leed ga flashcards

Upload: naveed-ahmed

Post on 04-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 LEED GA Flashcards

    1/49

    Printing Instructions:

    Use standard 8 1/2 x 11

    In your printer dialogue tell your printer to print double

    sided, pages 2 through 49.

    If your printer cannot print double sided:

    Open your printer dialogue.

    In your print dialogue tell the printer to print odd

    numbered pages only, starting with page 3.

    After this is complete turn the printed odd page flash-

    cards over and reload in the printer face up.

    In your printer dialogue, tell the printer to print even

    number pages in reverse order.

  • 8/13/2019 LEED GA Flashcards

    2/49

    The total square footage of

    all buildings within a par-

    ticular area is referred to as

    ____________?

    The connection between

    a site and the surrounding

    community is referred to as

    ____________?

    What are the different levels

    of LEED certification?What does LEED stand for?

    What does GBCI stand for?What does USGBC stand

    for?

  • 8/13/2019 LEED GA Flashcards

    3/49

    Community ConnectivityDevelopment Density

    Leadership in Energy and

    Environmental Design

    Certified (40-49 Points)

    Silver (50-59 Points)

    Gold (60-79 Points)

    Platinum (80+ Points)

    United States Green Building

    Council

    Green Building Certification

    Institute

  • 8/13/2019 LEED GA Flashcards

    4/49

    True or False:

    A project must meet all

    MPRs.

    Where can documentation

    for appeals be found?

    How much does an appeal

    cost?

    What is the time period

    within which to appeal a

    credit rejection?

    What 2 factors influence

    the Solar Reflectance Index

    (SRI)?

    What is imperviousness?

  • 8/13/2019 LEED GA Flashcards

    5/49

    The resistance of a mate-

    rial to penetration by a liquid

    such as water.

    Emmissivity and Albedo

    $500 per credit25 business days after

    reciept of the credit rejection.

    LEED OnlineTrue

  • 8/13/2019 LEED GA Flashcards

    6/49

    When is LEED for Homes

    applicable?

    When would the Commercial

    Interiors rating system be

    used?

    What rating system would be

    used for a high school cam-

    pus?

    When would the Core and

    Shell rating system be used?

    When would the New

    Construction rating system

    be used?

    What is a hard cost?

  • 8/13/2019 LEED GA Flashcards

    7/49

    The guts of a building:

    framing, equipment and

    building materials.

    New buildings OR existing buildings with

    significant HVAC or envelope modifications.Building types include: Offices, institutional

    buildings, hotels, and residential buildings

    with 4 or more stories.Owener must occupy more than 50% of the

    building.

    LEED for Schools (Building

    Design & Construction)

    If 50% or less of the building

    is occupied by the owner

    For situations where the

    tenant does not occupy the

    entire building.

    Single-family homes. Low-rise multi-family

    homes.

    Production and major

    remodels of existing homes.

  • 8/13/2019 LEED GA Flashcards

    8/49

    What credit category refers

    to the EPA Construction

    General Permit?

    What is the goal of

    Sustainable Sites?

    What is the minimum per-

    formance period for Building

    Operations & Maintenance?

    Name the credit topics under

    the LEED rating system.

    Is a building certified under theBuilding Operations & Mainte-

    nance rating system required to

    have previous certification?

    When would the LEED forBuilding Operations &

    Maintenance rating system

    be applicable?

  • 8/13/2019 LEED GA Flashcards

    9/49

    On existing buildings

    maintenance plans and

    operations.

    No.

    However, having the building

    previously certified is helpful.

    Sustainable Sites

    Water Efficiency

    Energy & Atmosphere

    Materials & Resources

    Indoor Environmental Quality

    Innovations

    Regional Priority

    Three months.

    To reduce the impact of a

    new building or major

    remodel on the surrounding

    environment.

    Construction Activity

    Pollution Prevention

  • 8/13/2019 LEED GA Flashcards

    10/49

    What is blackwater?What type of water exceeds

    EPA standards for drinking?

    Name 10 types of basic

    services in regards to

    community connectivity.

    Low-emitting and fuel-

    efficient vehicles are de-

    fined as vehicles that are

    classified as _______?

    What determines if a site is a

    brownfield?

    Which types of land should

    be avoided when selecting a

    site?

  • 8/13/2019 LEED GA Flashcards

    11/49

    Potable water.Toilet and urinal waste water.

    Zero Emission Vehicles (ZEV) by the

    California Air Resources Board or have

    achieved a minimum green score of 40

    on the American Council for an EnergyEfficient Economy (ACEEE)

    Banks Schools Laundry Services Churches Libraries Parks Senior Care Facilities Post offices Theaters Hardware Stores

    Prime farmland Flood prone areas Any habitat for

    threatened or en-dangered species

    Either designation by agovernment agency

    OR

    an ASTM E1903-97 Phase II

    Environmental Site Assessment

    Community Centers Pharmacies Restaurants Small grocery stores Supermarkets Daycare centers Fire Stations Fitness Centers Museums Beauty Salons

    Wetlands Undeveloped land

    within 50 feet of

    a body of water Land that was a

    public park

  • 8/13/2019 LEED GA Flashcards

    12/49

    How can you achieve

    Innovation credits?

    What are the standards for

    adhesives and sealants?

    What is the acceptable

    threshold for formaldehyde?

    Name some examples of

    rapidly renewable materials.

    What are regional materials?What types of materials are

    recyclable?

  • 8/13/2019 LEED GA Flashcards

    13/49

    SCAQMD Rule 1168

    GreenSeal GS-36 Standard

    for Commercial Adhesives

    Requirements.

    Achieving significant, measur-

    able environmental perfor-

    mance using a strategy not ad-

    dressed in the Rating System

    Cork Bamboo Natural Rubber Wheat

    27 parts per billion.

    Paper Corrugated Cardboard

    Glass

    Plastic

    Metal

    Materials that have beenharvested, recovered, or

    manufactured within 500

    miles of a project site.

    Cotton Straw

    Linseed

  • 8/13/2019 LEED GA Flashcards

    14/49

    What is the purpose of a

    CIR?How much does a CIR cost?

    How long can a CIR (Credit

    Interpretation Request) be?

    When is the LEED Scorecard

    constructed for a project?

    What is the minimum

    passing score for the LEED

    Examinations?

    How many points are avail-

    able for having a LEED AP on

    staff?

  • 8/13/2019 LEED GA Flashcards

    15/49

    One point is available.170.

    No more than 600 words or

    4,000 characters.

    During the integrated design

    process. (or eco-charette)

    $220.

    Used for clarification or

    special exceptions to a

    credit.

  • 8/13/2019 LEED GA Flashcards

    16/49

    What is the baseline flush

    rate for urinals?

    What is the baseline flush

    rate for water closets?

    Which is more desirable: A

    low SRI or a high SRI?

    Name another strategy for

    controlling transportation.

    Which rating system cannot

    use a 2-phase submittal

    option?

    During which 2 phases of a

    project can LEED documents

    be submitted?

  • 8/13/2019 LEED GA Flashcards

    17/49

    Design or Construction.Building Operations &

    Maintenance

    A high value is more

    desriable. (78 or higher)

    Locate near mass transit

    Limit parking

    Encourage carpooling

    Promote alternative fuel vehicles

    Offer incentives Support alternative transportation.

    1.6 Gallons Per Flush (GPF)1.0 Gallons Per Flush (GPF)

  • 8/13/2019 LEED GA Flashcards

    18/49

    Which protocol bans the use

    of CFC refrigerants?

    What is the goal of Energy &

    Atmosphere credits?

    What are two options for

    acquiring renewable energy?

    What are strategies for

    reducing outdoor water use?

    What is one way to reduce

    indoor water use?

    Where can baseline flush

    rates be found?

  • 8/13/2019 LEED GA Flashcards

    19/49

    Energy Policy Act of 1992.Install efficient plumbing fixtures.

    Use non-potable water.

    Install submeters.

    Renewable Energy can be

    generated on-site (using wind,

    solar or other forms of power)

    or purchased through renew-able energy programs.

    Choose locally adapted plants. Use xeriscaping. Select efficient irrigation technologies.

    Use non-potable water. Install submeters.

    To reduce the amount of

    energy used, and to reduce

    the amount of pollutants re-

    leased into the atmosphere.

    The Montreal Protocol

  • 8/13/2019 LEED GA Flashcards

    20/49

    Which credit topic refers to

    indoor air quality and thermal

    comfort, lighting and

    acoustics?

    Name some ways to help

    control the amount of air-

    borne contaminants in the

    encironment.

    Which credit topic suggests

    developing a plan for

    construction waste?

    LEED requires you to

    follow what guidelines

    for construction IAQ

    management?

    For LEED purposes, how long

    does it take for renewable

    materials to grow or raise?

    Name some examples of

    renewable energy.

  • 8/13/2019 LEED GA Flashcards

    21/49

    Solar Wind

    Geothermal10 years or less.

    SMACNA 2007 guidelines. Materials & Resources.

    Use permanent entry systems that can becleaned (such as a system of grates)

    Use exhaust systems to create negative pres-

    sure in areas with potential sources of pollution

    Install new air filters with a MERV rating of 13

    or more for incoming and outgoing air

    Provide sealed, temporary storage for

    hazardous waste (ideally outside)

    Indoor Environmental Quality.

    Wave/Tidal Bio-fuels

    Low-impact

    Hydroelectric

  • 8/13/2019 LEED GA Flashcards

    22/49

    Who produces the Green

    Label Testing program?

    Who certifies wood and pa-

    per products?

    Wate Use Reduction refer-

    ences which standard?

    What standard is referenced

    by low-emitting vehicle

    requirements?

    Name some strategies for

    improving outdoor environ-

    ments.

    What is a VOC?

  • 8/13/2019 LEED GA Flashcards

    23/49

    The Forest Stewardship

    Council. (FSC)The Carpet and Rug Institute.

    The California Air Resources

    Board Zero-Emission Defini-

    tion.

    The International Code Council

    International Plumbing Code

    2006, Section 604: Design of

    Building Water DistributionSystems.

    A Volatile Organic Compound.A VOC is an off-gas from many

    materials, including adhesives,

    sealants, paints, carpets and

    particle board.

    Use daylighting Install operable windows

    Give occupants thermal controls

    Give occupants ventilation controls

    Give occupants lighting controls

    Conduct occupant surveys to ensure occu-pants are content with their environments.

  • 8/13/2019 LEED GA Flashcards

    24/49

    The LEED for Green Interior

    Design & Construction Refer-

    ence Guide is applicable to

    which rating systems?

    The LEED for Green Building

    Design & Construction Refer-

    ence Guide is applicable to

    which rating systems?

    What does ASTM 773-03

    determine?What does NPDES stand for?

    A sustainable purchasing

    policy is used in which rating

    system?

    What does ASHRAE stand

    for?

  • 8/13/2019 LEED GA Flashcards

    25/49

    The American Society for

    Heating, Refrigeration, and

    Air conditioning Engineers.

    The Building Operations &

    Maintenance rating system.

    National Pollutant Discharge

    Elimination System.

    Air leakage rates using fan

    pressurization. Its used in

    the Indoor Environmental

    Quality credits.

    LEED for New Construction &

    Major Renovation

    LEED 2009 for Core & Shell

    Development Rating System

    LEED 2009 for Schools New Construction

    and Major Renovations Rating System

    LEED 2009 for Commercial

    Interiors Rating System.

  • 8/13/2019 LEED GA Flashcards

    26/49

    Green Building practices can

    lower what?

    In the United States, build-

    ings account for the highest

    proportion of what?

    The clearing of land for

    development often destroys

    _______________?

    What are the impacts of

    extracting, manufacturing

    and transporting materials?

    The LEED for Homes Refer-

    ence Guide applies to which

    rating systems?

    The LEED for Green BuildingOperations & Maintenance

    Reference Guide applies to

    which rating systems?

  • 8/13/2019 LEED GA Flashcards

    27/49

    LEED 2009 for Existing

    Buildings Operations &

    Maintenance Rating System.

    LEED for Homes

    Rating System.

    Additional vehicle use,

    excessive energy consump-

    tion, and other environmental

    effects.

    Wildlife habitats.

    Energy usage.

    The use of natural resources,

    and they can lower operating

    costs.

  • 8/13/2019 LEED GA Flashcards

    28/49

    Green building costs and

    benefits can include:

    _______________?

    Using an integrative ap-

    proach can mean bringing

    these people together.

    Life Cycle Assessment

    includes ___________?

    The General Services Admin-

    istration requires that all new

    federal government buildings

    achieve what?

    Federal, state and local gov-

    ernment agencies have ad-

    opted more ___________?

    What effect does green

    building have on humans?

  • 8/13/2019 LEED GA Flashcards

    29/49

    Green buildings can increase

    human productivity.

    Sustainable building

    practices.

    Planning, design, construc-

    tion, operations, retirement

    and renewability.

    LEED certification. A Silver

    rating is encouraged

    Building owners, operators,

    architects, planners, engi-

    neers and contractors to de-

    velop innovative solutions.

    Lower maintenance cost,

    less energy usage, high oc-

    cupant satisfaction, lower

    CO2emissions.

  • 8/13/2019 LEED GA Flashcards

    30/49

    GBCI is accredited by what

    third party certification body?

    GBCI manages all aspects

    of the LEED professional Ac-

    creditation program. What

    are the three levels?

    The LEED rating systems

    were created by the USGBC

    for what reason?

    LEED promotes a whole-

    building approach to sustain-

    ability by recognizing perfor-

    mance in _____________?

    The mission of the USGBC is

    _______________?

    The U.S. EPA conducted astudy and found that on av-

    erage, we spend how much

    of our time indoors?

  • 8/13/2019 LEED GA Flashcards

    31/49

    We spend 90% of our time

    indoors.

    Transform the way buildings and

    communities are designed, built and

    operated, enabling an environmen-

    taly and socially responsible, healthy

    and prosperous environment that

    improves the quality of life.

    Location and planning, sustainable

    site development, water savings,

    energy efficiency, materials selection,

    indoor environmental quality, innova-tive strategies, and regional priority.

    To provide a framework for

    meeting sustainability goals

    and assessing building per-

    formance.

    LEED Green Associate

    LEED Accredited Professional

    LEED Fellow

    The American National

    Standards Institute.

  • 8/13/2019 LEED GA Flashcards

    32/49

    A buildings carbon footprint

    is the total greenhouse gas

    emissions associated with its

    _________________.

    The score for each LEED

    credit is estimated based

    on the carbon footprint for

    __________________.

    LEED Rating Systems

    generally have how many

    base points?

    Each category of the LEED

    rating systems include what

    2 elements?

    LEED for Neighborhood

    Development is Designed to

    address what?

    The LEED for New Construc-tion rating system addresses

    the full design and construc-

    tion of what type of building?

  • 8/13/2019 LEED GA Flashcards

    33/49

    Location & Linkages and

    Awareness & Education

    The land use planning of en-tire neighborhoods, including

    buildings, infrastructure, street

    design and open space.

    100 Prerequisites and Credits

    A typical LEED buidling.Construction and Operations

  • 8/13/2019 LEED GA Flashcards

    34/49

    Where can the team upload

    information and documenta-

    tion on a LEED certification

    project?

    If a question of issue aris-

    es on a LEED certification

    project, a team can submit

    __________________?

    LEED certification documen-

    tation is submitted in how

    many stages?

    The LEED certifica-

    tion process begins with

    ________________?

    Achieving LEED certification

    requires _____________?

    Which organization deter-

    mines whether or not a site

    is prime farmland?

  • 8/13/2019 LEED GA Flashcards

    35/49

  • 8/13/2019 LEED GA Flashcards

    36/49

    Projects located in a high-

    density location can easily

    utilize what type of transpor-

    tation system?

    Projects can reduce trans-

    portation impacts by using a

    variety of practical strategies

    like _________________?

    What does it mean if an area

    has a lighting zone level of

    4?

    Efficient Irrigation Systems

    include _____________?

    A site contaminated with

    hazardous materials is called

    _________________?

    The sustainability of a site

    has several aspects that in-

    clude ____________?

  • 8/13/2019 LEED GA Flashcards

    37/49

    Transportation, Site selec-tion, Site design and man-

    agement, and Stormwater

    management.

    A brownfield.

    Micro-irrigation

    Moisture Sensors

    Rain shutoffs

    Evapotranspiration Controllers

    Drip Irrigation

    LZ4 areas are major metro-

    politan areas with high activity.

    These areas generally have a

    lot of light, and commerical dis-tricts fall into this zone.

    Providing alternative modes of trans-portation, encouraging walking and

    bicycling, providing fueling facilities

    for alternative fuel vehicles, and re-

    ducing the number and lengths of

    automobile trips.

    Mass transit systems, such

    as busses or light rail.

  • 8/13/2019 LEED GA Flashcards

    38/49

    What is the ventilation rate?

    Occupants who have control

    over their temperature, air-

    flow and lighting have what?

    Exemplary performance for

    Sustainable Sites can be

    achieved by ___________?

    Define xeriscaping.

    What is a pollutant?What is included in the

    building envelope?

  • 8/13/2019 LEED GA Flashcards

    39/49

    The exterior surface of thebuilding: Walls, windows,

    roof and floor. This is also

    known as the building shell.

    A harmful substance that is

    introduced to an environ-

    ment.

    Doubling the credit

    requirement or exceeding

    the credit threshold

    A method of using only na-

    tive, adaptable and low-wa-

    ter plants for landscaping.

    Controllability of systems.The amount of air circulated

    through a space.

  • 8/13/2019 LEED GA Flashcards

    40/49

    What are 4 strategies for

    reducing energy demand?

    What natural resources can

    be used to benefit the entire

    building?

    What does the Montreal

    Protocol ban?Whats a CxA?

    Why is staff training

    important?

    Name 4 strategies for

    reducing waste.

  • 8/13/2019 LEED GA Flashcards

    41/49

    Compost Encourage reycling Size the building appropriately Implement a construction waste

    management plan

    Knowledge of the operations

    of a green building can lead

    to better efficiency.

    The use of CFC refrigerants.

    It also encourages phasing

    out HCFC refrigerants.

    Commissioning Authority

    Sun and wind can be used

    for heating, cooling, daylight

    and energy.

    Establish design goals Size the building appropriately Use free energy

    Insulate

    Monitor consumption

  • 8/13/2019 LEED GA Flashcards

    42/49

    LEED recognizes smart lo-

    cations for building, which

    fall within a 1/4-mile walk of

    _______________?

    Where is water used in a

    building?

    Which have lower irrigation

    efficiencies: Overhead spray

    systems or drip systems?

    What does GPF stand for?

    What are some typical

    measures of energy?

    What is the calculation for

    determining greenhouse gas

    emissions per capita?

  • 8/13/2019 LEED GA Flashcards

    43/49

    A communitys total green-

    house gas emission divided

    by the number of residents.

    British Thermal Units (BTUs) of energy Kilowatt-Hours of electricity Therms of natural gas Gallons of liquid fuel

    Overhead spray sprinklers. Gallons Per Flush.

    Indoors for restrooms and

    kitchens

    Outdoors for landscaping.

    Industrial uses.

    Bus or streetcar stops, and1/2 mile of rapid transit sta-

    tions, light or heavy passenger

    rail stations, ferry terminals or

    tram terminals.

  • 8/13/2019 LEED GA Flashcards

    44/49

    LEED for Neighborhood De-

    velopment has two credit cat-

    egories that arent applicable

    anywhere else. What are they?

    Which two sections are

    only applicable to LEED for

    Homes?

    How many review phases

    are required under the LEED

    for Homes rating system?

    What is a footcandle?

    Define Street Grid Density.What does VMT stand for?

  • 8/13/2019 LEED GA Flashcards

    45/49

    Vehicle Miles TraveledThe number of centerline

    miles per square mile.

    5 steps are required under

    the verification process.

    The amount of illumination

    falling on a surface.

    Location and Linkages

    Education and Awareness Neighborhood Pattern and Design

    Green Infrastructure and Buildings

  • 8/13/2019 LEED GA Flashcards

    46/49

    Where is HFC-23 mainly

    used?What does LEED deliver?

    If a material is biodegrad-

    able, it is ___________?What does BTU stand for?

    What is wetland vegetation?Which rating system has 136

    available points?

  • 8/13/2019 LEED GA Flashcards

    47/49

  • 8/13/2019 LEED GA Flashcards

    48/49

    How many points are obtain-

    able for Regional Priority?

    What is the recertification

    fee for Building Operations &

    Maintenance Certified

    Buildings?

    Can a project be built off-

    site, then relocated?

    How much does it currently

    cost to register a project that

    is less than 50,000 square feet

    under LEED for New Construc-tion for USGBC members?

    Did Langdon find greenbuildings to cost more in the

    long run, or less than tradi-

    tional, non-green structures?

    How much does it cost totake the Green Associate

    exam if you arent a member

    of the USGBC?

  • 8/13/2019 LEED GA Flashcards

    49/49

    $200, plus a $50

    registration fee.

    He found them to cost

    less over time.

    No. Projects must be built

    on-site, according to the

    MPRs.

    $1,750.

    50% of the initial

    tifi ti f

    There are six available, but a

    j t l hi f