ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIES LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 1 LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS PTO PRESENTATION 22 AUGUST 2017 ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIES

Upload: others

Post on 23-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 1

LYCÉE FRANÇAISDE LA NOUVELLE ORLÉANSPTO PRESENTATION22 AUGUST 2017

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIES

Page 2: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 2

Client:Lycee Francais de La Nouvelle Orleans5951 Patton StreetNew Orleans, LA 70115Keith Bartlett, CEO/Principal

Architect:Eskew+Dumez+Ripple365 Canal Street #3150New Orleans, LA 70130Tracy Lea, Principal-in-Charge

Structural/Civil Engineer:Morphy Makofsky Inc.336 N. Jefferson Davis PkwyNew Orleans, LA 70119Jamie Saxon, Principal-in-Charge

Historic Preservation Consultant:Rick Fifield Architect600 St. Roch AvenueNew Orleans, LA 70117Rick Fifield, Principal

Program Manager:4th Sector Solutions2372 St. Claude Avenue, Ste 300New Orleans, LA 70117Joe Keeney, CEO

Landscape Architect:Spackman Mossop+Michaels7735 Maple StreetNew Orleans, LA 70118Wes Michaels, Principal-in-Charge

Mechanical/Electrical Engineer:TLC Engineering201 St. Charles AvenueNew Orleans, LA 70170Steven Pinto, Project Engineer

Traffic Engineer:Batture LLC500 Crystal StreetNew Orleans, LA 70124Jenny Snape, Project Engineer

PROJECT TEAM

Page 3: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 3

K - 12 EDUCATION

Trinity SchoolNew Orleans, LA

McDonogh 42 Elementary New Orleans, LA

Landry-Walker High SchoolNew Orleans, LA

Thaden Independent SchoolBentonville, AR

Comeaux High SchoolLafayette, LA

NOCCANew Orleans, LA

Samuel J. Green Charter SchoolNew Orleans, LA

Mt Carmel High SchoolNew Orleans, LA

Transfiguration of the Lord New Orleans, LA

St Dominic SchoolNew Orleans, LA

Banks Elementary SchoolNew Orleans, LA

HIGHER EDUCATION

Tulane University

Louisiana State University

University Medical Center

UL Monroe

UL Lafayette

Nicholls State University

SELECTED PROJECTS

Page 4: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 4

SITE CONTEXT

Page 5: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 5

AERIAL VIEW

CARROLLTON CAMPUS

JOHNSON BULDING

PRIESTLEY CAMPUS

Page 6: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 6

BIRDSEYE VIEW

LEONIDAS S

T

JOLIET S

T

GREEN ST

BIRCH ST

Page 7: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 7

EXISTING BUILDINGS

Page 8: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 8

EXISTING CONDITIONS

Page 9: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 9

Provide a functional, efficient, economical facility to meet the expanded curriculum requirements of Lycée Français in support of its mission.

Design a healthy, innovative learning environment informed by current best practices in K-12 pedagogy to promote diversity and academic excellence.

Renovate and enhance the existing property in a way that is environmentally, contextually, and socially responsive.

Respect the history of the property and its neighborhood context, and build a school that is inclusive and fosters community connectivity.

Establish and implement a collaborative process throughout design and construction that allows for input from all stakeholders.

Adhere strictly to budget, schedule, and program parameters as determined by Lycée Français.

PROJECT GOALS

Page 10: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 12

EDUCATION IS IN CONSTANT EVOLUTION

WITH THE ABILITY TO ADAPT AND CHANGE.

LYCEE’S APPROACH IS PROGRESSIVE AND

INNOVATIVE. THE NEW FACILITY WILL GROW

WITH YOUNG STUDENTS AS THEY PROGRESS

TO COMPLETE HIGH SCHOOL, MUCH LIKE

THE NEIGHBORHOOD WHICH IS UNDERGOING

TRANSITION AND REJUVINATION.

TRANSFORMATION

Page 11: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 13

STORIES HAVE BEEN SHARED IN EVERY CULTURE AS A

MEANS OF ENTERTAINMENT, EDUCATION, CULTURAL

PRESERVATION AND INSTILLING MORAL VALUES.

STORIES ARE UNIVERSAL IN THAT THEY CAN BRIDGE

CULTURAL, LINGUISTIC AND AGE-RELATED DIVIDES.

INTERACTIVE STORYTELLING POSITIONS THE USER

AS A CHARACTER WITHIN A BIGGER WORLD. THE

NEW LYCEE SCHOOL SEEKS TO REFLECT ON THE PAST

WHILE SETTING THE STAGE FOR THE OPTIMISTIC

FUTURE YET TO COME.

STORYTELLING

Page 12: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 10

PHASING DIAGRAM

Phase 1A - Gymnasium Renovation 6,500 sq ft Gym 300 bleacher seats Combine with Phase 1B

Phase 1B - Priestley School Renovation 31,143 sq ft. 3 story Classroom Building 7,700 sq. ft. Addition 16 Classrooms/29 Faculty/25 Staff Capacity = 400 students Start construction 2018

Phase 2 - New Classroom Wing 32,165 sq ft. 3 story Classroom Addition + 1,185 sq ft. Kitchen/Dining Addition 29 Classrooms/29 Faculty/17 Staff Capacity = +/-700 students Start construction 2019

PROJECT OVERVIEW

1A

1B 1B

2

2

LEONIDAS STREET

JOLIET STREET

BIR

CH

S

TR

EE

T

GR

EE

N

ST

RE

ET

FACULTY ENTRY

9-12 ENTRY

3-8 ENTRY

QUAD

GYM ENTRY

SERVICE

DR

OP

-OF

F

BU

S Z

ON

E

Page 13: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 12

LEONIDAS STREET

GR

EEN

STR

EET

JOLIET STREET

BIR

CH

STR

EET

EXISTING GYM6,500 SF

EXISTING CLASSROOM BUILDING32,140 SF

PHASE 232,165 SF

FACULTYENTRANCE

MAIN ENTRANCE

CLASSROOM BUILDINGADDITION7,700 SF

BIO-RENTENTION BASIN/RAIN GARDEN

PETANQUE/BIO-RETENTION BASIN

SERVICE

PETANQUE/BIO-RETENTION BASIN

BIO-RETENTION BASIN

BIO-RETENTION BASIN

BIO-RETENTION BASIN

BUS

ZON

E

DRO

P O

FF

PHASE 2DINING + KITCHEN

1,185 SF

PLAYFIELD

PHASE ONE SITE PLAN 40’0’

Page 14: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 13

COMMUNITY/MULTIPURPOSE

SUPPORTLOBBY/ATRIUM

REC

EPTI

ON

ACCT/FINANCE

HR

HEAD OF SCHOOL

CAOFLEX

LEARNING

STUDENTSERVICES

SMALLCONF.

SMALLCONF.

CONFERENCE

STAGING/SUPPORT

JANITORDINING

KITCHEN

MEDICALSUITE

BREAKROOM

FACULTY/STAFF FACULTY/STAFF

SUPPLY MECHANICAL

RECEIVING

SUPPLY

FIRST FLOOR PLAN

FACULTY/ADMIN

COLLABORATION

OUTDOORCOLLABORATION

DINING

CORRIDOR

SERVICE/SUPPORT

16’0’

E X I S T I N GN E W

FIRST FLOOR PLAN

Page 15: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 14

GYMNASIUM16’0’

BLEACHER SEATING 300 SEATS

GYMNASIUM

Page 16: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 15

MEDIALIBRARY

COMPUTER LAB

TUTORING TUTORING

FLEXLEARNING

OPENTO

BELOW

OPENTO

BELOW

ISS

DEAN

CONFERENCEROOM

JANITOR

MATH 1 MATH 2 MATH 3 HISTORY/GEOGRAPHY

ARTELEC.

SUPPORT

SCIENCESCIENCE

SECOND FLOOR PLAN

FACULTY/ADMIN

COLLABORATION

OUTDOORCOLLABORATION

CLASSROOM

CORRIDOR

SERVICE/SUPPORT

16’0’

E X I S T I N GN E W

SECOND FLOOR PLAN

Page 17: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 16

SENSORYCLASSROOM

INSTRUCTIONALADMIN

WORKROOM

FLEXLEARNING

OPENTO

BELOW

OPENTO

BELOW

ENGLISH 1

JANITOR

ENGLISH 2 ENGLISH 3MATH 3 HISTORY/

GEOGRAPHY

ELEC.

PRACTICE ROOM

FRENCH

OPENTO

BELOW

PRACTICE ROOM

MUSICFRENCH FOREIGNLANGUAGE

THIRD FLOOR PLAN

FACULTY/ADMIN

COLLABORATION

OUTDOORCOLLABORATION

CLASSROOM

CORRIDOR

SERVICE/SUPPORT

16’0’

E X I S T I N GN E W

THIRD FLOOR PLAN

Page 18: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 17

CLASSROOM OPTIONS

GROUP

LECTURE/TEST

DISCUSSSION

ACTIVE, FLEXIBLE CLASSROOM

Multi-sensory approach to teaching and learning in-creases engagement, promotes deeper participation, maximizes student achievement and elevates the idea that learning is fun.

Static furniture designed for one-way transmis-sion of information simply cannot support active learning.

As learning becomes more interactive, classrooms, must support multiple types of collaboration, includ-ing informative, evaluative and generative, as well as peer-to-peer learning and many other emerging modes.

One-size-fi ts-all classrooms neglect the modern day needs of educators and students. Difference subjects and teaching methods require different mixes of furni-ture, technology and space.

Just as there is a variety of ways in which we learn, there must also be a variety of spaces in which learning occurs.

Page 19: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 18

TRADITIONAL LAYOUT

CLASSROOM PLAN

Page 20: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 19

TRADITIONAL LAYOUT

Page 21: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 22

COLLABORATIVE LEARNING

CLASSROOM PLAN

Page 22: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 23

COLLABORATIVE LEARNING

Page 23: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 24

CLASSROOM PLAN

GROUP DISCUSSION

Page 24: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 25

GROUP DISCUSSION

Page 25: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 20

DYNAMIC INTERACTION

CLASSROOM PLAN

Page 26: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 21

DYNAMIC INTERACTION

Page 27: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 22

DPT RM Program Actual - Existing Building

Deficit Notes

1.0 Lobby/Atrium 2,550 sf 109 2,4411 . 1 Lobby/Atrium 500 1091 . 2 Stair 1 2501 . 3 Elevator 1001 . 1 Lobby/Atrium 5001 . 2 Stair 1 2501 . 3 Elevator 1003 . 1 Lobby/Atrium 5003 . 2 Stair 1 2503 . 3 Elevator 100

2.0 Administration 1,596 1,7292 . 1 Reception 1002 . 1 Office Manager 1602 . 2 Head of School 1602 . 3 CAO 1202 . 4 Dean 962 . 6 ISS - 5 Students 2502 . 8 Small Conference 1 1202 . 9 Small Conference 2 1202 . 10 Staff Kitchen/Pantry 1502 . 12 Human Resources 1202 . 13 Finance 1002 . 14 Accounting 100

3.0 Student Services 1,110 1,2843 . 1 Counselor 1003 . 2 Counselor 1003 . 3 Director of Student Services 1003 . 3 Sp Ed Data Manager 803 . 4 Special Ed Office 1603 . 5 Speech Language Pathology 1003 . 6 ESL Teacher 1603 . 7 Nurse Office 1603 . 7 Medical Suite/Toilet 150

4.0 Faculty Staff Offices 1,940 725 1,2154 . 1 Math - 4 Work Stations 2604 . 1 French - 4 Work Stations 2604 . 1 English - 4-6 Work Stations 3804 . 1 Foreign Language - 3 Work Stations 2604 . 1 Physics/Chem/Bio - 4 Work Stations 2604 . 1 History/Geography - 4 Work Stations 2604 . 1 Fine Arts - 4 Work Stations 260

5.0 Instructional Admin 930 0 9305 . 1 French Director 605 . 1 Director of Academics 605 . 1 Coordinator of Academic Programs 605 . 1 Workroom 1 2505 . 2 Workroom 2 2505 . 3 Workroom 3 250

6.0 Collaboration 2,750 948 1,8026 . 1 Library 700 4746 . 1 Library Office 1006 . 1 Computer Lab 750 4746 . 1 Digital Media Specialist 1006 . 2 Large Conference 6006 . 3 Medium Conference 3006 . 4 Tutoring 1 1006 . 5 Tutoring 2 100

7.0 Learning 12,350 11,561 789

SF from BK Programming where addition did not include

programmed space

Building

7 . 3 English 1 750 6497 . 4 English 2 750 6307 . 5 English 3 750 6547 . 6 Math 1 750 7387 . 7 Math 2 750 6497 . 8 Math 3 750 6497 . 9 French 1 750 6307 . 10 French 2 750 6547 . 11 History/Geography 1 750 7257 . 12 History/Geography 2 750 6447 . 13 Foreign Language 1 750 6447 . 14 Foreign Language 2 750 6627 . 15 Art Lab 750 7407 . 16 Music Lab 700 7457 . 16 Practice Room 1 50 507 . 16 Practice Room 2 50 50

8.0 Food Service 4,580 4,7058 . 1 Dining/Multi Purpose 2,000 2,1418 . 2 Kichen 2,000 1,9848 . 3 Serving 200 2008 . 4 Receiving/Storage 300 3008 . 4 Meal Services Office 80 80

10.0 Support Services 6,200 4,434 1,76610 . 15 Security 10010 . 15 Facilities 10010 . 1 Girls Toilet 300 33310 . 2 Boys Toilet 300 33310 . 3 Storage 350 35010 . 4 Storage 350 35010 . 5 Mechanical 500 50010 . 6 Electrical 150 15010 . 7 Comm/Tech 100 10010 8 Fire Suppression (With Pump) 260 26010 . 9 Custodial 80 2210 . 1 Girls Toilet 300 33310 . 2 Boys Toilet 300 33310 . 3 Storage 350 15510 . 4 Storage 350 17410 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 10010 . 8 Fire Suppression 8010 . 1 Girls Toilet 300 33310 . 2 Boys Toilet 300 33310 . 3 Storage 350 12510 . 4 Storage 350 25010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80

20.00 Circulation 5,877 5,87720 . 1 West Stair 2 185 18520 . 2 East Stair 3 275 27520 . 3 Corridor 1,476 1,47620 . 1 West Stair 2 263 26320 . 2 East Stair 3 190 19020 . 3 Corridor 1,560 1,56020 . 1 East Stair 3 190 19020 . 2 West Stair 2 178 17820 . 3 Corridor 1,560 1,560

2.0 Administration2 . 1 Reception 1002 . 1 Office Manager 1602 . 2 Head of School 1602 . 3 CAO 1202 . 4 Dean 962 . 6 ISS - 5 Students 2502 . 8 Small Conference 1 1202 . 9 Small Conference 2 1202 . 10 Staff Kitchen/Pantry 1502 . 12 Human Resources 1202 . 13 Finance 1002 . 14 Accounting 100

3.0 Student Services3 . 1 Counselor 1003 . 2 Counselor 1003 . 3 Director of Student Services 1003 . 3 Sp Ed Data Manager 803 . 4 Special Ed Office 1603 . 5 Speech Language Pathology 1003 . 6 ESL Teacher 1603 . 7 Nurse Office 1603 . 7 Medical Suite/Toilet 150

4.0 Faculty Staff Offices4 . 1 Math - 4 Work Stations 2604 . 1 French - 4 Work Stations 2604 . 1 English - 4-6 Work Stations 3804 . 1 Foreign Language - 3 Work Stations 2604 . 1 Physics/Chem/Bio - 4 Work Stations 2604 . 1 History/Geography - 4 Work Stations 2604 . 1 Fine Arts - 4 Work Stations 260

5.0 Instructional Admin5 . 1 French Director 605 . 1 Director of Academics 605 . 1 Coordinator of Academic Programs 605 . 1 Workroom 1 2505 . 2 Workroom 2 2505 . 3 Workroom 3 250

1.0 Lobby/Atrium1 . 1 Lobby/Atrium 5001 . 2 Stair 1 2501 . 3 Elevator 1001 . 1 Lobby/Atrium 5001 . 2 Stair 1 2501 . 3 Elevator 1003 . 1 Lobby/Atrium 5003 . 2 Stair 1 2503 . 3 Elevator 100

20.00 Circulation20 . 1 West Stair 2 18520 . 2 East Stair 3 27520 . 3 Corridor 1,47620 . 1 West Stair 2 26320 . 2 East Stair 3 19020 . 3 Corridor 1,56020 . 1 East Stair 3 19020 . 2 West Stair 2 17820 . 3 Corridor 1,560

6 . 1 Library 7006 . 1 Library Office 1006 . 1 Computer Lab 7506 . 1 Digital Media Specialist 1006 . 2 Large Conference 6006 . 3 Medium Conference 3006 . 4 Tutoring 1 1006 . 5 Tutoring 2 100

7 . 3 English 1 7507 . 4 English 2 7507 . 5 English 3 7507 . 6 Math 1 7507 . 7 Math 2 7507 . 8 Math 3 7507 . 9 French 1 7507 . 10 French 2 7507 . 11 History/Geography 1 7507 . 12 History/Geography 2 7507 . 13 Foreign Language 1 7507 . 14 Foreign Language 2 7507 . 15 Art Lab 7507 . 16 Music Lab 7007 . 16 Practice Room 1 507 . 16 Practice Room 2 50

8.0 Food Service8 . 1 Dining/Multi Purpose 2,0008 . 2 Kichen 2,0008 . 3 Serving 2008 . 4 Receiving/Storage 3008 . 4 Meal Services Office 80

10.0 Support Services10 . 15 Security 10010 . 15 Facilities 10010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 4 Storage 35010 . 5 Mechanical 50010 . 6 Electrical 15010 . 7 Comm/Tech 10010 8 Fire Suppression (With Pump) 26010 . 9 Custodial 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 4 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 10010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 4 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80

FACULTY/ADMIN

COLLABORATION

OUTDOORCOLLABORATION

DINING

CORRIDOR

SERVICE/SUPPORT

CLASSROOM

7.0 Learning 12,350 11,561 789

DPT RM Program Actual - Existing Building

Deficit Notes

Page 28: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 23

DPT RM Program Actual - Existing Building

Deficit Notes

60.0 Gymnasium 8,210 6,500 1,71060 . 1 Basketball/Volleyball Court 6,500 6,50060 . 3 Equipment Storage 35060 . 4 Women's Public Toilet 60060 . 5 Men's Public Toilet 60060 . 6 Office Suite - 2 Work Stations 160

70.0 Burden 1,000 770

Total Excluding Gym 39,883 32,142 5,713Total With Gym 48,093 38,642 7,423

Existing Area 32,142

Priestley Building and Addition

16 classrooms4 sections per grade @ 25 students /section 400 student capacity29 faculty, 25 Staff

Phase 1Grades 3 - 6Warming Kitchen & Cafeteria3 servings at 133 students each

Phase 2Grades 9 - 12Full Commercial Kitchen & Cafeteria

3 servings at 333 students each

60.0 Gymnasium60 . 1 Basketball/Volleyball Court 6,50060 . 3 Equipment Storage 35060 . 4 Women's Public Toilet 60060 . 5 Men's Public Toilet 60060 . 6 Office Suite - 2 Work Stations 160

FACULTY/ADMIN

COLLABORATION

OUTDOORCOLLABORATION

DINING

CORRIDOR

SERVICE/SUPPORT

CLASSROOM

Page 29: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 24

DPT RM Program Actual - Existing Building

Deficit Notes

2.2.0 Phase 2 Admin 9222 . 1 Dean 1202 . 2 ISS - 5 Students 2502 . 3 Admissions 962 . 3 Enrollement 962 . 3 Admissions Data Manager 1202 . 3 Communications 1202 . 3 Development 120

2.3.0 Phase 2 Student Services 7403 . 1 Special Ed Office 1603 . 2 ESL Teacher 1603 . 3 Occupational Therapy 1003 . 4 Gifted Teacher 1603 . 5 Gifted Teacher 1603 . 6 Nurse Office 160

2.4.0 Phase 2 Faculty Staff Offices 5004 . 8 English - 7 Work Stations 500

2.5.0 Phase 2 Instructional Admin 1205 . 1 French Director 605 . 1 Cycle Coordinator 1 605 . 1 Cycle Coordinator 2 60

2.6.0 Phase 2 Collaboration 5006 . 1 Med Conference 3006 . 2 Tutoring 3 1006 . 3 Tutoring 4 100

2.7.0 Phase 2 Learning 22,0507 . 1 Grade 3 Classroom 1 7507 . 2 Grade 3 Classroom 2 7507 . 3 Grade 3 Classroom 3 7507 . 4 Grade 3 Classroom 4 7507 . 5 Grade 3 Classroom 5 7507 . 6 Grade 4 Classroom 1 7507 . 7 Grade 4 Classroom 2 7507 . 8 Grade 4 Classroom 3 7507 . 9 Grade 4 Classroom 4 7507 . 10 Grade 4 Classroom 5 7507 . 11 Grade 5 Classroom 1 7507 . 12 Grade 5 Classroom 2 7507 . 13 Grade 5 Classroom 3 7507 . 14 Grade 5 Classroom 4 7507 . 15 Grade 5 Classroom 5 7507 . 16 Grade 6 Classroom 1 7507 . 17 Grade 6 Classroom 2 7507 . 18 Grade 6 Classroom 3 7507 . 19 Grade 6 Classroom 4 7507 . 20 Grade 7 Classroom 1 7507 . 21 Grade 7 Classroom 2 7507 . 22 Grade 7 Classroom 3 7507 . 23 Grade 7 Classroom 4 7507 . 24 Grade 8 Classroom 1 7507 . 25 Grade 8 Classroom 2 7507 . 26 Grade 8 Classroom 3 7507 . 27 Grade 8 Classroom 4 7507 . 28 Art Lab 9007 . 29 Music Lab 900

2.8.0 Phase 2 Food Serivice 3,5008 . 1 Dining 3,500

2.10.0 Support Services 4,890

DPT RM Program Actual - Existing Building

Deficit Notes

10 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80

2.20.0 Circulation 4,95020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 2 South Stair 25020 . 5 Corridor 1,400

60.0 Gymnasium 16060 . 1 Office Suite - 2 Work Stations 160

70.0 Burden 2,000

Total Phase 2 Program 40,332

Classroom Wing - Phase 2

Grades 3-829 classrooms29 faculty, 17 staff

+/- 700 student capacity

FACULTY/ADMIN

COLLABORATION

OUTDOORCOLLABORATION

DINING

CORRIDOR

SERVICE/SUPPORT

CLASSROOM

2.2.0 Phase 2 Admin 9222 . 1 Dean 1202 . 2 ISS - 5 Students 2502 . 3 Admissions 962 . 3 Enrollement 962 . 3 Admissions Data Manager 1202 . 3 Communications 1202 . 3 Development 120

2.3.0 Phase 2 Student Services 7403 . 1 Special Ed Office 1603 . 2 ESL Teacher 1603 . 3 Occupational Therapy 1003 . 4 Gifted Teacher 1603 . 5 Gifted Teacher 1603 . 6 Nurse Office 160

2.4.0 Phase 2 Faculty Staff Offices 5004 . 8 English - 7 Work Stations 500

2.5.0 Phase 2 Instructional Admin 1205 . 1 French Director 605 . 1 Cycle Coordinator 1 605 . 1 Cycle Coordinator 2 60

2.20.0 Circulation 4,95020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 2 South Stair 25020 . 5 Corridor 1,400

2.6.0 Phase 2 Collaboration 5006 . 1 Med Conference 3006 . 2 Tutoring 3 1006 . 3 Tutoring 4 100

2.7.0 Phase 2 Learning 22,0507 . 1 Grade 3 Classroom 1 7507 . 2 Grade 3 Classroom 2 7507 . 3 Grade 3 Classroom 3 7507 . 4 Grade 3 Classroom 4 7507 . 5 Grade 3 Classroom 5 7507 . 6 Grade 4 Classroom 1 7507 . 7 Grade 4 Classroom 2 7507 . 8 Grade 4 Classroom 3 7507 . 9 Grade 4 Classroom 4 7507 . 10 Grade 4 Classroom 5 7507 . 11 Grade 5 Classroom 1 7507 . 12 Grade 5 Classroom 2 7507 . 13 Grade 5 Classroom 3 7507 . 14 Grade 5 Classroom 4 7507 . 15 Grade 5 Classroom 5 7507 . 16 Grade 6 Classroom 1 7507 . 17 Grade 6 Classroom 2 7507 . 18 Grade 6 Classroom 3 7507 . 19 Grade 6 Classroom 4 7507 . 20 Grade 7 Classroom 1 7507 . 21 Grade 7 Classroom 2 7507 . 22 Grade 7 Classroom 3 7507 . 23 Grade 7 Classroom 4 7507 . 24 Grade 8 Classroom 1 7507 . 25 Grade 8 Classroom 2 7507 . 26 Grade 8 Classroom 3 7507 . 27 Grade 8 Classroom 4 7507 . 28 Art Lab 9007 . 29 Music Lab 900

60.0 Gymnasium 16060 . 1 Office Suite - 2 Work Stations 160

70.0 Burden 2,000

2.8.0 Phase 2 Food Serivice 3,5008 . 1 Dining 3,500

2.10.0 Support Services 4,890

10 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80

33,350

Page 30: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 25

PHASE 2 PROGRAM - FIRST FLOOR PLAN

Page 31: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 26

PHASE 2 PROGRAM - SECOND FLOOR PLAN

Page 32: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 27

PHASE 2 PROGRAM - THIRD FLOOR PLAN

Page 33: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 28

SITE STRATEGIES• Existing building reused and all trees on site preserved• 66% of site is open space• Stormwater management program: 100% of pre-construction runoff managed onsite Bio-swales and retention areas to capture first 1.25 inches of rainfall• Bicycle parking with showers availableWATER EFFICIENCY• Low-flow plumbing fixtures and auto-flow valves• Goal is 30% improvement in water consumption over baselineENERGY AND ATMOSPHERE• Energy conservation goals: 30% improvement over baseline for new construction 20% improvement over baseline for renovation• Building systems are “solar ready”- easy retrofit of PV panels in futureMATERIALS AND RESOURCES• 50% waste diverted from landfill during construction• Product selections prioritize materials with recycled content• Material selection prioritize local sourcing (produced within 500 mi radius)INDOOR ENVIRONMENTAL QUALITY• Dedicated filtered fresh air ventilation system to classrooms• Daylight harvesting and direct/indirect low glare lighting in learning spaces• Classroom acoustics designed to improve speech recognitionINNOVATION• Building as a Teaching Tool: Green design features accessible to teachers• Project is designed to LEED for Schools v.4 standards

SUSTAINABLE DESIGN ELEMENTS

Page 34: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 29

JOLIET STREET ELEVATION

LEONIDAS STREET ELEVATION

Page 35: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 30

SECTION THROUGH PHASE 1 ADDITION

Page 36: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 31

VIEW FROM LEONIDAS AND BIRCH STREET

Page 37: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 32

VIEW FROM THE QUAD

Page 38: LYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS · New Orleans, LA 70115 Keith Bartlett, CEO/Principal Architect: Eskew+Dumez+Ripple 365 Canal Street #3150 New Orleans, LA 70130 Tracy Lea,

ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 33

THANK YOU!