konza technopolis city status update as at april 2012
TRANSCRIPT
KONZA T
ECHNOPOLIS
CITY
PRES
ENTA
TION B
Y HEN
RY MUNG’A
SIA
DURING T
HE CONNECTE
D KEN
YA F
ORUM
LOCATION OF KONZA CITY IN KENYA
E-READINESS: CONNECTIVITY AVAILABLE FOR KONZA CITY
WHY KONZA CITY
Project Profile
Konza is envisioned to be an exemplar mixed development technology city developed on a Greenfield site 60 kms from Nairobi on the major Mombasa Nairobi Highway.
Phased development over 20 years with the BPO Park taking up 23% of the planned 6M square feet of floor space.
Economic Benefits
Create 200,000 jobs over in BPO, IT ITES and related sectors in 20 years.
World class infrastructure and technology to facilitate research, education and business.
Kenya becomes a knowledge based economy.
Social Benefits
Mixed urban development and best in class residential and working environment.
Enhance local research and development and entrepreneurship and IT enterprise formation culture.
PROPOSED KONZA CITY
PROPOSED KONZA CITY CONT.
KONZA CITY KONZA CITY 5000 ACRES 5000 ACRES (2011 HA) (2011 HA) PLAN PLAN
Attribute Option 1 - Grid
Option 2 - Corridor
Option 3 - Radial Corridor
BPO/ITES Technopark area, ha
162.00 163.00 0 163.00
CBD area, ha 99.20 99.20 99.20
Hospital/ University area, ha
21.90 21.90 21.90
Residential community, ha
969.10 947.20 955.80
Water/ Sewage infrastructure, ha
74.60 74.60 74.60
Strategic reserve 42.00 48.80 25.30
Central park, ha 18.90 36.10 20.40
ALLOCATION OF ALLOCATION OF LAND IN KONZA LAND IN KONZA CITYCITY
K
INVESTMENT OPPORTUNITIES IN KONZA CITY Ready-built structures to house BPO and IT Enabled Services Commercial office space and Hotels Real Estate residential Large scale commercial shopping malls Recreation and entertainment venues Film and Media City Financial District Center Community support services, including health, clinics, green
space, educational institutions, houses of worship, etc University, research centre and convention centre Transportation infrastructure World class ICT infrastructure Utilities, roads and other infrastructure
CURRENT STATUS OF PROJECT Procured 5,000 Ha of Land Operationalized the BPO Directorate to spearhead the project
implementation Temporary Fencing of the entire City Completed Legal Notice on Establishment of Konza Technology City Development
Authority finalized Ground Water Potential Mapping done and Identified 75 sites with 9 viable
sites NYS engaged to drill ,equip one borehole and construct Modern Sanitation
Block
Notice to Plan Issued for zoning around the city covering 10KM
Park Power Requirement Phases incorporated in the LCPDP for 2012-2032
Training Needs in BPO/KPO Identified
Eight forums held in Asia , Europe and America
Local Marketing Campaign through the Media ongoing
CURRENT STATUS OF PROJECT CONT.
Konza Mark of Identity adopted
Intention to Plan issued for the 5,000 Ha
RFP for hiring Master Delivery Partner Consultancy services finalized
Expression of Interest (EOI) to procure Master Delivery Partner Advertised.
Feasibility Study for construction of 60KM High Speed Railway line ongoing
Project Launch tentatively set for the month of August
Investor’s Conference in May 2012Ground breaking in August 2012
KONZA CITY INCENTIVES PACKAGEGroup Scheme/Activity Income Tax
RateWithholding Tax
Investment Deductions
Import Duty/VAT
% Stamp Duty Reduction
% Work Permits Allowed
%
Domestic Market Access
AICT Park & ICT TowerICT Services
10 year exempt 20% there after
10 Years exempt
100% after tax holiday
Perpetually exempt
100% reduction
20% 100%
BScience and technology park
10 year exempt 20% there after
10 Years exempt
100% on new investment after tax holiday
Perpetually exempt on all inputs
100% reduction
20% 100%
CManufacturing and other services for export
10 year exempt 20% there after
10 Years exempt
100% on machinery and buildings after end of holiday
Perpetually exempt on all input
100% reduction
20% 70% for logistic good 50% for non strategic goods
DIncubator manufacturing and other services
10 year exempt 20% there after
10 Years exempt
100% on machinery and buildings after end of holiday
Perpetually exempt on all inputs
100% reduction
10% 70% for logistic good 50% for non strategic goods
ERegional headquarters
20% through out
100% on dividends
100% deductions on building
Perpetually exempt on all office equipment furniture and telecommunication
50% reduction
10% Restricted to regional affiliates
CONT…Group Scheme/Activity Income Tax
RateWithholding Tax
Investment Deductions
Import Duty/VAT
% Stamp Duty Reduction
% Work Permits Allowed
FZone developer and operator
10 year exempt 20% there after
10 Years exempt
100% on new investment & buildings after end of holiday
Perpetually exempt on all inputs
100% reduction
Class A: for managerial technical & supervisory cadre 5% of employees in drainage, telecommunication, roads, schools, health clinics, accommodation industrial go down, workshops offices, docks, yards, and related amenities granted
INVESTMENT SUMMARY
Infrastructure development $ 2.1 B On-site $ 1.9 B Off-site $ 200 M
Site real estate development $ 4.9 B
Total project cost $ 7.0 B
Average expected return - based on real estate market in Kenya:
12 -15% per annum for lease income 20% capital gains per annum (straight line)
INVESTOR PARTICIPATION APPROACH
Single Private Master Developer undertakes the master planning of the entire property under Master Development Agreement and finances its development directly or through sub-developers. Government finances backbone infrastructure fully or partially.
Government Authority finances backbone infrastructure and undertakes the master planning of the property, including attracting developers for specific land uses.
Government contributes land to an SPV to be established jointly with private Master Developer. Terms and responsibilities of each party to be determined.