INSTALLATION AND MAINTENANCE INSTRUCTIONSMOS GB 0923-2EVP 500031285 EVP 500

20 100

40 8060

0 120

LEK

Page 2: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

LE

K

LEK

LE

K

LE

K

1 2

3 4

LE

K

5

LE

K

6

Page 3: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

For Home Owners

General

System descriptionPrinciple of operation 3Abbreviations 3System diagram 3

Front panelVisible part of front panel 4Functions on the front panel 4

Room temperatureHeating control system 6Default setting 6Changing the room temperature manually 6

Hot water temp.Maintenance routines 7

For the Installer

General information for the installerTransport and storage 8Assembly 8Inspection of the installation 8Connection 8Extra electric hot water heater 9

Electrical connectionsFolding down the front panel 10Connection 11Internal fuse protection 11Resetting the temperature limiter 11Power rating as set at the factory 12Max phase current 12Connecting the outside sensor 13Input for external power monitor 13Centralised load control/Tariff 13Quick start boiler mode 13Blocking room heating during tariff control 13Input for external charge pump feed 14External additional relay 14Temperature sensor data 14

DockingGeneral 15

Pipe connection to NIBE FIGHTER outdoor air heatpump 15Communication between EVP 500 and F20XX 16Pipe connection to other outdoor air heat pump 17Extra docking connections 17Electric boiler mode 17Electrical connection 17EVP 500, F20XX and solar panel 18Abbreviations 18EVP 500, F20XX and oil/pellet/gas boiler 19EVP 500, F20XX and combi/wood boiler 20EVP 500, wood boiler, accumulator tank and solar pan-el 21

Commissioning and adjustingPreparations 22Addition 22Venting the heating system 22Start-up and inspection 22Setting of temperature levels 23Adjustment, charge flow F20XX 24Charge pump diagram 25Readjustment 25Draining the heating system 25Setting of flow temperature 26

Miscellaneous

Dealing with malfunctionsLow hot water temperature or no hot water 27High hot water temperature 27Low room temperature 27High room temperature 27Electric boiler operation due to blocked heat pump 27Switch position 28Resetting the miniature circuit breakers 29Alarm 29Fine wire fuse 29

Electrical circuit diagram

Dimensions

Technical specificationsComponent positions 34List of components 35Technical specifications 36Accessories 37Enclosed kit 37

1EVP 500

Table of Contents

Page 4: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

GeneralIn order to get the ultimate benefit from your indoor module, EVP 500 you should read through the For HomeOwners section in this Installation and Maintenance Instruction. EVP 500 is intended for houses/properties withwaterborne heating. A climate controlled automatic bypass ensures that the indoor module is always working asefficiently as possible.

EVP 500 is a Swedish-made quality product offering a long life span and reliable operation.

The serial number* (95) must always be stated in all correspondence with NIBE.

089_ _ _ _ _ _ _ _ _ _ _

Installation date

Installation engineers

Setting, "VP connection difference" (2 ºC at delivery)

Setting "Max electrical output" (9 kW at delivery)

Setting "Max flow line" (55 ºC at delivery)

Setting "Heat pump operating mode" (NORM at time of delivery)

Setting, "Immersion heater thermostat" (60 ºC at delivery)

Setting "Option, heating curve" (10 at delivery)

Setting "Offset heating curve" (-2 at delivery)

Any changes to default values are made here.

Datum__________________________ Sign___________________________

*Serial numbers are on the left of the top cover.

This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience andknowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.Children should be supervised to ensure that they do not play with the appliance.Rights to make any design or technical modifications are reserved.©NIBE 2008.

EVP 5002

For Home Owners

General

Page 5: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

System description

Principle of operation

EVP 500 is an indoor module designed for houses/smallerproperties with waterborne heating. The indoor moduleconsists of a pressure vessel, two immersion heater, chargepump as well s intelligent control and is suitable for dockingwith NIBE's air/water heat pumps.

Hot water heating occurs via a cam pipe coil. The low internalvolume and high circulation rate of the water in the coilprevents bacterial growth. In the event of a domestic waterflow greater than 12 l/min, supplementing with a core waterheater is recommended.

The immersion heaters have a max output of 18 kW withop-tion of setting lower outputs. The supplied output is 9 kW.

The indoor module and heat pump work optimally towardsa heat distribution system of up to 55/45 °C at dimensionedoutdoor temperature. At higher flow line temperatures(maximum 65 °C) heat pump operation can be limited. If theheat pump operation is limited the installation only workswith the addition. The heat pump starts when temperaturespermit operation again. For further information about systemlimitation, see the heat pump manual.

The total boiler water volume is 500 litres.

The supply temperature is determined by the current outdoortemperature and selected settings.

AbbreviationsShut-off valveOFF*

Mixer valveBL*

Circulation pumpCP*

Docking sensorDG

Expansion vesselEXP*

Temperature sensor, flow lineFG

Boiler sensorPG

Control boxRC

Shunt valveSV

Safety valve, boilerSÄV1*

Safety valve, water heaterSÄV2*

Safety valve, heat pumpSÄV3*

Drain valveTV

Temperature sensor, outdoorOS**

Non-return valveBV**

Charge pumpSN

Particle filterSF*

System diagram

F20XX EVP 500

RC

UG**

SF* LP TV

PG

DG

FG

SV

SÄV2*SÄV1*

EXP*

BL*

CP*

AV*

AV* BV**

SÄV3*

* Not included in the consignment

** Enclosed

NOTE: This is an outline diagram. Actual installations must beplanned according to applicable standards.

F20XX EVP 500

3EVP 500

For Home Owners

System description

Page 6: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Front panel

Visible part of front panel

20 100

40 8060

0 120

A B C

D E F G H In

Boiler temperature gauge Heat pump operating mode Immersion heater thermostat

Switch Operating mode,immersion heater

Operating modeindicator

Alarm indication Curve coefficient Offset heating curve

Functions on the front panelBoiler temperature gaugeA

Current boiler � temperature is displayed here.

Heat pump operating modeB

This knob can be set in five positions.Economy modeECO

NORM minus---

Normal modeNORM

NORM plus---

Comfort modeCOMF

Immersion heater thermostatC

Displays the selected setting on the immersion heater ther-mostat.

SwitchD

with three modes 1 - 0 - :Normal mode. All control functions connected.1

The indoor module is completely switched off.0

Standby mode. This mode is used in the eventof operating disturbances.

EVP 5004

For Home Owners

Front panel

Page 7: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Operating mode, immersion heaterE

with 2 modes: ON and OFFAn immersion heater is permitted if so required(Normal mode)

ON

Immersion heater is completely blocked.OFF

Operating mode indicatorF

This is a green lamp which can either light continuously orflash once, twice or three times every 5 seconds.

Shows that EVP 500 is opera-tional and that no heating isrequired.

Constantly on

EVP 500 emits signals to theheat pump (F20XX), indicat-ing that heating is required.

One flash

EVP 500 emits signals to boththe heat pump (F20XX) andthe additional heat output,indicating that heating is re-quired.

Two flashes

EVP 500 emits a signal to theadditional heat output, indic-ating that heating is required(F20XX blocked).

Three flashes

Alarm indicationG

This is a red lamp which may be on, flashing or off.Existing alarms in the heat pump or sensoralarms in EVP 500.

On

Communication error between heat pumpand EVP 500.

Flashing*

Normal operationOff

Curve coefficientH

Knob "Curve coefficient" is used to set the automaticheating control system, see section "Default setting" onpage 6.

Offset, heating curveIn

With the knob "Offset heating curve", you can changethe heating curve offset and hence the room temperature;see section "Default setting" on page 6 and "Setting offlow temperature" on page 26.

* If the heat pump is made by a manufacturer other than NIBE, see section "Electrical connection" on page 17.

5EVP 500

For Home Owners

Front panel

Page 8: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Room temperature

Heating control system

The indoor temperature depends on several factors. Duringthe hot season, solar radiation and heat given off by peopleand equipment are sufficient to keep the house warm.

When it gets colder outside, the heating system must bestarted. The colder its gets, the hotter the radiators must be.

This adjustment is made automatically, however the basicsettings must first be made on the indoor module, see thesection “Default setting” on page 6.

NOTEWait one day between settings so that the temperat-

ures have time to stabilise.

Default setting

For optimum operational economy, make settings first onthe indoor module with any room thermostats fully open.When the correct "Heating curve selection" and "Offset,heat curve" have been selected, the thermostats can becontrolled to compensate for solar radiation etc.

For basic setting, use the knob "Option, heating curve"

and the knob "Offset heating curve".

If the required room temperature is not obtained, readjust-ment may be necessary.

Readjustment the default settings

Cold weather conditions

If the room temperature is too low, increase the heatingcurve offset setting by one step.

If the room temperature is too high, reduce the “Option,heating curve” setting by one step.

Warm weather conditions

If the room temperature is too low, increase the heatingcurve offset setting by one step.

If the room temperature is too high, reduce the "Heatingcurve offset" setting by one step.

Changing the room temperature manually

If you want to temporarily or permanently lower or raise theindoor temperature relative to the previously set temperature,

turn the "Heating curve offset" knob anticlockwise orclockwise. One line approximately represents a 1 degreechange in room temperature.

NOTE: An increase in the room temperature may be limitedby the radiator or underfloor heating thermostats, if so thesemust be turned up.

EVP 5006

For Home Owners

Room temperature

Page 9: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Hot water temp.Upon delivery, the indoor module is set to normal mode on

the knob and 60 °C on the knob . This usually givesa good combination of optimal savings and comfort. To in-crease the hot water capacity (the comfort):

In cold weather

Turn the knobs and one step clockwise.

In hot weather

Turn the knob, one step clockwise.

If the hot water capacity is sufficient, both knobs and

can be turned one step counterclockwise. This results inless comfort but greater savings.

0

100

200

300

400

1

2

Tappvarmvatten-

volym 40 ºC [liter]

ECO NORM COMF

Hög

kom

fort

Nor

mal

kom

fort

Hög besparing Normal besparing

1. Normal drain flow (8 l / min) 2. High drain flow (12 l / min)

Supreme comfort

Normal comfort

High savings Normal saving

Domestic hot water volume 40 C

(litres)

Maintenance routines

Checking the safety valves

EVP 500 ,must be provided with two safety valves when in-stalled; one for the heating system and one for the waterheater.

The heating system’s safety valve must be completely tight,but the water heater’s safety valve may occasionally releasesome water after hot water has been used. This is becausethe cold water, which enters the water heater to replace thehot water, expands when heated causing the pressure torise and the safety valve to open.

The safety valves must be checked regularly. Check as fol-lows:

Open the valve.

Check that water flows through the valve.

Close the valve again.

Check the pressure. If the pressure is too low, top up theboiler water.

NOTEIn the event of a domestic water flow greater than 12l/min, it is recommended to supplement with a core

water heater.

7EVP 500

For Home Owners

Hot water temp.

Page 10: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

General information for the installer

Transport and storage

The inside module should be transported and stored verticallyin a dry place. If the inside module has to be transportedhorizontally, this should be done with care.

Assembly

The indoor module is ideally located in a utility room orboiler room. The unit can be aligned using the adjustablefeet.

The inside module's factory-fitted lifting eye can be removedafter installation and the insulation plug enclosed is pressedinto place in order to reduce heat losses.

If pipes are to be routed on an internal wall that backs onto a bedroom or living room, this must take place withoutclamping.

Inspection of the installation

Current regulations require the system to be inspected beforeit is commissioned. The inspection must be carried out by asuitably qualified person and should be documented. Theabove applies to closed heating systems. Therefore, theboiler must not be replaced without reinspection.

Connection

Pipe installation must take place in accordance with applic-able heating and hot water standards. Internal supportbushes should be fitted when an annealed copper or steelpipe is used.

Overflow pipes from safety valves must be passed to floordrains so that hot water cannot splash when the valves haveto checked or the indoor module vented. The overflow pipemust be routed enclosed along its entire length to preventwater pockets and be frost proof. The outlet of the pipe mustbe clearly visible.

The hot water circuit must be provided with a mixing valveas the boiler temperature can exceed 60 °C and there is arisk of scalding.

EVP 500 can be connected to both an open and a closedexpansion tank.

If the heating system is provided with an open expansiontank, the distance between the highest radiator and the ex-pansion tank must be no less than 2.5 m.

Min

2,5

m

EVP 5008

For the Installer

General information for the installer

Page 11: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Extra electric hot water heater

The facility should be supplemented with an electric waterheater, if a hot tub or other significant consumer of hotwater is installed.

If the heater is equipped with a valve connector Ø 15 mmthis should be replaced with a corresponding one (separable)Ø 22 mm.

Appropriate heater is COMPACT 100-300 for floor mountingand EMINENT 35-100 for wall mounting.

1. Separate the valve connector.

2. Install the valve connector part on incoming cold waterto the heater.

3. Install the mixing valve part on outgoing hot water fromthe heater.

4. Plug the part on the valve connector part.

LEK

ARMATUR

Kv

Vv från värmepump

Vv

Proppas

Backventil

Ventilkoppel-del

Blandningsventil-del

HW OFF EVP 500

CWNON-RETURNVALVE

PLUGGING

HW

VALVECONNECTION-SPLIT

MIXING VALVE-SPLIT

MIXING VALVE-SPLIT

VALVECONNECTION-SPLIT

NOTEThe pipe work must be flushed before the indoor

module is connected, so that any contaminants do notdamage the component parts.

9EVP 500

For the Installer

General information for the installer

Page 12: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Electrical connections

Folding down the front panel

The front panel folds down by undoing the two screws atthe top of the panel. The panel can then be folded downinto a horizontal position (against stop lugs on either side ofthe front panel).

Rear of front panel

LEK

33

34

Strain relief device

When connecting an electrical output greater than 9 kW,the strain relief device for the supply cable needs to be re-placed with an enclosed strain relief device. For cables up to2.5 mm2, the small one can ideally the factory fitted strainrelief device be used. The one included is fitted for thickercables.

EVP 50010

For the Installer

Electrical connections

Page 13: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

LE

K

X9

X11X10

X12

Connection

Disconnect the indoor module before insulation testing thehouse wiring.

EVP 500 must be installed via an isolator switch with a min-imum breaking gap of 3 mm. When the building is equippedwith an earth-fault breaker, EVP 500 should be equippedwith a separate one. Remove the upper cover. The connectioncable must be connected to the terminal block (X9) accordingto the terminal block's markings and installed in one of thestrain reliefs for the cable.

0 N L L1 L2 L3 X9

NOTEElectrical installation and service must be carried outunder the supervision of a qualified electrician. Electric-al installation and wiring must be carried out in accord-

ance with the stipulations in force.

NOTEThe switch (8) must not be moved from "0" until theboiler has been filled with water. Otherwise the tem-perature limiter, thermostat and immersion heater may

be damaged.

Internal fuse protection

Automatic elements, charge pump (17) and its cabling arefuse-protected internally with a miniature circuit breaker (7),plus a fine-wire fuse (33) on the relay card (34).

Resetting the temperature limiter

The temperature limiters (6) 1 and 2 interrupt the powersupply to the immersion heaters and the boiler temperatureis between 90 °C and 100 °C, these can be reset by pressingthe button on the relevant temperature sensor.

The temperature limiters (6) 1 and 2 can be accessed behindthe lower cover, where they are positioned on top of thepanel. These can be reset by pressing the buttons on the re-spective temperature limiters.

NOTEReset the temperature limiters, they may have tripped

during transport.

6 6

11EVP 500

For the Installer

Electrical connections

Page 14: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Power rating as set at the factory

The two immersion heaters have a total max. output of 18kW. The power rating as set at the factory is 9 kW.

Max phase currentMax load phase (A)Immersion heater, output

(kW)

0.50

4.83

9.26

13.59

17.912

22.215

26.618

Different max outputs are set using the knob "Max electricaloutput" (61) on the relay card (34).

LEK

33

34

61

EVP 50012

For the Installer

Electrical connections

Page 15: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Connecting the outside sensor

The outside sensor (15) must be installed in a shaded locationon a wall facing north or north-west, where it will not beaffected by the morning sun, for example. This sensor isconnected by twin cables to terminal (X12), positions "7"and "8". The minimum cable cross section should be 0.4mm2

up to lengths of 50 metres, for example, EKKX or LiYY.

X12

UG

EVP 500

ExterntExternal

Input for external power monitor

The indoor module EVP 500 is provided with a control inputfor an external output monitor. The output (potential free)of the external output monitor is connected to terminal (X12),positions "5" and "6". If positions "5" and "6" are closed,any connected electrical steps are gradually disconnected at10 second intervals until the current does not exceed thepermissible value. Reconnection of the additional electricitythen occurs automatically.

EVP 500X12

Centralised load control/Tariff

If tariff control is use, it can be connected to terminal (X12).If positions ”1” and ”2” are closed, all electric addition willbe blocked. If positions ”3” and ”4” are closed, heat pumpoperation will be blocked. However, this assumes that thedocked heat pump is F20XX.

EVP 500X12

Quick start boiler mode

During normal operation, it takes one hour from boiler oper-ation activation until the first electrical step cuts in, and thenone hour between each electrical step.

To shorten the time until the first electrical step cuts in, it ispossible to quick start EVP 500 by:

1. Bridge both tariff A (electrical tariff) and tariff B (com-pressor tariff), terminal block X12 terminal 1 and 2 aswell as 3 and 4.

2. Remove tariff A terminals 1 and 2.

This means that the first electrical step cuts in after only5 seconds.

3. When the first electrical step is activated, tariff B, termin-al block 12, terminals 3 and 4 are also removed to allowthe compressor in the heat pump to produce heat.

Blocking room heating during tariff control

The supplied bridge is used to save the stored heat energyin EVP 500 for hot water production, when both tariff A andB are activated.

LEK

Connect the bridge on the microprocessor board (41), ter-minal block X3 between terminals 31 and 32. With the bridgeinstalled, the shunt valve closes completely as tariffs A andB are activated at the same time. This means that no heat isretrieved from EVP 500.

During the time that tariff A and B are activated, no new hotwater is produced, only access to existing hot water is avail-able EVP 500.

13EVP 500

For the Installer

Electrical connections

Page 16: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Input for external charge pump feed

If EVP 500 does not have to be docked with F20XX but withsome other external heat source, the charge pump can stillbe used. This is achieved by manually supplying the chargepump externally via terminal (X10) positions ”1” and ”2” inaccordance with the required operating conditions. In addi-tion, the connector (13) must be moved from an internalsocket to an external one as shown in the diagram below.

13

External additional relay

When EVP 500 is to be docked to an external heat sourcedesigned to replace the additional heater, terminal (X11)may be used to control switching this on and off. When theadditional heater is to be activated, contact is achievedbetween terminal (X11) position "1" and position "3". Thiscontact is potential free and activated according to the sameconditions as the additional heater.

X11

EVP 500

NOTESupply for external ciculation pump in the heating

system is not available in EVP 500

Temperature sensor dataVoltage (V)Resistance (k )Temperature (°C)

3,16102,35-40

3,1073,51-35

3,0453,44-30

2,9539,29-25

2,8529,20-20

2,7221,93-15

2,5716,62-10

2,4112,17-5

2,239,810

2,047,625

1,855,9710

1,654,7115

1,473,7520

1,293,0025

1,122,4230

0,971,9635

0,841,6040

0,721,3145

0,621,0850

0,460,74660

0,340,52570

EVP 50014

For the Installer

Electrical connections

Page 17: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Docking

General

EVP 500 can be installed in a number of different ways. For all docking options, the necessary safety equipment must be fittedin accordance with applicable rules. EVP 500 must be docked to an outdoor air heat pump with a maximum output of 15 kW.

Pipe connection to NIBE FIGHTER outdoor air heat pump

Connect the heat pump's supply (70) to the EVP's "Supply HP." (76). The heat pump's return line (71) must be connected tothe EVP's "Return line HP" (75). The heat pump's supplied particle filter must be installed on the heat pump's return line.

LEK

Typ: Fighter 2010-4/8kW

Art.nr. : 089261Tillv.nr. och tillv.år: se separat skylt

Spänning: 400V 3N+PE 50Hz

Märkström (A): 8.4 A

Inställningar av motorskydd: 7 A

Värmebärardel

-Volym:

-Beräkningstryck:

-Provtryck:

-Beräkningstemp:

1.5 l3 bar (0.3 MPa)

3,9 bar (0,39 MPa)

100 °C

Köldmediemängd:

Köldtyp:

Provtryck, kylsystem:

2,2 kgR407C26 bar (2,6 MPa)

Made by NIBE AB, SE-285 21 Markaryd, SWEDEN

70

71

Flow line(from the heat pump)

Return line(to heat pump)

Flow line(to EVP 500)

Return line(from EVP 500)

76

75

NOTE: This is an outline diagram. Actual installations must be planned according to applicable standards.

* Not included in boiler delivery

** Enclosed

F20XX EVP 500

RC

UG**

SF* AV*

AV*

LP TV

BV**

PG

DG

FG

SV

SÄV2*

SÄV1*

EXP*

BL*

CP*

SÄV3*

F20XX EVP 500

15EVP 500

For the Installer

Docking

Page 18: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Communication between EVP 500 and F20XX

Electrical connection F20XX

EVP 500 switches the compressor on and off in F20XX.Connect according to the following image with screenedcable. Connect the screen to EVP 500. Suitable cable is 3 x0,22-0,25, LiYCY

F20XX

44

Note! The communication cables must be kept a distanceofat least 20 cm from high voltage cables during cablerouting.

EVP 500

1 2 3 4 5 6 7 8 9 10 11

1 2 3 4 5 6 7 8 9 10 11

X12

GND

B-

A+

9 10 11

EVP 500FIGHTER 2020

44

F20XX EVP 500

X12

EVP 50016

For the Installer

Docking

Page 19: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Pipe connection to other outdoor air heat pump

Connect the heat pump's supply to the indoor module's”Supply HP.” (76). The heat pump's return line must beconnected to the EVP's ”Return line HP” (75).

Flow line(to EVP 500)

Return line(from EVP 500)

76

75

Extra docking connections

Route any pipes from the docked option that are to be con-nected to the docking terminal on EVP through the under-neath of the front cover. Cut the plastic cover according tothe punched pattern.

Electric boiler mode

If EVP 500 is to be used without a heat pump, e.g. if a faulthas occurred in the heat pump or if the heat pump has notyet been installed, a jumper must be placed between posi-tions ”3” and ”4” on terminal (X12). This stops the boilersignalling a communications alarm when communicationwith F20XX is not found. EVP 500 then functions as a purelyelectric boiler with automatic heating controls, althoughwithout freeze protection.

X12

EVP 500

Electrical connection

When connecting an air/water heat pump other than F20XX,it will not be possible to utilise parts of the intelligence in thecontrols of EVP 500.

It is best to place a suitable thermostat which operates theheat pump's on and off control in the EVP 500´s submersibletube to the heat pump sensor. To use the integral chargepump, an external supply is required at terminal (X10), posi-tions ”1” and ”2” according to the operating conditionsrequired (e.g. frost protection circulation). In addition, theconnector (13) must be moved from an internal socket to anexternal one. The electric boiler temperature is set using the

knob to a suitable temperature (lowest reference valuesupply line at DOT). Place a jumper between positions ”3”and ”4” on terminal (X12). This ensures that the boiler doesnot signal a communications alarm when communicationwith F20XX is not found.

X12

EVP 500

There are three options for blocking immersion heater oper-ation as the heat pump alone is able to cover the heatingrequirements in the building. It is most appropriate to use arelay which bridges positions "1" and "2", i.e. the tariffelectricity supplement is activated when the heat pump hasfull coverage, output-wise.

The other alternative is to manually block the additionalheater, as the heat pump alone is able to meet the heat re-

quirements by setting the change-over switch on thecontrol panel to "OFF". When the heat requirement is thennot met by the heat pump alone, the change-over switch isset back to "ON".

The third alternative is to set potentiometer (61) to 0 kW.

X12

EVP 500

NOTEThere is a risk of freezing if immersion heater operation

is blocked.

17EVP 500

For the Installer

Docking

Page 20: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 500, F20XX and solar panel

NOTE: This is an outline diagram. Actual installations mustbe planned according to applicable standards.

F20XXEVP 500

RC

UG**

SF* LP TV

PG

DG

FG

SV

SÄV2*SÄV1*

EXP*

BL*

CP*

AV*

AV* BV**

SÄV3*

RC

P

BV

F20XXEVP 500

General

The heat from the solar panels is transferred to EVP 500 viaa plate heat exchanger, which is connected to EVP 500'sextra docking connections (77) and (78). A temperaturesensor from the solar heating systems control box is locatedin "submerged tube extra docking connection" (86).

A non-return valve with opening pressure is installed on theindoor module’s side of the plate heat exchanger, to preventself-circulation.

NOTETo prevent interference, sensor cables and communic-ation cables must be separated (min 20 cm) from high

voltage cable when cable routing.

NOTEMax 85 °C to EVP 500 from connected units.

Install a non-return valve or a gravity brake towards theheating system to prevent self ciculation and therefore a re-duced energy loss.

AbbreviationsShut-off valveOFF*

Mixer valveBL*

Circulation pumpCP*

Docking sensorDG

Expansion vesselEXP*

Temperature sensor, flow lineFG

Boiler sensorPG

Control boxRC

Shunt valveSV

Safety valve, boilerSÄV1*

Safety valve, water heaterSÄV2*

Safety valve, heat pumpSÄV3*

Drain valveTV

Temperature sensor, outdoorOS**

Non-return valveBV**

Charge pumpSN

Particle filterSF*

Not included in the consignment*

Enclosed**

EVP 50018

For the Installer

Docking

Page 21: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 500, F20XX and oil/pellet/gas boiler

NOTE: This is an outline diagram. Actual installations mustbe planned according to applicable standards.

FIGHTER 20XXEVP 500

RC

UG**

SF* LP TV

PG

DG

FG

SV

SÄV2*SÄV1*

EXP*

BL*

CP*

AV* BV

AV* BV**

SÄV3*

OljepannaOil/pellets/gas boiler.F20XXEVP 500

General

Oil/Pellets/Gas boiler pipe connections are connected to EVP500's extra docking connections (77) and (78).

The charge pump for Oil/Pellets/Gas boiler is supplied via theexternal addition relay terminal block (X11) terminal ”1” and”3”. Max power output is set to 0 kW. A non-return valvewith opening pressure must be installed to prevent self-circu-lation.

F20XX's addition relay blocks the external addition until thereis a demand.

NOTETo prevent interference, sensor cables and communic-ation cables must be separated (min 20 cm) from high

voltage cables when cable routing.

NOTEMax 85 °C to EVP 500 from connected units.

Install a non-return valve or a gravity brake towards theheating system to prevent self ciculation and therefore a re-duced energy loss.

Not included in the consignment*

Enclosed**

19EVP 500

For the Installer

Docking

Page 22: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 500, F20XX and combi/wood boiler

NOTE: This is an outline diagram. Actual installations mustbe planned according to applicable standards.

FIGHTER 20XXEVP 500

RC

UG**

SF* LP TV

PG

DG

FG

SV

SÄV2*SÄV1*

EXP*

BL*

CP*

AV* BV

AV* BV**

SÄV3*

BV

Kombipanna / ACCU

BL*

Combi/wood boilerF20XXEVP 500 ACCU

General

The accumulator tank's pipe connections are connected toEVP 500's extra docking connections (77) and (78).

The charge pump to the multi-fuel heating boiler is suppliedvia an appropriate thermostat. A non-return valve withopening pressure is fitted so as to prevent self-circulation.

The thermostat that is to be installed in the accumulator tankto start heating EVP 500, should have a starting temperatureof approx. 55-60 °C. A thermal mixing valve. e.g. Laddomattype N, is installed to limit the incoming temperature for EVP500 to 65 °C. This is to prevent HP alarms at F20XX whenits frost protection circulation is activated.

NOTEThe charge circuits between EVP 500 and the accumu-lator tank must be supplied with thermal mixing valves

(max 65 °C).

Install a non-return valve or a gravity brake towards theheating system to prevent self ciculation and therefore a re-duced energy loss.

NOTETo prevent interference, sensor cables and communic-ation cables must be separated (min 20 cm) from high

voltage cables when cable routing.

Not included in the consignment*

Enclosed**

EVP 50020

For the Installer

Docking

Page 23: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 500, wood boiler, accumulator tank andsolar panel

NOTE: This is an outline diagram. Actual installations mustbe planned according to applicable standards.

EVP 500

RC

LP TV

BV**

PG

DG

FG

SV

SÄV2*SÄV1*

EXP*

BL*

CP*

RC

P

BVBV

Vedpanna ACCUWood-fired

General

The accumulator tank's pipe connections are connected toEVP 500's extra docking connections (75) and (76). Totransfer heat from the accumulator tank to EVP 500, the in-door module's internal charge pump is used.

The charge pump is controlled by an appropriate thermostatlocated in the accumulator tank and supplied via terminalblock (X10) terminal ”1” and ”2”.

In addition, connector (13) must be reconnected externallyfrom internally.

A non-return valve with opening pressure are fitted to boththe circuit for the wood boiler and the sun circuit in orderto prevent self-circulation.

Twin thermometers that are to be installed in the accumulatortank must cut EVP 500 charging at max 85 °C and a suitablestart temperature should be approx. 60 °C.

NOTETo prevent interference, sensor cables and communic-ation cables must be separated (min 20 cm) from high

voltage cables when cable routing.

NOTEMax 85 °C to EVP 500 from connected units.

Install a non-return valve or a gravity brake towards theheating system to prevent self ciculation and therefore a re-duced energy loss.

Not included in the consignment*

Enclosed**

21EVP 500

For the Installer

Docking

Page 24: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Commissioning and adjusting

Preparations

Check that the switch (8) is set to "ON" and that the temper-ature limiters (6) have not tripped (press the button hard toreset).

Addition

It is best to top up the indoor module by means of a fixedfiller pipe to the radiator return.

Venting the heating systemBleed the indoor module via the bleeder nipple (81) andthe rest of the heating system through the relevantventing valves.

Keep topping up and venting until all air has been re-moved and the pressure is correct.

Start-up and inspection1. Check that the water is full and vented.

2. Turn on the main circuit breaker.

3. Check that all incoming phases are powered.

4. Check that the miniature circuit-breaker (7) is on.

5. Check that the temperature limiters (6) have not trippedduring transit.

6. Turn on the switch (8).

7. Adjust the curve coefficient and heating curve offsetaccording to the requirements of the property using the

knobs and .

8. If F20XX is not to be connected, bridge positions ”3”and ”4” on terminal (X12).

Continue with the following points if EVP 500 is to be dockedto NIBE's air/water heat pump.

1. Connect a shielded communications cable betweenF20XX and EVP 500 as per "Communication betweenEVP 500 and F20XX" on page 16.

2. Follow the start-up and inspection instruction for therespective heat pumps.

3. Check that the value is ”1” in channel A1 inF2020/F2025 (in F2005/2010 channel 13 must be set to2).

4. Set the heating system's balance temperature (accordingto dimensioning) in channel A5 in F2020/F2025 orchannel 17 in F2005/F2010.

5. Adjust the charge flow between the heat pump and EVP500 using the mode switch on the charge pump.

Guideline value balance temperature

The table applies at DOT and with an approximate hot water demand of 5000 kWh/year and a heat distribution system with amaximum supply/return temperature of 55/45 °C. Where the table only contains guideline values, it is important that the heatingsystem's balance temperature is dimensioned, preferably with the dimensioning tool VPDIM.

Previous annual consumption (kWh/m3 oil)Heat pump

50000/6.745000/640000/5.335000/4.730000/425000/3.320000/2.7

2 °C1 °C-1 °C-2 °C-5 °C-8 °C-12 °CF2025 10 kW

-2 °C-3 °C-5 °C-7 °C-10 °C-13 °C-15 °CF2025 14 kW

NOTEIt is of the utmost importance that the balance temper-ature is adjusted to suit the independent heating sys-tem, so that the additional heat is not engaged earlier

than necessary.

EVP 50022

For the Installer

Commissioning and adjusting

Page 25: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Setting of temperature levels

The indoor module and, indirectly also the cam pipe coil, is,on delivery, set to normal stop temperature ”NORM” for the

heat pump and 60 °C electric boiler temperature .All additional power is blocked until the heat pump can nolonger manage the entire heating demand itself (below thebalance temperature).

This means that the electric boiler temperature is significantonly below the heat pump's balance temperature. In the caseof outdoor temperatures above the balance temperature,the heat pump's stop temperature is thus controlled and so

all the comfort of hot water is controlled via the knob .

The heat pump's stop temperature is variable and dependson the knob setting and outdoor temperature. At a higheroutdoor temperature, the heat pump does not need to workas hard to get up to boiler temperature as it does when theoutdoor temperature is colder, so increasing savings (see thediagram below).

The temperature in the cam pipe coil increases as the boilertemperature increases. The output hot water temperaturecan be limited by means of a mixer valve (not included asstandard).

The maximum supply temperature can also be limited up-wards in temperature (35 °C - 65 °C) to protect an underfloorheating system for example. This is done via a potentiometer(62) on circuit board (34), which is located behind the frontpanel.

The indoor module's maximum power output is also set onthe same circuit board (34) via potentiometer (61) and canbe adjusted between 0-18 kW in stages of 3 kW. The powerstages are connected, if necessary, at hourly intervals, on thecondition that "Operating mode, immersion heater " is onposition "on". The connection difference between start/stoptemperature is set using potentiometer (60). At outdoortemperatures above 10 °C, boiler control is automatically setto 1 °C on the connection difference's setting to extend theheat pump's operating time when the given output is high.

Stop temperature, heat pump

-20 -15 -10 -5 0 5 10 15 20 25 30 35

45,0

46,0

47,0

48,0

49,0

50,0

51,0

52,0

53,0

54,0

55,0

Stop temperature

Outdoor temp.VP thermostat, stop COMFVP thermostat, stop NORM plusVP thermostat, stop NORMVP thermostat, stop NORM minusVP thermostat, stop ECO

23EVP 500

For the Installer

Commissioning and adjusting

Page 26: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Adjustment, charge flow F20XX

Adjusting the temperature difference ( T) between the heatpump's supply temperature and the heat pump's returntemperature is important to maintain optimal operationaleconomy.

This is most easily done using the temperatures measured inchannel T2 (supply temperature) and channel T3 (returntemperature). This temperature difference ( T) is adjustedusing the charge pump. Adjustment is performed with stableoperation about 5 minutes after start, or about 5 minutesafter defrosting in cold outdoor temperatures.

NOTEThe temperature difference must be within the greymarked area in the diagram below. Adjust as close to

the nominal value as possible.

Adjustment of charge flow for EVP 500

30 35-20 -15 -10 -5 0 5 10 15 20 25

2,0

3,0

4,0

5,0

6,0

7,0

8,0

9,0

10,0

11,0

12,0

13,0

14,0

15,0

16,0

17,0

18,0

Outdoor temperature ( C)

T ( C)

Max

Min

Nom

EVP 50024

For the Installer

Commissioning and adjusting

Page 27: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Charge pump diagram

The curves represent the different speeds which can be setfor the charge pump.

Externally accessible pressure charge circuit (particlefilter and non-return valve included)

0,0

5,0

10,0

15,0

20,0

25,0

30,0

35,0

40,0

45,0

50,0

800 900 1000 1100 1200 1300 1400

1

2

3

Available pressure (kPa)

Flow (l/h)

Readjustment

Air is initially released from the hot water and venting maybe necessary. If bubbling sounds can be heard from the in-door module, the entire system requires further venting.When the system is stable (correct pressure and all air elim-inated) the automatic heating control system can be set asrequired. See the sections "Heating control system" on page6 and "Functions on the front panel" on page 4.

Draining the heating system

The power supply must be disconnected before the boiler/ra-diator water is drained.

The boiler/radiator water can be drained via drain valve (44).Loosen the cover of the drain valve and mount the suppliedhose connector to an appropriate hose.

NOTEThe hose must be fitted to the hose coupling suppliedbefore being fitted to the drain valve (44). The valveopens automatically when the hose coupling is fitted

to the valve.

2

1

LEK

25EVP 500

For the Installer

Commissioning and adjusting

Page 28: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Setting of flow temperature

Heating curve offset -2

15 14 13 12 11 10

9

8

7

6

5

4

3

2

1

- 40 °C

UTETEMPERATUR

- 10010

- 5

+ 5

30

40

50

60

70°C

FR

AM

LED

NIN

GS

TE

MP

ER

ATU

R

- 20 - 30

FÖRSKJUTNINGVÄRMEKURVA (-2)

VÄRMEKURVAHEATING CURVE

OUTSIDETEMPERATURE

SUPPLY TEMPERATURE

OFFSET HEAT CURVE -2

Heating curve offset 0

30

40

50

60

70°C

FR

AM

LED

NIN

GS

TE

MP

ER

ATU

R

- 40 °C

UTETEMPERATUR

- 10010 - 20 - 30

15 14 13 12 11 10 9

8

7

6

5

4

3

2

1

VÄRMEKURVA

- 5

+ 5

FÖRSKJUTNINGVÄRMEKURVA (0)

HEATING CURVE

OUTSIDETEMPERATURE

SUPPLY TEMPERATURE

OFFSET HEAT CURVE 0

Heating curve offset +2

1514 13 12 11 108

7

6

5

4

3

2

1

- 40 °C

UTETEMPERATUR

- 10010

- 5

+ 5

30

40

50

60

70°C

FR

AM

LED

NIN

GS

TE

MP

ER

ATU

R

- 20 - 30

FÖRSKJUTNINGVÄRMEKURVA (+2)

9

VÄRMEKURVAHEATING CURVE

OUTSIDETEMPERATURE

SUPPLY TEMPERATURE

OFFSET HEAT CURVE +2

Setting after diagram

EVP 500 is equipped with an outdoor temperature controlledheating control system. This means the flow temperature isregulated in relation to the current outdoor temperature.The relationship between outdoor temperature and supplytemperature is set with the “Heating curve selection” and“Heating curve offset” knobs.

The diagram is based on the dimensioned outdoor temperat-ure in the area and the dimensioned flow temperature ofthe heating system. When these two values “meet”, theheating control's curve coefficient can be read. The “Heatingcurve offset” knob is then set. A suitable value for underfloorheating is -1 and for a radiator system -2.

See also section "Default setting" on page 6.

Relationship between set temperature and availablehot water volume

0

100

200

300

400

1

2

Tappvarmvatten-

volym 40 ºC [liter]

ECO NORM COMF

Hög

kom

fort

Nor

mal

kom

fort

Hög besparing Normal besparing

1. Normal drain flow (8 l / min) 2. High drain flow (12 l / min)

Supreme comfort

Normal comfort

High savings Normal saving

Domestic hot water volume 40 C

(litres)

As hot water is heated in the cam pipe coil at the same timeas it is used, the hot water volume is dependent on the flowthrough the coil. This means that a larger quantity of hotwater can be taken at a lower flow. If large hot water flowsare required, the boiler temperature may be increased using

the knobs and as per section "Hot water temperat-ure" on page 7. The available hot water volume can beseen in the diagram.

In the event of a hot water flow greater than 12 l/min, it isrecommended to supplement with a core water heater.

EVP 50026

Miscellaneous

Commissioning and adjusting

Page 29: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Dealing with malfunctions

In the event of malfunction or operating disturbances first check the points below. Remember that there is an hourinterval between each power stage.

Low hot water temperature or no hot waterToo high domestic water flow. See section Hot watertemp. on page 7.

Large amounts of hot water were used.

Circuit or main MCB tripped.

Possible earth circuit-breaker tripped.

Mixer valve set too low (if mounted).

Switch (8) set to ”0”.

Tripped Miniature circuit-breaker (7) or Fine-wire fuse(33).Refer to the section "Resetting the miniature circuitbreakers" on page 29.

Tripped temperature limiters (6). Contact service.

Check if "operating mode, immersion heater" is in modeOFF

Closed or throttled shut off valve to the water heater.

External output monitor may have blocked the electricalpower.

Hot water capacity is set too low on and/or .

"Balance temperature" set too low in F20XX.

Alarm indicator, see "Alarm" on page 29.

High hot water temperatureMixer valve set too high.

Low room temperatureCircuit or main MCB tripped.

Possible earth circuit-breaker tripped.

Tripped Miniature circuit-breaker (7) or Fine-wire fuse(33).Refer to the section "Resetting the miniature circuitbreakers" on page 29.

Tripped temperature limiters (6). Contact service.

Incorrectly set values for "Option, heating curve" and/or"Offset heating curve" on page 6.

Circulation pump stopped.

Air in the indoor module or in the system.

The pressure is to low in the expansion vessel.

External output monitor may have blocked the additionalheater.

"Balance temperature" set too low in F20XX.

Alarm indicator, see "Alarm" on page 29.

High room temperatureIncorrectly set values for "Option, heating curve" and/or"Offset heating curve" on page 6.

Electric boiler operation due to blocked heatpump

The heat pump may be blocked due to a high supply or re-turn temperature, which can depend on incorrect heat pumpand/or indoor module settings. When the heat pump isblocked, this is indicated by three flashes on the operatingmode indicator on EVP 500.

1. Set the heating system's balance temperature in F20XX.

2. The charge flow between supply and return to the heatpump (T2 - T3) must be according to the diagram onpage 24.

3. A high set value on the heat curve results in a high supplytemperature, which in turn, results in a high returntemperature. The heat pump is then outside its workingrange.

4. The flow in the heating system is limited by the thermo-stats for the radiators or underfloor heating. Instead,regulate the room temperature using "Heating curveselection" and "Offset, heat curve" on EVP 500 (seepage 6).

5. Check that "temperature sensor, heat pump" (89) iscorrectly installed in the submerged tube on EVP 500.

6. Adjust T above the heating system using the heatingmedium pump or any external valves according to theprojected flow for the house.

7. In the event of docking to another heat source, thecharge temperature should be limited to 55-60 °C.

8. The heat pump's output can be limited by the heatingsystem.

27EVP 500

Miscellaneous

Dealing with malfunctions

Page 30: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Switch position

In "Reserve mode", the indoor module's electroniccontrol is disconnected.

The immersion heater is controlled by a separate thermostat(3), and the available output in reserve mode is 9 kW.

The charge pump is functional, but the automatic heatingcontrol system is not, so manual shunt operation is required.This is done by using a screwdriver to set the change-over

switch on the shunt motor (19) in mode . The shuntmotor can then be turned to the desired position.

LEK

The adjustmentscrew

NOTEWhen returning to normal mode do not forget to resetthe shunt motor to its original position by turning the

change-over switch to "A".

If the operating disturbance cannot be rectified by means of the above an installation engineer should be called.

If necessary set the switch to "reserve mode" (manual shunt operation necessary).

EVP 50028

Miscellaneous

Dealing with malfunctions

Page 31: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Resetting the miniature circuit breakers

The MCB (7) is accessible behind the cover and is located tothe left of the panel. Normal mode of the miniature circuit-breaker is "1" (up).

7

Alarm

In the event of a communications error between EVP 500and F20XX, the red LED (31) flashes. This malfunction willbe noted as EVP 500 then switches to alarm operation if theoutdoor temperature is lower than +5 °C. This means 35 °Cboiler temperature and 15 °C reference temperature at theflow line.

At higher outdoor temperatures, only the reference valueon the flow line is set to +15 °C.

In the event of an internal sensor error or a constant F20XXalarm, the red LED (31) lights continuously. This malfunctionwill be noted as EVP 500 then automatically switches to alarmoperation (described above).

Alarm indication

31

Fine wire fuse

Automatic elements, charge pump (17) and its cabling arefuse-protected internally with a miniature circuit breaker (7),plus a fine-wire fuse (33) on the relay card (34). The fine-wirefuse may be replaced only once the fault has been rectified.Fine-wire fuse 2 AT, 5 x 20 mm. A defective fine-wire fuseis indicated by the operating mode indicator being off whenthe switch is set to 1.

33 34

NOTEWork behind covers secured by screws may only becarried out under the supervision of a qualified install-

ation engineer.

29EVP 500

Miscellaneous

Dealing with malfunctions

Page 32: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Electrical circuit diagram

EVP 50030

Miscellaneous

Electrical circuit diagram

Page 33: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

31EVP 500

Miscellaneous

Electrical circuit diagram

Page 34: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 50032

Miscellaneous

Electrical circuit diagram

Page 35: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Dimensions

Dimensions without insulation and front panel

70 70 70 70 70

49

5

57

0

1m

utr

ym

me

r serv

ice

1 m free space for service

Ø650

17

60

55

Ceiling height 1870 mm Ceiling height 1930 mm

Measuring principleDimensions with insulation and front panel

Cu-rörCu pipe

18

05

16

95

Ø670

Ø750

950

20

-55

Ceiling height 1900 mm Ceiling height 1980 mm

33EVP 500

Miscellaneous

Dimensions

Page 36: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Technical specifications

Component positions

20 100

40 8060

0 120

LEK

LE

K

73

71

74

98

96

76

70

7595 97

40 36 35

8 3230 37 3831

33

34

60

61

62

19

43

88

67

68

69

80

1

77

44

11

12

6

81

10

9

1

90

7

13

89

17

86

78

3

41

EVP 50034

Miscellaneous

Technical specifications

Page 37: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

List of componentsImmersion heater 9 kW1

Thermostat, standby mode3

Temperature limiter6

Miniature circuit-breaker7

Switch, position 1 - 0 -8

Terminal block, power supply9

Connecting terminal, external supply charge pump10

Connecting terminal, external additional heater11

Terminal block, sensor, communication12

Connector13

Outside sensor15

Charge pump17

Shunt motor with handwheel19

Switch, "Operating mode, immersion heater"30

Indicator lamp, "Alarm indicator"31

Indicator lamp, "Immersion heater operational"32

Fine-wire fuse relay card 2 AT, 5x2033

Relay card34

Knob, "Immersion heater thermostat"35

Knob, "Heat pump operating mode"36

Knob, "Curve coefficient"37

Knob, Offset heating curve38

Thermometer40

Microprocessor card41

Shunt valve43

Tapping valve44

Knob, setting "VP connection difference"60

Knob, setting "Max electrical output"61

Knob, setting "Max flow temperature"62

Relay, 3.0 kW67

Relay, 6.0 kW68

Relay, 9.0 kW69

Connection

Ø 28 mmFlow line, heating system70

Ø 28 mmReturn line, heating system71

Ø 22 mmCold water connection73

Ø 22 mmHot water connection74

Ø 28 mmDocking connection, supply (to another heat source)75

Ø 28 mmDocking connection, return (from another heat source)76

G1 int.Extra docking equipment, front77

G1 int.Extra docking connection, return78

1/2" hose couplingDrain connection, heating system80

Venting nipple81

Submerged tube, extra docking connection (Ø 10.5 mm, length 160 mm)86

Temperature sensor, boiler88

Temperature sensor, submersible tube, heat pump89

Temperature sensor, heat system flow line90

Signs, serial numbers95

Sign, pipe connection96

Rating plate97

Lifting eye98

Enclosed kit99

35EVP 500

Miscellaneous

Technical specifications

Page 38: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

Technical specifications

IP 21

1810 mm (1760* mm)Height (excl. foot: 20 – 55 mm)

1870 mmRequired ceiling height

750 mm (670* mm)Width

950 mm (905* mm)Depth

175 kgWeight

500 litresVolume total

495 litresVolume of vessel

3 litresVolume loop�

400 V 3 NAC 50HzSupply voltage

90 WRated output charge pump

15 kWMaximum heat pump output**

18 kW (output on delivery 9 kW)Output immersion heater

IP 21Enclosure class

0,9 MPa (9 bar)Cut-off pressure, loop

0,3 MPa (3 bar)Max permitted pressure in boiler

069 050Art.Nr EVP 500 with cam pipe coil made of copper

069 060Art.Nr EVP 500 with a tin coated cam pipe coil made of copper

60 WIdle loss according to EN 255-3***

* Measured without insulation and covers

** Applies to outdoor air heat pump at 7/45 °C (Outdoor temperature / Supply temperature)

*** EVP 500 docked to F2020-14

EVP 50036

Miscellaneous

Technical specifications

Page 39: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

AccessoriesLaddomat type NPLEX 310-20Current limiter EBV 112 VX

When docking to combi/wood-fired boiler,the charge circuit must be equipped witha thermal mixing valve.

Plate heat exchanger for solar panel install-ations with MAX 10 m² solar panel sur-face.

EBV 112 VX is a load monitor used to dis-connect output that exceeds the outputset on the load monitor.

Part.No 024836Part.No 07 53 15Part.No 41 81 21

LEK

LEK

Enclosed kitNon-return valveInsulation plug at the topOutside sensorCable relief

LE

K

LEK

LEK

Bridge, tariff

LEK

37EVP 500

Miscellaneous

Technical specifications

Page 40: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 50038

Page 41: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

39EVP 500

Page 42: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

EVP 50040

Page 43: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek
Page 44: LEK - NIBE · mos gb 0923-2 installation and maintenance instructions evp 500 031285 evp 500 100 80 60 120 lek

PL

NO

NL

FI

DK

DE

CZ

NIBE – Haato OY, Valimotie 27, 01510 Vantaa

3C Broom Business Park, Bridge Way, Chesterfield S41 9QG

Puh: 09-274 697 0 Fax: 09-274 697 40 E-mail: [email protected] www.haato.fi

NIBE-BIAWAR Sp. z o. o. Aleja Jana Pawła II 57, 15-703 BIAŁYSTOKTel: 085 662 84 90 Fax: 085 662 84 14 E-mail: [email protected] www.biawar.com.pl

NIBE AB, Fekjan 15F, 1394 NesbruTel: 22 90 66 00 Fax: 22 90 66 09 E-mail: [email protected] www.nibevillavarme.no

NIBE Energietechniek B.V., Postbus 2, NL-4797 ZG WILLEMSTAD (NB)Tel: 0168 477722 Fax: 0168 476998 E-mail: [email protected] www.nibenl.nl

Vølund Varmeteknik, Filial af NIBE AB, Brogårdsvej 7, 6920 VidebækTel: 97 17 20 33 Fax: 97 17 29 33 E-mail: [email protected] www.volundvt.dk

NIBE Systemtechnik GmbH, Am Reiherpfahl 3, 29223 CelleTel: 05141/7546-0 Fax: 05141/7546-99 E-mail: [email protected] www.nibe.de

Druzstevni zavody Drazice s.r.o, Drazice 69, CZ - 294 71 Benatky nad JizerouTel: +420 326 373 801 Fax: +420 326 373 803 E-mail: [email protected] www.nibe.cz

CHNIBE Wärmetechnik AG, Winterthurerstrasse 710, CH-8247 FlurlingenTel: (52) 647 00 30 Fax: (52) 647 00 31 E-mail: [email protected] www.nibe.ch

ATKNV Energietechnik GmbH, Gahberggasse 11, 4861 SchörflingTel: +43 (0)7662 8963-0 Fax: +43 (0)7662 8963-44 E-mail: [email protected] www.knv.at

NIBE AB Sweden, Box 14, Järnvägsgatan 40, SE-285 21 MarkarydTel: +46-(0)433-73 000 Fax: +46-(0)433-73 190 E-mail: [email protected] www.nibe.eu

GBNIBE Energy Systems Ltd,Tel: 0845 095 1200 Fax: 0845 095 1201 E-mail: [email protected] www.nibe.co.uk