Client:Lycee Francais de La Nouvelle Orleans5951 Patton StreetNew Orleans, LA 70115Keith Bartlett, CEO/Principal
Architect:Eskew+Dumez+Ripple365 Canal Street #3150New Orleans, LA 70130Tracy Lea, Principal-in-Charge
Structural/Civil Engineer:Morphy Makofsky Inc.336 N. Jefferson Davis PkwyNew Orleans, LA 70119Jamie Saxon, Principal-in-Charge
Historic Preservation Consultant:Rick Fifield Architect600 St. Roch AvenueNew Orleans, LA 70117Rick Fifield, Principal
Program Manager:4th Sector Solutions2372 St. Claude Avenue, Ste 300New Orleans, LA 70117Joe Keeney, CEO
Landscape Architect:Spackman Mossop+Michaels7735 Maple StreetNew Orleans, LA 70118Wes Michaels, Principal-in-Charge
Mechanical/Electrical Engineer:TLC Engineering201 St. Charles AvenueNew Orleans, LA 70170Steven Pinto, Project Engineer
Traffic Engineer:Batture LLC500 Crystal StreetNew Orleans, LA 70124Jenny Snape, Project Engineer
PROJECT TEAM
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 3
K - 12 EDUCATION
Trinity SchoolNew Orleans, LA
McDonogh 42 Elementary New Orleans, LA
Landry-Walker High SchoolNew Orleans, LA
Thaden Independent SchoolBentonville, AR
Comeaux High SchoolLafayette, LA
NOCCANew Orleans, LA
Samuel J. Green Charter SchoolNew Orleans, LA
Mt Carmel High SchoolNew Orleans, LA
Transfiguration of the Lord New Orleans, LA
St Dominic SchoolNew Orleans, LA
Banks Elementary SchoolNew Orleans, LA
HIGHER EDUCATION
Tulane University
Louisiana State University
University Medical Center
UL Monroe
UL Lafayette
Nicholls State University
SELECTED PROJECTS
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 4
SITE CONTEXT
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 5
AERIAL VIEW
CARROLLTON CAMPUS
JOHNSON BULDING
PRIESTLEY CAMPUS
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 6
BIRDSEYE VIEW
LEONIDAS S
T
JOLIET S
T
GREEN ST
BIRCH ST
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 7
EXISTING BUILDINGS
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 8
EXISTING CONDITIONS
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 9
Provide a functional, efficient, economical facility to meet the expanded curriculum requirements of Lycée Français in support of its mission.
Design a healthy, innovative learning environment informed by current best practices in K-12 pedagogy to promote diversity and academic excellence.
Renovate and enhance the existing property in a way that is environmentally, contextually, and socially responsive.
Respect the history of the property and its neighborhood context, and build a school that is inclusive and fosters community connectivity.
Establish and implement a collaborative process throughout design and construction that allows for input from all stakeholders.
Adhere strictly to budget, schedule, and program parameters as determined by Lycée Français.
PROJECT GOALS
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 12
EDUCATION IS IN CONSTANT EVOLUTION
WITH THE ABILITY TO ADAPT AND CHANGE.
LYCEE’S APPROACH IS PROGRESSIVE AND
INNOVATIVE. THE NEW FACILITY WILL GROW
WITH YOUNG STUDENTS AS THEY PROGRESS
TO COMPLETE HIGH SCHOOL, MUCH LIKE
THE NEIGHBORHOOD WHICH IS UNDERGOING
TRANSITION AND REJUVINATION.
TRANSFORMATION
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 13
STORIES HAVE BEEN SHARED IN EVERY CULTURE AS A
MEANS OF ENTERTAINMENT, EDUCATION, CULTURAL
PRESERVATION AND INSTILLING MORAL VALUES.
STORIES ARE UNIVERSAL IN THAT THEY CAN BRIDGE
CULTURAL, LINGUISTIC AND AGE-RELATED DIVIDES.
INTERACTIVE STORYTELLING POSITIONS THE USER
AS A CHARACTER WITHIN A BIGGER WORLD. THE
NEW LYCEE SCHOOL SEEKS TO REFLECT ON THE PAST
WHILE SETTING THE STAGE FOR THE OPTIMISTIC
FUTURE YET TO COME.
STORYTELLING
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 10
PHASING DIAGRAM
Phase 1A - Gymnasium Renovation 6,500 sq ft Gym 300 bleacher seats Combine with Phase 1B
Phase 1B - Priestley School Renovation 31,143 sq ft. 3 story Classroom Building 7,700 sq. ft. Addition 16 Classrooms/29 Faculty/25 Staff Capacity = 400 students Start construction 2018
Phase 2 - New Classroom Wing 32,165 sq ft. 3 story Classroom Addition + 1,185 sq ft. Kitchen/Dining Addition 29 Classrooms/29 Faculty/17 Staff Capacity = +/-700 students Start construction 2019
PROJECT OVERVIEW
1A
1B 1B
2
2
LEONIDAS STREET
JOLIET STREET
BIR
CH
S
TR
EE
T
GR
EE
N
ST
RE
ET
FACULTY ENTRY
9-12 ENTRY
3-8 ENTRY
QUAD
GYM ENTRY
SERVICE
DR
OP
-OF
F
BU
S Z
ON
E
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 12
LEONIDAS STREET
GR
EEN
STR
EET
JOLIET STREET
BIR
CH
STR
EET
EXISTING GYM6,500 SF
EXISTING CLASSROOM BUILDING32,140 SF
PHASE 232,165 SF
FACULTYENTRANCE
MAIN ENTRANCE
CLASSROOM BUILDINGADDITION7,700 SF
BIO-RENTENTION BASIN/RAIN GARDEN
PETANQUE/BIO-RETENTION BASIN
SERVICE
PETANQUE/BIO-RETENTION BASIN
BIO-RETENTION BASIN
BIO-RETENTION BASIN
BIO-RETENTION BASIN
BUS
ZON
E
DRO
P O
FF
PHASE 2DINING + KITCHEN
1,185 SF
PLAYFIELD
PHASE ONE SITE PLAN 40’0’
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 13
COMMUNITY/MULTIPURPOSE
SUPPORTLOBBY/ATRIUM
REC
EPTI
ON
ACCT/FINANCE
HR
HEAD OF SCHOOL
CAOFLEX
LEARNING
STUDENTSERVICES
SMALLCONF.
SMALLCONF.
CONFERENCE
STAGING/SUPPORT
JANITORDINING
KITCHEN
MEDICALSUITE
BREAKROOM
FACULTY/STAFF FACULTY/STAFF
SUPPLY MECHANICAL
RECEIVING
SUPPLY
FIRST FLOOR PLAN
FACULTY/ADMIN
COLLABORATION
OUTDOORCOLLABORATION
DINING
CORRIDOR
SERVICE/SUPPORT
16’0’
E X I S T I N GN E W
FIRST FLOOR PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 14
GYMNASIUM16’0’
BLEACHER SEATING 300 SEATS
GYMNASIUM
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 15
MEDIALIBRARY
COMPUTER LAB
TUTORING TUTORING
FLEXLEARNING
OPENTO
BELOW
OPENTO
BELOW
ISS
DEAN
CONFERENCEROOM
JANITOR
MATH 1 MATH 2 MATH 3 HISTORY/GEOGRAPHY
ARTELEC.
SUPPORT
SCIENCESCIENCE
SECOND FLOOR PLAN
FACULTY/ADMIN
COLLABORATION
OUTDOORCOLLABORATION
CLASSROOM
CORRIDOR
SERVICE/SUPPORT
16’0’
E X I S T I N GN E W
SECOND FLOOR PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 16
SENSORYCLASSROOM
INSTRUCTIONALADMIN
WORKROOM
FLEXLEARNING
OPENTO
BELOW
OPENTO
BELOW
ENGLISH 1
JANITOR
ENGLISH 2 ENGLISH 3MATH 3 HISTORY/
GEOGRAPHY
ELEC.
PRACTICE ROOM
FRENCH
OPENTO
BELOW
PRACTICE ROOM
MUSICFRENCH FOREIGNLANGUAGE
THIRD FLOOR PLAN
FACULTY/ADMIN
COLLABORATION
OUTDOORCOLLABORATION
CLASSROOM
CORRIDOR
SERVICE/SUPPORT
16’0’
E X I S T I N GN E W
THIRD FLOOR PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 17
CLASSROOM OPTIONS
GROUP
LECTURE/TEST
DISCUSSSION
ACTIVE, FLEXIBLE CLASSROOM
Multi-sensory approach to teaching and learning in-creases engagement, promotes deeper participation, maximizes student achievement and elevates the idea that learning is fun.
Static furniture designed for one-way transmis-sion of information simply cannot support active learning.
As learning becomes more interactive, classrooms, must support multiple types of collaboration, includ-ing informative, evaluative and generative, as well as peer-to-peer learning and many other emerging modes.
One-size-fi ts-all classrooms neglect the modern day needs of educators and students. Difference subjects and teaching methods require different mixes of furni-ture, technology and space.
Just as there is a variety of ways in which we learn, there must also be a variety of spaces in which learning occurs.
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 18
TRADITIONAL LAYOUT
CLASSROOM PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 19
TRADITIONAL LAYOUT
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 22
COLLABORATIVE LEARNING
CLASSROOM PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 23
COLLABORATIVE LEARNING
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 24
CLASSROOM PLAN
GROUP DISCUSSION
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 25
GROUP DISCUSSION
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 20
DYNAMIC INTERACTION
CLASSROOM PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 21
DYNAMIC INTERACTION
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 22
DPT RM Program Actual - Existing Building
Deficit Notes
1.0 Lobby/Atrium 2,550 sf 109 2,4411 . 1 Lobby/Atrium 500 1091 . 2 Stair 1 2501 . 3 Elevator 1001 . 1 Lobby/Atrium 5001 . 2 Stair 1 2501 . 3 Elevator 1003 . 1 Lobby/Atrium 5003 . 2 Stair 1 2503 . 3 Elevator 100
2.0 Administration 1,596 1,7292 . 1 Reception 1002 . 1 Office Manager 1602 . 2 Head of School 1602 . 3 CAO 1202 . 4 Dean 962 . 6 ISS - 5 Students 2502 . 8 Small Conference 1 1202 . 9 Small Conference 2 1202 . 10 Staff Kitchen/Pantry 1502 . 12 Human Resources 1202 . 13 Finance 1002 . 14 Accounting 100
3.0 Student Services 1,110 1,2843 . 1 Counselor 1003 . 2 Counselor 1003 . 3 Director of Student Services 1003 . 3 Sp Ed Data Manager 803 . 4 Special Ed Office 1603 . 5 Speech Language Pathology 1003 . 6 ESL Teacher 1603 . 7 Nurse Office 1603 . 7 Medical Suite/Toilet 150
4.0 Faculty Staff Offices 1,940 725 1,2154 . 1 Math - 4 Work Stations 2604 . 1 French - 4 Work Stations 2604 . 1 English - 4-6 Work Stations 3804 . 1 Foreign Language - 3 Work Stations 2604 . 1 Physics/Chem/Bio - 4 Work Stations 2604 . 1 History/Geography - 4 Work Stations 2604 . 1 Fine Arts - 4 Work Stations 260
5.0 Instructional Admin 930 0 9305 . 1 French Director 605 . 1 Director of Academics 605 . 1 Coordinator of Academic Programs 605 . 1 Workroom 1 2505 . 2 Workroom 2 2505 . 3 Workroom 3 250
6.0 Collaboration 2,750 948 1,8026 . 1 Library 700 4746 . 1 Library Office 1006 . 1 Computer Lab 750 4746 . 1 Digital Media Specialist 1006 . 2 Large Conference 6006 . 3 Medium Conference 3006 . 4 Tutoring 1 1006 . 5 Tutoring 2 100
7.0 Learning 12,350 11,561 789
SF from BK Programming where addition did not include
programmed space
Building
7 . 3 English 1 750 6497 . 4 English 2 750 6307 . 5 English 3 750 6547 . 6 Math 1 750 7387 . 7 Math 2 750 6497 . 8 Math 3 750 6497 . 9 French 1 750 6307 . 10 French 2 750 6547 . 11 History/Geography 1 750 7257 . 12 History/Geography 2 750 6447 . 13 Foreign Language 1 750 6447 . 14 Foreign Language 2 750 6627 . 15 Art Lab 750 7407 . 16 Music Lab 700 7457 . 16 Practice Room 1 50 507 . 16 Practice Room 2 50 50
8.0 Food Service 4,580 4,7058 . 1 Dining/Multi Purpose 2,000 2,1418 . 2 Kichen 2,000 1,9848 . 3 Serving 200 2008 . 4 Receiving/Storage 300 3008 . 4 Meal Services Office 80 80
10.0 Support Services 6,200 4,434 1,76610 . 15 Security 10010 . 15 Facilities 10010 . 1 Girls Toilet 300 33310 . 2 Boys Toilet 300 33310 . 3 Storage 350 35010 . 4 Storage 350 35010 . 5 Mechanical 500 50010 . 6 Electrical 150 15010 . 7 Comm/Tech 100 10010 8 Fire Suppression (With Pump) 260 26010 . 9 Custodial 80 2210 . 1 Girls Toilet 300 33310 . 2 Boys Toilet 300 33310 . 3 Storage 350 15510 . 4 Storage 350 17410 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 10010 . 8 Fire Suppression 8010 . 1 Girls Toilet 300 33310 . 2 Boys Toilet 300 33310 . 3 Storage 350 12510 . 4 Storage 350 25010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80
20.00 Circulation 5,877 5,87720 . 1 West Stair 2 185 18520 . 2 East Stair 3 275 27520 . 3 Corridor 1,476 1,47620 . 1 West Stair 2 263 26320 . 2 East Stair 3 190 19020 . 3 Corridor 1,560 1,56020 . 1 East Stair 3 190 19020 . 2 West Stair 2 178 17820 . 3 Corridor 1,560 1,560
2.0 Administration2 . 1 Reception 1002 . 1 Office Manager 1602 . 2 Head of School 1602 . 3 CAO 1202 . 4 Dean 962 . 6 ISS - 5 Students 2502 . 8 Small Conference 1 1202 . 9 Small Conference 2 1202 . 10 Staff Kitchen/Pantry 1502 . 12 Human Resources 1202 . 13 Finance 1002 . 14 Accounting 100
3.0 Student Services3 . 1 Counselor 1003 . 2 Counselor 1003 . 3 Director of Student Services 1003 . 3 Sp Ed Data Manager 803 . 4 Special Ed Office 1603 . 5 Speech Language Pathology 1003 . 6 ESL Teacher 1603 . 7 Nurse Office 1603 . 7 Medical Suite/Toilet 150
4.0 Faculty Staff Offices4 . 1 Math - 4 Work Stations 2604 . 1 French - 4 Work Stations 2604 . 1 English - 4-6 Work Stations 3804 . 1 Foreign Language - 3 Work Stations 2604 . 1 Physics/Chem/Bio - 4 Work Stations 2604 . 1 History/Geography - 4 Work Stations 2604 . 1 Fine Arts - 4 Work Stations 260
5.0 Instructional Admin5 . 1 French Director 605 . 1 Director of Academics 605 . 1 Coordinator of Academic Programs 605 . 1 Workroom 1 2505 . 2 Workroom 2 2505 . 3 Workroom 3 250
1.0 Lobby/Atrium1 . 1 Lobby/Atrium 5001 . 2 Stair 1 2501 . 3 Elevator 1001 . 1 Lobby/Atrium 5001 . 2 Stair 1 2501 . 3 Elevator 1003 . 1 Lobby/Atrium 5003 . 2 Stair 1 2503 . 3 Elevator 100
20.00 Circulation20 . 1 West Stair 2 18520 . 2 East Stair 3 27520 . 3 Corridor 1,47620 . 1 West Stair 2 26320 . 2 East Stair 3 19020 . 3 Corridor 1,56020 . 1 East Stair 3 19020 . 2 West Stair 2 17820 . 3 Corridor 1,560
6 . 1 Library 7006 . 1 Library Office 1006 . 1 Computer Lab 7506 . 1 Digital Media Specialist 1006 . 2 Large Conference 6006 . 3 Medium Conference 3006 . 4 Tutoring 1 1006 . 5 Tutoring 2 100
7 . 3 English 1 7507 . 4 English 2 7507 . 5 English 3 7507 . 6 Math 1 7507 . 7 Math 2 7507 . 8 Math 3 7507 . 9 French 1 7507 . 10 French 2 7507 . 11 History/Geography 1 7507 . 12 History/Geography 2 7507 . 13 Foreign Language 1 7507 . 14 Foreign Language 2 7507 . 15 Art Lab 7507 . 16 Music Lab 7007 . 16 Practice Room 1 507 . 16 Practice Room 2 50
8.0 Food Service8 . 1 Dining/Multi Purpose 2,0008 . 2 Kichen 2,0008 . 3 Serving 2008 . 4 Receiving/Storage 3008 . 4 Meal Services Office 80
10.0 Support Services10 . 15 Security 10010 . 15 Facilities 10010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 4 Storage 35010 . 5 Mechanical 50010 . 6 Electrical 15010 . 7 Comm/Tech 10010 8 Fire Suppression (With Pump) 26010 . 9 Custodial 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 4 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 10010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 4 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80
FACULTY/ADMIN
COLLABORATION
OUTDOORCOLLABORATION
DINING
CORRIDOR
SERVICE/SUPPORT
CLASSROOM
7.0 Learning 12,350 11,561 789
DPT RM Program Actual - Existing Building
Deficit Notes
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 23
DPT RM Program Actual - Existing Building
Deficit Notes
60.0 Gymnasium 8,210 6,500 1,71060 . 1 Basketball/Volleyball Court 6,500 6,50060 . 3 Equipment Storage 35060 . 4 Women's Public Toilet 60060 . 5 Men's Public Toilet 60060 . 6 Office Suite - 2 Work Stations 160
70.0 Burden 1,000 770
Total Excluding Gym 39,883 32,142 5,713Total With Gym 48,093 38,642 7,423
Existing Area 32,142
Priestley Building and Addition
16 classrooms4 sections per grade @ 25 students /section 400 student capacity29 faculty, 25 Staff
Phase 1Grades 3 - 6Warming Kitchen & Cafeteria3 servings at 133 students each
Phase 2Grades 9 - 12Full Commercial Kitchen & Cafeteria
3 servings at 333 students each
60.0 Gymnasium60 . 1 Basketball/Volleyball Court 6,50060 . 3 Equipment Storage 35060 . 4 Women's Public Toilet 60060 . 5 Men's Public Toilet 60060 . 6 Office Suite - 2 Work Stations 160
FACULTY/ADMIN
COLLABORATION
OUTDOORCOLLABORATION
DINING
CORRIDOR
SERVICE/SUPPORT
CLASSROOM
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 24
DPT RM Program Actual - Existing Building
Deficit Notes
2.2.0 Phase 2 Admin 9222 . 1 Dean 1202 . 2 ISS - 5 Students 2502 . 3 Admissions 962 . 3 Enrollement 962 . 3 Admissions Data Manager 1202 . 3 Communications 1202 . 3 Development 120
2.3.0 Phase 2 Student Services 7403 . 1 Special Ed Office 1603 . 2 ESL Teacher 1603 . 3 Occupational Therapy 1003 . 4 Gifted Teacher 1603 . 5 Gifted Teacher 1603 . 6 Nurse Office 160
2.4.0 Phase 2 Faculty Staff Offices 5004 . 8 English - 7 Work Stations 500
2.5.0 Phase 2 Instructional Admin 1205 . 1 French Director 605 . 1 Cycle Coordinator 1 605 . 1 Cycle Coordinator 2 60
2.6.0 Phase 2 Collaboration 5006 . 1 Med Conference 3006 . 2 Tutoring 3 1006 . 3 Tutoring 4 100
2.7.0 Phase 2 Learning 22,0507 . 1 Grade 3 Classroom 1 7507 . 2 Grade 3 Classroom 2 7507 . 3 Grade 3 Classroom 3 7507 . 4 Grade 3 Classroom 4 7507 . 5 Grade 3 Classroom 5 7507 . 6 Grade 4 Classroom 1 7507 . 7 Grade 4 Classroom 2 7507 . 8 Grade 4 Classroom 3 7507 . 9 Grade 4 Classroom 4 7507 . 10 Grade 4 Classroom 5 7507 . 11 Grade 5 Classroom 1 7507 . 12 Grade 5 Classroom 2 7507 . 13 Grade 5 Classroom 3 7507 . 14 Grade 5 Classroom 4 7507 . 15 Grade 5 Classroom 5 7507 . 16 Grade 6 Classroom 1 7507 . 17 Grade 6 Classroom 2 7507 . 18 Grade 6 Classroom 3 7507 . 19 Grade 6 Classroom 4 7507 . 20 Grade 7 Classroom 1 7507 . 21 Grade 7 Classroom 2 7507 . 22 Grade 7 Classroom 3 7507 . 23 Grade 7 Classroom 4 7507 . 24 Grade 8 Classroom 1 7507 . 25 Grade 8 Classroom 2 7507 . 26 Grade 8 Classroom 3 7507 . 27 Grade 8 Classroom 4 7507 . 28 Art Lab 9007 . 29 Music Lab 900
2.8.0 Phase 2 Food Serivice 3,5008 . 1 Dining 3,500
2.10.0 Support Services 4,890
DPT RM Program Actual - Existing Building
Deficit Notes
10 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80
2.20.0 Circulation 4,95020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 2 South Stair 25020 . 5 Corridor 1,400
60.0 Gymnasium 16060 . 1 Office Suite - 2 Work Stations 160
70.0 Burden 2,000
Total Phase 2 Program 40,332
Classroom Wing - Phase 2
Grades 3-829 classrooms29 faculty, 17 staff
+/- 700 student capacity
FACULTY/ADMIN
COLLABORATION
OUTDOORCOLLABORATION
DINING
CORRIDOR
SERVICE/SUPPORT
CLASSROOM
2.2.0 Phase 2 Admin 9222 . 1 Dean 1202 . 2 ISS - 5 Students 2502 . 3 Admissions 962 . 3 Enrollement 962 . 3 Admissions Data Manager 1202 . 3 Communications 1202 . 3 Development 120
2.3.0 Phase 2 Student Services 7403 . 1 Special Ed Office 1603 . 2 ESL Teacher 1603 . 3 Occupational Therapy 1003 . 4 Gifted Teacher 1603 . 5 Gifted Teacher 1603 . 6 Nurse Office 160
2.4.0 Phase 2 Faculty Staff Offices 5004 . 8 English - 7 Work Stations 500
2.5.0 Phase 2 Instructional Admin 1205 . 1 French Director 605 . 1 Cycle Coordinator 1 605 . 1 Cycle Coordinator 2 60
2.20.0 Circulation 4,95020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 1 South Stair 25020 . 4 Corridor 1,40020 . 2 South Stair 25020 . 5 Corridor 1,400
2.6.0 Phase 2 Collaboration 5006 . 1 Med Conference 3006 . 2 Tutoring 3 1006 . 3 Tutoring 4 100
2.7.0 Phase 2 Learning 22,0507 . 1 Grade 3 Classroom 1 7507 . 2 Grade 3 Classroom 2 7507 . 3 Grade 3 Classroom 3 7507 . 4 Grade 3 Classroom 4 7507 . 5 Grade 3 Classroom 5 7507 . 6 Grade 4 Classroom 1 7507 . 7 Grade 4 Classroom 2 7507 . 8 Grade 4 Classroom 3 7507 . 9 Grade 4 Classroom 4 7507 . 10 Grade 4 Classroom 5 7507 . 11 Grade 5 Classroom 1 7507 . 12 Grade 5 Classroom 2 7507 . 13 Grade 5 Classroom 3 7507 . 14 Grade 5 Classroom 4 7507 . 15 Grade 5 Classroom 5 7507 . 16 Grade 6 Classroom 1 7507 . 17 Grade 6 Classroom 2 7507 . 18 Grade 6 Classroom 3 7507 . 19 Grade 6 Classroom 4 7507 . 20 Grade 7 Classroom 1 7507 . 21 Grade 7 Classroom 2 7507 . 22 Grade 7 Classroom 3 7507 . 23 Grade 7 Classroom 4 7507 . 24 Grade 8 Classroom 1 7507 . 25 Grade 8 Classroom 2 7507 . 26 Grade 8 Classroom 3 7507 . 27 Grade 8 Classroom 4 7507 . 28 Art Lab 9007 . 29 Music Lab 900
60.0 Gymnasium 16060 . 1 Office Suite - 2 Work Stations 160
70.0 Burden 2,000
2.8.0 Phase 2 Food Serivice 3,5008 . 1 Dining 3,500
2.10.0 Support Services 4,890
10 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 8010 . 1 Girls Toilet 30010 . 2 Boys Toilet 30010 . 3 Storage 35010 . 5 Mechanical 20010 . 6 Electrical 15010 . 7 Comm/Tech 25010 . 8 Fire Suppression 80
33,350
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 25
PHASE 2 PROGRAM - FIRST FLOOR PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 26
PHASE 2 PROGRAM - SECOND FLOOR PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 27
PHASE 2 PROGRAM - THIRD FLOOR PLAN
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 28
SITE STRATEGIES• Existing building reused and all trees on site preserved• 66% of site is open space• Stormwater management program: 100% of pre-construction runoff managed onsite Bio-swales and retention areas to capture first 1.25 inches of rainfall• Bicycle parking with showers availableWATER EFFICIENCY• Low-flow plumbing fixtures and auto-flow valves• Goal is 30% improvement in water consumption over baselineENERGY AND ATMOSPHERE• Energy conservation goals: 30% improvement over baseline for new construction 20% improvement over baseline for renovation• Building systems are “solar ready”- easy retrofit of PV panels in futureMATERIALS AND RESOURCES• 50% waste diverted from landfill during construction• Product selections prioritize materials with recycled content• Material selection prioritize local sourcing (produced within 500 mi radius)INDOOR ENVIRONMENTAL QUALITY• Dedicated filtered fresh air ventilation system to classrooms• Daylight harvesting and direct/indirect low glare lighting in learning spaces• Classroom acoustics designed to improve speech recognitionINNOVATION• Building as a Teaching Tool: Green design features accessible to teachers• Project is designed to LEED for Schools v.4 standards
SUSTAINABLE DESIGN ELEMENTS
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 29
JOLIET STREET ELEVATION
LEONIDAS STREET ELEVATION
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 30
SECTION THROUGH PHASE 1 ADDITION
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 31
VIEW FROM LEONIDAS AND BIRCH STREET
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 32
VIEW FROM THE QUAD
ESKEW+DUMEZ+RIPPLE ARCHITECTURE. INTERIOR ENVIRONMENTS. URBAN STRATEGIESLYCÉE FRANÇAIS DE LA NOUVELLE ORLÉANS | PTO MEETING | 22 AUGUST 2017 33
THANK YOU!