    LECTURE 03LECTURE 03

    Service and UtilizationService and Utilization

  • 8/7/2019 Lec 03a#Service Utilization

    2/27

    GENERATING STATION

    Secondary Customer 240 V

    Subtransmission Customer11kV

    Subtransmission Customer33kV

    TRANSMISSION TOWER550 kV, 275 kV

    SUTSDT

    GENERATION

    TRANSMISSION

    DISTRIBUTION

  • 8/7/2019 Lec 03a#Service Utilization

    3/27

    IntroductionIntroduction

    The service tab may be a connection on a poleThe service tab may be a connection on a polewith the overhead service drop or anwith the overhead service drop or an

    underground service lateral to the building, or aunderground service lateral to the building, or a

    connection to an underground utility line with aconnection to an underground utility line with aservice lateral to the building. All electricalservice lateral to the building. All electrical

    construction work on private property isconstruction work on private property is

    normally at he owners expenses, and fornormally at he owners expenses, and for

    installation outside of private property normallyinstallation outside of private property normallybared by electric utility company (TNB) withbared by electric utility company (TNB) with

    some contribution charges.some contribution charges.

  • 8/7/2019 Lec 03a#Service Utilization

    4/27

    Service from the utility line to the building now daysService from the utility line to the building now daysrun underground except rural area where overheadrun underground except rural area where overhead

    line is using due to certain constrain.line is using due to certain constrain.

  • 8/7/2019 Lec 03a#Service Utilization

    5/27

    DistributionDistribution

    TNB Sub

    Station

    Main Switch

    Room

    Sub Switch

    Board

    Distribution

    Board/Panel

    Transformer

    RMU

    Breaker

    TNB CONSUMER

  • 8/7/2019 Lec 03a#Service Utilization

    6/27

    DB

    MAIN

    SWITCHBOARD

    SS

    DP

    DP

    M

    M

    TRANSFORMER

    HIGH VOLTAGE

    PRIMERY

    FEEDER

    11,000 V

    SECONDARY

    SERVICE 415 V

    MAIN FEEDER

    415 V

    BRANCH CIRCUITWIRING 415 V/240 V

    STARTER PANEL

    MOTOR

    STARTER PANEL

    SINGLE LINE DIAGRAM

  • 8/7/2019 Lec 03a#Service Utilization

    7/27

    SCHEMATIC

    DIAGRAM

  • 8/7/2019 Lec 03a#Service Utilization

    8/27

    Overhead ServicesOverhead Services

  • 8/7/2019 Lec 03a#Service Utilization

    9/27

    Overhead services are commonly used to carryOverhead services are commonly used to carry

    two types of electric power lines, transmissiontwo types of electric power lines, transmissionlines @lines @ subtransmissionsubtransmission lines and distributionlines and distribution

    lines (also known as feeder). Distribution lineslines (also known as feeder). Distribution lines

    carry power from local substation to customers.carry power from local substation to customers.

    They generally carry voltages from 4.6 to 11They generally carry voltages from 4.6 to 11

    (kV) for distances up to thirty miles, and include(kV) for distances up to thirty miles, and include

    transformers to step the voltage down from thetransformers to step the voltage down from the

    primary voltage of the lines to the lowerprimary voltage of the lines to the lowersecondary voltage used by the customersecondary voltage used by the customer

  • 8/7/2019 Lec 03a#Service Utilization

    10/27

    A service drop carries this lower voltage to theA service drop carries this lower voltage to the

    customer's premises.customer's premises. SubtransmissionSubtransmission lineslinescarry higher voltage power from regionalcarry higher voltage power from regional

    substations to local substations. They usuallysubstations to local substations. They usually

    carry 66 kV for distances up to 60 miles.carry 66 kV for distances up to 60 miles.

    Voltages of 230kV can be placed on twoVoltages of 230kV can be placed on two-- oror

    threethree--pole towers. Transmission lines carryingpole towers. Transmission lines carrying

    voltages of above 230kV are usually notvoltages of above 230kV are usually not

    supported by poles, but by metal pylon (knownsupported by poles, but by metal pylon (knownas transmission towers).as transmission towers).

  • 8/7/2019 Lec 03a#Service Utilization

    11/27

    For economic or practical reasons, such as toFor economic or practical reasons, such as to

    save space in urban areas, a distribution line issave space in urban areas, a distribution line isoften carried on the same poles as aoften carried on the same poles as a

    subtransmissionsubtransmission line but mounted under theline but mounted under the

    higher voltage lines; a practice calledhigher voltage lines; a practice called

    ""underbuildunderbuild".".

  • 8/7/2019 Lec 03a#Service Utilization

    12/27

    OverheadOverhead

    AdvantagesAdvantages

    Low costLow cost in generalin general Space ConstrainSpace Constrain

    Limited accessibilityLimited accessibility

    Easy InstallationEasy Installation

    Shorter installation timeShorter installation time

    Overhead cable are in several types;Overhead cable are in several types;

    barebare

    WeatherproofWeatherproof

    Preassemble aerial cablePreassemble aerial cable consist three or fourconsist three or four

    insulated cables wrapped together.insulated cables wrapped together.

  • 8/7/2019 Lec 03a#Service Utilization

    13/27

    Overhead DistributionOverhead Cable

    Aerial Cable

    ABc Cable

  • 8/7/2019 Lec 03a#Service Utilization

    14/27

  • 8/7/2019 Lec 03a#Service Utilization

    15/27

    Underground ServicesUnderground Services

  • 8/7/2019 Lec 03a#Service Utilization

    16/27

    Electric power can also be transmitted byElectric power can also be transmitted by

    underground power cable instead of overheadunderground power cable instead of overhead

    power lines. They can assist the transmission ofpower lines. They can assist the transmission ofpower across:power across:

    Densely populated urban areasDensely populated urban areas

    Areas where land is unavailable or planningAreas where land is unavailable or planning

    consent is difficultconsent is difficult

    Rivers and other natural obstaclesRivers and other natural obstacles

    Land with outstanding natural or environmentalLand with outstanding natural or environmental

    heritageheritage Areas of significant or prestigious infrastructuralAreas of significant or prestigious infrastructural

    developmentdevelopment

    Land whose value must be maintained for futureLand whose value must be maintained for future

    urban expansion and rural developmenturban expansion and rural development

  • 8/7/2019 Lec 03a#Service Utilization

    17/27

    Some other advantages of underground powerSome other advantages of underground power

    cables:cables:

    oo Less subject to damage from severe weatherLess subject to damage from severe weatherconditions (mainly lightning, wind and freezing)conditions (mainly lightning, wind and freezing)

    ooGreatly reduced emission, into the surroundingGreatly reduced emission, into the surrounding

    area, of electromagnetic fields (EMF). All electricarea, of electromagnetic fields (EMF). All electric

    currents generate EMF, but the shielding providedcurrents generate EMF, but the shielding providedby the earth surrounding underground cablesby the earth surrounding underground cables

    restricts their range and power.restricts their range and power.

    ooUnderground cables need a narrower surroundingUnderground cables need a narrower surrounding

    strip of about 1strip of about 110 meters to install, whereas an10 meters to install, whereas anoverhead line requires a surrounding strip of aboutoverhead line requires a surrounding strip of about

    2020200 meters wide to be kept permanently clear200 meters wide to be kept permanently clear

    for safety, maintenance and repair.for safety, maintenance and repair.

  • 8/7/2019 Lec 03a#Service Utilization

    18/27

    ooUnderground cables pose no hazard to low flyingUnderground cables pose no hazard to low flying

    aircraft or to wildlife, and are significantly safer asaircraft or to wildlife, and are significantly safer as

    they pose no shock hazard (except to the unwarythey pose no shock hazard (except to the unwary

    digger).digger).

  • 8/7/2019 Lec 03a#Service Utilization

    19/27

    Some disadvantages of underground powerSome disadvantages of underground power

    cables:cables:

    ooUndergrounding is more expensive, since the costUndergrounding is more expensive, since the costof burying cables at transmission voltages is severalof burying cables at transmission voltages is several

    times greater than overhead power lines, and thetimes greater than overhead power lines, and the

    lifelife--cycle cost of an underground power cable is twocycle cost of an underground power cable is two

    to four times the cost of an overhead power line.to four times the cost of an overhead power line.ooWhereas finding and repairing overhead wireWhereas finding and repairing overhead wire

    breaks can be accomplished in hours, undergroundbreaks can be accomplished in hours, underground

    repairs can take days or weeks, and for this reasonrepairs can take days or weeks, and for this reason

    redundant lines are run.redundant lines are run.oo The principal disadvantages of this service is highThe principal disadvantages of this service is high--

    cost and to overcome this direct buried technique iscost and to overcome this direct buried technique is

    usedused eliminating the raceway, But, problem of thiseliminating the raceway, But, problem of this

    technique is; cables cannot be pulled out if it is fault.technique is; cables cannot be pulled out if it is fault.

  • 8/7/2019 Lec 03a#Service Utilization

    20/27

    Underground WiringUnderground Wiring

    Exterior installation are generally in connectionExterior installation are generally in connectionwith servicewith service either directly from the utility or aeither directly from the utility or a

    subfeedsubfeed between buildings . The methodsbetween buildings . The methods

    available for underground wiring are:available for underground wiring are:oo direct burialdirect burial

    oo TrenchTrench direct burial ductdirect burial duct

    oo TrenchTrench concrete encased ductconcrete encased duct

    Armored cable with 4 core, 3 core or singleArmored cable with 4 core, 3 core or single

    core cable normally used for undergroundcore cable normally used for underground

    wiringwiring..

  • 8/7/2019 Lec 03a#Service Utilization

    21/27

  • 8/7/2019 Lec 03a#Service Utilization

    22/27

  • 8/7/2019 Lec 03a#Service Utilization

    23/27

    TrenchTrench

    Trench - Direct Burial Duct

  • 8/7/2019 Lec 03a#Service Utilization

    24/27

  • 8/7/2019 Lec 03a#Service Utilization

    25/27

    TrenchTrench

    Trench Concrete encased

  • 8/7/2019 Lec 03a#Service Utilization

    26/27

  • 8/7/2019 Lec 03a#Service Utilization

    27/27