Southern Natural Gas Company 2019 Outage Review Meeting Customer con call and Webex October 23, 2019 1

Upload: others

Post on 07-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Southern Natural Gas Company2019 Outage Review Meeting

Customer con call and Webex

October 23, 2019

1

Welcome

2

Agenda

• Review of current and upcoming notable Outages-

–October/November/December

• Unscheduled outages

• North System

• South System

• South Louisiana System

• EEC 2019

• Contacts3

Disclaimers

• Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary.

• Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time).

• Scheduled dates are subject to change.

• Projects may be added, altered, delayed or cancelled.

• SNG will provide notice of such additions or changes via Southern’s electronic bulletin board postings.

• Dates as posted on the EBB should be deemed correct in the event of conflicts between the EBB posted dates and dates within this presentation.

4

Color Key for Maps• Yellow

– Restrictions are possible

– With extended duration, restrictions could be necessary from time to time

– Lower than normal pressures may be experienced

– Meter(s) affected are noted with (PIN #)

• Red

– Restrictions are probable

5

Southern Natural Gas Pipeline

LA

MS

AL

GA

FL

Enterprise

White Castle

Bear Creek

Muldon

Chattanooga

Atlanta

Thomaston

Albany

Elba

SCAiken

North System

South Louisiana

South System

6

Compressor Station

Storage Field

LNG

Pearl River

Franklinton

GwinvilleLogansport

Bienville

Onward

Pickens

Rankin

Toca

Shady Side

Louisville

Bay SpringsYork

GallionSelma Elmore

Auburn

Holy Trinity

Pavo

Reform

McConnells

Providence

Tarrant

Pell City DeArmanville

Bell Mills

Rome

Ellerslie

Ocmulgee

Hall Gate

Wrens

Hartwell

Riceboro

Brookman

Southern Natural Gas PipelineUnscheduled Outage Update

LA

MS

AL

GA

FL

Enterprise

White Castle

Bear Creek

Muldon

Chattanooga

Atlanta

Thomaston

Albany

Elba

SCAiken

North System

South Louisiana

South System

7

Compressor Station

Storage Field

LNG

Pearl River

Franklinton

Gwinville

Logansport

Bienville

Onward

Pickens

Rankin

Toca

Shady Side

Louisville

Bay Springs

York

GallionSelma Elmore

Auburn

Holy Trinity

Pavo

ReformMcConnells

Providence

Tarrant

Pell CityDeArmanville

Bell Mills

Rome

Ellerslie

Ocmulgee

Hall Gate Wrens

Hartwell

Riceboro

Brookman

Unanticipated leak on the SS 28 line in Segment 340. SNG

will not be able to accept receipts. Reference notice of Force Majeure 703716 posted

on 9-16-19

Unscheduled unit outages at Gallion compressor station.Seg. 440 capacity of 2,283 Mdth/d reduced up to 25

Mdth/d RTS TBD

SNG North SystemMaint. Review Oct./Nov./Dec.

LA

MS

AL

GA

Logansport

Bienville

Bear Creek Storage

Onward

Pickens

Rankin

Louisville

Muldon Storage

Reform

McConnells

Providence

TarrantPell City

DeArmanville

Bell Mills

Rome

Compressor Station

Storage Field

Huntsville

Chattanooga

Atlanta

8

Southern will be conducting other general maintenance during this period

AL

P/L maintenance Bessemer Calera line and loop one at a

time the last of October.

Pigging Bessemer Calera loop l ine(37079) 11-5-19 &

11-6-19

Maintenance at Bienville compressor station 11-20-19

SNG South System Maint. Review October/November/December

MS

AL

GA

Enterprise

Gwinville

Selma

Auburn

Ellerslie

Thomaston

Ocmulgee

Hallgate

Wrens

Elmore

York

Gallion

Bay Springs

Compressor Station

Storage Field

LNG

Atlanta

Elba

Hartwell

Aiken

Holy Trinity

Albany

Pavo

9

Brookman

Riceboro

Southern will be conducting other general maintenance during this period

Remediation on SML east of Ocmulgee 11-17-19 to

11-23-19 in Seg. 560.

Remediation SMLL east of Auburn-10-21-19 to 10-29-19

Seg. 460 cap. Of 1,943 Mdth/d reduced up to 250 Mdth/d

Sta. Maint. At Gwinville 10-8-19 to 11-11-19

Segment 410 capacity of 1,658 Mdth/d reduced up

to 270 Mdth/d up to 11-1-19. From 11-1-19 seg. 410 cap. of 1,802

Mdth/d reduced up to 414 Mdth/d

IT & OOP could be impacted Remediation SMLL east of Ellerslie

11-9-19 to 11-16-19. Seg. 490 cap. Of 1,663 Mdth/d reduced up to 139

Mdth/d. Seg. 530 cap. Of 900 Mdth/d reduced up to 57 Mdth/d

Unit Maint. At Auburn 11-11-19 to 12-06-19

Seg. 460 capacity of 2,075 Mdth/d reduce up to 181

Mdth/d

Remediation SML east of Selma-10-30-19 to 11-8-19

Seg. 460 cap. Of 2,373 Mdth/d reduced up to 233 Mdth/d until 11-1-19. After 11-1-19 Seg. 460 cap. Of 2,415 Mdth/d reduced up to 275

Mdth/d.

SNG South Louisiana System Maint. Review Oct./Nov./Dec.

Shadyside

White Castle

Franklinton

Toca

Gwinville

LAMS

Compressor Station

Storage Field

West Leg

East Leg

10

Pearl River

Southern will be conducting other general maintenance during this period

White Castle and Shadyside unit maintenance

9-1-19 to 10-31-19Segment 350 capacity of 701 Mdth/d impacted as much as

100 Mdth/d

SNG North SystemMaint. Review remainder of year

LA

MS

AL

GA

Logansport

Bienville

Bear Creek Storage

Onward

Pickens

Rankin

Louisville

Muldon Storage

Reform

McConnells

Providence

TarrantPell City

DeArmanville

Bell Mills

Rome

Compressor Station

Storage Field

Huntsville

Chattanooga

Atlanta

11

Southern will be conducting other general maintenance during this period

AL

SNG South System Maint. Review Remainder of the year

MS

AL

GA

Enterprise

Gwinville

Selma

Auburn

Ellerslie

Thomaston

Ocmulgee

Hallgate

Wrens

Elmore

York

Gallion

Bay Springs

Compressor Station

Storage Field

LNG

Atlanta

Elba

Hartwell

Aiken

Holy Trinity

Albany

Pavo

12

Brookman

Riceboro

Southern will be conducting other general maintenance during this period

SNG South Louisiana System Maint. review Remainder of year

Shadyside

White Castle

Franklinton

Toca

Gwinville

LAMS

Compressor Station

Storage Field

West Leg

East Leg

13

Pearl River

Southern will be conducting other general maintenance during this period

Gas Control Contacts • Reese Hart – Manager

(713) – 420 – 4774 (office)(832) – 248-2937 (cell)[email protected]

• Kal Dankovich – Outage Coordinator (724) – 662 – 6451 (office) (205) - 533 - 4795 (cell)

[email protected]

• Jimmy Reese – Lead Controller (713) – 420 – 7310 (office)

[email protected]

• Daniel Mitchell – Lead Controller (713) – 420 – 5874 (office)

[email protected]

14

Questions?