Page 5: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 6: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 7: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 8: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 9: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 10: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 11: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 12: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 13: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 14: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Probability of Pipeline Failure

• All refined product pipelines in California –1986-2001

• Annual failure probability– 1.3 x 10-3

• One incident every 769 years• No. 1 cause of failure – third party damage• Earthquake

Page 15: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Earthquakes and Pipelines

• Failure mechanisms• Ground shaking• Liquefaction/lateral spreading• Landslides• Maximum credible earthquake – MMI 6.6• Newport-Inglewood Fault – 7 miles SW• Failure probability – 5.1 x 10-3

• Once every 196 years

Page 16: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Earthquakes and Pipelines (cont.)

• Northridge Earthquake -1994• All petroleum product pipelines shut down within

1 minute – regulatory requirement• 2 petroleum pipeline breaks• Kinder Morgan pipeline – low probability of

break given earthquake occurs• Buried 3 feet below ground surface• Steel pipelines ductile – less susceptible to

ground movement• New pipe (<25 yrs old) – corrosion less likely

Page 17: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Pipeline Failure – What Happens and Where Does the Product Go?

• Leak – 5 times more likely than full break• Product travels along backfill below

ground surface• Most likely never reaches the surface• Worst case scenario – full pipeline rupture

Page 18: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Pipeline Shutdown and Manual vs Automatic Valves

• Manual shutoff valves – Ortega Highway and Talega Creek – 14.6 miles apart

• One-way check valve – La Pata Road• Kinder Morgan control center – Orange, CA• Staffed with 16 people operating 24/7• Continuous monitoring of pipeline for pressure,

flow rate, temperature, etc. with SCADA system• Automatic shutdown time – 0 to 30 seconds,

assume 1 minute

Page 19: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

What Happens After Shutdown?• Pumps turned off• Assume discharge of product for one

minute prior to shutdown• 6,000 bbl/hr = 4,200 gallons in one minute• Distance to school site = 2,150 feet • 7 football fields• Product adsorbed into soil• Never reaches school site

Page 20: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

What Happens After Shutdown?

• In addition to product released during shutdown period

• Gravity drainage from pipeline • Amount discharged based on elevation

profile and break location

Page 21: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 22: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 23: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 24: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 25: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 26: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

Page 27: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

San Juan Hills HS

Kinder Morgan 16-Inch Pipeline

Check Valve Elev. 331 msl

High Point Elev. 1,022 msl

Segment A Segment B

Page 28: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

How Much Product Is Released?Distance from High Point (ft)

Amount Released

During Shutdown (gal)

Amount Released

During Gravity Drainage (gal)

Total Amount Released (gal)

0 4,200 0 4,200

500 4,200 5,221 9,421

1,000 4,200 10,442 14,642

4,300 4,200 44,901 49,101

30-foot Round Pool,

4 feet deep

Page 29: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

How Far Will Product Travel?

• Worst case scenario – 49,100 gallons released – volumes of 2.3 aboveground swimming pools

• Discharge into drainage channel• Lateral spreading, infiltration, adhesion, and

evaporation• Assume 30 foot wide channel• Product infiltrates into soil within 300 to 600 feet• Distance from pipeline to storm drain – 2,100

feet• Product will not reach storm drain

Page 30: Kinder Morgan Pipeline Assessment - Environmental Risk

THE PLANNING CENTER

The End