lincolnshire low carbon hub

30
Lincolnshire Low Carbon Hub Steven Burns

Upload: nili

Post on 22-Feb-2016

29 views

Category:

Documents


0 download

DESCRIPTION

Lincolnshire Low Carbon Hub. Steven Burns. Presentation Outline. Background to the Hub Progress Learning Next Steps. mVA Harmonics Voltage. Foot print Site Layout. Project Background. Lincolnshire Low Carbon Hub. Year 1 Tier 2 Project Total Budget£3.4m LCNF £3m Objectives - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Lincolnshire Low  Carbon Hub

Lincolnshire Low Carbon HubSteven Burns

Page 2: Lincolnshire Low  Carbon Hub

• Background to the Hub• Progress• Learning • Next Steps

Presentation Outline

mVAHarmonicsVoltageFoot print

Site Layout

Page 3: Lincolnshire Low  Carbon Hub

Project Background

Page 4: Lincolnshire Low  Carbon Hub

Year 1 Tier 2 ProjectTotal Budget £3.4mLCNF £3m

ObjectivesDemonstrate 6 innovative techniques

Make it easier for generation to connect

Develop an investment ahead of need concept

Lincolnshire Low Carbon Hub

Page 5: Lincolnshire Low  Carbon Hub

Existing 33kV Network Layout

Page 6: Lincolnshire Low  Carbon Hub

Dynamic Line Rating

Network Enhancement

s

Commercial Agreements FACTs

Dynamic Voltage Control

33kV Active Ring

Low Carbon Hub Network

Elements of the Hub

Page 7: Lincolnshire Low  Carbon Hub

Proposed Layout

Page 8: Lincolnshire Low  Carbon Hub

Progress To Date

Page 9: Lincolnshire Low  Carbon Hub

• FACTS Specification complete• FACTS ITT Issued and being scored• Wayleaves for OHL rebuild well underway• Harmonisation with works at Trusthorpe

Progress to Date

Trusthorpe

Page 10: Lincolnshire Low  Carbon Hub
Page 11: Lincolnshire Low  Carbon Hub

New 4.5km Overhead Line

• Local opposition

• Unintended Consequences

• Investment ahead of need Vs business need

• Compulsory wayleaves a last resort

• Not appropriate in this scenario

Page 12: Lincolnshire Low  Carbon Hub

Proposed Revised Layout

Page 13: Lincolnshire Low  Carbon Hub

TRUSTHORPE

ALFORD

CHAPEL ST LEONARDS

INGOLDMELLS

SKEGNESS 33kV

NO

NO

NO

NO

Tee

SPILSBY

s

Current LayoutBAMBERS

FARM

Page 14: Lincolnshire Low  Carbon Hub

TRUSTHORPE

ALFORD

CHAPEL ST LEONARDS

INGOLDMELLS

SKEGNESS 33kV

NO

NO

NO

NO

Tee

SPILSBY

s

Current Layout - 2 Radial FeedersBAMBERS

FARM

Page 15: Lincolnshire Low  Carbon Hub

TRUSTHORPE

ALFORD

CHAPEL ST LEONARDS

INGOLDMELLS

SKEGNESS 33kV

NO

NO

NO

Tee

SPILSBY

s

Outline Ring DesignBAMBERS

FARM

FACTS

Page 16: Lincolnshire Low  Carbon Hub
Page 17: Lincolnshire Low  Carbon Hub

TRUSTHORPE

ALFORD

CHAPEL ST LEONARDS

INGOLDMELLS

SKEGNESS 33kV

NO

NO

Tee

SPILSBY

s

Design 1: Full Unit Protection SchemeBAMBERS

FARM

FACTS

Proposed 9MW

Wind Farm

s

NO

7 Panel Board

7 Panel Board

6 Panel Board

3 Panel Board

Unit Protection

Page 18: Lincolnshire Low  Carbon Hub

Design 1: Full Unit Protection Scheme

Time – Offline Build, but stretching

Cost - £1.3m over budget

Quality - Significant Network Improvement

Project - Full rebuild not in ethos of scheme

Page 19: Lincolnshire Low  Carbon Hub

ALFORD

CHAPEL ST LEONARDS

INGOLDMELLS

SKEGNESS 33kV

NO

NO

NO

Tee

SPILSBY

s

Design 2 : Minimal Unit SchemeBAMBERS

FARM

TRUSTHORPE

FACTS

s

7 Panel Board

CTs and Breaker

CTs and Breaker

CTs and Breaker

Unit Protection

Page 20: Lincolnshire Low  Carbon Hub

Chapel St Leonards

Page 21: Lincolnshire Low  Carbon Hub

Ingoldmells

Page 22: Lincolnshire Low  Carbon Hub

Time – Online build with complex works

Cost - On budget

Quality - Significant site reworks, little benefit

Project - High risk, complex

Design 2 : Minimal Unit Scheme

Page 23: Lincolnshire Low  Carbon Hub

ALFORD

CHAPEL ST LEONARDS

INGOLDMELLS

SKEGNESS 33kV

NO

NO

NO

Tee

SPILSBY

s

Design 3 : Minimal SchemeBAMBERS

FARM

TRUSTHORPE

FACTS

s

7 Panel Board

Change Protection

Distance Protection

Change Protection

Change Protection

Change Protection

Page 24: Lincolnshire Low  Carbon Hub

Time – Site works realistic

Cost - On budget

Quality - Increased protection risk

Project - Delivers all 6 elementsUtilises existing assets

Design 3 : Minimal Scheme

Page 25: Lincolnshire Low  Carbon Hub

Learning

Ingoldmells

Page 26: Lincolnshire Low  Carbon Hub

Unintended Consequences

Page 27: Lincolnshire Low  Carbon Hub

Investment ahead of need

• Change Process• Space to Innovate• Project Continuity• Re-design Time

Page 28: Lincolnshire Low  Carbon Hub

Cultural change & technical change

Page 29: Lincolnshire Low  Carbon Hub

Working with the business

• Space to Innovate• Project Continuity• Re-design Time• Change Process

Page 30: Lincolnshire Low  Carbon Hub

www.westernpowerinnovation.co.uk

Thank you for listening