lean management system

42
only Lean Management System Agile Austin - Agile Leaders SIG Leland Newsom October 7, 2016 10/7/2016 1

Upload: leland-newsom-csm-csp-spc4

Post on 14-Apr-2017

118 views

Category:

Software


3 download

TRANSCRIPT

Page 1: Lean Management System

Lean Management SystemAgile Austin - Agile Leaders SIGLeland NewsomOctober 7, 2016

10/7/2016

Page 2: Lean Management System

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 3: Lean Management System

3

Psychological Safety is #1

10/7/2016

Page 4: Lean Management System

VersionOne 10th Annual State of Agile Survey

10/7/2016

Page 5: Lean Management System

VersionOne 10th Annual State of Agile Survey continued

10/7/2016

Page 6: Lean Management System

6

SAFe House of Lean

10/7/2016

Page 7: Lean Management System

7

Lean Enterprise Academy – Lean Transformation Model

10/7/2016

Page 8: Lean Management System

8

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 9: Lean Management System

The three leadership elements create a closed-loop system that creates process focus and extends new habits to build a culture of continuous improvement. • Focus of leadership shifts from delivery only to delivery +

growing the capabilities of the organization.

DELIGHTED CUSTOMERS

Process / Value Flow

Visual Controls

Transparency/

Accountability

Leader Standard

Work

Changing Culture with Lean Leadership

10/7/2016 9

Page 10: Lean Management System

10

Making Lean Management Go

Original image taken from: Creating a Lean Culture, Third Edition by David Mann

10/7/2016

Page 11: Lean Management System

11

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 12: Lean Management System

12

Visual Controls – The Transmission The primary purpose of visual controls is to focus on the process and the

flow of value to the client. − show process abnormalities and opportunities so the teams can take appropriate

action.−Should provide error proofing.−Measure and show progress of how valuable software flows through the process.

10/7/2016

Page 13: Lean Management System

13

Tiered Visual Management Systems Team – Have the most power to affect component or “project” level metrics Manager/Director – Have the most power to affect tactical execution and

influence LOB product direction Executives – Have the power to affect organizational issues, budgets, and

strategy

10/7/2016

Agile Metrics in Action Christoher W. H. Davis 2015

Page 14: Lean Management System

14

SDPI - Balanced Metrics

10/7/2016

Get the report at: https://www.rallydev.com/finally-get-real-data-about-benefits-adopting-agile?nid=6201

Page 15: Lean Management System

15

Control Chart - LeanKit

10/7/2016

Page 16: Lean Management System

1610/7/2016

Page 17: Lean Management System

17

Visual Controls

10/7/2016

Page 18: Lean Management System

18

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 19: Lean Management System

19

Leader Standard Work – The Engine

VP Standard Work

MD/Mgr. Standard Work

Team Standard Work

Purpose: Provides a structure and routine that helps shift from a sole focus on value delivery to a dual focus on value delivery and building the capabilities of the organization. − Allows leaders to get the routine tasks taken

care of with less mental energy, leaving them free to focus on improvements and building the capabilities of the organization.

− Provides a way to sustain and extend improvements by updating the standard work as kaizen events occur.

− Overlapping elements in leader standard work across levels supports the integrity of the process.

Guidelines1. Focus on activities and behaviors that

demonstrate leading with respect.2. Make development and coaching a central

theme.3. The higher the level of the manager, the

more strategic the focus will be.

Strategic Focus

Tactical Focus

10/7/2016

Page 20: Lean Management System

20

Leader Standard Work - Example

10/7/2016

Page 21: Lean Management System

21

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 22: Lean Management System

22

Accountability/Transparency- The Steering Wheel and Gas Pedal

Sets direction and pace. Ensures that focus on process leads to action to improve it. Daily Standup Kanban Board Gemba walk – Go see, ask why, show respect −Have a purpose for the walk− Focus on flow and value delivery− Look for wastes (Defects, Over Production, Waiting, Non-utilized

talent/resources, Transportation, Inventory, Motion and Excess Processing) Observations from the visual controls and Gemba walks are converted

to assignments for action− Follow up occurs regularly (daily standup) to track progress

10/7/2016

Page 23: Lean Management System

23

Transparency/Accountability Board

10/7/2016

Page 24: Lean Management System

24

Discipline to Sustain

Force of

Habit

10/7/2016

Page 25: Lean Management System

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 26: Lean Management System

True North

True North defines the strategic objectives of an organization.−defines the outcomes of the system and where we want the system to take

us in the future−define direction, purpose and values

Hoshin Kanri and “catch ball”−Hoshin Kanri is a strategic planning process.

"Hoshin" meaning shining needle or compass. Kanri means management or control

− Is a process for embedding strategy and aligning an organization toward common goals.

− “Catch ball” is a negotiation process where goals, strategies, action items, and measures are tossed back and forth between management and employees to gain consensus and focus.

10/7/2016

Page 27: Lean Management System

X-Matrix Hoshin Kanri

Strategy

Tact

ics

Process

Resu

lts

10/7/2016

Page 28: Lean Management System

X-Matrix Hoshin Kanri cont.

10/7/2016

Page 29: Lean Management System

X-Matrix Example

10/7/2016

Page 30: Lean Management System

Strategy deployment is a negotiation process is known as “catchball,” because the “ball” of strategy is tossed back and forth from team to team until a final consensus is reached about what needs to be done and how to do it.

10/7/2016

Page 31: Lean Management System

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 32: Lean Management System

People Systems

10/7/2016

Page 33: Lean Management System

Management by Objective

Management by Objectives Strategy DeploymentTop Down (unidirectional) Built both top down and bottom up

(catchball)Focuses on rear-view mirror results

Concentrates resources on key priorities

Little effort to understand or improve the system or process

Controls means and methods, not just results

Usually based on calendar for performance review cycles (annual, bi-annual, quarterly reviews)

Continuous/Frequent reviews up & down the org chart. Not based on the calendar

Often unlinked (individual goals not tied to strategic objectives)

Linked to the strategic objectives

Tied to performance appraisals (carrot or whip)

Not tied to performance appraisals

Focus on profits/delivery. Adding value to shareholders.

Voice of the Customer (VOC),not just profit/delivery goals10/7/2016

Strategy Deployment

Page 34: Lean Management System

34

Facts about Appraisals

10/7/2016

Page 35: Lean Management System

Capability Matrix

10/7/2016

Page 36: Lean Management System

True North

People Systems

Standard Work

Visual Controls

Leader Standard

Work

Accountability /

Transparency Systems

Lean Management System

10/7/2016

Page 37: Lean Management System

Standard Work

Standard work answers the who, what, where, when, why, and how.−Who operates this process?−What are the quality check points? What does the final product look like? −Where is this process completed? −When will it be done?−Why is this step necessary? Why is this a quality check point? Why is this a value-

adding?−How is the process followed? How do I know the process is followed? How do we

measure success? Standard work is a collection and implementation of best practices known

at that point.−Update Standard work as improvements are made.

Update work instruction documents, training, onboarding, and practice. Standard work incorporates what is needed to start the process and the

finished state of the process. Standard work should always be questioned and improvements sought. 5S – Sort, Set in Order, Shine, Standardize, Sustain10/7/2016

Page 38: Lean Management System

Standard Work

Provides structure and routine to build the capabilities of the organization that sustain and extend improvements. Without standardization, incremental improvements may be lost with time.

10/7/2016

Page 39: Lean Management System

39

Standard Work Example

10/7/2016

Page 40: Lean Management System

PDCA Loop

True North

People SystemsStandard WorkLeader Std. Work

Visual Controls

Accountability Systems

10/7/2016

Page 41: Lean Management System

10/7/2016